opportunities for suppliers in the off-shore and naval...
TRANSCRIPT
Opportunities for Suppliers in the Off-shore
and Naval Brazilian Industry
DEUTSCH-BRASILIANISCHE INDUSTRIE- UND HANDELSKAMMER
RIO DE JANEIRO JUN2014
• Strong growth untill 2030.
• Biggest participation of China in the maritimeindustry.
• Growth in the world maritime commerce from9 to 19 billion yearly ton.
World Cenarium
Global Marine Trends 2030
Regions / Countries
2010 2030
North America 48 56
South America 58 67
África 51 107Europ 42 46Ásia 27 110Japan 19 30Austrália 16 20Mediterran 3 55Others 6 127Total 270 618
Global Marine Trends 2030 – producted by Lloyd Register,
Qinetiq e Strathclyde University, in two years of studiesabout the future of the maritime industry.
Oil platforms evolution
GMT 2030 Shipbuilding Evolution
Data from Opep
Fonte: OPEP – World Oil Outlook 2013
Investiments on oil production, from 2012 a 2035, are estimatedon US$ 5,2 trillion.
The major part will be on the offshore production.
Brasil is the biggest in quantity of offshore field to get in production
Data from Opep
Fonte: OPEP – World Oil Outlook 2013
Oil Consumption inmillion barrels/day
2010 2020 2035
81,2 89,7 100,2
The forecast of oil consumptionrepresents a challenger to the productors countries.
The production from the nonaffiliates countries to OPEP willgive the biggest contribution to the production increment.
In Latin America, the productionwill increase from the actual4,2 to 5,5 mb/d, em 2018.
Brasilian aditional productionwill be the biggest contribution, with 1,2 mb/d.
New positioning announced by the
President of Brasil at the end of 2013:
• Maintenance of the Local Content
Policy.
• Focus on the production
• “We will need more 12 to 16 platforms
for the Libra Field”.
• Best planning on orders to have less
oscilation on jobs in the shipyards.
Petrobras data
President of Brasil and the President from Petrobras.Delivery of the platform P-58, in the Polo Naval Sul, Rio Grande (RS).
Rio de JaneiroRio de Janeiro
State
Capacity and Occupancy of Major Shipyards and Construction SitesMauá
36.000 tons per year36.000 tons per year
Steel Processing
Occupancy
NiteróiNiterói
City
334.000 m2334.000 m2
Available Area
11
Dry Docks
44
Quays
11
Careers
• 8 Panamax
• 1 Building Modules and Integration (FPSO Cidade Ilha Bela)
• 7 Light Products
In OperationIn Operation
Current Situation
• 2 Dark Products
Source: SINAVAL
Labor Peak:3.950 people in Sep/2014
Labor Peak:3.950 people in Sep/2014
Rio de JaneiroRio de Janeiro
State
50.000 tons per year50.000 tons per year
Steel Processing
Occupancy
Angra dos ReisAngra dos Reis
City
410.000 m2410.000 m2
Available Area
11
Dry Docks
22
Quays
33
Careers
• 6 Semi-submersible Drilling Rigs
• 2 Building Modules and Integration (Replicantes 1 and 4)
• 1 Hull Construction and Integration (P-61)
In OperationIn Operation
Current Situation
• 2 Integrations (Cidade São Paulo
and Cidade Paraty)
Source: SINAVAL
Capacity and Occupancy of Major Shipyards and Construction Sites Brasfels
Labor Peak:7.900 people in Aug/2014
Labor Peak:7.900 people in Aug/2014
Rio Grande do SulRio Grande do Sul
State
120.000 tons per year120.000 tons per year
Steel Processing
Occupancy
Rio GrandeRio Grande
City
834.300 m2834.300 m2
Available Area
11
Dry Docks
22
Quays
00
Careers
In Operation (ERG 1) / Under construction (ERG 2)In Operation (ERG 1) / Under construction (ERG 2)
Current Situation
• 8 Hull Constructions (Replicantes 1 - 8)
• 3 Drilling Vessels
• 1 Building Modules, Topside and Integration (P-55)
(ERG 2)
Source: ENGENHARIA
Capacity and Occupancy of Major Shipyards and Construction SitesERG 1 and ERG 2
Labor Peak:7.750 people in Sep/2015
Labor Peak:7.750 people in Sep/2015
PernambucoPernambuco
State
160.000 tons per year160.000 tons per year
Steel Processing
Occupancy
IpojucaIpojuca
City
1.500.000 m21.500.000 m2
Available Area
11
Dry Docks
22
Quays
22
Careers
In OperationIn Operation
Current Situation
• 11 Suezmax
• 8 Aframax
• 1 Building Modules, Conversion and Integration (P-62)
• 7 Drilling Vessels
Source: SINAVAL
Capacity and Occupancy of Major Shipyards and Construction SitesAtlântico Sul (EAS)
Labor Peak:8.000 people in Aug/2016
Labor Peak:8.000 people in Aug/2016
BahiaBahia
State
36.000 tons per year36.000 tons per year
Steel Processing
Occupancy
MaragogipeMaragogipe
City
1.600.000 m21.600.000 m2
Available Area
11
Dry Docks
11
Quays
00
Careers
Under ConstructionUnder Construction
Current Situation
• 6 Drilling Vessels
Source: SINAVAL
Capacity and Occupancy of Major Shipyards and Construction Sites Enseada do Paraguaçu (EEP)
Labor Peak:4.200 people in Apr/2016
Labor Peak:4.200 people in Apr/2016
Espírito SantoEspírito Santo
State
48.000 tons per year48.000 tons per year
Steel Processing
Occupancy
AracruzAracruz
City
825.000 m2825.000 m2
Available Area
11
Dry Docks
11
Quays
00
Careers
Under ConstructionUnder Construction
Current Situation
• 7 Drilling Vessels
• 2 Building Modules and Integration(Replicantes 3 and 6)
Source: SINAVAL
Capacity and Occupancy of Major Shipyards and Construction Sites Jurong
Labor Peak:4.850 people in Oct/2016
Labor Peak:4.850 people in Oct/2016
Rio de JaneiroRio de Janeiro
State
42.000 tons per year42.000 tons per year
Steel Processing
Occupancy
Rio de JaneiroRio de Janeiro
City
320.000 m2320.000 m2
Available Area
22
Dry Docks
22
Quays
00
Careers
In ModernizationIn Modernization
Current Situation
• 4 Hull Conversion – Transfer of Rights (P-74, P-75, P-76 and P-77)
Source: ENGENHARIA
Capacity and Occupancy of Major Shipyards and Construction SitesInhaúma
Labor Peak:4.800 people in Nov/2012
Labor Peak:4.800 people in Nov/2012
DM-TKK Consortium – Itajaí (SC) – Total Area of 98.300m2 – In Planning
• 8 Building Fuel Gas and Dehydration Modules
• 8 Building Generation 1Modules
• 8 Building Generation 2 Modules
IESA – Charqueada (RS) – Total Area of 359.300m2 – Under Construction
• 8 Building CO² Compression Modules
• 8 Building Gas Compression Exportation Modules
• 8 Building Main Compression and Vapor Recovery Modules
• 8 Building Injection Gas Compression Modules
Tomé/Ferrostal – Maceió (AL) – Total Area of 77.000m2 – Under Construction
• 8 Building Oil Processing Modules
• 8 Building Launchers, Receivers and Manifolds Modules
• 8 Building Oil Processing and Production Water Treatment Modules
Capacity and Occupancy of Major Shipyards and Construction Sites Shipyards - 8 FPSO Replicantes Modules
Occupancy
• 7 Gas Tankers – Itajaí (SC) Shipyard
• 4 Panamax – EISA (RJ)
• 3 Bunkers – SUPERPESA (RJ)
• 3 Bunkers – São Miguel (RJ)
• 8 GLPs – STX Promar (PE)
Occupancy
• 2 Building Modules (P-58 and P-
62) – UTC (RJ)
• 2 Building Modules (P-58 and P-
62) – NUCLEP (RJ)
• 1 Building Modules (Cidade Paraty) – EBSE (RJ)
• 1 Building and Integration Modules (Cidade Ilha Bela –SBM/Brasa (RJ)
• 2 Building Probe (Jack-up P-59
and P-60) – CRP (BA)
• 2 Building Modules (P-55 and P-
63) – Porto Rio Grande (RS)
• 1 Building Modules and Integration (P-58) – Porto Rio Grande (RS)
• 7 Light Products – Rio Nave (RJ)
• 3 Dark Products – Rio Nave (RJ)
Capacity and Occupancy of Major Shipyards and Construction Sites Other Shipyards and Construction Sites
(1) The future situation of 2020 does not reflect the sum of the current situation with future demand, as there are vessels whose contracts expire by 2020. This demand may be revised as necessary.
(2) Future Demand includes hired demand, demands in hiring phase and yet to be hired demand.
Petrobras VesselsCurrent and projected fleet
Critical ResourcesJan/12
Situation
Future SituationAccumulated Values(1)
By 2016 By 2020
Tanker Vessels (DWT x 1000t) 16,000 19,000 24,500
Large Supply Boats* 216 313 358
Production Units (SS and FPSO) 45 56 81
Drilling Rigs (SWD > 2.000 m) 26 42 65
Source: Transpetro; PNG 2012-16; Petrobras (E&P-SERV/US-CONT and AB-LO/TM)
+ 198 Large Supply Boats
+ 198 Large Supply Boats
2020 Strategic Planning
Significant equipment demand mapping:
� Historically imported equipment with potential to attract foreign suppliers
� Equipment produced nationally but with potential bottlenecks in production capacity
+ 38 Production Units
+ 38 Production Units
+ 48 Drilling Rigs**+ 48 Drilling Rigs**
+ 88 Tanker Vessels+ 88 Tanker Vessels
Future Demand (2013-2020)
Example of equipment with potential for national development
PROMEF I and IIPROMEF I and II EBN I and IIEBN I and II
49 Vessels until 2020 39 Vessels until 2017
3 delivered Vessels and 22 Vessels in advanced stage of
construction
24 Vessels in hiring phase or initial
construction phase
24 Vessels in hiring phase or initial
construction phase
12 Products8 L&G
3 Bunkers
14 Suezmax8 Aframax4 Panamax
26 Products6 Bunker
7 L&G
2 Vessels in advanced stage of construction
37 Vessels in hiring phase or initial
construction phase
37 Vessels in hiring phase or initial
construction phase
Equipment demand not yet addressed for 61 Vessels (until 2020)
Petrobras Fleet Growth Program with
Brazilian Vessels
Tanker VesselsFleet increase by 2020
Source: Transpetro; Petrobras (AB-LO/TM)
� 61 Vacuum Sewage Systems
� 53 Inert Gas Generation Unit
� 72 Life Boats + Davit
� 1.830 Accomodation Cabines
Promef – Delivery and forecast of tankers
Estaleiros / Navios 2012 2013 2014 2015 2016 2017 2018 2019 2020
EAS (PE)
10 Suezmax 1 2 3 2 2
4 Suezmax DP 3 1
5 Aframax 2 2 1
3 Aframax DP 3
Mauá (RJ)
11 product vessels 2 1 2 3 3
4 Panamax 3 1
VARD Promar (PE)
8 gas tankers 2 3 3
Shipyard to be defined
3 bunker 1 2
Total: 48 navios 3 3 8 8 8 5 2 5 6
Fonte: Petrobras
Delivery of vesselsto Transpetro untillapril 2014:
Nov 2011 - Celso Furtado
(Mauá)May 2012 - João Cândido
(EAS)July 2012 - Sérgio Buarque
de Holanda (Mauá)Jan 2013 - Rômulo Almeida
(Mauá)May 2013 - Zumbi dos
Palmares (EAS) Jan 2014 – José Alencar (Mauá)Apr 2014 – Dragão do Mar (EAS)
Tankers orders
Demand for the 61 Vessels to be delivered between 2013 and 2020
Equipament Demand
MAIN ENGINE (UN) 61
AUXILIARY ENGINE (UN) 177
PROPELLERS (FPP & VPP) (UN) 61
AZIMUTAL & TUNNEL THRUSTERS (UN) 12
AUXILIARY BOILERS(UP TO 35 TONS PER HOUR) (UN)
66
EXHAUSTED GAS ECONOMIZER/COMPOSED BOILER (UN)
51
THERMAL OIL HEATER (UN) 12
START AIR COMPRESSORS (30 BAR) (UN) 111
AIR COMPRESSOR (UN) 170
PLATE HEAT EXCHANGER (UN) 333
FRESH WATER GENERATOR (UN) 55
VALVES (UN) 75.270
ELETRIC(MAIN/AUX) SWITCHBOARDS (UN) 120
WINDLASS / WINCH (UN) 346
CHAINS (KM) 39
CRANES (3 TO 20 TONS) (UN) 214
ANCHORS (UN) 144
Equipament Demand
LIFEBOAT (UN) 72
INFLATABLE BOATS (UN) 355
TOILET UNITS (UN) 1.849
PURIFIERS (UN) 293
INTEGRATED BRIDGE (UN) 61
CARGO PUMPS(FUEL OIL,DIESEL OIL, LUB. OIL) (UN)
67
CARGO PUMP (DEEP WELL) (UN) 384
MOORING LINES (UN X 200 METRES) 840
CHOCK, BOLLARD (UN) 7.271
ACCESS HATCH (UN) 1.220
VACUUM SEWAGE SYSTEMS (UN) 61
INERT GAS GENERATION UNIT (UN) 53
LIFE BOATS + DAVIT (UN) 72
ARCHITECTURE MATERIALS(ACCOMODATION PACKAGE)
61
MANUAL OPERATED VALVES (TON) 58.500
PIPES (TON) 9.800
FITTINGS (TON) 7.900
Tanker VesselsMain demands for equipment
Source: Transpetro; Petrobras (AB-LO/TM)
Example of equipment with potential for national development
+ 198 Large Supply Vessels
until 2020
(almost the same quantity as the current
fleet – 216)
Source: E&P-SERV/US-CONT
OSRVOil Recovery
OSRVOil Recovery
PSVGeneral Cargo + Oil + Bulk + Cement
PSVGeneral Cargo + Oil + Bulk + Cement
TSTugs + Oil Recovery
TSTugs + Oil Recovery
LHSOS Standby + Handling Spy (messenger)
LHSOS Standby + Handling Spy (messenger)
SVSOS Standby
SVSOS Standby
AHTSMaintenence TO´s + DMA´s + New Production Units
Instalation + FPSO`s and NT´s Operation
AHTSMaintenence TO´s + DMA´s + New Production Units
Instalation + FPSO`s and NT´s Operation
UT / PEmergency Cargo / Passenger
UT / PEmergency Cargo / Passenger
55
36
125
21
30
4
38
Current Petrobras Fleet Quantity Future Demand
� 198 Offshore Cranes
� 198 Vacuum Sewage Systems
� 396 Life Boats
� 55.700 Manual Operated Valves
� 44.550 ton of Pipinp
� 4.800 ton of Fitting
Large Supply VesselsFleet increase by 2020
Demand for 198 vessels to be delivered until 2020
Equipament Demand
Classified profiles (ton) 59.400
Shock fast (UN 300L) 1.584
Directional propulsion system (UN) 396
Transverse thrusters (UN) 396
Generator set (UN) 792
Emergency generator - port (UN) 198
Compressors (UN) 594
Oil Purifier (UN) 396
Oil water separator (UN) 198
Heat exchanger (UN) 792
Fans and blowers (UN) 7.326
Vacuum sewage system (system) 198
Air-conditioning system (system) 198
Fresh water heater (UN) 198
Domestic refrigeration (system) 198
Laundry equipment (set) 396
Trailer/mooring winch (UN) 396
Equipament Demand
Provisions crane (UN) 198
Compressors for bulk (UN) 198
Cargo pump (UN) 1.188
Control systems and supervising machines (system)
198
Metal pipes (yards) (meters) 1.584.000
Valves (estimated) (pieces) 74.250
Manual Operated Valves (estimated) (pieces) 55.700
Fittings (estimated) (ton) 4.800
Parts passage (UN) 19.800
Main switchboard (set) 198
Distribution Panels (UN) 3.960
Starters (UN) 1.980
Spotlights and reflectors (UN) 3.960
Navigation lights (set) 198
Aldis lamp (UN) 198
Battery charger (UN) 198
Static Inverter/Frequency Converter (UN) 792
Rotary guard and cleaner (UN) 4.950
Source: E&P-SERV/US-CONT
Large Supply VesselsMain demands for equipment (1/2)
Equipment Demand
Self excited phone (UN) 792
Fonoclama and TV and sound system (system) 198
Transformers and Rectifiers (UN) 396
Radar (UN) 396
Navigation, communication and signaling equipments (set)
198
Eco-probe and echobathymeter (UN) 198
VHF Radio (UN) 792
SSB Radio (UN) 396
Odometer (UN) 198
Automatic Pilot (UN) 198
Satellite navigator+ Ploter (UN) 396
Automation System/Micro Full (system) 198
Dynamic Positioning System(system) (system) 198
Steel doors (UN) 5.940
Ducts of natural and forced ventilation (UN) 594
Windows (UN) 7.524
Guards and wide eyes (UN) 5.940
Equipment Demand
Fixed firefighting system (system) 198
Smoke and heat detectors (set) 198
General alarm (system) 198
Whistle (UN) 198
Magnetic needle (UN) 198
General bulkheads (m 2) 396.000
Ceiling and bulkhead liners (m 2) 396.000
Paving (m 2) 178.200
Doors class B (UN) 9.900
Anchors (UN) 396
Mooring lines (UN) 396
Cables mooring and trailer (UN) 1.782
Rubber Fenders (UN) 3.960
Motorized service boats (UN) 198
Small Lifeboat (UN) 1.188
Buoys and life jackets (UN) 1.584
Boats transceivers (UN) 1.188
Demand for 198 vessels to be delivered until 2020
Large Supply VesselsMain demands for equipment (2/2)
Source: E&P-SERV/US-CONT
Example of potential equipment for national development
Source: PNG 2012-16; Sinaval
� 81 Chemical Injection Units
� 81 Offshore Cranes
� 27 Vacuum Sewage System
� 81 Offloading System
� 108 Life Boats + Davit
� 189.000 Manual Operated
Valves
� 54.000 ton of Piping
� 43.200 ton of Fittings
Equipment demand not
yet addressed for 27
Production Units to be
delivery until 2020
Production UnitsFleet increase by 2020
ND: Not defined * Charted Production Unit ** Integrated in Brazil with imported Hull or Modules
Production Units considered for the equipment demand analysis
Operation Startup Timeline for Petrobras Production Units
Abroad/Brazil **
Brazil
To be defined
Abroad
Construction Site
Delivery and Forecast from2013 and forecast for 2014
Shipyard
2013 (delivered)
P-55 – SS EAS (PE) – Hull. QUIP (RS) – Módules. 100% built in Brasil.
P-58 – FPSO QUIP (RS) – Integration of modules.
P-61 – TLWP BrasFELS (RJ) – First platform TLWP (Tension Leg Wellhead
Platform) built in Brasil P-62 – FPSO EAS (PE) – Integration of modules.P-63 – FPSO QUIP (RS) – Integration of modules.
Cidade de Paraty – FPSO BrasFELS (RJ) – Integration of modules.2014 (forecast)Cidade de Mangaratiba –FPSO
BrasFELS (RJ) – Integration of modules.
Cidade de Ilhabela – FPSO Estaleiro Brasa (RJ) – Integration of modules.
Orders book Production Platforms
29
Package/SkidDemand(units)
ELETRO CHLORINATION UNIT 31
VAPOR RECOVERY UNIT 54
GAS DEHYDRATION UNIT 27
VACUUM DEAERATOR UNIT 27
CHEMICAL INJECTION UNIT 81
H2S REMOVAL UNIT 27
NITROGEN GENERATOR UNIT 27
SULPHATE REMOVAL UNIT 27
ELECTROSTATIC TREATERS PACKAGE 27
PRODUCED WATER TREATMENT 27
FLARE GAS RECOVERY COMPRESSION UNIT 27
FLARE 27
FRESH WATER MAKER 27
SHELL&TUBES HEAT EXCHANGE PACKAGE 27
PLATE HEAT EXCHANGERS PACKAGE 27
PRESSURE VESSELS / SEPARATORS PACKAGES 27
CENTRIFUGAL PUMPS PACKAGE 27
SEA WATER LIFT PUMPS PACKAGE 27
Package/SkidDemand(units)
WATER INJECTION PUMPS PACKAGE 27
WELL SERVICE PUMP PACKAGE 27
RECIPROCATING PUMPS PACKAGE 27
POSITIVE DISPLACEMENT PUMPS PACKAGE 27
FILTERS PACKAGE 27
PIG LAUNCHERS & RECEIVERS PACKAGE 27
MECHANICAL HANDLING EQUIPMENT PACKAGE 27
ICSS – INTEGRATED CONTROL & SAFETY SYSTEM 27
HYDRAULIC POWER UNIT - HPU 27
FISCAL METERING SKID 27
ELECTRICAL AND AUTOMATION MODULE 27
HVAC SYSTEM 27
EXPORTATION GAS COMPRESSION UNIT 27
CO2 COMPRESSION UNIT 27
MAIN GAS COMPRESSOR 27
INJECTION GAS COMPRESSION UNIT 27
MAIN TURBOGENERATOR UNIT 27
Demand for the 27 Production Units to be delivered between 2015 and 2020
Production UnitsMain demands for equipment – Topside
Source: PNG 2012-16; Sinaval
Equipment Demand
COMPRESSOR 567
PRESSURE VESSEL (Scrubber/Separator/K.O.Drum) 1.674
TANK 729
CONTROL PANEL (Distribution panel) 2.241
PUMPS 2.808
HYDROCYCLONES / GAS FLOTATION 189
FILTER 594
SHELL&TUBES HEAT EXCHANGER 1.269
PLATE HEAT EXCHANGER 486
MECHANICAL HANDLING EQUIPMENT 2.862
OIL DEHYDRATOR / PRE-OIL DEHYDRATOR 54
OIL DEHYDRATOR DEGASSER / PRE-OIL DEHYDRATOR DEGASSER 54
PIG LAUNCHERS & RECEIVERS 648
CONTROL, SHUTDOWN, CHOKE, PRESSURE SAFETY, DELUGE VALVES 21.600
MANUAL VALVES (un) 189.000
PIPING (ton) 54.000
FITTING (ton) 43.200
CABLE (Electrical/Instrumentation/Telecom) (km) 13.500
INSTRUMENTATION (Transmitter/Gauge/Indicator) (un) 54.000
Production UnitsMain demands for equipment – Loose Equipment
Source: PNG 2012-16; Sinaval
Demand for the 27 Production Units to be delivered between 2015 and 2020
EquipmentDemand(units)
OFFSHORE CRANE API-2C (50T) 81
ALUMINIUM HELIDECK 27
LIFEBOAT & DAVIT 108
RESCUE BOAT & DAVIT 108
FOAM FIREFIGHTING SYSTEM 27
CO2 FIREFIGHTING SYSTEM 27
OFFLOADING SYSTEM 54
INERT GAS SYSTEM 27
SEWAGE TREATMENT & VACUUM UNIT 27
AUXILIARY & EMERGENCY DIESEL GENERATOR 54
DIESEL FIRE WATER PUMP 54
BALLAST PUMPS 108
COOLING WATER PUMPS 54
FRESH WATER GENERATOR 54
PORTABLE WATER GENERATOR 54
EquipmentDemand(units)
FIRE DETECTION SYSTEM 27
ENVIRONMENTAL & POSITIONING SYSTEM 27
NAVIGATION AID SYSTEM 27
OFFLOADING SYSTEM 27
MOORING SYSTEM 108
PULL-IN / PULL-OUT SYSTEM 27
SUBMERGED CARGO PUMPS 378
SUBMERGED DEBALLAST PUMPS 162
CONTROL VALVES SYSTEM (un) 5.400
HELICOPTER REFUELING SYSTEM 27
DIESEL PURIFIER 27
VAC SYSTEM 27
ACCOMODATION PACKAGE 27
AUTOMATION & ELECTRIC PACKAGE 27
Production UnitsMain equipment demand – Hull
Source: PNG 2012-16; Sinaval
Demand for the 27 Production Units to be delivered between 2015 and 2020
Tomé – Ferrostaal (RS):Modules for 06 platforms FPSO “replicantes” under construction in ERG, em Rio Grande (RS).
EBR – Toyo (RS):Modules for FPSO P-74 (hull in construction on Estaleiro Inhaúma - RJ).
Technip – Techint (PR):Modules for FPSO P-76 – (hull in Estaleiro Inhaúma – RJ)
Estaleiro Brasa (RJ):Modules for 02 FPSOs built in Asia for SBM-Queiroz Galvão Óleo e Gás.
Mendes Júnior – OSX (RJ):Built and Integration of 08 modules for FPSO to consortium Petrobras, BG Group, e Petrogal for Pre-Salt field.
EAS (PE):Integration of modules P-62.
Modules Order Book
FPSOs Integration of modules
33
Example of equipment with potential for national development
� 29 Derrick Structure
� 29 Traveling equipment
� 29 Choke and Kill Manifold
� 29 sets of Risers
� 29 BOP (parcial)
� 29 sets Eletrical System
� 174 Main Diesel Generators (parcial)
� 29 Emergency generators
� 87 Deck Cranes
� 174 Azimut Thrustrs
� 2.813 Pumps
� 957 HVAC System
� 29 Accomodation
+8
+5
+9
+6
+5
+14
+1
Drilling RigsFleet increase by 2020
Equipment demand not
yet addressed for the 29
drilling rigs to be
delivery until 2020
Source: Petrobras; Sinaval
Drilling rigs considered for the
equipment demand analysis
Petrobras Drilling Rigs Startup Timeline
* Being negotiated. Estimate will be confirmed at the contract signingBrazilAbroad
Construction Site
Equipment Demand
ELECTRICAL & INSTRUMENTS AUTOMATION SYSTEM (ESD,fire/gas detection, Ship Sever ,electrical power (transfomers/swicth borders) (System,UPS system)
29
HEAVE COMPENSATION SET 29
TOPDRIVES & ASSOCIATED EQUIPMENT(907 mtx 2x857 KW) 29
VERTICAL PIPEHANDLING - STANBUILDING 29
TRAVELING EQUIPMENT - GENERAL 29
DRAWWORKS AND MACHINERY(8508 KN /10056 KN) 29
ROTARY TABLE & ASSOCIATED EQUIPMENT(47,5 KN, 40 rpm) 29
HYDRAULIC ROUGHNECKS FOR WELL CENTRE & STADBUILDING 29
RISER & PIPE RACK HANDLING SYSTEM 29
HYDRAULIC POWER UNIT(4x 150 KW + 1x 9 KW) 145
MUD SYSTEM (Pums, accessories, mixer)7500 psi x 4 un. 29
CHOKE & KILL MANIFOLD 29
DRILLERS CONTROL CABIN & CONTROL SYSTEM 29
BOP / XMAS TREE TRANSPORTATIO / HANDLING SYSTEM 29
RISER TENSIONING SYSTEM 29
BULK MUD & CEMENT SYSTEM 29
SUBSEA PACKAGE 29
Drilling RigsMain demands for equipment – Drilling Package
Demand for the 29 Drilling Rigs to be delivered between 2016 and 2020
Source: Petrobras; Sinaval
Equipament Demand
ELECTRICAL & INSTRUMENTS AUTOMATION SYSTEM (ESD,fire/gas detection, Ship Sever ,electrical power (transfomers/swith borders) (System,UPS system)
29
MAIN DIESEL GENERATORS SETS(7680 KW X720 RPMX11000v) 174
EMERGENCY GENERATOR SET (1180 KW x1800 rpmx600V) 29
DECK CRANE-Lattice boom 25tx42m 87
DECK CRANES-KNUCKLE BOOM -25TX45M + 1X85T X19M 58
AZIMUTH THRUSTERS(4500 kwX4,50M Dia) 174
ANCHORING & MORING EQUIPMENTS(electrichal hyd. Driven) 29
PUMPS( centrifugal,Pneumatics,Positive displac.) 2.813
HVAC SYSTEM (Main machines) (un) 87
HVAC SYSTEM (Self-container) (un) 870
ACCOMODATION MODULE (Persons) 29
PIPING ( ton) 17.576
FITTINGS (ton) 11.424
CABLE (Electrical / Instrumentation / Telecom) (km) 23.200
VALVES (ton) 21.490
Drilling RigsMain demands for equipment – Ship Package
Source: Petrobras; Sinaval
Demand for the 29 Drilling Rigs to be delivered between 2016 and 2020
Generation of jobsuntill 2013
78.136
2000 1.910
2001 3.976
2002 6.493
2003 7.465
2004 12.651
2005 14.442
2006 19.600
2007 39.000
2008 40.277
2009 46.500
2010 56.112
2011 59.167
2012 62.036
2013 78.136
Jobs
Vessels and Platforms
6 production platforms2 Promef vessels
21 supply vessels10 pushers44 barges
Fonte: SINAVAL / DFMM
Balance delivery 2013
Works & Jobs
State / Localization Works Part. % Jobs Part. %Rio de Janeiro 97 26,01 30.506 39,05,São Paulo 116 31,10 1.782 2,28
Espírito Santo 9 2,41 410 0,52 Total Southeast 222 59,52 32.698 41,85Santa Catarina 48 12,87 4.247 5,43Rio Grande do Sul 20 5,36 19.954 25,54Total South 68 18,23 24.201 30,97Alagoas -- -- ND --Pernambuco (Suape) 36 9,65 7.923 10,14Bahia 6 1,61 92 0,12Ceará ND ND 702 0,90Sergipe ND ND 38 0,05Total Northeast 42 11,26 8.755 11,21Pará (Belém) 37 9,92 580 0,74Amazonas 4 1,07 11.902 15,23Total North 41 10,99 12.482 15,97Total 373 100,00 78.136 100,00
In operation:
Rio de Janeiro, Rio Grande do Sul, Amazonas, Pernambuco e Santa Catarina
Under implementation:
Bahia e Espírito Santo.
Naval Polos
Shipbuilding Polos
SINAVAL Associates
ALIANÇA S. A. – Indústria Naval e Empresa de Navegação
ARPOADOR Engenharia Ltda.
BENETEAU Brasil Ltda. - BENETEAU - FRANCE
BR Offshore S. A.
BRASFELS S.A. - KEPPEL FELS SINGAPORE
BRAVANTE – Navegação SÃO MIGUEL Ltda.
CAMARGO CORRÊA Naval Participações Ltda.
CMO Construções e Montagem Offshore S.A.
CNI – Construções Navais Itajaí S. A.
CONSTRUCAP CCPS Engenharia e Comércio S.A.
Construtora QUEIROZ GALVÃO S. A.
COREMA Indústria e Comércio Ltda.
DETROIT Brasil Ltda. - DETROIT GROUP - CHILE
DOCK BRASIL Engenharia e Serviços Ltda.
DOCKSHORE Navegação e Serviços Ltda.
DSN Equipemar Engenharia e Indústria Naval Ltda.
EASA – Estaleiros Amazônia S. A.
ECOVIX – Engevix Construções Oceânicas S. A. – MITSUBISHI - JAPAN
EISA Alagoas S. A.
EISA -Estaleiro Ilha S. A.
EJA – Estaleiro Jurong Aracruz Ltda. - SINGAPORE
Empresa Brasileira de Reparos Navais S. A. -RENAVE
ENAVAL – Engenharia Naval e Offshore Ltda.
Estaleiro ATLÂNTICO SUL S. A. – ISHIKAWAGIMA - JAPAN
Estaleiro BIBI Ltda.
Estaleiro BRASA Ltda. - SBM GROUP - NORWEG
Estaleiro Enseada S. A. - KAWASAKI - JAPAN
Estaleiro MAUÁ S. A
Estaleiro NAVSHIP Ltda. - EDISON CHOUEST - USA
Estaleiro OCEANA S. A.
Estaleiro RIO MAGUARI S. A.
Estaleiro RIO TIETÊ Ltda.
Estaleiros do Brasil S. A. –EBR – TOYO - JAPAN
ETP Engenharia Ltda.
ICN – Itaguaí Construções Navais S. A.
INTECNIAL S.A.
KEPPEL Singmarine Brasil Ltda. – KEPPEL FELS - SINGAPORE
MAC LAREN OIL Estaleiros Ltda.
NAPROSERVICE Offshore Estaleiros do Brasil Ltda.
OSX Construção Naval S. A.
QUIP S. A.
RG Estaleiros S.A. -
RIO NAVE Serviços Navais Ltda.
SERMETAL Estaleiros Ltda.
SRD Offshore S. A.
TOYO SETAL S. A. – TOYO - JAPAN
TRIUNFO Operadora Portuária Ltda.
UTC Engenharia S. A.
VARD Brazil Electro Ltda. - FINCANTIERI - ITALY
VARD Niterói S. A. - FINCANTIERI - ITALY
VARD PROMAR S. A. - FINCANTIERI - ITALY
VELLROY Estaleiros do Brasil Ltda.
WILSON, SONS – Com Ind e Ag de Naveg Ltda. – WILSON, SONS - UK
SINAVAL – SINDICATO NACIONAL DA INDÚSTRIA DA CONSTRUÇÃO E REPARAÇÃO NAVAL E OFFSHORE
Tel.: +55 (21) 2532-4878 / 2533-4568 Fax: + 55 (21) 2533-5310
E-mail: [email protected]
www.sinaval.org.br