opportunities by the millions
DESCRIPTION
Opportunities by the Millions. Patricia Gallagher EMS/P2 Team Leader Los Alamos National Laboratory. LA-UR 07-7709. Control Mechanisms. Treatment & Recovery. Other Recycling. In Process Recycling. Source Reduction. Who Implements P2/EMS. Waste Management Professionals. - PowerPoint PPT PresentationTRANSCRIPT
U N C L A S S I F I E D
U N C L A S S I F I E D
Policy & Commitment
Opportunities by the Millions
Patricia Gallagher
EMS/P2 Team Leader
Los Alamos National Laboratory
LA-UR 07-7709
Who Implements P2/EMS
ControlMechanismsTreatment &Recovery
Other Recycling
In Process Recycling
Source Reduction
CO$T$
Waste Management Professionals
Technical Process/ Facility
Staff
Pre-EMS P2
• Before EMS, P2 was a guerilla effort: coerce, cajole, convince, beg
• Not nearly as successful as a result
• P2 fully integrated into EMS effort
• LANL received ISO 14001:2004 third party certification in 2006
• P2 efforts have increased by orders of magnitude with EMS
Environmental Management System
Remedy: LANL developed a P2-based EMS• Required by DOE O 450.1
– LANL certified to ISO 14001:2004 standard
• Governing Policy begins with Prevention
• Identifies significant environmental aspects & risks
• Directorates develop action plans to address risks
• Process creates institutional objectives and targets– Waste reduction– Energy and Fuel Conservation– Equipment & Materials Disposition– Zero Liquid Discharge– Compliance
• P2 Program provides upstream implementation mechanisms
• Aligning EMS objectives to key organizational priorities
Working Groups led by P2 staff
Participation : Numbers and levels are key in Developing EMS
• 2005-2006: Created at the worker level with upper and middle management support– Senior management environmental steering committee– 33 divisions as organizational units– Over 90 participants in the development of the EMS– Really engaged the brilliance of workers– Won the DOE P2 Star Award in 2006
• 2007: New contractor, massive reorganization– Even stronger senior management support – 16 directorates as organizational units with 69 divisions
– Lost active division participation; middle management essential– Need to re-engage at a lower level again, higher level too removed– New worker safety teams provide a great opportunity– Won NNSA Award, “Integrating Safety and Security into EMS
Lifecycle: A Body-Contact Sport”
P2/EMS Program Process
Assess Risks
EMS GoalsWaste generation #sEMS Action Plans
Planning:Develop
P2 targetsImplementation
Preventive Action &Review
Waste Volume ForecastHaz Waste Min Plan
Enviro-GramsLANL & NNSA P2 Awards/Newsbulletins
Lean/Six Sigma ProcessEngineering SupportGSAF ProjectsNew Project/Design ReviewsLab Policies/Guidance/Toolkits
Communicate successes
Internal & External assessmentsSenior Mgmt Steering Committee
Tools for Generators
• Created tools: – ROI calculator– Clean out toolkits– EMS toolkit– Badges, posters– Presentations
• ROI calculator is an eye-opening tool in terms of recognizing the cost of waste
Lean/Six Sigma
• Using new Laboratory improvement initiatives to include prevention in institution-wide efforts– Chemical management– Hazardous materials acquisition and disposition– Fleet management– Work planning– Safety and security planning
• Lean/Six Sigma tools replace traditional P2 assessments
Results were immediate
• 2007 $1.2 million in investment provided $5.2 million in cost avoidance using only pilot results
• 2007 projects totaled $17 million in cost avoidance
• 2008 P2 awards involved 56 teams, over 300 staff and resulted in $5 million in cost avoidance
• Cost avoidance tricky: staff and support systems still on the books, cost avoidances are transparent to managers– Real cost savings is in avoidance of management less than just
disposal
P2 Program Reach
• Operational improvements – Steamer Lay-up: just produce process steam when needed, not
24/7– Isolated duct work to keep from washing down an entire facility– Use of dissolvable PPE, extending use of launderable PPE– Chemical Lifecycle Management– Green Procurements
• Construction/Sustainable Design:– CMRR soil reuse and recycle project: 150,000 cubic yards of
waste diverted– LEED standards for large projects
• Office waste– Restricting use of canned air and UPSs
• Procedural– Improving work review and materials management processes
Key Findings
• Insert yourself into the biggest organizational problems – P2 staff are expert problem solvers and facilitators
• Leverage everything
• Spend more time planning– Lean/Six Sigma approach: 90-95% time planning, 5% execution– Get the right sponsorship – Define the process owner and all the players– Understand all the issues and upstream and downstream
effects– Understand the strategy and tactics necessary for
implementation
• Couch benefits in a way that resonates with customers/sponsors
Contact Information
• Patricia [email protected]