AEC Project
Creative Collaborators December 5, 2010
• Relocation of Massachusetts office to a new building at 1560 Trapelo Road in Waltham.
Objectives• Use Public elements such as a display space to showcase
Autodesk’s technology;• The design will showcase new methods of development
that Autodesk currently recommends to customers;• Manage a limited budget and a very short timeline in
which to complete the project.
Introduction
1
• A software program that allows for a space to be mapped in 3-D, to show all of the design and construction elements;
• 3-D renderings of a space under construction enables major design elements, such as lighting, to be modified early on, during construction;
• This process helps facilitate key design changes and provides for a more collaborative design process.
What is Building Information Modeling (“BIM”)?
1
• A design and construction process, between architects, contractors and the client, which is highly collaborative;
• Agreement to work in an IPD environment can be built into the contracts for the architect and contractors.;
• If the project does not get completed on time or budget, no one gets paid;
• Major challenge is to find architects and contracts willing to work in such an environment.
What is Integrated Project Delivery (“IPD”)?
1
• Target cost (billed at cost)• Contingency budget (5%)• Quality Bonus• Incentive Compensation Layer (ICL)COMPENSATION
• On budget?• On schedule?• LEED Platinum Certification?• Workmanship Quality
EVALUATION AREAS
Measuring Success - And Paying For It
1
3 Key Objectives
1
→ Move 300 people with supplies and equipment
→ Creating a case study for future customers
→ LEED Platinum Certification
LEED Platinum Certification
1
BENEFITS
Improved air quality
Improved Water quality
Reduced use of resources
Reduced Waste
EXPECTATIONSYields 10x initial investment over life
35% less energy use annually
260,000 gallons of water saved annually
• Four weeks behind schedule• Complete the move before lease expiration
• Lesson– Agile processes require metrics and discipline
Complete the Move on Schedule
1
→ change in scope
→ Small slips for earlier tasks let to disproportionate slips later
Managing a More Agile Process
1
→ metrics
→ evaluation
→ discipline
• Long term stakeholders• Project team stakeholders• Issues– Café kitchen scope creep– Facilities removed from original scope– Other scope changes
• Lesson– Stakeholder analysis– Formal scope change process
Meet the Needs of Stakeholders
1
• Long term stakeholders• Project team stakeholders• Issues– Café kitchen scope creep– Facilities removed from original scope– Other scope changes
• Lesson– Stakeholder analysis– Formal scope change process
Meet the Needs of Stakeholders
1
Stakeholder Satisfaction
1
Tocci Building CompaniesKling Stubbins Architects
Subcontractors
LEED ConsultantVerizon
Autodesk LegalFurniture VendorMoving Company
Autodesk CorporateAutodesk MarketingBuilding OccupantsProject Champions
Facilities Mgmt CompanyBuilding OwnerCity of Waltham
Autodesk ITFood Service VendorWaltham Residents
Short-term Stakeholders Long-term Stakeholders
Mor
e Im
port
ant
Less
impo
rtan
t
Create Marketing Materials
1
• Marketing opportunity and public exposure• White papers and videos• Millennium article• HBS case• Publications of AIA
• Risks• Extremely aggressive schedule• High degree of publicity
• Lesson• Magnitude of the risks versus cost of risk
mitigation
Achieve LEED Certification
1
•Outside LEED certification consultant•Architect and contractor highly motivated
Reason
•Hire outside experts•Alignment within the project team
Lesson
• Integrated Project Delivery at Autodesk, Inc. (A), p. 8. Harvard Business School Case 9-610-016, 1 Mar 2010, Harvard Business School Press.
• Integrated Project Delivery at Autodesk, Inc. (C), p. 1. Harvard Business School Case 9-610-018, 24 Sept 2009, Harvard Business School Press.
• LaBarre, S. & Goldberg, J. (2009). IPD – The Tools. Metropolismag.com, Issue 11, page 50 .• “Leadership in Energy and Environmental Design,” www.wikipedia.com, Accessed on 3 Dec
2010.• Project Charter, Team Creative Collaborators
Sources
1