Operational, Under construction & Planned
Renewable Projects in India, 2016: Status Track of
Capacity Addition Pace
(Region Wise Track of Forthcoming Solar Rooftop Projects, Solar Parks,
Wind Power Projects, Biomass Plants, Cogeneration Plants, SHP and Waste
to Energy Projects with Key Contact Details of the Key People/ Agencies
such as Developing Agency & EPC Contractor )
E-REP Data Factor Project Tracker Series
August 2016
© enincon consulting llp 2016
Upcoming Renewable Power Projects in India , 2016 I 2
join the Future now
Research Base
Copyright© 2016 ENINCON, All rights reserved
2022
Four Fold increase in the market size of renewable energy
industry anticipated by 2022 as of now. Platter full of fresh
business opportunities in line for the value chain players.
Planned Renewable Power
Capacity Aspirations of India by
2022
A movement towards a “zero carbon world” that has been observed in India as well over the last
decade is seen to be even more aggressive in past 2-3 years, which might transform the energy
landscape of the country at a broader scale. With India being keen on fostering the development
of renewable energy potential, it has gathered lot of attention from the international and domestic
players.
Operational, Under Construction & Planned RE Projects in
India 2016: Status Track of Capacity Addition Pace I 2
Solar
Wind
Biomass
SHP
175 GW 100
60
5 10
With no time, the RES industry in India has gain
momentum by enrooting serious flow of funds of above
USD 20 Billion from domestic as well as global market till
the last fiscal (FY’2015-16). It is pertinent to note that
during 2015, India was ranked among the top 5
developing countries of the world for highly investing into
RES, courtesy the flow funds into the solar facet. The
initiatives taken by the Indian government to push the
solar industry has really worked well in pulling more than
decent investments into the domain. It is significant to
note that the grid connected solar power projects have
safely secured above USD 6 Billion of investments till
May 2016 with an estimated installed capacity of 7.5 GW.
Not only this, but the over all RE business potential in India
is likely to offer a huge market size of more than USD 200
Billion within seven to eight years down the line.
Not only for solar, but India’s quest for harnessing more of all green energy
sources has surpassed a major milestone this May, when the total RE capacity
of India by reaching to a level of 42,850 MW in May 2016 overtook the
cumulative portfolio of large hydro power projects in India. Wind energy being
the largest contributor , supports nearly 26.8 GW to the existing RE capacity.
However, the segment witnessed a stealth mode in terms of investments over
the last 16-18 months. But, given the planned capacity addition for wind in
upcoming years, the segment still holds an investment potential of close to USD
80-85 Billion by 2022.
Exhibit 01: Source Wise Split of Targeted Renewable
Energy Installations During FY’ 2016-2018
Infographic
27
6.8
0.28 0.9
0
5
10
15
20
25
30
Solar Wind Biomass SHP
Capacity in
GW
Solar and Wind cumulatively likely to
offer an investment opportunity of
between USD 30-35 Billion during the mentioned years
Source: enincon, MNRE,
Research Case
join the Future now
Copyright© 2016 ENINCON, All rights reserved
The Solar Way in India
20GW Targeted solar power capacity by 2020
Existing business opportunity till 2020 12.5GW
60 Number of Indian cities to be developed as “Solar City”
$ 264.7Million Serious business potential till 2017for grid connected solar
Close
to
Operational, Under Construction & Planned RE Projects in
India 2016: Status Track of Capacity Addition Pace I 3
Business Case for Solar
$ 6.3
Billion
$26.2 Billion
Worth $ 7.6 Billion of
the upcoming
capacity is proposed
as of now
Existing
Till May’16
Upcoming
Till FY’17
Infographic
Exhibit 02: Business Opportunity Potential for Solar in India by 2022
$ 10.3 Billion of total
business opportunity for the
highlighted eastern region
states
$ 18.7 Billion of total
business opportunity from the
highlighted southern region
states
$ 21.07
Billion of total
business
opportunity from
the highlighted
western states
$ 21.6
Billion of total
business
opportunity for
the highlighted
northern region
states
Region Wise Potential in Key States Capacity Split Wise Potential
$ 43 Billion
$15.3 Billion
$30.7 Billion
Grid Connected Rooftop
Solar UMPP
Utility Scale Solar Projects
Source: enincon, MNRE,
Copyright© 2016 ENINCON, All rights reserved
Indian Solar Sector Perspective: A Glance
INR 880
INR 935
15 GW
17 GW
Underlying Business Opportunity for Solar to be
Explored Till 2022
INR
412.5
INR 440
13.5% in
2010
10.5% in 2016
Falling interests rate
on loans for RE
projects shall trigger
more traffic into the
industry
Business Case Evaluation of
Indian States for Solar Till 2022
Hot spots basis the latest
industry movements (Capacity 5
GW and above)
Market sentiments for
solar
are very high.
Push Mechanism is
ultimately Pulling high
cash flows into the industry.
Research Objective & Results
ENINCON
Data base
Report provide
authentic data
of projects.
Operational , Under Construction and Planned
RE Projects in India, 2016: Take a Deep Dive and
know what all number of projects are coming up in the solar rooftop domain, solar
parks, solar UMPPs facet, wind power generation, biomass and the small hydro segment
with detailed information track on the project development status, power Offtake scenario
for the project, financial status, EPC details and contact details of the project awarding
agency, developing agency, OEM and EPC Contractor.
Res
ear
ch O
bje
ctiv
e
Res
ear
ch R
esu
lts
1. Track the Renewable Market Potential in India
2. Track the business opportunity for the key value chain players in the RE pie
3. Understanding of Private and Government Participation Share in the Indian RE Market
4. State wise Participation Analysis in developing the RE Power in India
5. To provide a holistic picture about the future outlook of the RE Market in India by 2020
1. Track of upcoming projects in the solar, wind , biomass and SHP segment in India.
2. Identify the upcoming tune of investment into the solar, wind , biomass, SHP segment in India
3. Track the development & financial status of all the upcoming solar, wind, biomass, SHP projects in India
4. Region wise overview of upcoming RE projects in India
5. Facilitate the client with details of in competition OEM & EPC contractor details
6. Incentives offered by states for developing such RE projects
join the Future now
Copyright© 2016 ENINCON, All rights reserved
Operational, Under Construction & Planned RE Projects in
India 2016: Status Track of Capacity Addition Pace I 4
ENINCON Database reports
delivering domain
knowledge, key quires
are resolve with useful
database.
ENINCON Research &
Services Framework
Research Reports
ENINCON Research
Desk
Business Stakeholders/Partic
ipants
Experts Insights/ Market view
Validated data & analysis
Opportunity mapping
& Market sizing
First hand sector
knowledge & inputs
Gist of the report in .pdf format for
ready use
Free Author
support on report & Competitive
cost
Customized Research Solution
Primary research
inputs from F2F
interviews
ENINCON’S Research Difference
Germinates from minds that think fresh to evolve path finding guide for all stake holders through quality information & analyses
Emanates from seamless integration of domain expertise with first hand industry knowledge and customized research solutions at a very competitive cost
ENINCON’S Service Difference
ENINCON’s DIFFERENCE
join the Future now
Copyright© 2016 ENINCON, All rights reserved
Operational, Under Construction & Planned RE Projects in
India 2016: Status Track of Capacity Addition Pace I 5
Key Queries Resolved
3. Contact Details of the
•Project Developing
Agency
•Project Awarding Agency
•EPC Contractor
Must buy for Solar Parks Project Developers Solar Rooftop Project Developers Solar UMPPs Developers Solar OEMs Wind Power Plant developers Wind Turbine Manufacturers EPC Service Providers Electrical Equipment Providers Discoms/Power off-takers Power traders State’s Energy Development
Authorities MNRE Ministry of Power Government Libraries Private Institutes/Libraries FII’s/Banks Renewable Consulting Agencies Research Firms/ Institutes Industry Associations
join the Future now
Copyright© 2016 ENINCON, All rights reserved
ENINCON Database reports
delivering domain
knowledge, key
quires are
resolve with
useful
database.
2. The report includes region wise track of
Upcoming RES projects. Hence, a clear
picture on the state wise upcoming solar
power, wind power, biomass and small
hydro projects shall be seen
Upcoming RE
Capacity Clarity on
State
wise upcoming
RE capacity
Key
Contact
Details
Clarity on the state’s
investment
environment for RE
Business
Opportunity
1
2
3
4
5
5. Project wise tune of investment
(In INR/USD) shall be mentioned
in each category of RE projects in
the dossier
1. Project wise capacity tune (In MW/GW)
shall be mentioned for each category of RE
projects in the dossier, which shall help
analyzing the gap b/w the aspired and actually
realized RE power generation in the country
along with the business potential
4. Clarity on the business friendly
environment offered for establishing RE
business in the state. Incentives such as
financial support, subsidy, tax holidays
other cash and kind benefits offered by the
states to RE project developers /
manufacturing units for RE projects
Operational, Under Construction & Planned RE Projects in
India 2016: Status Track of Capacity Addition Pace I 6
Executive Summary xx
Segment I: Track of Upcoming Solar Power
Projects in India
xx
1. Upcoming Solar Park Projects in India: State
Wise Coverage
xx
1.1 Project Overview xx
1.1.1 Name of the Project xx
1.1.2 State xx
1.1.3 Project Implementation Unit xx
1.1.4 Project Type (New/ Expansion) xx
1.1.5 Nature of Project (State / Private/ Central) xx
1.1.6 Plant Capacity in (In MW) xx
1.1.7 Project Technology xx
i. PV xx
ii. CSP xx
1.1.8 Business Model of the Project xx
1.1.9 Year of Commissioning* xx
1.1.10 Project Owner xx
1.1.11 Project Developing Agency xx
1.1.12 EPC Contractor for the Project xx
1.1.13 Subsidy/Tax Incentives/Other Support
Offered for the Project if any xx
1.2 Development Status of the Project xx
1.2.1 Clearance Status of the Project xx
1.2.2 EPC / Construction Status of the Project xx
1.3 Power Offtake Status of the Project xx
1.3.1 PPA Status/ Details of the Project xx
1.3.2 Tariff Rate at which Power Offtake Fixed
(INR/kWh) xx
1.4 Key Financials for the Project xx
1.4.1 Cumulative Implementation Cost of the
Project * (In INR) xx
1.4.2 EPC Cost of the Project* (In INR) xx
1.4.3 Project Financing Agency xx
1.5 Key Bidding Details for the Project xx
1.5.1 Name of Bid under which Project is Allocated xx
1.5.2 Type of Bid (Open/ Closed) xx
1.5.3 Bid Opening Date xx
1.5.4 Bid Closing Date xx
© enincon consulting llp 2016
join the Future now
Table of Content
© enincon consulting llp 2016
1.5.5 Bid Price (Winning Quote in INR) xx
1.5.6 Key L1 Participants xx
1.6 Contact Details of Key Contractors /
Agencies for the Projects
xx
1.6.1 Contact Details of the Project Developing
Agency xx
1.6.2 Contact Details of the EPC Service Provider xx
2. Upcoming Solar Rooftop/ Solar Pump Projects
in India: State Wise Coverage
xx
2.1 Project Overview xx
2.1.1 Name of the Project xx
2.1.2 State xx
2.1.3 Project Implementation Unit xx
2.1.4 Project Type (New/ Expansion) xx
2.1.5 Nature of Project (State / Private/ Central) xx
2.1.6 Plant Capacity in (In MW) xx
2.1.7 Business Model of the Project xx
2.1.9 Year of Commissioning* xx
2.1.10 Project Owner xx
2.1.11 Project Developing Agency xx
2.1.11 EPC Contractor for the Project xx
2.1.12 Subsidy/Tax Incentives/Other Support
Offered for the Project if any xx
2.2 Development Status of the Project xx
2.2.1 Clearance Status of the Project xx
2.2.2 EPC/ Construction Status of the Project xx
2.3 Power Offtake Status of the Project xx
2.3.1 PPA Status/ Details of the Project xx
2.3.2 Tariff Rate at which Power Offtake Fixed
(INR/kWh) xx
2.4 Key Financials for the Project xx
2.4.1 Implementation Cost of the Project * (In INR) xx
2.4.2 EPC Cost of the Project* (In INR) xx
2.4.3 Project Financing Agency xx
join the Future now
© enincon consulting llp 2016
2.5 Key Bidding Details for the Project xx
2.5.1 Name of Bid under which Project is Allocated xx
2.5.2 Type of Bid (Open/ Closed) xx
2.5.3 Bid Opening Date xx
2.5.5 Bid Price (Winning Quote in INR) xx
2.5.6 Key L1 Participants xx
2.6 Contact Details of Key Contractors /
Agencies for the Projects
xx
2.6.1 Contact Details of the Project Developing
Agency xx
2.6.2 Contact Details of the EPC Service Provider xx
3. Upcoming Solar UMPPs in India: State
Wise Coverage
xx
3.1 Project Overview xx
3.1.1 Name of the Project xx
3.1.2 State xx
3.1.3 Project Implementation Unit xx
3.1.4 Type of Project ( New / Expansion) xx
3.1.5 Nature of the Project (State / Private/ Central) xx
3.1.6 Plant Capacity in (In MW) xx
3.1.7 Project Technology xx
i. PV xx
ii. CSP xx
3.1.8 Business Model of the Project xx
3.1.9 Year of Commissioning* xx
3.1.10 Project Owner xx
3.1.11 Project Developing Agency xx
3.1.11 EPC Contractor for the Project xx
3.1.12 Subsidy/Tax Incentives/Other Support Offered for
the Project if any xx
3.2 Development Status of the Project xx
3.2.1 Clearance Status of the Project xx
3.2.2 EPC/ Construction Status of the Project xx
3.3 Power Offtake Status of the Project xx
3.3.1 PPA Status/ Details of the Project xx
3.3.2 Tariff Rate at which Power Offtake Fixed
(INR/kWh) xx
3.4 Key Financials for the Project xx
3.4.1 Implementation Cost for the Project* (In INR) xx
join the Future now
3.4.2 EPC Cost of the Project* (In INR) xx
3.4.3 Project Financing Agency xx
3.5 Key Bidding Details for the Project xx
3.5.1 Name of Bid under which Project is Allocated xx
3.5.2 Type of Bid (Open/ Closed) xx
3.5.3 Bid Opening Date xx
3.5.5 Bid Price (Winning Quote in INR) xx
3.5.6 Key L1 Participants xx
3.6 Contact Details of Key Contractors /
Agencies for the Projects
xx
3.6.1 Contact Details of the Project Developing
Agency xx
3.6.2 Contact Details of the EPC Service Provider xx
© enincon consulting llp 2016
Segment II: Track of Upcoming Wind Power
Projects in India
xx
1. Upcoming Wind Power Projects in India:
State Wise Coverage
xx
1.1 Project Overview xx
1.1.1 Name of the Project xx
1.1.2 State xx
1.1.3 Project Implementation Unit xx
1.1.4 Type of Project (New/ Expansion) xx
1.1.5 Nature of the Project (State/ Private/ Central) xx
1.1.6 Plant Capacity in (In MW) xx
1.1.7 Business Model of the Project xx
1.1.8 Date of Commissioning* xx
1.1.9 Project Owner xx
1.1.10 Project Developing Agency xx
1.1.11 EPC Service Provider for the Project xx
1.1.12 Subsidy/Tax Incentives/Other Support Offered
for the Project if any xx
1.1.13 Project Developing Agency xx
join the Future now
1.2 Development Status of the Project xx
1.2.1 Clearance Status of the Project xx
1.2.2 EPC / Construction Status of the Project xx
1.3 Power Offtake Status of the Project xx
1.3.1 PPA Status/ Details of the Project xx
1.3.2 Tariff Rate at which Power Offtake Fixed
(INR/kWh) xx
1.4 Key Financials for the Project xx
1.4.1 Implementation Cost of the Project * (In INR) xx
1.4.2 EPC Cost of the Project* (In INR) xx
1.4.3 Project Financing Agency xx
1.4.4 Project Financing Status xx
1.5 Key Bidding Details for the Project xx
1.5.1 Name of Bid under which Project is Allocated xx
1.5.2 Type of Bid (Open/ Closed) xx
1.5.3 Bid Opening Date xx
1.5.4 Bid Closing Date
1.5.5 Bid Price (Winning Quote in INR) xx
1.5.6 Key L1 Participants xx
© enincon consulting llp 2016
1.6 Contact Details of Key Contractors /
Agencies for the Projects
xx
1.6.1 Contact Details of the Project Developing
Agency xx
1.6.2 Contact Details of the EPC Service Provider xx
Segment III: Track of Upcoming Biomass
Power Projects in India
xx
1. Upcoming Biomass Cogeneration Projects in
India: State Wise Coverage
xx
1.1 Project Overview xx
1.1.1 Name of the Project xx
1.1.2 State xx
1.1.3 Project Implementation Unit xx
1.1.4 Type of Project (New / Expansion) xx
1.1.5 Nature of the Project (State/ Private/ Central) xx
1.1.6 Plant Capacity in (In MW) xx
1.1.7 Business Model of the Project xx
1.1.8 Date of Commissioning* xx
1.1.9 Project Owner xx
1.1.10 Project Developing Agency xx
join the Future now
© enincon consulting llp 2016
1.1.11 EPC Service Provider for the Project xx
1.1.12 Subsidy/Tax Incentives/Other Support Offered
for the Project if any xx
1.1.13 Project Developing Agency xx
1.2 Development Status of the Project xx
1.2.1 Clearance Status of the Project xx
1.2.2 EPC / Construction Status of the Project xx
1.3 Power Offtake Status of the Project xx
1.3.1 PPA Status/ Details of the Project xx
1.3.2 Tariff Rate at which Power Offtake Fixed
(INR/kWh) xx
1.4 Key Financials for the Project xx
1.4.1 Implementation Cost of the Project * (In
INR) xx
1.4.2 EPC Cost of the Project* (In INR) xx
1.4.3 Project Financing Agency xx
1.4.4 Project Financing Status xx
1.5 Key Bidding Details for the Project xx
1.5.1 Name of Bid under which Project is
Allocated xx
1.5.2 Type of Bid (Open/ Closed) xx
1.5.3 Bid Opening Date xx
1.5.4 Bid Closing Date xx
1.5.5 Bid Price (Winning Quote in INR) xx
1.5.6 Key L1 Participants xx
1.6 Contact Details of Key Contractors /
Agencies for the Projects
xx
1.6.1 Contact Details of the Project Developing
Agency xx
1.6.2 Contact Details of the EPC Service Provider xx
2. Upcoming Bio Fuel/ Bio Diesel Projects
in India: State Wise Coverage
xx
2.1 Project Overview xx
2.1.1 Name of the Project xx
2.1.2 State xx
2.1.3 Project Implementation Unit xx
2.1.4 Type of Project (New / Expansion) xx
2.1.5 Nature of the Project (State / Private/ Central) xx
2.1.6 Plant Capacity in (In MW) xx
2.1.7 Business Model of the Project xx
2.1.8 Date of Commissioning* xx
join the Future now
2.1.9 Project Owner xx
2.1.10 Project Developing Agency xx
2.1.11 EPC Service Provider for the Project xx
2.1.12 Subsidy/Tax Incentives/Other Support Offered
for the Project if any xx
2.2 Development Status of the Project xx
2.2.1 Clearance Status of the Project xx
2.2.2 EPC / Construction Status of the Project xx
2.3 Power Offtake Status of the Project xx
2.3.1 PPA Status/ Details of the Project xx
2.3.2 Tariff Rate at which Power Offtake Fixed
(INR/kWh) xx
2.4 Key Financials for the Project xx
2.4.1 Implementation Cost of the Project * (In
INR) xx
2.4.2 EPC Cost of the Project* (In INR) xx
2.4.3 Project Financing Agency xx
2.4.4 Project Financing Status xx
2.5 Key Bidding Details for the Project xx
2.5.1 Name of Bid under which Project is
Allocated xx
2.5.2 Type of Bid (Open/ Closed) xx © enincon consulting llp 2016
2.5.3 Bid Opening Date xx
2.5.4 Bid Closing Date xx
2.5.5 Bid Price (Winning Quote in INR) xx
2.5.6 Key L1 Participants xx
2.6 Contact Details of Key Contractors /
Agencies for the Projects
xx
2.6.1 Contact Details of the Project Developing
Agency xx
2.6.2 Contact Details of the EPC Service Provider xx
3. Upcoming Multi Fuel Power & Waste to
Energy Projects in India: State Wise Coverage
xx
3.1 Project Overview xx
3.1.1 Name of the Project xx
3.1.2 State xx
3.1.3 Project Implementation Unit xx
3.1.4 Type of the Project (New / Expansion )
3.1.5 Nature of the Project (State / Private / Central ) xx
3.1.6 Plant Capacity in (In MW) xx
3.1.7 Business Model of the Project xx
3.1.8 Date of Commissioning* xx
3.1.9 Project Owner xx
join the Future now
© enincon consulting llp 2016
3.1.10 Project Developing Agency xx
3.1.11 EPC Service Provider for the Project xx
3.1.12 Subsidy/Tax Incentives/Other Support Offered
for the Project if any xx
3.2 Development Status of the Project xx
3.2.1 Clearance Status of the Project xx
3.2.2 EPC / Construction Status of the Project xx
3.3 Power Offtake Status of the Project xx
3.3.1 PPA Status/ Details of the Project xx
3.3.2 Tariff Rate at which Power Offtake Fixed
(INR/kWh) xx
3.4 Key Financials for the Project xx
3.4.1 Implementation Cost of the Project * (In
INR) xx
3.4.2 EPC Cost of the Project* (In INR) xx
3.4.3 Project Financing Agency xx
3.4.4 Project Financing Status xx
3.5 Key Bidding Details for the Project xx
3.5.1 Name of Bid under which Project is
Allocated xx
3.5.2 Type of Bid (Open/ Closed) xx
3.5.3 Bid Opening Date
3.5.4 Bid Closing Date xx
3.5.5 Bid Price (Winning Quote in INR) xx
3.5.6 Key L1 Participants xx
3.6 Contact Details of Key Contractors /
Agencies for the Projects
xx
3.6.1 Contact Details of the Project Developing
Agency xx
3.6.2 Contact Details of the EPC Service Provider xx
Segment IV: Track of Upcoming Small
Hydro Projects in India
xx
1. Upcoming Small Hydro Projects in India:
State Wise Coverage
xx
1.1 Project Overview xx
1.1.1 Name of the Project xx
1.1.2 State xx
1.1.3 Project Implementation Unit xx
1.1.4 Type of Project (New / Expansion ) xx
1.1.5 Nature of the Project (State / Private / Central) xx
1.1.6 Plant Capacity in (In MW) xx
1.1.7 Business Model of the Project xx
1.1.8 Date of Commissioning* xx
join the Future now
© enincon consulting llp 2016
1.1.9 Project Owner xx
1.1.10 Project Developing Agency xx
1.1.11 EPC Service Provider for the Project xx
1.1.12 Subsidy/Tax Incentives/Other Support Offered
for the Project if any xx
1.2 Development Status of the Project xx
1.2.1 Clearance Status of the Project xx
1.2.2 EPC / Construction Status of the Project xx
1.3 Power Offtake Status of the Project xx
1.3.1 PPA Status/ Details of the Project xx
1.3.2 Tariff Rate at which Power Offtake Fixed
(INR/kWh) xx
1.4 Key Financials for the Project xx
1.4.1 Implementation Cost of the Project * (In
INR) xx
1.4.2 EPC Cost of the Project* (In INR) xx
1.4.3 Project Financing Agency xx
1.4.4 Project Financing Status xx
1.5 Key Bidding Details for the Project xx
1.5.1 Name of Bid under which Project is
Allocated xx
1.5.2 Type of Bid (Open/ Closed) xx
1.5.3 Bid Opening Date xx
1.5.4 Bid Closing Date
1.5.5 Bid Price (Winning Quote in INR) xx
1.5.6 Key L1 Participants xx
1.6 Contact Details of Key Contractors /
Agencies for the Projects
xx
1.6.1 Contact Details of the Project Developing
Agency xx
1.6.2 Contact Details of the EPC Service Provider xx
Segment V: RE Source Wise Analytical Track
for the Best Fit State for Investments into Solar,
Wind , Biomass and SHP
xx
1. Best Fit State for Solar xx
2. Best Fit State for Wind xx
3. Best Fit State for Biomass xx
4. Best Fit State for SHP xx
join the Future now