Operational Risk
Management
&
Risk Assessment
Levels of Operational Risk Management
Planning Level
Operational Level
Time Critical Level
Risk Assessment PlanningRisk Management Process Planning Operational
Tools 215A/Risk Mgmt Matrix IAP
Situation Awareness Establishing situation awareness/gathering information
Planning Strategy Meeting Operations Safety Logistics Plans
Incident objectives (202)Incident organization (203)Weather forecastFire behavior forecastCommunications Plan (205)
Hazard Assessment Identifying hazards and assessing the risk
Risk Management MatrixJHA/RA
Safety MessagesPocket cardBriefings
Hazard Control Controlling or eliminating hazards
Safety Planning - (215A) Engineering Administrative PPE Educational Avoidance
Safety MessagesMedical Plans
Decision Point Making go/no-go decisions based on acceptability of remaining risk Residual risk
Operational Planning – (215) Contingency plans Incident Emergency Plans Safety Action Plan ICP/Remote Camp Safety Plans Incident within Incident PlanRe-evaluate and revise strategy and/or tactics
Work Assignments (204)Medical Plan (206)Turndown protocols (IRPG)
Evaluate Evaluating effectiveness of hazard controls and continuously re-evaluating situation
During Action ReviewConcurrence from Command & General Staff
Debrief
Operational Risk Management Red Book
Chapters 1 & 7
Blue Book (BIA) Chapters 2 & 9
Fireline Handbook Local Unit SOP’s IRPG
Operational Risk Management
IRPG - Green Pages Risk Management Process Look Up, Down, Around LCES Safety Zones Urban Interface Complexity Analysis Refuse Risk
The Five Step Process
Principles of Operational Risk Management
Manage risk in the planning stage
Do not accept unnecessary risk Make risk decisions at the
appropriate level Accept risk when benefits
outweigh costs and/or potential consequences
Operational Risk Management Process
Determine level of Risk and establish Mitigations
Risk Assessment Matrix
Hazard Probability Codes
Frequent (A) Likely (B) Occasional (C) Rarely (D)
DefinitionProbability – The likelihood that a hazard will result in a mishap or loss (Exposure in terms of time, proximity, and repetition)
Risk Assessment Code Matrix
Severity Codes
Catastrophic (I) Critical (II) Significant (III) Minor (IV)
Definition:Severity – The worst credible consequence that can occur as a result of a hazard
Risk Assessment Code Matrix
Risk Management Process
Risk An expression of possible loss in terms of severity and probability HazardAny real or potential condition that can cause injury, illness or death of personnel, or damage to, or loss of equipment or property.
Incident Risk Assessment Worksheet
1. Incident Name
2. Location
Identification of Hazards and Risk Assessment
3. Name and Title of Analyst
4. Date
5. Pre-Mitigation 6. Mitigation or Abatement Action
(Engineering, Administrative, PPE, Avoidance, Education, etc)
7. Post-Mitigation
8. Hazard 9.
Hazard Probability
10. Severity
Code
11. RAC
12. Hazard
Probability
13. Severity
Code
14. RAC
15. Acceptable
Yes/No
Risk Assessment Worksheet Instructions
The Risk Assessment (RA) Worksheet will identify location(s) of the work project or activity, the name of employee(s) creating the RA, and date created. The approving Agency Administrator (AA), or Superintendent will review the RA and mitigation strategies to ensure risk is at an acceptable level for task or activity. A signed document will be required for apporval of the RA. The supervisor or project leader of the project/task will share information with affected employees through a safety meeting. Employees participating in the project/task will be required to sign RA acknowleding participation in safety meeting and that they have received the necessary training, and understand procedures, protocol and mitigation strategies to reduce risk with the project. Blocks 1, 2, 3, and 4 – Self explanitory Block 5 – Pre-Mitigation: What hazards are involved with the project or activity Block 6 – Mitigation or Abatement Strategy: What mitigation or abatement strategy will minimize risk or exposure (ex. engineering, administrative, PPE, Avoidance, education, etc.) Block 7 – Post-Mitigation: What hazards and risk associated with hazards are still present following mitigation or abatement strategy Block 8 – Hazards: What hazards exist with project (ex. hazard trees, driving, rolling debris, heat, etc.) Block 9 – Hazard Probability: What is probability a hazard will be encountered during project or activity, refer to Probability table Block 10 – Severity Code: What are the consequences should an unplanned event occur, refer to Severity table Block 11 – Risk Level: Assign a Risk Level prior to mitigation measures assigned, listed by RAC number, followed by Frequecy and Severity, ex. 1(A)(1) Block 12 – Hazard Probabilty: Following mitigation or abatement actions the probability of exposure or risk Block 13 – Severity Code: Following mitigation or abatement actions the severity or consequences associated with task or project Block 14 – Risk Level: Assign a Risk Level following mitigation strategies, listed by RAC number, followed by Frequecy and Severity, ex. 1(A)(1) Block 15 – Acceptable Level Yes/No: Is level of risk acceptable following mitigation or abatement actions, decision should be made at appropriate management level Risk Assessment Code (RAC) Severity Code Catastrophic (I) - Imminent and immediate danger of death or permanent disability. Critical (II) - Permanent partial disability, temporary total disability. Significant (III) - Hospitalized minor injury, reversible illness. Minor (IV) - First aid or minor medical treatment.
Hazard Probability Frequent (A) - Immediate danger to health and safety of the public, staff or property and resources. Likely (B) - Probably will occur in time if not corrected, or probably will occur one or more times. Occasional (C) - Possible to occur in time if not corrected. Rarely (D) - Unlikely to occur; may assume exposure, will not occur. Definitions Probability – The likelihood that a hazard will result in a mishap or loss (Exposure in terms of time, proximity, and repetition) Severity – The worst credible consequence that can occur as a result of a hazard Hazard – Any real or potential condition that can cause injury, illness or death of personnel, or loss and damage to equipment Risk – An expression of possible loss in terms of severity and probability (associated with human interaction)
Risk Management Process
Types of Hazards
Material
Environment
Organizational
Special Considerations
Assess hazards to determine risks
Assess impact of each hazard Potential loss (Risk vs Reward) Cost Mission degradation based on
probability and severity.
Risk Management Process
Develop Controls
Reduce risk by lowering the probability of occurrence and decreasing potential severity of a hazard, or both.
Types of Controls – Engineering Administrative PPE Educational Avoidance
Most often described as “mitigations” within the wildland fire community.
Criteria for Controls
Suitability – The control must truly remove the hazard or mitigate (reduce) the risk to an acceptable level.
Feasible – The end user will have the capability to implement the control.
Acceptable – The end user will accept and implement the control.
Effectiveness – Benefit gained by implementing the control and justifying the cost in resources and time.
Residual Risk
The level of risk remaining after controls have been identified and selected.
Eliminating every risk is often not achievable
Residual risk after mitigation needs to be identified and determined if the risk is at an acceptable level.
Overall Residual Risk
Cumulative Risk Should be determined based on the
hazard having the greatest residual risk down to the hazard having the least risk.
Determining overall mission risk by averaging the risks of all hazards is not valid.
The decision to accept or not accept the Risk(s) associated with an action.
Based on residual risk Benefits outweigh the
cost/potential consequence Made at the appropriate level
Risk Decision
Decision Options Accept Risk Modify Risk with control
measures Requires more information Reject Risk Elevate to higher levels Consider alternative action Avoidance
Risk Management Process
Evaluate hazard controls and continuously monitor the overall situation
Each operational period, leaders should evaluate how well the risk management process was executed.
Completed Risk Assessments
• 13 Generic R.A.’s Completed
• Need to Complete R.A. Codes
• Add/Delete Mitigation Measures
http://www.bia.gov/nifc/safety/risk/index.htm
Incident Risk Assessment Worksheet
1. Incident/Activity Name Daily Physical Training
2. Location
Identification of Hazards and Risk Assessment
3. Name and Title of Analyst
4. Date
5. Pre-Mitigation 6. Mitigation or Abatement Action
(Engineering, Administrative, PPE, Avoidance, Education, etc)
7. Post-Mitigation
8. Hazard 9.
Hazard Probability
10. Severity
Code
11. RAC
12. Hazard
Probability
13. Severity
Code
14. RAC
15. Acceptable
Yes/No
Improper Warm Up
Warm up 10-15 minutes prior to actual exercise
Use proper stretching techniques
Use equipment properly
Poor or improper
equipment
Ensure proper shoes/boots for P/T exercise
Ensure clothing is appropriate for existing weather conditions
Exercise equipment is functioning properly according to Manufacturers specs
Unfit for Duty
Have passed Medical Standards Program fit for duty exam
Have passed the Work Capacity Test
Daily assessment of personnel prior to initiating daily training
Don’t allow to participate in daily training, or send home