OPERATIONAL PROGRAMME ON TRANSPORT 2007-2013
BULGARIAN PORTS INFRASTRUCTURE CO.
Kuzman GenovICT Director and BulRIS Project manager, BPI Co. – HQ Sofia
Implementation of BulRIS Project
RIS Workshop Danube CommissionApril 11, 2011
Budapest
Agenda: Project Overview System Components
Tracking & Tracing Voice VHF Communication System ERI Data Gateway Notices to Skippers
Communication Infrastructure AIS and VHF Network Layout & Design Construction Works What next ? - Phase II and III
Implementation of River Information System on the Bulgarian Part of Danube -
BulRIS
Project duration 18 Months Start: May 2010 End: November 2011
Contracting Authority: Bulgarian Ports Infrastructure Co.
Budget 5.6 Mil €
Project is co-funded by EFRD - Operational Program on Transport 2007 – 2013
Project overview - General
Project Overview - Project Goals
To establish the required base infrastructure for RIS operation on the Bulgarian part of Danube
Communication infrastructure Tracking and tracing (AIS) infrastructure Voice VHF Communication System ERI Data Gateway Notices to Skippers
To apply DIRECTIVE 2005/44/EC of the European Parliament and of the Council
Implementation of River Information System on the Bulgarian Part of Danube -
BulRIS
Task 1: Inception report and planing (completed) Task 2: System design (completed)
Task 3: Construction (in progress) Task 3: Software development (completed) Task 4: System installation (in progress) Task 5: System integration (Q2-Q3’2011) Task 6: Testing and training (Q3-Q4’2011) Task 7: Migration to real life operation
(Q4’2011)
Project Overview – Implementation Schedule
Implementation of River Information System on the Bulgarian Part of Danube -
BulRIS
Implementation of River Information System on the Bulgarian Part of Danube -
BulRISSystem Components - Tracking and Tracing
AIS based system8 sitesExchange of actual, safety related information
between ships and shoreClient – Server architectureWeb interfaceFunctions:
Provision of a TTI/STIProvision of traffic management or
fairway information servicesWeb access for logistic users
System Components - Tracking and Tracing
Implementation of River Information System on the Bulgarian Part of Danube -
BulRIS
dGPS trough AIS network
Improves the accuracy of the vessel positioning
Functions:
Correction of GPS positioning
Compliant with international recommendations
Tracking and Tracing - Additional AIS functions
Implementation of River Information System on the Bulgarian Part of Danube -
BulRIS
Implementation of River Information System on the Bulgarian Part of Danube -
BulRISSystem components - Voice VHF Communication Network
8 sites along Bulgarian Danube
Cohabitation with AIS base stations
Independant system
Integration and data exchange with AIS
Graphic presentation of the vessels position
Allows simplification of cross border procedures Functions:
Data exchange between vessel and competent authorities
Available via web application Access according to the user rights
Users: Vessel parties Competent authorities
Compliant with European and international standards
Implementation of River Information System on the Bulgarian Part of Danube -
BulRIS
System Components - ERI
Implementation of River Information System on the Bulgarian Part of Danube -
BulRIS
System Components - ERI
National and international exchange of RIS data
Functions: Provision of relevant RIS data Interface to T&T, ERI and Hull system Web based users interface
Users:Governmental usersCommercial users
Different data access rights have to be defined
System Components – Data Gateway
Implementation of River Information System on the Bulgarian Part of Danube -
BulRIS
Implementation of River Information System on the Bulgarian Part of Danube -
BulRIS
System Components – Data Gateway
Used for fairway information, traffic information and management as well as voyage planning
Functions: Available via web service Automatic translation on 23 languages Input information for voyage planning
Users: Traffic/Fairway authorities Harbour Master’s Offices/Port authority Police Shippers Skippers/Captains Inspection and customs authorities
Compliant with European standards
Implementation of River Information System on the Bulgarian Part of Danube -
BulRISSystem Components – Notices to Skippers
System Components – Notices to Skippers
Implementation of River Information System on the Bulgarian Part of Danube -
BulRIS
Total of 16 sites 14 radio reley links 1 dedicated optical link 1 MAN link
Interlinked togeather to form a closed network Network is invisble to outside world Hack proof Used for AIS and VHF communication
Real time data replication between Ruse and Varna backup centre
Implementation of River Information System on the Bulgarian Part of Danube -
BulRISSystem Components – Communication Network
Implementation of River Information System on the Bulgarian Part of Danube -
BulRISSystem Components – Communication Network
Implementation of River Information System on the Bulgarian Part of Danube -
BulRIS
AIS and VHF Network - Locations
(c) Kongsberg Seatex AS
Implementation of River Information System on the Bulgarian Part of Danube -
BulRIS
AIS and VHF Network – Radio Coverage
GUI of the Client Application 1/2
(c) Periskal
Implementation of River Information System on the Bulgarian Part of Danube -
BulRIS
GUI of the Client Application 2/2
Implementation of River Information System on the Bulgarian Part of Danube -
BulRIS
GUI AIS WEB Application 1/2
(c) Periskal
Implementation of River Information System on the Bulgarian Part of Danube -
BulRIS
GUI AIS WEB Application 2/2
(c) Periskal
Implementation of River Information System on the Bulgarian Part of Danube -
BulRIS
Scope of works Design Evaluation of radiation
influence Obtainig building permits Site construction Exploatation permits
4 new sitesOther sites are existing sites
owned by Bulgarian telecom
Construction Works
Implementation of River Information System on the Bulgarian Part of Danube -
BulRIS
Implementation of River Information System on the Bulgarian Part of Danube -
BulRIS
What next? – Phase II and III
Construction of the RIS Center building Conceptual design finalized Technical project – start in May 2011 Construction works – start in fall 2011 In operation – end of 2012
Upgrade and development of the services (pre-project study) Automatic water level measurement/modeling RIS portal WLAN access to RIS services Calamity abatement services ………………………………………
THANK YOU FOR YOUR KIND ATTENTION