operational intelligence operational intelligence pre launch, current reality and next generation
TRANSCRIPT
Technology ReportsInsights
Projects and Activity
One Version Of Truth
Mobile Asset Inventory
Outlet map reporting
Insights
Instore Routine Project
- SS (Planogram ) - SOS (Share Of Shelf)- Proposition (Proposition)
Call Cycle Project
- Field Force - Shops Plan
FOS Dashboard
Survey Module e.g. ROD Competition Unilever Share On ROD
GAP SKU SKU Unavailability
OSA
InputCOMPOSA
OutputReports/Dashboard
Projects and Activity
Planorama
Reporting Overview
Dynamic Reporting Model
ROD Competition
OSA
Stolen & Damages
Technology ReportsPS-Reports REPORT NAME DAILY WEEKLY MONTHEnhance FOS Dashboard Start of Day-National ••• Start of Day-Zonal ••• Start of Day- Area Manager ••• Active/Inactive Field Force Details ••• Accepted Vs Actual Call Compliance-National ••• Accepted Vs Actual Call Compliance-ZMM ••• Accepted Vs Actual Call Compliance-AMM ••• Accepted Vs Actual Call Compliance-Monthly Report •••Image Report ••• GAP-SKU-National GAP-SKU-Zonal
Gap SKU Report -AMM ••• ••• •••
GAP SKU Report -FMM Call Cycly Analyzer(Callage Compliance) ••• •••Instore Routine- Checkedstore ••• •••Perfect Store Tracker - Compliance ••• •••AMM CheckedStore Summary ••• •••AMM CheckedStore Details ••• •••FMM CheckedStore Summary ••• •••FMM CheckedStore Details ••• •••
FM Checklist-Perfect store Checklist-Field Manager (By Category) ••• •••
FM Checklist-Perfect store Checklist-Field Manager (By Element) ••• •••
AM Checklist-Perfect store Checklist-Field Manager (By Category) ••• •••
AM Checklist-Perfect store Checklist-Field Manager (By Element) •••
• Enhanced FOS Dashboard tracking (Field Force , Region, distributors and AMM Level)• All Reports Bust till FMM Level daily, weekly and monthly.• Web Portal for backup. • Dynamic Reporting Model (
Asset Inventory and Update
YTD Statistic Nationally:- 2013-2014- Total Mobile Sets Purchased = 780 (Model, Y-300= 720 & G510=60)Distributed Mobile Sets = 771 (640+59+19+3+49+01)Stolen Mobile Sets = 49Sets Replaced Against Stolen = 35 Damages and Repair = 13 (7 Repaired, 3 under repair, 3 Write off)
Mobile Asset Inventory Update Zone Y-300 G-510North 280 6Central 212 26South 219 26 HO 1 Total 711 60
Assets Inventory Update @ Call Cycle Level Zone MS FMM AMM ZMM Stolen Damages &
Repaired IT
North 280 22 5 1 16 1 Central 212 19 6 1 10 9 South 219 18 8 1 23 3 HO 1
Total 640 59 19 3 49 13 1
Asset Inventory System