  • 8/11/2019 Operation and Maintenance Manual for Flood Mitigation Facilities

    1/42

    KEMENTERIAN ALAM SEKITAR DAN SUMBER ASLI

    JABATAN PENGAIRAN DAN SALIRAN MALAYSIA

    OPERATION & MAINTENANCE MANUAL

    FOR

    SG RASAU, SG. AIR HITAM, SG. PARIT TAMPOI

    AND ASSOCIATED WORKS

    IN MULTIMEDIA SUPER CORRIDOR

    October 2007

    Prepared by

    Dr. Nik & Associates Sdn Bhd No. 22, Jalan !27"

    #$ala %$ p$r S$b$rban 'entre (#%S')Section *, P$sat Bandar +an sa -a $

    *//00 #$ala %$ p$r

  • 8/11/2019 Operation and Maintenance Manual for Flood Mitigation Facilities

    2/42

  • 8/11/2019 Operation and Maintenance Manual for Flood Mitigation Facilities

    3/42

    O&- -an$al O' 1

    O&M MANUALFOR SG. RASAU, SG. AIR HITAM AND SG. PARIT TAMPOI

    IN MULTIMEDIA SUPER CORRIDOR

    TABLE OF CONTENTS

    CONTENTS Page No.

    1 GENERAL........................................................................................................1

    1.1 Introduction ..........................................................................................................................1.1.1 Purpose and Scope ..............................................................................................................1.1.2 Use of Manual .......................................................................................................................

    1.2 Historical Summary ...........................................................................................................21.2.1 Planning and Construction ..................................................................................................21.2.2 Project Cost. ..........................................................................................................................21.2. Project References. ............................................................................................................../

    2 !MPLEMEN"!NG AGENC#.............................................................................

    L$CA"!$N.......................................................................................................

    % PER"!NEN" !N&$RMA"!$N..........................................................................%

    ' (ESCR!P"!$N $& PR$)EC" &EA"URES....................................................*

    5.1 General Description ...........................................................................................................

    5.2 Sg. Rasau/Sg. Air Hitam and Associated Works ........................................................'.2.1 $+issions ..............................................................................................................................'.2.2 Ri,er C-annel and Ri,er und ...........................................................................................

    '.2. $utfall Structures. .................................................................................................................3'.2.% Access Road .........................................................................................................................3'.2.' Ri,er Protection /or0s ........................................................................................................3

    5. Sg. !arit "ampoi and Associated Works .................................................................... 0'. .1 Ri,er C-annel and Ri,er und ......................................................................................... 0'. .2 $utfall Structures. ............................................................................................................... 0'. . Access Road ....................................................................................................................... 0'. .% Ri,er Protection /or0s ...................................................................................................... 0

  • 8/11/2019 Operation and Maintenance Manual for Flood Mitigation Facilities

    4/42

    O&- -an$al O' 1

    5.# !er$ormance %onitoring And Assessment ................................................................

    5.5 &'% &$ !ro(ect In$rastructure ......................................................................................'.'.1 General .................................................................................................................................'.'.2 Legislation ............................................................................................................................ 2'.'. Controls ................................................................................................................................ *

    '.'.% !nspection $f &lood Mitigation /or0s .............................................................................. 4' .' .' Maintenance $f &lood Mitigation /or0s .........................................................................'.'. E+ergenc Measures ........................................................................................................20314 Acti,e 5oiling .......................................................................................................................2324 Seepage and Piping ...........................................................................................................223 4 Ri,erside Erosion ................................................................................................................223%4 Saturation .............................................................................................................................223'4 Local $,ertopping ..............................................................................................................223 4 !nternal (rainage ................................................................................................................2/364 E+ergenc /arning ...........................................................................................................2/'.'.6 Repairs 7 Restoration /or0 .............................................................................................2/'.'.* Records ................................................................................................................................2/'.'.8 Sur,eillance .........................................................................................................................25

    '.'.19 Repair Replace+ent And Re-a5ilitation 3RR7R4 ..........................................................2*'.'.11 Notification $f (istress ......................................................................................................24

    "A)*+S

    "a5le 1.1. Su++ar of Project Costs 4 "a5le 1.2. Project References"a5le %.1. Project (ata Su++ar 2

    A!!+,DI-+S

    A Project Rig-t $f /a (ra:ings3a4 Sg. Rasau;Air

  • 8/11/2019 Operation and Maintenance Manual for Flood Mitigation Facilities

    5/42

    O&- -an$al o6 55

    1 G+,+RA*

    1.1 Introduction

    1.1.1 !urpose and Scope

    314 "-is +anual :ill ser,e as a guide for t-e operation and +aintenance 3$7M4 of Sg.

    Rasau;Air

  • 8/11/2019 Operation and Maintenance Manual for Flood Mitigation Facilities

    6/42

    O&- -an$al 2 o6 55

    1.2 Historical Summary

    1.2.1 !lanning and -onstruction

    "-e :or0s :ere identified under t-e !++ediate Action Plan of Multi+edia Super Corridor

    Master (rainage Plan co+pleted in 1888 5 (r. Ni0 7 Associates for t-e (epart+ent of

    !rrigation and (rainage Mala sia. Separate tenders :ere called for Sg. Rasau;Sg. Air

  • 8/11/2019 Operation and Maintenance Manual for Flood Mitigation Facilities

    7/42

    O&- -an$al / o6 55

    1.2. !ro(ect Re$erences.

    "a5le 1.2 pro,ides a su++ar of related project references.

    "a le 1.2 !ro(ect Re$erences

    T"$(e Da$e P)!#osehe -$lti edia S$per 'orridor

    -acro Draina e -aster Plan, Dr. Nik & Associates Sdn Bhd

    Dec 333 9denti6ication o6 inade:$acies in e;istinand proposed draina e

  • 8/11/2019 Operation and Maintenance Manual for Flood Mitigation Facilities

    8/42

    O&- -an$al 5 o6 55

    # !+R"I,+," I, &R%A"I&,

    "a5le %.1 lists t-e pertinent infor+ation for Sg. Rasau;Air

  • 8/11/2019 Operation and Maintenance Manual for Flood Mitigation Facilities

    9/42

    O&- -an$al * o6 55

    Ta*(e +. P!o-e $ Da$a S) a!/ o%$83'

    I$e 0)a%$"$/1Meas)!e e%$

    Re a!2s

    B!"3ge No. 9'haina e 0*0Span Sin le * Sin le span bo; irder brid e+idth 0 Deck @le=ation *.202 8i hest le=el o6 bo; irder at id1span.Brid e load capacity 8A & 8B loadin

    A ess Roa3oad len th

    1 S . asa$1Air 8ita1 S . Air 8ita

    4,000 3,2 0

    Pro=ides access alon ri=er b$nd 6or inspectionand aintenance. 'r$sher1r$n s$r6ace.

    +idth* incl$dinsho$lders 'r$sher1r$n s$r6acin 6or /

  • 8/11/2019 Operation and Maintenance Manual for Flood Mitigation Facilities

    10/42

    O&- -an$al 4 o6 55

    Ta*(e +. P!o-e $ Da$a S) a!/ o%$83'

    I$e 0)a%$"$/1Meas)!e e%$

    Re a!2s

    Sg. Pa!"$ Ta #o"

    R"4e! B)%3 Protection o6 inhabitable areas a ainst desi n 6loodo6 00 years A 9

  • 8/11/2019 Operation and Maintenance Manual for Flood Mitigation Facilities

    11/42

  • 8/11/2019 Operation and Maintenance Manual for Flood Mitigation Facilities

    12/42

    O&- -an$al o6 55

    5 D+S-RI!"I&, & !R&3+-" +A" R+S

    5.1 General Description

    "-e project co,ers t-e i+pro,e+ent of Sg. Rasau;Sg. Air

  • 8/11/2019 Operation and Maintenance Manual for Flood Mitigation Facilities

    13/42

    O&- -an$al 3 o6 55

    5otto+ :idt- of ' +. "-e section fro+ C-. 1269 + to C-. %99 passes t-roug- peat soil.

    "-e peat soil at C-. 1269=%1'9 is s-allo: 3up to % + deep4 and soil replace+ent using

    i+ported sand :as carried out to for+ t-e ri,er section :it- 5unds on 5ot- sides of t-e

    ri,er and side slopes of 1 B < :ere pro,ided. (eep peat up to 6 + is found along C-.

    %1'9= %99I as suc- a natural co+pound c-annel :it- ,er flat 31 B'

  • 8/11/2019 Operation and Maintenance Manual for Flood Mitigation Facilities

    14/42

    O&- -an$al 0 o6 55

    Riprap :as placed at t-e toe of sand=filled +attress to pre,ent toe scour. !t :as also

    placed at pond inlets and outlets and at t-e outlet of all outfall structures to ensure t-e

    sta5ilit of t-e structures.

    Riprap :as also placed at t-e ri,er 5ed of Sg. Air

  • 8/11/2019 Operation and Maintenance Manual for Flood Mitigation Facilities

    15/42

    O&- -an$al o6 55

    5.# !er$ormance %onitoring And Assessment

    Silting of t-e ri,er 5ed and settle+ent of t-e ri,er 5unds +a occur. (esilting -as to 5e

    carried out :-en t-e ri,er capacit is reduced to 6'J of t-e design capacit . "opping up

    of t-e ri,er 5und :ill 5e needed :-en t-ere is e?cessi,e settle+ent. Ri,er cross=

    sectional sur,e inclusi,e of t-e 5unds at '9 + inter,als at '= ear inter,als is re@uired

    for proper planning of t-ese acti,ities.

    5.5 &'% &$ !ro(ect In$rastructure

    5.5.1 General

    Regular inspection and +aintenance of flood +itigation :or0s is necessar to +aintain

    t-e functionalit of t-e flood +itigation s ste+. "-e flood +itigation s ste+ refers to t-eintegration of all of t-e co+ponents and acti,ities t-at are re@uired to ensure t-e long

    ter+ protection of -a5ita5le areas during pea0 flo:s up to t-e design flood. !t includes

    5ut is not necessaril li+ited to t-e follo:ingB

    K t-e flood +itigation :or0s 3t-e /or0s4I

    K t-e $7M +anualI

    K t-e rig-t of :a :-ic- is needed for t-e :or0s 5ut +a also e?tend 5e ond t-e

    i++ediate ,icinit of t-e :or0s to facilitate access for t-e re+o,al of sedi+ent5uild=upI and

    K ot-er co+ponents i+ple+ented to ensure pu5lic safet 3suc- as e+ergenc

    operations plans and procedures :arning s ste+s and flood +onitoring

    operations4.

    617 Responsi ilities

    "-e responsi5ilit for t-e $7M rests :it- t-e respecti,e (istrict (epart+ent of !rrigation

    and (rainage 3-ereinafter referred to as (istrict )PSF4.627 De$inition

    "-e ter+ $7MF in t-is +anual refers to all :or0s and acti,ities t-at are re@uired to

    operate and +aintain t-e flood +itigation :or0s to t-e design standard. !t includes t-e

    repair and restoration of t-e flood +itigation :or0s and t-e re+o,al of sedi+ent 5uild=up

    and de5ris fro+ t-e c-annel after flood.

  • 8/11/2019 Operation and Maintenance Manual for Flood Mitigation Facilities

    16/42

    O&- -an$al 2 o6 55

    6 7 Rig t8o$8Way

    Rig-t=of=:a for construction and +aintenance and all necessar appro,als :ere

    o5tained 5 t-e (epart+ent of !rrigation and (rainage Mala sia 3)PS Mala sia4.

    A,aila5le details are included in Appendi? A.5.5.2 *egislation

    "-e principal legislation relating to flood +itigation :or0s is listed 5elo:.

  • 8/11/2019 Operation and Maintenance Manual for Flood Mitigation Facilities

    17/42

    O&- -an$al / o6 55

    627 ,ational *and -ode 19;5

    Section 1 B Alienation of land :it-in '9 +eters of ri,er 5an0s la0es drains or coast lines

    3po:er to alienate4.

    Section %8 B Effects of ad,ance or retreat of ri,ers etc.

    Section 2 B Ga etting of ri,er reser,e for pu5lic utilit 3ri,er reser,es4

    Section 69 61 62 7 6% 3ad,ice4 B Mining re@uire+ents

    6 7 *ocal Go4ernment Act 619=;7 > 6!eninsular7

    Section 8 69 and 61 B Po:er for Local aut-orit to reco,er an e?panses incurred in

    carr ing out an :or0 as a result of an person :-o co++its a nuisance or deposits an

    filt- in or upon t-e 5an0 of an strea+ c-annel pu5lic drain or ot-er :atercourses.

    Section 6 3a43ii4 and 3543i4 gi,es po:er to +a0e a+end or re,o0e 5 =la:s to 0eep pu5lic

    places 3including ri,ers4 free fro+ filt- and to also preser,e pu5lic -ealt-.

    Section 191 3e4 B po:er to di,ert strengt-en define and canali e t-e course of an

    strea+ c-annel or :atercourse su5ject to t-e consent of t-e appropriate aut-orities.

    Section 191 3,4 B Local aut-orit is gi,en po:er to do all t-ings necessar for or

    conduci,e to pu5lic safet -ealt- and con,enience.

    6#7 +art ?orks )yla?s

    Po:er for Local Aut-orit to control eart-:or0s 5eing carried out so as to pre,ent soil

    erosion and distur5ance pollution 3air and :ater4. Need to 5e ga etted 5 t-e State

    Go,ern+ent and adopted 5 indi,idual local aut-orities.

    657 "o?n and -ountry !lanning Act 19=;

    Section * B Preparation of draft Structure Plans 3incorporation of ri,er reser,e ri,er frontage de,elop+ent. flood le,els etc.4

    6;7 +n4ironmental @uality Act 19=# > 619

  • 8/11/2019 Operation and Maintenance Manual for Flood Mitigation Facilities

    18/42

    O&- -an$al 5 o6 55

    Section 2' B !nland :ater pollution control. Pro-i5its an disc-arge or deposit an :astes

    3unless licensed4 into an inland :ater including ri,ers strea+s drains la0es etc.

    Pro-i5its an raising or lo:ering of recei,ing :ater te+perature 5 +ore t-an t-e

    prescri5ed li+its.

    Section '1 B Po:er to +a0e regulations.

    6=7 +n4ironmenta l @uality Regulations 6!rescri ed premises Se?erage and

    Industrial +$$luent7 > -rude !alm8oil 619==7 Ra? ,atural Ru er 619=

  • 8/11/2019 Operation and Maintenance Manual for Flood Mitigation Facilities

    19/42

    O&- -an$al * o6 55

    5.5. -ontrols

    Using t-e legislation referred to in 2.9 as a reference t-e (istrict )PS s-ould control

    de,elop+ent or construction on t-roug- or in t-e ,icinit of t-e flood +itigation :or0s

    so t-at suc- acti,it does not reduce t-e e?isting standard of flood protection. Acti,itoutside t-e rig-t=of :a s-ould 5e in accordance :it- accepted +anage+ent practice

    3MSMA4 and t-is is ad+inistered 5 t-e local go,ern+ent.

    617 +Bca4ation

    E?ca,ation adjacent to t-e ri,er 5und 5an0 protection or ot-er flood protection

    structures s-ould 5e discouraged 5ut :-ere suc- e?ca,ation is necessar e?pert

    ad,ice s-ould 5e o5tained to ensure t-at t-e e?ca,ation does not desta5ili e t-e flood

    +itigation :or0s.

    627 !ipes ' -a les

    /-ere pipes ca5les or ot-er :or0s +ust pass t-roug- or along t-e ri,er 5unds t-e

    correct use of seepage collars and co+pacted 5ac0fill +aterials is +andator . Rupture

    resistant pipe :it- +ec-anical or e@ui,alent joints :-ic- :ill not separate under

    settle+ent s-all 5e used :-ere pipe is laid :it-in t-e design ri,er 5und section. Material

    e?ca,ated to install t-e :or0s s-ould 5e replaced :it- 5ac0fill +aterial of e@ui,alent

    flood resistant @ualit and in a +anner t-at :ill not reduce t-e standard of protection.

    6 7 +ncroac ment

    "rees or tall s-ru5s s-ould not 5e allo:ed to encroac- on t-e ri,er 5und. uildings or

    ot-er o5structions s-ould not 5e allo:ed :it-in t-e rig-t=of=:a or situated in a position

    t-at :ould i+pede ri,er 5und +aintenance :or0 or t-e functioning of designated

    flood:a corridors.

    6#7 Access

    Access to t-e ri,er 5und crest slopes and adjacent 5an0 protection s-ould 5e

    +aintained to per+it inspection +aintenance and repair of t-e flood +itigation :or0s.

    657 !roposed Works

    An :or0 or :or0s proposed on or in t-e i++ediate ,icinit of flood control :or0s

    co+prising t-e ri,er 5und 5an0 protection structures or internal drainage :or0s s-ould

    5e re,ie:ed 5 )PS and ot-er affected regulator agencies 5efore :or0 proceeds.

  • 8/11/2019 Operation and Maintenance Manual for Flood Mitigation Facilities

    20/42

    O&- -an$al 4 o6 55

    6;7 Sediment Remo4al

    Sedi+ent re+o,al s-ould 5e underta0en :-en t-e a,aila5le flo: area is reduced to 6'J

    of t-e design flo: area.

    Sedi+ent re+o,al fro+ t-e ri,er c-annel s-ould not 5e underta0en in a +anner :-ic-+a jeopardi e t-e integrit of t-e ri,er 5und. E?ca,ation on t-e ri,er side s-ould

    generall 5e underta0en a safe distance a:a fro+ t-e toe of an riprap as deter+ined

    5 t-e )PS (istrict Engineer.

    Care s-ould 5e ta0en to ensure t-at t-e operation does not da+age t-e 5an0 protection

    suc- as sand=filled +attress and t-e toe protection.

    5.5.# Inspection &$ lood %itigation Works

    !t is t-e responsi5ilit of (istrict )PS to conduct ri,er 5und inspections.

    617 Routine Annual Inspection

    At least once a ear t-e entire ri,er s ste+ s-ould 5e inspected 5 (istrict )PS for need

    of routine +aintenance. "-is inspection s-ould 5e sc-eduled earl enoug- prior to t-e

    flood season to allo: ade@uate ti+e for an re@uired +aintenance :or0 to 5e co+pleted

    prior to -ig- :ater conditions.

    "-e inspector fro+ (istrict )PS s-ould loo0 for and note an of t-e follo:ing ite+sB

    a4 t-e e?tent of ,egetation gro:t- and t-e presence of treesI

    54 an da+age to t-e ri,er 5und slopesI

    c4 an o5,ious lo: spots along t-e ri,er 5und crestI

    d4 ani+al 5urro:sI

    e4 an unaut-ori ed e?ca,ation or construction in on or adjacent to t-e ri,er 5und. !f

    dee+ed to 5e detri+ental to t-e integrit or perfor+ance of t-e flood +itigation

    :or0s t-e inspector s-ould report to t-e )PS (istrict Engineer :-o +a order

    correcti,e action.

    f4 signs of erosion of t-e ri,er5an0 or da+age to t-e e?isting 5an0 protection. (uring

    t-e inspection attention s-ould 5e gi,en toB

    i4 loss of roc0 fro+ t-e e?isting protecti,e la erI

  • 8/11/2019 Operation and Maintenance Manual for Flood Mitigation Facilities

    21/42

    O&- -an$al 7 o6 55

    ii4 slu+ping of t-e slopeI

    iii4 erosion or scour of t-e ri,er5an0 i++ediatel upstrea+ or do:nstrea+ of t-e

    5an0 protection or at t-e toe of t-e slope or riprap. !n so+e cases an under:ater

    sur,e of t-e slope +a 5e ad,isa5le to deter+ine t-e degree of an toe scourIi,4 :eat-ering or a5rasion of roc0I

    ,4 loss of or significant c-anges to t-e o,er5an0 area :-ic- could endanger t-e

    ri,er 5und.

    g4 t-e condition of flap gates of outfall structures as to t-e a5ilit to open and close

    freel and pro,ide a :atertig-t seal :-en s-utI

    -4 an access o5structions to t-e ri,er 5und and along t-e ri,er 5und crestI

    A :ritten report on t-e results of t-e inspection s-ould 5e prepared and su5+itted to )PS

    and t-e necessar :or0 sc-eduled for co+pletion prior to t-e ne?t flood period.

    627 Inspections During Hig Water +4ents

    Additional ri,er 5und inspections or patrols s-ould 5e carried out during -ig- :ater

    e,ents to +onitor t-e perfor+ance of t-e flood control :or0s and ta0e correcti,e action

    as re@uired see Section '.'. E+ergenc Measures and Repair /or0.

    (uring -ig- :ater e,ents local :ater le,el gauges s-ould 5e +onitored regularl and

    t-e readings recorded for long=ter+ reference. Ri,er 5und patrol fre@uenc s-ould

    increase as t-e :ater le,els approac- critical conditions and s-ould 5e continuous :-ile

    t-e le,el is :it-in 1.9 + of t-e ri,er 5und crest. "-e patrol cre:s are to o5ser,e and

    report to t-e )PS (istrict Engineer an occurrences t-at could signal a :ea0ening of t-e

    :or0s suc- asB

    a4 SeepageB Seepage t-roug- t-e ri,er 5und and at t-e landside toe of t-e ri,er 5und is

    to 5e e?pected at -ig- flood le,els. "-is seepage is considered to 5e nor+al pro,ided

    flo:s are not e?cessi,e or concentrated in t-e for+ of piping or 5oils.

    Piping results :-ere fill is transported 5 t-e seepage flo:I t-is can 5e identified eit-er

    as suspended silts 3+ur0 :ater4 or ,isi5le grain particles. "-is process enlarges or

    progresses to:ard t-e ri,er at an increasing rate. E,entuall an open pat- is created

    and t-e ri,er 5und is 5reac-ed.

  • 8/11/2019 Operation and Maintenance Manual for Flood Mitigation Facilities

    22/42

    O&- -an$al o6 55

    "-e piping process is so+eti+es indicated 5 5oils s+all up:ellings :-ic- can appear

    at considera5le distances inland fro+ t-e inside toe of t-e ri,er 5und and :-ic- are

    caused 5 e?cessi,e seepage pressure.

    Close attention s-ould 5e paid to seepage as an increase or concentration of seepageflo:s can t-reaten t-e safet of t-e ri,er 5und.

    54 Sloug-ing and;or erosion of t-e ri,er 5und slopes 3gull ing4.

    c4 Settle+ent of t-e ri,er 5und crest and slopes 3depressions4.

    e4 Crac0ing of t-e ri,er 5und crest or slopesB

    i4 desiccation crac0ingB for+s in rando+ -one co+5 patterns and is serious onl

    :-en deep.

    ii4 trans,erse crac0ingB for+s perpendicular to t-e ri,er 5und align+ent and can

    easil create a seepage pat-.

    iii4 longitudinal crac0ingB for+s parallel to t-e ri,er 5und align+ent and +a indicate

    t-e start of a slide or slu+p. Ma result fro+ toe erosion differential settle+ent or

    saturation.

    g4 Sloug-ing and;or erosion of 5an0 protection :or0s. Critical areas s-ould 5e

    closel inspected during and after -ig- :ater e,ents.

    -4 (e5ris accu+ulation at outfall structures and flap gates.

    j4 Ri,er 5loc0ages due to logs or de5ris especiall near 5ridges or ot-er

    constrictions.

    04 Seepage along cul,erts t-at trans,erse t-e ri,er 5und fill.

    5.5.5 %aintenance &$ lood %itigation Works

    617 Ri4er und %aintenance

    "-e essential ri,er 5und +aintenance acti,ities include t-e follo:ingB

    a7 Repair o$ Ri4er und Slope Damage

    (a+age to ri,er 5und slopes s-ould 5e repaired as soon as possi5le 5 t-e addition and

    co+paction of appropriate eart- fill +aterials to restore t-e slope to original condition.

  • 8/11/2019 Operation and Maintenance Manual for Flood Mitigation Facilities

    23/42

    O&- -an$al 3 o6 55

    7 "rimming o$ Cegetation Gro?t

    egetation on t-e ri,er 5und side slopes s-ould ideall consist of closel tri++ed grass.

    "-e ri,er 5und slopes s-ould 5e cut at least once annuall . "ree and 5rus- gro:t-

    s-ould 5e re+o,ed for t-e follo:ing reasonsB

    i4 "-e ,egetation attracts 5urro:ing ani+als :-ose 5urro:s are detri+ental to t-e

    ri,er 5und sta5ilit .

    ii4 "all ,egetation o5scures signs of seepage or da+age to t-e ri,er 5und :-ic- +a

    t-us go undetected and e,entuall cause ri,er 5und failure.

    iii4 "ree roots :-en t-e deco+pose can encourage t-e de,elop+ent of pipes and

    conse@uent ri,er 5und failure.

    i,4 Large trees pose an additional t-reat to ri,er 5und sta5ilit especiall during flood

    e,ents :-en t-e ri,er 5und structure 5eco+es saturated.

  • 8/11/2019 Operation and Maintenance Manual for Flood Mitigation Facilities

    24/42

    O&- -an$al 20 o6 55

    Repair s-ould 5e +ade 5 t-e addition of suita5l graded roc0 riprap. "-e roc0 s-ould

    5e placed 5 5ac0-oe - draulic e?ca,ator or cla+s-ell to fit tig-tl toget-er and for+ a

    s+oot- continuous slope.

    !f a +ajor failure of t-e 5an0 protection occurs specialist ad,ice s-ould 5e o5tained prior to underta0ing a repair.

    6 7 -ul4ert %aintenance

    Maintenance of a cul,ert consists of cleaning t-e inlet and outlet of an accu+ulated

    de5ris and sedi+ent to ensure :ater can flo: freel t-roug- t-e cul,ert. "-e flap gate

    :-ere fitted s-ould 5e periodicall cleaned and lu5ricated to ensure t-at it s:ings freel

    and closes properl :it- a good seal.

    "-e ri,er 5und slopes adjacent to t-e cul,ert s-ould 5e 0ept clear of trees and 5rus- to

    allo: uni+peded inspection of t-e inlet and outlet of t-e cul,ert.

    All inspections s-ould include a c-ec0 for signs of sloug-ing :-ic- could 5loc0 t-e inlet

    to t-e cul,ert. ot- t-e inlet and t-e outlet s-ould 5e c-ec0ed for signs of erosion or

    under+ining of t-e structure.

    All gates s-ould 5e inspected periodicall for e?cessi,e :ear or deterioration.

    Concrete inlet and outlet structures s-ould 5e inspected for e,idence of crac0ing or

    spalling. Concrete pipe cul,erts s-ould 5e inspected for e?cessi,e joint +o,e+ent loss

    of joint sealant and lea0s at joints.

    5.5.; +mergency %easures

    !t :ould 5e ad,isa5le to prepare a flood contingenc plan in conjunction :it- t-e local

    aut-orit .

    !f t-ere is a t-reat to t-e safet of a ri,er 5und t-e (istrict )PS +a carr out an :or0

    t-at is essential to pre,ent t-e ri,er 5und or 5an0 protection fro+ failing.

    "-e (istrict )PS is responsi5le to ensure t-ere are ade@uate personnel e@uip+ent and+aterials readil a,aila5le to respond to e+ergenc conditions. As t-e ri,er rises to

    critical le,els cre:s s-ould 5e prepared to underta0e e+ergenc repairs as outlined

    5elo:.

  • 8/11/2019 Operation and Maintenance Manual for Flood Mitigation Facilities

    25/42

    O&- -an$al 2 o6 55

    617 Acti4e oiling

    "-e si+plest and +ost effecti,e +et-od of treating an acti,e 5oil 3one t-at is carr ing

    sand and silt4 is to construct an i+per,ious ring around it of a sufficient -eig-t to stop t-e

    transportation of solid +aterial. !t s-ould not 5e 5uilt to a -eig-t :-ic- stops t-e flo: of clear :ater 5ecause of t-e pro5a5ilit of 5uilding up an e?cessi,e local pressure -ead

    :-ic- could cause ri,er 5und failure or additional 5oils near5 . Concrete :ell rings s-ort

    pieces of large dia+eter pipe eart- 5er+s steel s-eet pilings etc. can all 5e used 5ut

    t-e +ost generall accepted +et-od is using sand5ag rings.

    "-e reco++ended +et-od of 5uilding a sand5ag contain+ent ring is as follo:sB

    K Scarif t-e 5ase for t-e ring 3internal dia+eter of :-ic- s-ould 5e at least 1=1;2

    ti+es t-e conte+plated -eig-t4 to pro,ide a :atertig-t 5ond 5et:een t-e natural

    ground and t-e sac0 ring 3a ,er i+portant step4.

    K La sac0s in a ring around t-e 5oil and surrounding :ea0 ground starting at its

    outer edge and :or0ing to:ards t-e centre. )oints are staggered and loose eart- is

    used as a +ortar.

    K /-en t-e proper -eig-t is reac-ed 3:-en clear :ater onl is 5eing disc-arged4 a

    F=s-aped drain constructed of :ood or s-eet +etal s-ould 5e inserted near t-e top

    of t-e ring to carr off t-e :ater in a +ore controlled +anner in t-e +ost desira5le

    direction.

    K An alternati,e +et-od of controlling an acti,e 5oil is 5 placing a 5lan0et of gra,el

    or ot-er free=draining gra,el o,er it. "-e t-ic0ness of t-e gra,el 5lan0et +ust 5e

    increased until t-e seepage :ater runs clean. NoteB /-en soil conditions are suc-

    t-at 5oils occur it :ill pro5a5l 5e i+possi5le or i+prudent to 5ring loaded du+p

    truc0s into t-e area and o,er t-e ri,er 5und crest. &irst consideration s-ould 5e

    gi,en to +et-ods t-at do not i+pose -ea, loads on t-e ground adjacent to t-e

    5oils.

    K All flo:ing inacti,e 5oils s-ould 5e flagged and closel +onitored t-roug-out t-e

    flood period in case t-e start to transport solids.

    "-e Structural Geotec-nical and (a+ Specialist (i,ision s-ould 5e alerted under t-e

    follo:ing situationsB

    K t-e acti,e area of 5oiling is e?tensi,eI

  • 8/11/2019 Operation and Maintenance Manual for Flood Mitigation Facilities

    26/42

    O&- -an$al 22 o6 55

    K t-ere is an e?tensi,e area of inacti,e 5oils and t-e ri,er le,el is e?pected to rise.

    627 Seepage and !iping

    (uring -ig- :ater e,ents t-e land side slope and toe s-ould 5e +onitored for e?cessi,e

    seepage and possi5le piping pro5le+s. /-ere seepage on t-e ri,er 5unds landsideslope leads to sogg unsta5le conditions free draining fill 5er+s +a 5e added. /-ere

    ti+e per+its e?pert ad,ice s-ould 5e o5tained if possi5le 5efore ta0ing correcti,e

    action.

    6 7 Ri4erside +rosion

    /-ere ri,er currents are eroding t-e face of t-e ri,er 5und or near5 o,er5an0

    additional large roc0 riprap s-ould 5e placed :it- an e?ca,ator or end=du+ped if t-e site

    is accessi5le to -ea, e@uip+ent and safe for operationI -o:e,er e?pert ad,ice s-ould

    if possi5le 5e o5tained.

    6#7 Saturation

    !f -ig- :ater le,els are sustained for so+e ti+e and t-e ri,er 5unds 5eco+e t-oroug-l

    saturated it +a 5eco+e necessar to restrict traffic on t-e ri,er 5und crest road.

    657 *ocal &4ertopping

    As t-e prediction of flood profiles is uncertain and 5ecause ri,er 5unds often -a,e

    ,ar ing free5oard patrols s-ould 5e ad,ised to pa close attention to areas :it- lo:er t-an a,erage free5oard.

    $nce :ater flo:s o,er t-e ri,er 5und crest fill is usuall :as-ed a:a creating a 5reac-

    :-ic- is i+possi5le to close until t-e :ater le,els e@uali e and +uc- da+age -as

    resulted. !t is t-erefore i+perati,e t-at o,ertopping 5e pre,ented.

    "raditionall sand 5ags are considered for raising lo: sections of ri,er 5und.

  • 8/11/2019 Operation and Maintenance Manual for Flood Mitigation Facilities

    27/42

    O&- -an$al 2/ o6 55

    6;7 Internal Drainage

    Local runoff and drainage :ill not escape once outlets are closed in 5unded areas :-ic-

    are not pro,ided :it- per+anent pu+ping facilities. "e+porar pu+ping of localdrainage or interception and di,ersion of inflo: fro+ -ig-er ele,ations +a 5e

    necessar to alle,iate t-is condition.

    A regularl updated list of potential pu+p and generator suppliers toget-er :it- t-eir

    re@uired deli,er and setup ti+es s-ould 5e +aintained.

    6=7 +mergency Warning

    S-ould t-e possi5ilit of uncontrolla5le ri,er 5und failure arise t-e Local Aut-orit +ust

    5e alerted i++ediatel .

    5.5.= Repairs ' Restoration Work

    1. Minor RepairsB Minor repairs are co,ered in Section '.'.' of t-is +anual.

    2. Major Repairs 7 RestorationB Major repairs and restoration suc- as ri,er 5und

    re5uilding raising or :idening re+o,al of in=strea+ sedi+ent aggradation and de5ris

    ja+s and :or0 t-at in,ol,es 5reac-ing of e?isting ri,er 5unds suc- as cul,ert

    replace+ent re@uires e?pert engineering ad,ice. Engineering ad,ice s-ould also 5e

    o5tained regarding per+anent repair and restoration :or0 follo:ing e+ergencconditions. All cases of se,ere da+age s-ould if possi5le 5e recorded :it-

    p-otograp-s dates and ti+es of t-e occurrences.

    . Responsi5ilit for Repairs 7 RestorationB "-e /or0s are designed to pro,ide

    protection to -a5ita5le areas of de,elop+ent up to t-e design e,ent. Repairs and

    restoration of t-e /or0s as a result of da+age as :ell as t-e re+o,al of sedi+ent and

    de5ris aggradation fro+ t-e c-annel t-at is caused 5 floods :it- +agnitudes up to and

    including t-e +agnitude of t-e design are t-e responsi5ilit of t-e (istrict )PS.

    5.5.< Records

    "-e as=5uilt dra:ings s-ould 5e 0ept a,aila5le as a reference tool for staff assigned t-e

    dut of operating and +aintaining t-e flood +itigation s ste+. Ele,ations and cross=

    sectional infor+ation are especiall useful s-ould repair :or0s 5eco+e necessar .

  • 8/11/2019 Operation and Maintenance Manual for Flood Mitigation Facilities

    28/42

    O&- -an$al 25 o6 55

    Cases of se,ere da+age to flood protection :or0s during -ig- :ater conditions s-ould

    5e recorded :it- p-otograp-s and records s-ould 5e 0ept of ri,er 5und inspection logs

    gauge readings and -ig- :ater +ar0s. Also a detailed record -istor of all +ajor repair

    :or0 +ust 5e +ade and 0ept as constructed dra:ings. Repair records s-ould include

    dates stationing and;or location of repairs di+ensions and specifications for +aterials

    used a description of t-e pro5a5le or apparent failure process and 5eforeF and afterF

    p-otos of t-e repairs.

    A detailed record of all sedi+ent and de5ris re+o,al +ust 5e 0ept :it- t-e as=

    constructed dra:ings and inspection reports. "-is +ust include c-annel sur,e s 5efore

    and after sedi+ent re+o,al and sedi+ent ,olu+es re+o,ed.

    5.5.9 Sur4eillance

    617 General

    a. An acti,e +aintenance progra+ is 5ased on inspections and su5se@uent ser,icing

    adjust+ent or repair. "-ere are 2 +ain o5jecti,es of inspectionsB 314 to insure project

    ser,icea5ilit 5 ti+el and t-oroug- inspections t-ere5 a,oiding or reducing

    +aintenance costs and 324 to docu+ent t-e condition of t-e project as a 5aseline for

    consideration of re-a5ilitation for project da+age resulting fro+ a +ajor stor+ or flood

    e,ent.

    5. "-ere are 2 t pes of inspections for t-e projectB 314 Project !nspection 5 t-e )PS

    (istrict Engineer and 324 )oint !nspection 5 t-e )PS (istrict Engineer and personnel

    fro+ t-e Selangor State )PS Ri,er Engineering (i,ision.

    627 !ro(ect Inspection y 3!S District +ngineer

    a. "-e Project !nspection s-ould 5e perfor+ed 5 t-e )PS (istrict Engineer or

    appropriate representati,e for t-e purpose of noting routine deficiencies and initiating

    correcti,e actions. "-is inspection :ill 5e perfor+ed at periods not e?ceeding 12 +ont-sand :ill follo: inspection guidance presented in t-is +anual. !nspections s-ould 5e

    conducted after e,er flood. $t-er Project !nspections s-ould occur as necessar after

    -ig- :ater e,ents or as sc-eduled 5 t-e )PS (istrict Engineer.

    5. A Project !nspection c-ec0list -as 5een de,eloped as presented in Appendi? .

  • 8/11/2019 Operation and Maintenance Manual for Flood Mitigation Facilities

    29/42

    O&- -an$al 2* o6 55

    6 7 3oint Inspection y 3!S District +ngineer and State 3!S Ri4er +ngineering

    Di4ision

    a. Routine

    A )oint !nspection 5 t-e )PS (istrict Engineer and t-e State )PS Ri,er Engineering

    (i,ision :ill 5e sc-eduled 5 t-e latter. "-e purpose of t-is inspection is to assure t-at

    ade@uate +aintenance is 5eing perfor+ed as presented in t-is +anual. "-e )PS (istrict

    Engineer or Aut-ori ed Representati,es s-ould -a,e access to all portions of t-e

    constructed project for t-is purpose. Copies of t-is inspection :ill 5e furnis-ed to t-e

    )PS (istrict Engineer stating project +aintenance conditions. Correcti,e actions fro+

    t-ese inspections s-ould 5e acco+plis-ed 5 t-e )PS (istrict Engineer.

    5. Catastrop-ic

    A )oint !nspection 5 t-e )PS (istrict Engineer and t-e State )PS Ri,er Engineering

    (i,ision s-ould 5e for+all re@uested 5 t-e )PS (istrict Engineer i++ediatel follo:ing

    a specific stor+ or flood e,ent :-ic- causes e?cessi,e da+age to t-e infrastructure.

    "-e Project !nspections 5 t-e )PS (istrict Engineer and )oint !nspection results :ill 5e

    t-e 5asis for deter+ining +aintenance responsi5ilit and potential re-a5ilitation.

    5.5.1: Repair Replacement And Re a ilitation 6RR'R7

    Repair is considered to entail t-ose acti,ities of a routine nature t-at +aintain t-e project

    in a :ell 0ept condition. Replace+ent co,ers t-ose acti,ities ta0en :-en a :orn=out

    ele+ent or portion t-ereof is replaced. Re-a5ilitation refers to a set of acti,ities as

    necessar to 5ring a deteriorated project 5ac0 to its original condition. RR7R actions are

    to confor+ to t-e project as=5uilt plans and specifications unless ot-er arrange+ents are

    +ade :it- t-e )PS (istrict Engineer.

    617 General

    "-e (istrict )PS is responsi5le for +aintenance of constructed infrastructure.

  • 8/11/2019 Operation and Maintenance Manual for Flood Mitigation Facilities

    30/42

    O&- -an$al 24 o6 55

    627 !ro(ect Re a ilitation

    !n t-e e,ent of +ajor da+age project re-a5ilitation +a 5e re@uired. An c-anges to t-e

    project or ina5ilit to +aintain project infrastructure as designed s-ould 5e coordinated:it- t-e State )PS.

    5.5.11 ,oti$ication &$ Distress

    E,idence of distress of t-e ri,er 5und and;or structures +ust 5e i++ediatel reported to

    t-e Selangor State )PS Ri,er Engineering (i,ision. "-e follo:ing indi,iduals s-ould 5e

    contacted in t-e order indicatedB

    1. Senior Engineer Dejuruteraan Sungai)a5atan Pengairan dan Saliran Negeri Selangor "ing0at ' lo0 Podiu+ Selatan

    angunan Sultan Sala-uddin A5dul A i S-a-9 2 S-a- Ala+

    Selangor (arul E-san"el.B 9 =

    2. Dejuruteraan Sungai)a5atan Pengairan dan Saliran Negeri Selangor "ing0at ' lo0 Podiu+ Selatan

    angunan Sultan Sala-uddin A5dul A i S-a-9 2 S-a- Ala+

    Selangor (arul E-san"el.B 9 =

    . Dejuruteraan Sungai)a5atan Pengairan dan Saliran Negeri Selangor "ing0at ' lo0 Podiu+ Selatan

    angunan Sultan Sala-uddin A5dul A i S-a-9 2 S-a- Ala+

    Selangor (arul E-san"el.B 9 =

  • 8/11/2019 Operation and Maintenance Manual for Flood Mitigation Facilities

    31/42

    O&- -an$al Appendi; A 1 2

    O&M MANUAL

    APPENDI; A

    PROJECT RIGHT OF WAY < SG. RASAU1SG AIR HITAM

  • 8/11/2019 Operation and Maintenance Manual for Flood Mitigation Facilities

    32/42

    O&- -an$al Appendi; A 1 2

    O&M MANUAL

    APPENDI; A7

    PROJECT RIGHT OF WAY < SG. PARIT TAMPOI

  • 8/11/2019 Operation and Maintenance Manual for Flood Mitigation Facilities

    33/42

    O&- -an$al Appendi; B 1

    O#e!a$"o% & Ma"%$e%a% e C!"$e!"a

    No. Description Activity Criteria Ref. in Text1 Controls Pg 15 Para. 5.5.3

    1.1 Excavation Discourage excavation adjacent to river bund, bank protection or floodprotection structures.

    1.2 Pipes & Cables Pipes and cables passing through or along river bunds shall be provided ith seepage collars and co!pacted backfill

    1." Encroach!ent #rees and tall shrubs are not allo ed on river bund. $uildings are notallo ed ithin the river % '

    1.( )ccess )ccess to river bund should be !aintained to per!it inspection,!aintenance and repair of orks.

    1.* +edi!ent %e!oval 'hen available flo area drops to *- of design flo area.

    2 Inspection ofWor s

    2.1 Ro!tine Ann!al Inspection Prior to floo" season. Pg. 1#$ para. 5.5.%&1'

    a/ Extent of 0egetation treesb/ Da!age to river bund and slopesc/ o spots along river bund crestd/ )ni!al burro se/ 3nauthori4ed excavation constructionf/ Erosion da!age of river bank

    protection1/ oss of rock2/ +lu!ping of slope"/ Erosion scour of riverbank upstrea! do nstrea! or at toe(/ 'eathering abrasion of rock*/ oss significant changes to over5bank area that could endanger

    river bundg/ Condition of flap gatesh/ bstructions to river bund

    2.2 (pecial Inspections D!ring )ig) *ater events Pg. 1+$ para. 5.5.%&2'

    a/ +eepage through river bund 6 if not excessive or concentrated piping or boi ls /b/ Erosion of river bund crest slopec/ +ettle!ent of river bund

    RTB MSC Immediate Action Plan To Improve Dr. Nik & Associates Sdn Bhd S . Rasa!" S . Air #itam & S . Parit Tampoi

  • 8/11/2019 Operation and Maintenance Manual for Flood Mitigation Facilities

    34/42

    O&- -an$al Appendi; B 1

    O#e!a$"o% & Ma"%$e%a% e C!"$e!"a

    No. Description Activity Criteria Ref. in Text2 Inspection of

    Wor sd/ Cracking of river bund ook for transve rse cracks tha t can easil7 crea te seepage pa ths and

    longitudinal cracks indicating start of a slide or slu!p.Cont8d/ e/ Da!age to bank protection orks Cri tical areas to be closel7 inspected during high ater events

    f/ utfall st ructures f lap gates. ook for debris accu!ulation at inlets out le tsg/ %iver blockages due to logs debris

    3 ,aintenance &1' River -!n" ,aintenance Pg 1 $ para. 5.5.5&1'a/ %epair of %iver $und Da!age )s soon as possibleb/ Cutting of trees & #ri!!ing of

    0egetation)t least once per 7ear.

    c/ #opping up bund $ased on surve7, once ever7 " to ( 7ears

    &2' -an Protection ,aintenance&Repair'

    As an" *)en re/!ire" Pg 10$ para. 5.5.5&2'

    a/ +and5filled 9attress %epair for !inor da!age and replace for !ajor da!age.b/ %ip5rap %eplace rip5rap here necessar7.

    &3' C!lvert ,aintenance As an" *)en re/!ire". Pg 2 $ para. 5.5.5&3'a/ :nlet utlet %e!oval of debris sedi!ent;

    Erosion under!ining control !easures.b/

  • 8/11/2019 Operation and Maintenance Manual for Flood Mitigation Facilities

    35/42

    O&- -an$al Appendi; B 1

    O#e!a$"o% & Ma"%$e%a% e C!"$e!"a

    No. Description Activity Criteria Ref. in Text% ergency

    ,eas!res*/ ocal overtopping +top overtopping using sand5bags or prevent erosion of bund using

    reinforced plastic sheetingPg. 22, para. *.*.= */

    cont8d/ =/ :nternal Drainage #e!porar7 pu!ping. Pg. 2", para. *.*.= =// E!ergenc7 'arning )lert ocal )uthori ties i! !ediatel7 in case of uncontrollable bund fai lure . Pg. 2", para . * .* .= "/

    5 Repairs 4Restoration

    1/ 9inor repairs +ee +ection *.*.* of 9anual Pg. 2", para. *.*.

    2/ 9ajor repairs %estoration of river bund, culvert replace!ent, and all !ajor repairs >seek expert advice.

    5 ditto 5

    # Recor"s 9aintenance of as5built dra ings %ecord of !ajor repairs and desilting ork, including before and aftersurve7s, should be included as as5built dra ings.

    Pg. 2", para. *.*.?

    + (!rveillance 1/ :nspection b7 District @P+ Engineer )fter ever7 flood event. )t least once a 7ear.3se :nspection Checklist )ppendix $/.

    Pg. 2(, para. *.*.A 2/

    &2' oint District6(tate Inspection Pg. 25$ para. 5.5.0&3'a/ %outine :nspection n an agreed schedule proposed b7 the +tate @P+b/ +pecial :nspection )fter a flood event causing excessive da!ageB basis for !aintenance

    responsibilit7 and potential rehabilitation

    RTB MSC Immediate Action Plan To Improve Dr. Nik & Associates Sdn Bhd S . Rasa!" S . Air #itam & S . Parit Tampoi

    /

  • 8/11/2019 Operation and Maintenance Manual for Flood Mitigation Facilities

    36/42

    O&- -an$al Appendi; ' 1

    APPENDI; C

    PROJECT INSPECTION CHECKLIST

    Pro ect EEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEE

    9nspected by EEEEEEEEEEEEEEEEEEEEEEEEEEEE Date EEEEEEEEEEEEE

    ype o6 9nspection (ann$al) (e er ency1disaster) (other)

    PROJECT INSPECTIONI$e Co e%$1Co%3"$"o%

    a. R"4e! C:a%%e( a%3 B)%3( ) @;cessi=e sedi entation EEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEE

    ( ) Settle ent, slo$ hs, or loss o6 section EEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEE

    ( ) Seepa e, sat$rated areas, sand boils EEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEE( ) Bank erosion! oe Sco$rin EEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEE

    ( ) O=ertoppin erosion EEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEE

    ( ) >e etati=e co=er EEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEE

    ( ) Da a ed!Displaced sand16illed attress EEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEE

    ( ) Displaced! issin riprap EEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEE

    ( ) +aste aterials!$na$thori?ed str$ct$res EEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEE

    ( ) Fna$thori?ed ra?in or tra66ic EEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEE

    ( ) @ncroach ents EEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEE( ) Others EEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEE

    *. B!"3ges( ) 'oncrete Str$ct$re EEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEE

    ( ) Approach road EEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEE

    ( ) Brid e deck S$r6acin EEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEE

    ( ) Brid e sc$pper drains EEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEE

    ( ) G$ard1rail EEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEE

    ( ) Brid e Bearin s EEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEE

    ( ) @;pansion Joints EEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEE

    ( ) Brid e Protection +orks EEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEE

    ( ) Debris EEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEE

    ( ) Others EEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEE

    RTB MSC Immediate Action Plan To Improve Dr. Nik & Associates Sdn Bhd S . Rasa!" S . Air #itam & S . Parit Tampoi

  • 8/11/2019 Operation and Maintenance Manual for Flood Mitigation Facilities

    37/42

    O&- -an$al Appendi; ' 1

    . O)$(e$ S$!) $)!es( ) Seepa e, sat$rated areas, sand boils EEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEE

    ( ) Gates EEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEE

    ( ) 'oncrete EEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEE

    ( ) Displaced! issin riprap EEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEE( ) Blocka e o6 inlet and o$tlet channels EEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEE

    ( ) @rosion ad acent to str$ct$re EEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEE

    ( ) Others EEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEE

    ( ) i=er +ater @le=ation EEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEE

    3. Po%3 I%(e$s1O)$(e$s1Co%5()e% es( ) ip1rap EEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEE

    ( ) Sand16illed -attress EEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEE

    ( ) Others EEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEE

    e. A ess Roa3( ) S$r6acin EEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEE

    ( ) +aste aterials!$na$thori?ed str$ct$res EEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEE

    ( ) Others EEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEE

    5. A33"$"o%a( Co e%$s

    EEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEE

    EEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEE

    EEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEE EEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEE

    RTB MSC Immediate Action Plan To Improve Dr. Nik & Associates Sdn Bhd S . Rasa!" S . Air #itam & S . Parit Tampoi

    2

  • 8/11/2019 Operation and Maintenance Manual for Flood Mitigation Facilities

    38/42

    O&- -an$al Appendi; D 1

    L"s$ O5 As=*)"($ D!a>"%gs Fo! Ra% a%ga% Te*a$a% Ba%-"! = Me%a"2$a!a5 Sg. Rasa) 3a% Sg. A"! H"$a se!$a Ke!-a=Ke!-a Ya%g Be!2a"$a%

    NO. D A+9NG NO. D@S' 9P 9ON

    A%9GN-@N & %ONG9 FD9NA% S@' 9ON

    JS!#%!20/ !0*! 8!AS As B$ilt S$r=ey "ro 8. 200 o 8. 00

    2 JS!#%!20/ !0*! 8!AS2 As B$ilt S$r=ey "ro 8. 00 o 8. *00

    / JS!#%!20/ !0*! 8!AS/ As B$ilt S$r=ey "ro 8. *00 o 8. 2/00

    5 JS!#%!20/ !0*! 8!AS5 As B$ilt S$r=ey "ro 8. 2/00 o 8. 2 00

    * JS!#%!20/ !0*! 8!AS* As B$ilt S$r=ey "ro A8. 0 o A8. 400

    4 JS!#%!20/ !0*! 8!AS4 As B$ilt S$r=ey "ro A8. 700 o A8. /00

    7 JS!#%!20/ !0*! 8!AS7 As B$ilt S$r=ey "ro A8. 500 o A8. 2000JS!#%!20/ !0*! 8!AS As B$ilt S$r=ey "ro A8. 2 00 o A8. 2700

    3 JS!#%!20/ !0*! 8!AS3 As B$ilt S$r=ey "ro A8. 2 00 o A8. /500

    0 JS!#%!20/ !0*! 8!AS 0 As B$ilt S$r=ey "ro A8. /*00 o A8. 5000

    JS!#%!20/ !0*! 8!AS As B$ilt S$r=ey "ro A8. 5 00 o A8. 5700

    2 JS!#%!20/ !0*! 8!AS 2 As B$ilt S$r=ey "ro A8. 5 00 o A8. *500

    / JS!#%!20/ !0*! 8!AS / As B$ilt S$r=ey "ro A8. **00 o A8. 4000

    5 JS!#%!20/ !0*! 8!AS 5 As B$ilt S$r=ey "ro A8. 4 00 o A8. 4500

    * JS!#%!20/ !0*! 8!AS * As B$ilt S$r=ey "ro . 150 to 400

    4 JS!#%!20/ !0*! 8!AS 4 As B$ilt S$r=ey "ro . 400 o 000

    ' OSS S@' 9ON

    7 JS!#%!20/ !0*! 8!'S 'ross Section S$r=ey "ro 8.200 o 8 700

    JS!#%!20/ !0*! 8!'S2 'ross Section S$r=ey "ro 8. 00 o A8. /00

    3 JS!#%!20/ !0*! 8!'S/ 'ross Section S$r=ey "ro 8. 500 o A8. 300

    20 JS!#%!20/ !0*! 8!'S5 'ross Section S$r=ey "ro 8. 2000 o A8.2*00

    2 JS!#%!20/ !0*! 8!'S* 'ross Section S$r=ey "ro 8.2400 o 8. 2 00

    22 JS!#%!20/ !0*! 8!'S4 'ross Section S$r=ey "ro A8.0 o A8.*00

    2/ JS!#%!20/ !0*! 8!'S7 'ross Section S$r=ey "ro A8.400 o A8. 00

    25 JS!#%!20/ !0*! 8!'S 'ross Section S$r=ey "ro A8. 200 o A8. 700

    2* JS!#%!20/ !0*! 8!'S3 'ross Section S$r=ey "ro A8. 00 o A8. 2/0024 JS!#%!20/ !0*! 8!'S 0 'ross Section S$r=ey "ro A8.2500 o A8.2300

    27 JS!#%!20/ !0*! 8!'S 'ross Section S$r=ey "ro A8./000 o A8./*00

    2 JS!#%!20/ !0*! 8!'S 2 'ross Section S$r=ey "ro A8./400 o A8.5 00

    23 JS!#%!20/ !0*! 8!'S / 'ross Section S$r=ey "ro A8.5200 o A8.5700

    /0 JS!#%!20/ !0*! 8!'S 5 'ross Section S$r=ey "ro A8.5 00 o A8.*/00

    / JS!#%!20/ !0*! 8!'S * 'ross Section S$r=ey "ro A8.*500 o A8.*300

    RTB MSC Immediate Action Plan To Improve Dr. Nik & Associates Sdn Bhd S . Rasa!" S . Air #itam & S . Parit Tampoi

  • 8/11/2019 Operation and Maintenance Manual for Flood Mitigation Facilities

    39/42

    O&- -an$al Appendi; D 1

    NO. D A+9NG NO. D@S' 9P 9ON

    /2 JS!#%!20/ !0*! 8!'S 4 'ross Section S$r=ey "ro A8.4000 o A8.4500

    // JS!#%!20/ !0*! 8!'S 7 'ross Section S$r=ey "ro .150 o .700

    /5 JS!#%!20/ !0*! 8!'S 'ross Section S$r=ey "ro . 00 o . 000

    S F' F @ D@ A9%S

    /* DNA33!JPS!9AP!5!AB!0 Slope Protection Details 6or S . asa$1Air 8ita

    /4 DNA33!JPS!9AP!5!AB!02 Slope Protection Details 6or S . asa$ & S . Air 8ita

    /7 DNA33!JPS!9AP!5!AB!0/ ypical 'ross1section 6or Access oad and B$nd

    / DNA33!JPS!9AP!5!AB!05 Plan & %on it$dinal Section o6 Bed 'ontrol at '81 7*

    /3 DNA33!JPS!9AP!5!AB!0* Details o6 Bed 'ontrol Str$ct$re at '81 7* & Bank Protection 6orBrid e50 DNA33!JPS!9AP!5!AB!04 %ayo$t o6 'on6l$ence 6or '$l=ert ' , '2 & '/

    5 DNA33!JPS!9AP!5!AB!07 Plan & %on it$dinal Section 6or Sin le Pipe '$l=ert

    52 DNA33!JPS!9AP!5!AB!0 Plan & %on it$dinal Section 6or

  • 8/11/2019 Operation and Maintenance Manual for Flood Mitigation Facilities

    40/42

    O&- -an$al Appendi; D 1

    NO. D A+9NG NO. D@S' 9P 9ON

    45 DNA33!JPS!9AP!A% B2!00* Pilin %ayo$t

    4* DNA33!JPS!9AP!A% B2!004 Pilecap A & B

    44 DNA33!JPS!9AP!A% B2!007 Pilecap A & B ein6orce ent47 DNA33!JPS!9AP!A% B2!00 Brid e Bearin

    B 9DG@ NO. /

    4 DNA33!JPS!9AP!A% B/!00 Plan & @le=ation

    43 DNA33!JPS!9AP!A% B/!002 'ross Section O6 Bo; Girder

    70 DNA33!JPS!9AP!A% B/!00/ Bo; Girder ein6orce ent (Sheet )

    7 DNA33!JPS!9AP!A% B/!005 Bo; Girder ein6orce ent (Sheet 2)

    72 DNA33!JPS!9AP!A% B/!00* Pilin %ayo$t

    7/ DNA33!JPS!9AP!A% B/!004 Pilecap A & B

    75 DNA33!JPS!9AP!A% B/!007 Ab$t ent A & B7* DNA33!JPS!9AP!A% B/!00 Brid e Bearin s

    RTB MSC Immediate Action Plan To Improve Dr. Nik & Associates Sdn Bhd S . Rasa!" S . Air #itam & S . Parit Tampoi

    /

  • 8/11/2019 Operation and Maintenance Manual for Flood Mitigation Facilities

    41/42

    O&- -an$al Appendi; D21

    L"s$ O5 As=*)"($ D!a>"%gs Fo! Ra% a%ga% Te*a$a% Ba%-"! = Me%a"2$a!a5 Sg. Pa!"$ Ta #o" se!$a Ke!-a=Ke!-a Ya%g Be!2a"$a%

    9 @- D A+9NG NO. D A+9NG 9 %@

    O>@ A%% %AHOF P%ANDNA! S!00!0 4! !2 O=erall %ayo$t Plan

    A%9GN-@N & %ONG9 FD9NA% S@' 9ONS

    2 DNA! S!00!0 4!2! " O- '8 0.00 O '8 /00.00/ DNA! S!00!0 4!2!2 " O- '8 /00.00 O '8 000.005 DNA! S!00!0 4!2!/ " O- '8 000.00 O '8 *00.00* DNA! S!00!0 4!2!5 " O- '8 *00.00 O '8 2 00.004 DNA! S!00!0 4!2!* " O- '8 2 00.00 O '8 2700.007 DNA! S!00!0 4!2!4 " O- '8 2700.00 O '8 /200.00

    DNA! S!00!0 4!2!7 " O- '8 /200.00 O '8 /300.003 DNA! S!00!0 4!2! " O- '8 /300.00 O '8 5*00.000 DNA! S!00!0 4!2!3 " O- '8 5*00.00 O '8 5300.00

    DNA! S!00!0 4!2! 0 " O- '8 5300.00 O '8 *400.002 DNA! S!00!0 4!2! " O- '8 *400.00 O '8 4 00.00/ DNA! S!00!0 4!2! 2 " O- '8 4 00.00 O '8 4/00.005 DNA! S!00!0 4!/! " O- '8 0.00 O '8 /00.00* DNA! S!00!0 4!/!2 " O- '8 500.00 O '8 400.004 DNA! S!00!0 4!/!/ " O- '8 700.00 O '8 300.007 DNA! S!00!0 4!/!5 " O- '8 000.00 O '8 200.00

    DNA! S!00!0 4!/!* " O- '8 /00.00 O '8 *00.003 DNA! S!00!0 4!/!4 " O- '8 400.00 O '8 00.00

    20 DNA! S!00!0 4!/!7 " O- '8 300.00 O '8 2 00.002 DNA! S!00!0 4!/! " O- '8 2200.00 O '8 2500.0022 DNA! S!00!0 4!/!3 " O- '8 2*00.00 O '8 2700.002/ DNA! S!00!0 4!/! 0 " O- '8 2 00.00 O '8 /000.0025 DNA! S!00!0 4!/! " O- '8 / 00.00 O '8 //00.002* DNA! S!00!0 4!/! 2 " O- '8 /500.00 O '8 /400.0024 DNA! S!00!0 4!/! / " O- '8 /700.00 O '8 /300.0027 DNA! S!00!0 4!/! 5 " O- '8 5000.00 O '8 5200.002 DNA! S!00!0 4!/! * " O- '8 5/00.00 O '8 5*00.0023 DNA! S!00!0 4!/! 4 " O- '8 5400.00 O '8 5 00.00/0 DNA! S!00!0 4!/! 7 " O- '8 5300.00 O '8 * 00.00/ DNA! S!00!0 4!/! " O- '8 *200.00 O '8 *500.00/2 DNA! S!00!0 4!/! 3 " O- '8 **00.00 O '8 *700.00// DNA! S!00!0 4!/!20 " O- '8 * 00.00 O '8 4000.00/5 DNA! S!00!0 4!/!2 " O- '8 4 00.00 O '8 4/00.00

    ' OSS1S@' 9ONS

    /* DNA! S!00!0 4!5! ypical 'ross Sections/4 DNA! S!00!0 4!5!/ ypical 'ross Section "or Access oad and B$nd

    S F' F @ D@ A9%S

    RTB MSC Immediate Action Plan To Improve Dr. Nik & Associates Sdn Bhd S . Rasa!" S . Air #itam & S . Parit Tampoi

  • 8/11/2019 Operation and Maintenance Manual for Flood Mitigation Facilities

    42/42