7/28/2019 Operating Management - Reduce FIFR
1/25
REDUCE
Fatigue Incident Frequency Rate
(FI
FR)
Adrianus D 2911 2615
Denastri Ramli 2911 2624
Beniardi M 2911 2627
Meiliza 2911 2639
Sigit Saputro 2911 2647
-
7/28/2019 Operating Management - Reduce FIFR
2/25
Project Background
Fatigue related incidents are still of major issue within
KPC operations.
Fatigue has caused serious incidents including fatality,
potential fatality and high cost property damage.
Various programs have been conducted but FI-FR has
not been reduced significantly.
Change of shift crews roster from 8 hrs to 12 hrs may
increased the risks of fatigue.
No practical standard fatigue guidelines across KPC.
-
7/28/2019 Operating Management - Reduce FIFR
3/25
Project Summary
GOALS :
Reduce Fatigue Incident Frequency Rate (FI-FR) to 0.5 per
million man hour
Eliminate Potential Fatality incident due to fatigue FOCUS AREA :
For MOD, MSD, and Mining Contractors (CMD)
BOUNDARIES :
Review and programs will include MOD, MSD and Mining
Contractors.
No major capital expenditures
-
7/28/2019 Operating Management - Reduce FIFR
4/25
Benefit of The Project
This project will provide potential of reducing costs
of incident and saving of property damage loss up to:
$ 180,750.00 - annualized from history of:
Operation Time Periode Loss due to Fatigue
PTDH Mining Ops 2007-Apr 2009 US$53,676.00
TCI Mining Ops 2007-Apr 2009 US$ 15,300
Pama Mining Ops 2007-Apr 2009 US$ 200,587.00
KPC MSD Ops 2007-Apr 2009 US$ 10,102.00
KPC MOD Ops Jan-Apr 2009 US $ 20,299.00
-
7/28/2019 Operating Management - Reduce FIFR
5/25
Fatigue Incidents Record 2007-2009
-
7/28/2019 Operating Management - Reduce FIFR
6/25
Historical FR (Before Project)
Project of Reducing FI FR was introduced on mid-semester 2009.
Based on historical FI FR from 2003 until 2009:
- Average FI FR was about 0,88 per million workinghours
- Moving Range was about 0,55
Link data for historical FI FR : link
http://localhost/var/www/apps/conversion/tmp/scratch_5/Fatigue%20Inc%20Stat.xlsxhttp://localhost/var/www/apps/conversion/tmp/scratch_5/Fatigue%20Inc%20Stat.xlsx -
7/28/2019 Operating Management - Reduce FIFR
7/25
Chart Limit Before Project
-
7/28/2019 Operating Management - Reduce FIFR
8/25
Range Limit Before Project
-
7/28/2019 Operating Management - Reduce FIFR
9/25
PARETO of Fatigue Incident Root Causes
9
0
10
20
30
40
50
60
Not reporting
when fatigue
Sleep disturbed Domestic
activities
Traveling Hobbies Rest time not
used
New employee
Numberofincident
Fatigue Incidents 2007-2009
-
7/28/2019 Operating Management - Reduce FIFR
10/25
10
Survey Result: Why Not Reporting
21.4%
19.0%
14.4%
35.9%
25.8%
0.0%
5.0%
10.0%
15.0%
20.0%
25.0%
30.0%
35.0%
40.0%
Malu/takut/khawatir
penilaian buruk
Tidak mengetahui
aturan wajib lapor bila
fatigue
Laporan fatigue tidak
ditanggapi pengawas
1 bulan terakhir
pengawas tidakmenanyakan fatigue
Terpengaruh
kebiasaan/rekan kerja
Note: MOD all respondents are aware on requirement for reporting when fatigue
-
7/28/2019 Operating Management - Reduce FIFR
11/25
Survey Result : Alarming Facts
78.0%
22.0%
51.3%
33.4%
0.0%
10.0%
20.0%
30.0%
40.0%
50.0%
60.0%
70.0%
80.0%
90.0% 1 bulan terakhirpernah fatigue tetapbekerja
1 bulan terakhir > 3xfatigue tetap bekerja
1 bulan terakhir
tidak pernahmelapor saat fatigue
Tidak selalu bisatidur minimal 6 jam
setiap hari
-
7/28/2019 Operating Management - Reduce FIFR
12/25
15.0%
11.3%
5.5%
4.6%
6.2%
15.9%
11.5%
13.3%
14.9%
0.0%
2.0%
4.0%
6.0%
8.0%
10.0%
12.0%
14.0%
16.0%
18.0%
Domestic activities
Hobbies
Second jobsTravelling
Social activities
Uncomfortable room
Family
Environment
Others
Survey Result: Sleep Disturbance
-
7/28/2019 Operating Management - Reduce FIFR
13/25
91.4%90.6%
89.4%
84.0%
80.0%
82.0%
84.0%
86.0%
88.0%
90.0%
92.0%Merasakan
pengaruh positif
fatigue alarm
Prosedur fatigue
saat ini sudah baik
Manfaat fatigue
check pada jam
kritis
Tindakan disiplinmeningkatkan
kesadaran
Survey: Positive Feedbacks
-
7/28/2019 Operating Management - Reduce FIFR
14/25
14
Proposed Solutions & Progress
No Action Progress
1 Improve Awareness:
- Trainer Training: Fatigue for Spouse
- Trainer Training: Fatigue for shift workers
- Sticker: Ngantuk Lapor!
- Training and refresher for Spouse
- Training and refresher for shift workers
100%
90%
100%
On going
-
2 Improve implementation of fatigue check by
supervision pre-shift and during critical hours
On going
3 Improve KPC fatigue alarm system to enablenotification to dispatcher
Proposal to be submittedto Mgt
4 Review shift roster to minimize potential
fatigue after long day offs
Options reviewed (need
further study)
5 Radio messages on critical times (FM &
communication radio)
On going
http://localhost/var/www/apps/conversion/tmp/Roster%202010(4%20day).xlshttp://localhost/var/www/apps/conversion/tmp/Roster%202010(4%20day).xls -
7/28/2019 Operating Management - Reduce FIFR
15/25
15
Results
Milestones completed to date :Stickers Ngantuk Lapor installed in equipment cabin
Fatigue Management for Spouse Training Material
has been reviewed and facilitators trainingconducted
Fatigue Awareness Training material for shiftworkers reviewed (facilitator training scheduled)
Proposal for upgrading KPC fatigue warning systemhas been submitted (cost US$ 55,000.00)
-
7/28/2019 Operating Management - Reduce FIFR
16/25
FI FR After Project
To see the affect of this project, we try to look upFI-FR after 2009 (started from Jan 2010).
Based on data FI FR from 2010 until March 2013:
-Average FI FR was reduced to 0,672-Moving Range was reduced to 0,36
Link data after project : link
-
7/28/2019 Operating Management - Reduce FIFR
17/25
Chart Limit After Project
-
7/28/2019 Operating Management - Reduce FIFR
18/25
Range Limit After Project
-
7/28/2019 Operating Management - Reduce FIFR
19/25
19
Capability
To check the capability for achieving FI-FR targetto 0,5, it can be checked based on before
project and after project:
Keterangan X? USL LSL Cp Cpk Control Capablity
FR BEFORE PROJECT 0,543 0,875 0,50 0 0,153 (0,23) Out of Control Not Capable
FR AFTER PROJECT 0,341 0,672 0,50 0 0,244 (0,17) Out of Control Not Capable
-
7/28/2019 Operating Management - Reduce FIFR
20/25
20
Achievement
The successful implementation of projectinitiatives has resulted in:
Average FR reduced during from Jan 2010
March 2013 from 0,88 to 0,672.
The intangible benefit realized so far :
YTD 2009: No fatigue incident resulted in
potential fatality (PF) compared to 4 fatigue
incidents resulted in PF in 2008
-
7/28/2019 Operating Management - Reduce FIFR
21/25
21
How To....
In
Control FI-FR:
To make Capable to achieve FI-FR = 0,50 :
-
7/28/2019 Operating Management - Reduce FIFR
22/25
22
Maintain Gains (Sustainability Plan)
Monitor on going implementation of Fatigue Management
Training and refresher for shift workers and for spouses
by trained facilitators at each div/dept/contractors.
Monitor the implementation of fatigue check by
supervisors (pre-shift and at critical times)
Line management to perform random check of fatigue
check by supervisors
Review implementation of dispatch improvement to
enable notification to dispatcher
-
7/28/2019 Operating Management - Reduce FIFR
23/25
23
What Next?
Continue review of SOP / Guidelines onFatigue Management and get appropriate
approval for implementation.
Further review of alternative shift roster
for MOD
-
7/28/2019 Operating Management - Reduce FIFR
24/25
24
Lessons learnt
Valuable experience gained by all team members during
involvement in the project: new knowledge,
perspectives, and team work.
Challenges faced during project:difficult to maintain good team members attendance
due to urgent matters, e.g. incidents.
collecting and compiling data and surveysEnrichment from sharing programs and experience from
other divisions / contractors involved.
-
7/28/2019 Operating Management - Reduce FIFR
25/25
INGAT: NGANTUK, LAPOR!!
THANK YOU
& KEEP SAFETY