OpenSG Closing Plenary Knoxville February, 2012

Upload: sharlene-montgomery

Post on 01-Jan-2016

214 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: OpenSG Closing Plenary Knoxville February, 2012. UCAIug IPR Policy UCAIug Public or Private Documents may or may not contain the information included

OpenSG Closing PlenaryKnoxville

February, 2012

Page 2: OpenSG Closing Plenary Knoxville February, 2012. UCAIug IPR Policy UCAIug Public or Private Documents may or may not contain the information included

UCAIug IPR Policy• UCAIug Public or Private Documents may or may not contain

the information included in the IPR Disclosure Form. • Any Sharing of any Contribution during any UCAIug Activity

shall be deemed to have occurred on a non-confidential basis.

• No valid copyright, trade secret or patent right shall be deemed to have been waived by such Sharing

• Any Contributor who knows that IPR is or may be included in his Contribution to UCAIug Document must disclose such IPR

• UCAIug was not formed for and is unable to verify the validity of any IPR and that all such information is being provided “AS IS”.

Page 3: OpenSG Closing Plenary Knoxville February, 2012. UCAIug IPR Policy UCAIug Public or Private Documents may or may not contain the information included

Opening Comments

•83 attendees•Perfect attendance, no no-showsI will need to collect people’s badges as they arrive at lunch for the drawing.  Please let me know when in the presentation you want me to be ready with the box of names, and who will be doing the drawing of the name badge.

•83 attendees•Perfect attendance, no no-showsI will need to collect people’s badges as they arrive at lunch for the drawing.  Please let me know when in the presentation you want me to be ready with the box of names, and who will be doing the drawing of the name badge.

Some presentations have been uploaded, Others will be uploaded as we get them from the chairs.

• 83 attendees• Perfect attendance, no no-shows • Great participation! Thanks to ALL!!

Make sure Belinda has your badges, if you did not give them to her already. They will be used for the IPad 3 Drawing.

•83 attendees•Perfect attendance, no no-showsI will need to collect people’s badges as they arrive at lunch for the drawing.  Please let me know when in the presentation you want me to be ready with the box of names, and who will be doing the drawing of the name badge.I will need to collect people’s badges as they arrive at lunch for the drawing.  Please let me know when in the presentation you want me to be ready with the box of names, and who will be doing the drawing of the name badge.

Page 4: OpenSG Closing Plenary Knoxville February, 2012. UCAIug IPR Policy UCAIug Public or Private Documents may or may not contain the information included

Agenda• Opening• SG Communications• SG Conformity• SG Simulations• SG Security• SG Systems• Feedback• Next Meeting

Total Registration for this meeting = ???

Page 5: OpenSG Closing Plenary Knoxville February, 2012. UCAIug IPR Policy UCAIug Public or Private Documents may or may not contain the information included

SG Communications• Key accomplishments

– SG-Network meetings• System requirements specification working sessions• Joint meeting with PAP 2 (Wireless standards for Smart Grid)

– OpenFAN meeting• Scoping and work product discussions

• Next steps– SG-Network has weekly calls on Mondays 4-5pm eastern

Page 6: OpenSG Closing Plenary Knoxville February, 2012. UCAIug IPR Policy UCAIug Public or Private Documents may or may not contain the information included

SG Conformity• Key accomplishments

– Agreement (in principle) for UCAIug support of creation of ITCA program ready for GreeenButton testing June 2012

– Discussions of using external Conformance Body with ITCA– Discussion of adaptations of IPRMv2 for OSG needs– AMI conformance testing to coordinate with OpenMUG

• Next steps– Assist OpenADE with requirements document to UCA– Work with UCAIug testing subcommittee to develop ITCA– Begin discussion thread on AMI testing program

Page 7: OpenSG Closing Plenary Knoxville February, 2012. UCAIug IPR Policy UCAIug Public or Private Documents may or may not contain the information included

SG Simulations• Key accomplishments

– Made progress on structure of Simulation Platform Architecture and Requirements (PAR) document

– Increased participation and commitment (to author doc sections)– Very productive joint session with SG Network on co-simulation

• Vendor (EDX) presentation on PHY layer modeling• Good discussion of real-world utility requirements• Agreement to collaborate on comms section of PAR document

• Next steps– Keep driving Sims PAR doc structure and content– Launch and sustain a new co-simulation work effort– Increase frequency of WG calls to fortnightly (from 1x/month)

Page 8: OpenSG Closing Plenary Knoxville February, 2012. UCAIug IPR Policy UCAIug Public or Private Documents may or may not contain the information included

SG Security – Key Accomplishments• Examination of technical approaches

– State machine analysis– CERT Resilience Management Model– Vulnerability handling and disclosure

• Review of progress on key documents– Secure Device Profile

• Section assignments and volunteer needs

– Distribution Automation Security Profile• Review of comments received during ratification vote

– Wide Area Monitoring, Protection, & Control (Synchrophasor) Security Profile• Completion of review and recommendation by Usability Analysis Task Force

– Substation Automation Security Profile• Review of proposed abstract communications architecture and security principles

– Demand-Response Security Profile (OpenADR)• Identification of outstanding tasks for completion• Discussion of technical questions

Page 9: OpenSG Closing Plenary Knoxville February, 2012. UCAIug IPR Policy UCAIug Public or Private Documents may or may not contain the information included

SG Security – Next Steps• Documents

– Secure Device Profile• Solicit volunteers, get the work done

– Distribution Automation Security Profile• Propose minor modifications to address comments

– Wide Area Monitoring, Protection, & Control (Synchrophasor) Security Profile• Call for Working Group review and consideration of a vote

– Substation Automation Security Profile• First full draft anticipated in April

– Demand-Response Security Profile (OpenADR)• Solicit team to complete control-use case mapping

• Next webinar– Monday, March 12, 3-4pm EDT

Page 10: OpenSG Closing Plenary Knoxville February, 2012. UCAIug IPR Policy UCAIug Public or Private Documents may or may not contain the information included

SG Systems• Key accomplishments

– AMI-Ent• Consensus on AMI-Enterprise 2.0 scope

– OpenADR• Performed planning for next steps• Worked on SEP harmonization• Met with OpenSG Security group and finalized plan for completing OpenADR

security profile

– EIM TF• Updated charter – more actionable• Clarified distinctions between generic EIM and how it applied to the SG• Created a roadmap for EIM Framework • Updated EIM Requirements Specification• Articulated how EIM supports analytics, but does not in itself perform analytics• Achieved agreement on how to work with SGIP Semantic Working Party

Page 11: OpenSG Closing Plenary Knoxville February, 2012. UCAIug IPR Policy UCAIug Public or Private Documents may or may not contain the information included

SG Systems• Next steps

– AMI-Enterprise • Call for participation; weekly meetings to begin• Announcements coming via Sharepoint and listserv

– OpenADR• Complete OpenADR security profile

– OpenHAN• Develop charter and recruit members to restart OpenHAN

– EIM TF• Continue making progress in biweekly meetings• Develop activity diagrams for semantic management, information services, and

data movement• Continue to advance the EIM Requirements Specification• Collaborate with SGIP SGAC Semantic Working Party

Page 12: OpenSG Closing Plenary Knoxville February, 2012. UCAIug IPR Policy UCAIug Public or Private Documents may or may not contain the information included

Edge/Enterprise Conformity

• Key accomplishmentsDiscussion about support of OpenADE Discussion about Conformance Assessment w.r.t. SG-Network SRS

• Next steps– Re-instate regular calls particularly for status reporting (fortnightly

Wednesday 1pm Eastern)– Focus on support for OpenADE for establishing test plan and ITCA

formation in UCAIug

Page 13: OpenSG Closing Plenary Knoxville February, 2012. UCAIug IPR Policy UCAIug Public or Private Documents may or may not contain the information included

Future Meeting Dates

• June 25 - 29, Chicago, IL ??

• October 22-26, Waikoloa, HI Summit (with CIMug and IEC 61850 [Attempting to get HECO as sponsor]

Note: These are tentative dates. Please do not plan travel until you receive a registration notice.

Page 14: OpenSG Closing Plenary Knoxville February, 2012. UCAIug IPR Policy UCAIug Public or Private Documents may or may not contain the information included

FEEDBACK?

Page 15: OpenSG Closing Plenary Knoxville February, 2012. UCAIug IPR Policy UCAIug Public or Private Documents may or may not contain the information included

Thank you!

Safe return!