opening comments - performance review...

5
SUPPLIER SUPPORT COMMITTEE (SSC) MEETING JUNE 2016 CONFIRMED CONFIRMED MINUTES TUESDAY, JUNE 21, 2016 LONDON, UNITED KINGDOM These minutes are not final until confirmed by the Task Group in writing or by vote at a subsequent meeting. Information herein does not constitute a communication or recommendation from the Task Group and shall not be considered as such by any agency. TUESDAY, JUNE 21, 2016 1.0 OPENING COMMENTS 1.1 Call to Order / Quorum Check The Supplier Support Committee (SSC) was called to order at 5:00 p.m., 21-JUN-2016 by Dale Harmon, SSC Chairperson. A quorum was established with the following representatives in attendance: Supplier Support Committee Leadership Team Members Present NAME COMPANY NAME Lei Bao NCS Testing Technology Co., Ltd. Dale Harmon CTS Chairperson Jonathan Hebben Avcorp Composites Fabrication Co-Vice Chairperson Eric Jacklin F. M. Callahan & Son, Inc. Steve Payne Praxair Surface Technologies Secretary Arno Toelkes Euro-Composites SA Gary White Orbit Industries Inc. Suppliers/Guests Present NAME COMPANY NAME Grace Atkinson Meggitt Polymers & Composites Richard Aylward TT Electronics / Roxspur James Bailey Applied Inspection Ltd. Andy Bakewell E M Inspection Co Ltd. Ramakrishnan Balasubramania n Tii Techno Testing Services Pvt. Ltd. Lynda Braine ITS Testing Services (UK) Ltd. Marc Breit SECU-CHEK GmbH Phillip Brockman Techmetals, Incorporated Larry Collins Nasmyth Technologies Ltd. Claire Devémy CREPIM David Eshleman The Young Engineers

Upload: others

Post on 13-Mar-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: OPENING COMMENTS - Performance Review Institutecdn.p-r-i.org/.../02192543/SSCMinutesJun2016CONFIRMED.docx · Web viewCONFIRMED MINUTES TUESDAY, JUNE 21, 2016 LONDON, UNITED KINGDOM

SUPPLIER SUPPORT COMMITTEE (SSC) MEETINGJUNE 2016

CONFIRMED

CONFIRMED MINUTESTUESDAY, JUNE 21, 2016

LONDON, UNITED KINGDOM

These minutes are not final until confirmed by the Task Group in writing or by vote at a subsequent meeting. Information herein does not constitute a communication or recommendation from the Task Group and shall not be considered as such by any agency.

TUESDAY, JUNE 21, 2016

1.0 OPENING COMMENTS

1.1 Call to Order / Quorum Check

The Supplier Support Committee (SSC) was called to order at 5:00 p.m., 21-JUN-2016 by Dale Harmon, SSC Chairperson.

A quorum was established with the following representatives in attendance:

Supplier Support Committee Leadership Team Members Present

NAME COMPANY NAME

Lei Bao NCS Testing Technology Co., Ltd.Dale Harmon CTS ChairpersonJonathan Hebben Avcorp Composites Fabrication Co-Vice ChairpersonEric Jacklin F. M. Callahan & Son, Inc.Steve Payne Praxair Surface Technologies SecretaryArno Toelkes Euro-Composites SAGary White Orbit Industries Inc.

Suppliers/Guests Present

NAME COMPANY NAME

Grace Atkinson Meggitt Polymers & CompositesRichard Aylward TT Electronics / RoxspurJames Bailey Applied Inspection Ltd.Andy Bakewell E M Inspection Co Ltd.Ramakrishnan Balasubramanian Tii Techno Testing Services Pvt. Ltd.Lynda Braine ITS Testing Services (UK) Ltd.Marc Breit SECU-CHEK GmbHPhillip Brockman Techmetals, IncorporatedLarry Collins Nasmyth Technologies Ltd.Claire Devémy CREPIMDavid Eshleman The Young EngineersPaul Evans James Fisher NDTRichard Haberbosch Aerotech Peissenberg GmbH & Co. KGPaul Haslin Alcoa Forgings & ExtrusionsFabienne Heron Sherwin Babb Co.Eric Jacklin F.M. Callahan & Son, Inc.Simon Krauer Franke Industrie AGMartin Lapierre Ellison Surface Technologies CanadaShelly Lawless Meyer Tool, Inc.Lindsay MacGregor InstronMarko Matijas Alcoa LeicesterEmmanuel Muzangaza The Manufacturing Technology CenterIan Palethorpe Meggitt Polymers and Composites

Page 2: OPENING COMMENTS - Performance Review Institutecdn.p-r-i.org/.../02192543/SSCMinutesJun2016CONFIRMED.docx · Web viewCONFIRMED MINUTES TUESDAY, JUNE 21, 2016 LONDON, UNITED KINGDOM

SUPPLIER SUPPORT COMMITTEE (SSC) MEETINGJUNE 2016

CONFIRMED

Kamlesh Patel Alcoa LeicesterMark Pennington Alcoa Forgings & ExtrusionsRobert Pianalto PPG Aerospace - AustraliaMartin Pojer LATECOERE Czech Republic s.r.o.Stéphanie Raison Thermi-Lyon DeveloppementStan Revers Senior Aerospace - Thermal EngineeringPaul Rose AlcoaTammi Schubert Helicomb Intl. Inc.Jason Staples ITS Testing Services (UK) LimitedJuliet Stringer Special Steels Ltd.Kumara Subramanian Tii Techno Testing Services Pvt Ltd.Vern Talmadge Alcoa-Howmet Thermatech CoatingsLewis Taylor Tata Steel SpecialityJeffrey Tomczak Techmetals

Subscriber Members/Participants Present

NAME COMPANY NAME

Mike Hayward Northrop Grumman CorporationHoward (Jeff) Lott The Boeing CompanyFrank McManus Lockheed Martin CorporationFabrizio Quadrini Finmeccanica S.p.A. – Helicopter Division

PRI Staff Present

Adrien BoespflugMike GrahamConnie HessSeema MartinCarol MartinJoe PintoLouise Stefanakis

1.2 Introductions/Routing of Attendance List/Code of Ethics/Review of Agenda

The Code of Ethics, Anti-Trust & Conflict of Interest (pg. 7 Attendees Guide) were reviewed by Dale Harmon, SSC Chairperson.

The SSC viewed the PRI anti-trust video. The safety information, including fire exits, was reviewed.

Dale Harmon, SSC Chairperson introduced the SSC Leadership Team, SSC Sub-Teams and PRI Staff

Dale Harmon, SSC Chairperson reviewed the Agenda

1.3 Approval of Previous Meeting Minutes

Motion made by Gary White and seconded by Arno Toelkes to approve the Minutes from February 2016 Nadcap meeting in Pittsburgh as written.

1.4 Awards and Recognition

Dale Harmon presented awards to the following people:

Lei Bao for the Survey Team

Jim Ringer for the Communications Team

Page 3: OPENING COMMENTS - Performance Review Institutecdn.p-r-i.org/.../02192543/SSCMinutesJun2016CONFIRMED.docx · Web viewCONFIRMED MINUTES TUESDAY, JUNE 21, 2016 LONDON, UNITED KINGDOM

SUPPLIER SUPPORT COMMITTEE (SSC) MEETINGJUNE 2016

CONFIRMED

Steve Payne for the Flow Down Sub Team

2.0 SSC MEMBERSHIP CHANGES

No changes to report at this time

3.0 NADCAP MANAGEMENT COUNCIL (NMC) CHAIR ADDRESS

Jeff Lott, NMC Chairperson, reviewed the “Self-Audit – SSC Presentation”

A self-audit will soon be a requirement and will be due 30 days before the audit start date. The audit will need to be uploaded into eAuditnet.

This still has to go to ballot and e-mail notifications sent. Training with more details will be communicated at the October meeting.

Mike Graham will be updating the Auditor Handbook.

4.0 SUPPLIER NEWS

Dale Harmon reviewed the “Supplier News Presentation”

Most SSC sponsored events are moving to Monday at the February 2017 Nadcap meeting in New Orleans.

Auditor evaluations will be shared with auditors in a new and better way.

The Flow Down Sub-Team is ending with Best Practices listed in eAuditnet

9 Tech Symposiums will be given in 2016; 3 US, 3 Europe, 2 Asia and 1 in India in September.

The NMC is working on auditor effectiveness and changing the risk mitigation process.

5.0 2015 SUPPLIER SURVEY RESULTS

Arno Toelkes, Supplier Survey Results Analysis Sub Team Lead, reviewed the “SSC Survey 2015-London 2016 Presentation”

Action plans will be developed and reported at the October 2016 meeting in Pittsburgh

SSC is looking for help/volunteers to analyze the survey data

Page 4: OPENING COMMENTS - Performance Review Institutecdn.p-r-i.org/.../02192543/SSCMinutesJun2016CONFIRMED.docx · Web viewCONFIRMED MINUTES TUESDAY, JUNE 21, 2016 LONDON, UNITED KINGDOM

SUPPLIER SUPPORT COMMITTEE (SSC) MEETINGJUNE 2016

CONFIRMED

6.0 NEW BUSINESS

No new business at this time

7.0 ADJOURN

ADJOURNMENT – 21-JUL-2016 – Meeting was adjourned at 6:30 p.m.

Minutes Prepared by: Carol Martin, [email protected]

***** For PRI Staff use only: ******

Are procedural/form changes required based on changes/actions approved during this meeting? (select one)

YES* ☐ NO ☒

*If yes, the following information is required:Documents requiring revision: Who is responsible: Due date: