open day - v2 validation – oro navigacija · 2018-03-23 · public safety public transport air...

17
Public Safety Public Transport Air Traffic Management Maritime Defence SESAR2020 PJ05 Solution 2 Multi Remote Tower Open Day - V2 Validation – Oro Navigacija

Upload: others

Post on 21-Feb-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Open Day - V2 Validation – Oro Navigacija · 2018-03-23 · Public Safety Public Transport Air Traffic SESAR2020 PJ05 Solution 2 Management Maritime Defence Multi Remote Tower Open

Public Safety

Public Transport

Air Traffic Management

Maritime

Defence SESAR2020 PJ05 Solution 2 Multi Remote Tower Open Day - V2 Validation – Oro Navigacija

Page 2: Open Day - V2 Validation – Oro Navigacija · 2018-03-23 · Public Safety Public Transport Air Traffic SESAR2020 PJ05 Solution 2 Management Maritime Defence Multi Remote Tower Open

| © 2018 Frequentis AG SESAR2020 PJ05 Solution 2 Multi Remote Tower | 2

- Integrated Multi Tower CWP - Planning and workflow tools - Integration of

Squelch Indication Met Warnings Surveillance Labels

Page 3: Open Day - V2 Validation – Oro Navigacija · 2018-03-23 · Public Safety Public Transport Air Traffic SESAR2020 PJ05 Solution 2 Management Maritime Defence Multi Remote Tower Open

| © 2018 Frequentis AG SESAR2020 PJ05 Solution 2 Multi Remote Tower | 3

DFS Advanced

Remote Tower

Jersey Contingency

Solution

VIE Apron

Management

Iceland Basic Remote Tower - AFIS

Auckland Demonstrator

Page 4: Open Day - V2 Validation – Oro Navigacija · 2018-03-23 · Public Safety Public Transport Air Traffic SESAR2020 PJ05 Solution 2 Management Maritime Defence Multi Remote Tower Open

| © 2018 Frequentis AG SESAR2020 PJ05 Solution 2 Multi Remote Tower | 4

Page 5: Open Day - V2 Validation – Oro Navigacija · 2018-03-23 · Public Safety Public Transport Air Traffic SESAR2020 PJ05 Solution 2 Management Maritime Defence Multi Remote Tower Open

| © 2018 Frequentis AG SESAR2020 PJ05 Solution 2 Multi Remote Tower | 5

ATM N

etwork

Recording

Video tracker, Cameras, sensor suite Visualization

Met Sensors, Airfield Lights, Nav Aids Information & Control

Radios, Phone, Backup System, Airport Audio Voice Communication

Flight Data Handling

ATC

Too

ls

Infra

- st

ruct

ure Container, Mast,

Network Virtual Tower

Simulator Simulation

Consoles ADS-B / MLAT Surveillance sensors/ fusion

Surveillance

System M

anagement

Ground / Air Display Video Fusion, Safety Net

Planning, Design, HF

Planning, Construction

Flight Strips, FDP, Planning

CONOPS, Transition, safety & regulation, training, OPS PM Extended OPS Services

Security, Network Support, Maintenance Extended Technical Services

Ser

vice

s

Specification, Installation, Configuration, Test and Acceptance, PM Basic Services FRQ

FRQ

DFS

Page 6: Open Day - V2 Validation – Oro Navigacija · 2018-03-23 · Public Safety Public Transport Air Traffic SESAR2020 PJ05 Solution 2 Management Maritime Defence Multi Remote Tower Open

| © 2018 Frequentis AG SESAR2020 PJ05 Solution 2 Multi Remote Tower | 6

- Flight and Support Information from multiple airports on a single control panel

- Import flight plan data from simulator (Jason API)

- Squelch indication from VCS simulation system

Page 7: Open Day - V2 Validation – Oro Navigacija · 2018-03-23 · Public Safety Public Transport Air Traffic SESAR2020 PJ05 Solution 2 Management Maritime Defence Multi Remote Tower Open

| © 2018 Frequentis AG SESAR2020 PJ05 Solution 2 Multi Remote Tower | 7

- Definition of technical infrastructure & scenarios

- HMI design adjustments with HC & ON ATCO‘s involved

- Technical Integration

- pre-Validation with Engineers & ATCOs testing the system

- Fine-tuning and improvement for V2 validation

Page 8: Open Day - V2 Validation – Oro Navigacija · 2018-03-23 · Public Safety Public Transport Air Traffic SESAR2020 PJ05 Solution 2 Management Maritime Defence Multi Remote Tower Open

| © 2018 Frequentis AG SESAR2020 PJ05 Solution 2 Multi Remote Tower | 8

- Workshops with ATCOs

- Paper Prototyping to get initial working position design

- Setup of simulation environment in Braunschweig

- Technical Integration

- Pre Validation Phase with ATCOs

Page 9: Open Day - V2 Validation – Oro Navigacija · 2018-03-23 · Public Safety Public Transport Air Traffic SESAR2020 PJ05 Solution 2 Management Maritime Defence Multi Remote Tower Open

| © 2018 Frequentis AG SESAR2020 PJ05 Solution 2 Multi Remote Tower | 9

Planning Tool Flight Strips

Support Information & Control Functions Voice Communication

Situation Display for each airport

Panorama Views with augmentation

PTZ View for each airport

Page 10: Open Day - V2 Validation – Oro Navigacija · 2018-03-23 · Public Safety Public Transport Air Traffic SESAR2020 PJ05 Solution 2 Management Maritime Defence Multi Remote Tower Open

| © 2018 Frequentis AG SESAR2020 PJ05 Solution 2 Multi Remote Tower | 10

- Timeline based traffic display: multiple airports & parallel traffic indication

- Planning of upcoming traffic situation

- Re-planning function - Integrated flight strips

functions - Clearance assignment - Integrated VCS functionality

(PTT / Squelch)

Page 11: Open Day - V2 Validation – Oro Navigacija · 2018-03-23 · Public Safety Public Transport Air Traffic SESAR2020 PJ05 Solution 2 Management Maritime Defence Multi Remote Tower Open

| © 2018 Frequentis AG SESAR2020 PJ05 Solution 2 Multi Remote Tower | 11

- Planning Tool - Flight Strips

Page 12: Open Day - V2 Validation – Oro Navigacija · 2018-03-23 · Public Safety Public Transport Air Traffic SESAR2020 PJ05 Solution 2 Management Maritime Defence Multi Remote Tower Open

| © 2018 Frequentis AG SESAR2020 PJ05 Solution 2 Multi Remote Tower | 12

- Planning Tool - Flight Strips

Page 13: Open Day - V2 Validation – Oro Navigacija · 2018-03-23 · Public Safety Public Transport Air Traffic SESAR2020 PJ05 Solution 2 Management Maritime Defence Multi Remote Tower Open

| © 2018 Frequentis AG SESAR2020 PJ05 Solution 2 Multi Remote Tower | 13

Split attention between three aerodromes -

first time

Maximum number of movements

safely manageable while maintaining

situational awareness

Familiarisation of ATCOs with new

aerodromes

Confusion over aerodromes and associated

aircraft

Challenge

Challenge

Challenge

Objective

Page 14: Open Day - V2 Validation – Oro Navigacija · 2018-03-23 · Public Safety Public Transport Air Traffic SESAR2020 PJ05 Solution 2 Management Maritime Defence Multi Remote Tower Open

| © 2018 Frequentis AG SESAR2020 PJ05 Solution 2 Multi Remote Tower | 14

Operational procedures

No airport mix-up

Traffic complexity

Frequency congestion

Advanced HMI for improved situational

awareness & adapted phraseology - usage of

tower designator

Harmonise procedures to lower workload

Based on ATCO feedback traffic

complexity is key factor in contributing

to workload

Frequency congestion to

impact manageable traffic numbers

Hungaro Control’s Initial Operational Findings

Page 15: Open Day - V2 Validation – Oro Navigacija · 2018-03-23 · Public Safety Public Transport Air Traffic SESAR2020 PJ05 Solution 2 Management Maritime Defence Multi Remote Tower Open

| © 2018 Frequentis AG SESAR2020 PJ05 Solution 2 Multi Remote Tower | 15

- Workload: Preview

- Timeline: Estimates

- Airport association: Squelch indication

- Traffic handling: seamless EFS integration

Page 16: Open Day - V2 Validation – Oro Navigacija · 2018-03-23 · Public Safety Public Transport Air Traffic SESAR2020 PJ05 Solution 2 Management Maritime Defence Multi Remote Tower Open

| © 2018 Frequentis AG SESAR2020 PJ05 Solution 2 Multi Remote Tower | 16

- pre-Validation @ Braunschweig for V3 – Nov 2018

- PJ 05 03 Validation with DFS – further automation functions

- Live Validation @ Budapest for 2-3 remotely controlled airports – March 2019

- … development to be continued in Wave 2

Page 17: Open Day - V2 Validation – Oro Navigacija · 2018-03-23 · Public Safety Public Transport Air Traffic SESAR2020 PJ05 Solution 2 Management Maritime Defence Multi Remote Tower Open

Public Safety

Public Transport

Air Traffic Management

Maritime

Defence