Project N-7137 CONSTRUCTION OF ROAD CROSSING DUCT BANK (OPEN-CUT)
@ EMAL GATE-C
Excavation, compaction of trench bed and casting blinding concrete up to 22:00 Night
Project N-7137 CONSTRUCTION OF ROAD CROSSING DUCT BANK (OPEN-CUT)
@ EMAL GATE-C
Casting RCC-concrete of duct & Lower Photo shows Duct after striking-off shuttering
Project N-7137 CONSTRUCTION OF ROAD CROSSING DUCT BANK (OPEN-CUT)
@ EMAL GATE-C