OPAL Reactor “Successes and Challenges” 28 May 2014 – Engineers Australia David Vittorio OPAL Reactor Manager

Upload: others

Post on 31-Dec-2019

7 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: OPAL Reactor “Successes and Challenges” · – Identify suitable equivalent material for fan blade shaft replacement Chemical analysis Physical properties analysis ... Surveillances,

OPAL Reactor

“Successes and Challenges”

28 May 2014 – Engineers Australia

David Vittorio

OPAL Reactor Manager

Page 2: OPAL Reactor “Successes and Challenges” · – Identify suitable equivalent material for fan blade shaft replacement Chemical analysis Physical properties analysis ... Surveillances,

Overview

• OPAL – Description

• Technical Challenges and

Improvements

• Practices and Processes

• Utilisation and Operating

Performance

Page 3: OPAL Reactor “Successes and Challenges” · – Identify suitable equivalent material for fan blade shaft replacement Chemical analysis Physical properties analysis ... Surveillances,

OPAL – Multipurpose

Pneumatic

Transfer

Irradiation

Facilities

Primary

Coolant

Large Volume

Irradiation

Facilities

Cold Neutron

Source

Core

Bulk Irradiation

Facilities

Page 4: OPAL Reactor “Successes and Challenges” · – Identify suitable equivalent material for fan blade shaft replacement Chemical analysis Physical properties analysis ... Surveillances,

Neutrons – For Health

10,000 hospitals in the

world use radioisotopes

40 million patients per year

Diagnostics (cardiology,

oncology, neurology)

Therapy / palliative care

10%

90%

Page 5: OPAL Reactor “Successes and Challenges” · – Identify suitable equivalent material for fan blade shaft replacement Chemical analysis Physical properties analysis ... Surveillances,

Neutrons – for Science

Small Angle

Neutron Scattering

High Intensity –

Powder Diffractometer

Reflectometer

High Resolution –

Powder Diffractometer

Laue

Diffractometer

Strain

Scanner

Time Of Flight

Inelastic Scattering

Ultra Small Angle Neutron

Scattering

Back-

Scattering

Crystal

Alignment

Small Angle Neutron

Scattering

Operating instruments

Construction/commissioning

Page 6: OPAL Reactor “Successes and Challenges” · – Identify suitable equivalent material for fan blade shaft replacement Chemical analysis Physical properties analysis ... Surveillances,

Neutrons – For Industry

Source: Topsil and Yole Development

• High and very high voltage markets• Low volume specialty products

• High and medium voltage markets• Medium volume specialty products

NTD - Silicon

Page 7: OPAL Reactor “Successes and Challenges” · – Identify suitable equivalent material for fan blade shaft replacement Chemical analysis Physical properties analysis ... Surveillances,

Technical Challenges and Improvements

Page 8: OPAL Reactor “Successes and Challenges” · – Identify suitable equivalent material for fan blade shaft replacement Chemical analysis Physical properties analysis ... Surveillances,

Cold Neutron Source

• Cryogenic Refrigeration System

• Cold Neutron Source Helium Compressors

• Multiple component failures

– Compressor Bearing Instability

– Compressor Air End Screw Failures

• Consequence

– Failures resulted in unreliable operation of reactor and

CNS supply

– Major maintenance intervention to rectify

– Suspension of CNS science based program

Page 9: OPAL Reactor “Successes and Challenges” · – Identify suitable equivalent material for fan blade shaft replacement Chemical analysis Physical properties analysis ... Surveillances,

Helium Compressor – Component Failures

2 x 250kW Helium compressors supply high pressure/high flow helium to the Cold Neutron Source cryogenic system

Compressor Screw Air Ends

Page 10: OPAL Reactor “Successes and Challenges” · – Identify suitable equivalent material for fan blade shaft replacement Chemical analysis Physical properties analysis ... Surveillances,

Root Cause Analysis

• Root Cause Analysis Outcome– Compressor oil degradation resulting in bearing instability

– Compressor oil degradation resulting in air end screw failures

High Oil

Temp.

Low

Viscosity

Screw

Contact

Debris

Filter

Blockage

Reduced

Oil Flow

FAILURE

Page 11: OPAL Reactor “Successes and Challenges” · – Identify suitable equivalent material for fan blade shaft replacement Chemical analysis Physical properties analysis ... Surveillances,

CNS Compressor Rectification

• Compressor Screw oil

injection temperature

reduced 45oC

11

• Installation of high capacity

plate-and-frame Heat

Exchangers

Page 12: OPAL Reactor “Successes and Challenges” · – Identify suitable equivalent material for fan blade shaft replacement Chemical analysis Physical properties analysis ... Surveillances,

Performance Indicator Actual Target

CNS Cold Source operations since

18/07/13 to 26 May 2014

- Days at full power in NO mode

- CNS Operational Availability

Reactor days at power

315.0

99.8%

315.0

95.0%

OPAL Full Power Days –

Calendar 2014 to 26 May

122 122

CNS Operational Availability in 2014

(to 26 May)

100% 95.0%

CNS Performance

Page 13: OPAL Reactor “Successes and Challenges” · – Identify suitable equivalent material for fan blade shaft replacement Chemical analysis Physical properties analysis ... Surveillances,

• Benefits

– Cost effective approach

– Local suppliers

– Lead times reduced from 19

weeks to 4 weeks

– Superior corrosion protection

than original

Cooling Tower Fan Refurbishments

• Aim

– Refurbish fans to extend life and improve

reliability

– Cost effective approach

– Keep installed spare fan operational

– Utilise standard shutdown periods

Page 14: OPAL Reactor “Successes and Challenges” · – Identify suitable equivalent material for fan blade shaft replacement Chemical analysis Physical properties analysis ... Surveillances,

7 x Al Blades (re-use)

Motor 45 kW (replace)

Gearbox (refurbish), specialist

Support Frame (refurbish), new HDG

Removable Walkway (refurbish), new HDG

All fasteners, (replace), use HDG

14 x hub blocks (refurbish), zinc electroplate

1 Hub (refurbish):

ENECON CeramAlloy CP & ChemClad SC

7 x blade shafts (replace), Bisplate 80 + HDG

Page 15: OPAL Reactor “Successes and Challenges” · – Identify suitable equivalent material for fan blade shaft replacement Chemical analysis Physical properties analysis ... Surveillances,

Original Fan Assembly New Fan Assembly

• Challenges

– Source local suppliers

– Identify suitable equivalent material for fan blade shaft

replacement

� Chemical analysis

� Physical properties analysis

� Metallographic examination

� Suitability for HDG

Page 16: OPAL Reactor “Successes and Challenges” · – Identify suitable equivalent material for fan blade shaft replacement Chemical analysis Physical properties analysis ... Surveillances,

Practices and Processes

Page 17: OPAL Reactor “Successes and Challenges” · – Identify suitable equivalent material for fan blade shaft replacement Chemical analysis Physical properties analysis ... Surveillances,

How do we decide and define an optimum mix of

maintenance tasks ?

Maintenance Strategy Optimisation

• Condition Monitoring Tasks - Surveillances, inspections,

testing, monitoring, trending or analysis tasks

addressing failure modes with a defined P-F interval.

• Fixed Time Tasks - Fixed time overhaul, restoration or

replacement tasks addressing failure modes that exhibit

a wear-out failure pattern.

• Corrective Maintenance Tasks – Correct expected or

unexpected failures.

Page 18: OPAL Reactor “Successes and Challenges” · – Identify suitable equivalent material for fan blade shaft replacement Chemical analysis Physical properties analysis ... Surveillances,

Condition

Based Task

3

Failure will

always be a

breakdown

(Expected

failure)4

Fixed Time Task

1 Fixed Time Task

Condition Based Task

OR

2

Pa

tte

rn o

f F

ail

ure

Rate of Deterioration

Age-Related (Wear-Out)

Random

Sudden

Gra

dualP

F

P-F interval(Potential to Functional failure)

P

F

P-F interval(Potential to Functional failure)

Safe or Economic Life

4%

2%

5%

7%

14%

68%

Quadrant 1

Fixed Time Strategy is the only option

Task interval is set by the safe or economic life (or

MTBF)

(Eg – Limit switches in a hot cell)

Quadrant 3

Condition Based Strategy is the only option

Task interval is set by the P-F interval

For the task to be feasible there must be:�A clearly defined P condition that the task is able to reliably detect

�A fairly consistent P-F interval

�A P-F interval that is long enough to be of practical use

Quadrant 4

Run to Fail strategy is the only option

(Eg Lighting)

Quadrant 2

Either Fixed Time or Condition Based

Strategy is an option

First look for a Condition Based Task (Quadrant 3)

Then look for a Fixed Time Task (Quadrant 1)

Maintenance Strategy Optimisation

Page 19: OPAL Reactor “Successes and Challenges” · – Identify suitable equivalent material for fan blade shaft replacement Chemical analysis Physical properties analysis ... Surveillances,

Condition Monitoring

• Condition Monitoring fits into quadrant 2 & 3 of

the Maintenance Feasibility & Effective Analysis

Random

Condition

Based Task

3

Failure will

always be a

breakdown

(Expected

failure)4

Fixed Time

Task

1 Fixed Time

Task

Condition

Based Task

OR

2

Pa

tte

rn o

f F

ail

ure

Rate of Deterioration

Age-Related

Sudden

Gra

dual

Quadrant 3 & 2

Condition Based Task is the only option

Task interval is set by the P-F interval

For the task to be effective there must be:

�A clearly defined P condition that the task is able to

reliably detect

�A fairly consistent P-F interval

�A P-F interval that is long enough to be of some use,

i.e. it is practical to monitor within the P-F interval

and there is sufficient time to plan and take action

before reaching the F condition

Page 20: OPAL Reactor “Successes and Challenges” · – Identify suitable equivalent material for fan blade shaft replacement Chemical analysis Physical properties analysis ... Surveillances,

Condition Monitoring for Safety and Reliability

• Vibration Monitoring (VA)

• Thermography

• Oil Analysis & Lubrication Management

• Chemistry Control

• Process Data review and trending

CM Techniques

Page 21: OPAL Reactor “Successes and Challenges” · – Identify suitable equivalent material for fan blade shaft replacement Chemical analysis Physical properties analysis ... Surveillances,

Bearings & Couplings (pump and fly- wheel):• Temperature• On-line VA• Handheld VA

Process:• Measurement of

inlet & outlet pressures (efficiency)

• Flow trending

Mechanical Seals:• Trending of

leakage rates

Oil Analysis of bearings

Thickness testing of pipes

Motor:• Bearings (VA)• Thermography• Insulation/winding

resistanceProcess:• Chemistry control

and monitoring

Condition Monitoring - Example

Page 22: OPAL Reactor “Successes and Challenges” · – Identify suitable equivalent material for fan blade shaft replacement Chemical analysis Physical properties analysis ... Surveillances,

• 129 Hz fault plus harmonics and the trend of worsening

condition.

Condition Monitoring - Example

Page 23: OPAL Reactor “Successes and Challenges” · – Identify suitable equivalent material for fan blade shaft replacement Chemical analysis Physical properties analysis ... Surveillances,

CM -Thermography

• Switchboards

• MotorsOVERLOADS

Page 24: OPAL Reactor “Successes and Challenges” · – Identify suitable equivalent material for fan blade shaft replacement Chemical analysis Physical properties analysis ... Surveillances,

Utilisation and Operating Performance

Page 25: OPAL Reactor “Successes and Challenges” · – Identify suitable equivalent material for fan blade shaft replacement Chemical analysis Physical properties analysis ... Surveillances,

Status of Mo99 Supply

Australia

< 5%

ANSTO

Canada

40%

Netherlands

30%

Belgium

10-15%

South Africa

10-15%

SAFARI

HFR

NRU

Poland

5%

Maria

BR-2

France

10-15%

OSIRIS

Page 26: OPAL Reactor “Successes and Challenges” · – Identify suitable equivalent material for fan blade shaft replacement Chemical analysis Physical properties analysis ... Surveillances,

Performance – Operating days

0

50

100

150

200

250

300

2006 2007 2008 2009 2010 2011 2012 2013 2014

39

94

128

248

286282

270

296

108 108

294

Total Power

Days (Calendar Years)

Ta

rge

t D

ay

s

Target - 300

Safe Days

OPAL critial

on 12 August 2006

2014 Status at:

Tuesday 28/4/14

Fo

reca

stP

ow

er

Da

ys

Act

ua

l P

ow

er

Da

ys

2012 – Planned

Long Shutdown (42 days)

Page 27: OPAL Reactor “Successes and Challenges” · – Identify suitable equivalent material for fan blade shaft replacement Chemical analysis Physical properties analysis ... Surveillances,

Performance – Availability to Plan

60

65

70

75

80

85

90

95

100

2008 2009 2010 2011 2012 2013 2014

72

91

9392

97

94

98

Availability to

Planned Schedule (%)

OPAL critial

on 12 August

2006

2014 Status (current): From 1/1/14 to 28/4/14

98% - Target Availability to Plan