onward walnut cove nc main street revitalization plan

69
MAIN STREET REVITALIZATION PLAN ONWARD NORTH CAROLINA

Upload: dbd-planning

Post on 27-Jul-2016

231 views

Category:

Documents


2 download

DESCRIPTION

 

TRANSCRIPT

Page 1: Onward Walnut Cove NC Main Street Revitalization Plan

MAIN STREET REVITALIZATION PLAN

ONWARDNORTHCAROLINA

Page 2: Onward Walnut Cove NC Main Street Revitalization Plan
Page 3: Onward Walnut Cove NC Main Street Revitalization Plan

Destination by Design Planning, LLC | 815 West King Street, Suite 2 | Boone, North Carolina 28607 | 828.386.1866 | www.DbDplanning.com

PRODUCED FOR

PRODUCED BY

The Town of Walnut Cove

MAIN STREET REVITALIZATION PLAN

ONWARDNORTHCAROLINA

Page 4: Onward Walnut Cove NC Main Street Revitalization Plan
Page 5: Onward Walnut Cove NC Main Street Revitalization Plan

acknowledgments

LYNN LEWISMAYOR

ELWOOD MABEMAYOR PRO TEM

SHARON CONAWAYCOMMISSIONER

DANNY HAIRSTONCOMMISSIONER

CHARLES MITCHELLCOMMISSIONER

Page 6: Onward Walnut Cove NC Main Street Revitalization Plan
Page 7: Onward Walnut Cove NC Main Street Revitalization Plan

/INTRODUCTIONMain Street: A Strategic Economic Development Priority

table of contents

/01 EXISTING CONDITIONS & ANALYSISOpportunities and Constraints: A Foundation for Practical Solutions

/02 RECOMMENDATIONSInfrastructure Investments to Grow and Develop Small Business

/03 IMPLEMENTATIONRealistic Strategies to Phase and Finance Improvements

Page 8: Onward Walnut Cove NC Main Street Revitalization Plan

“OUR ROOTS RUN DEEP“

Page 9: Onward Walnut Cove NC Main Street Revitalization Plan

LET’'S DEVELOP A VISION FOR MAIN STREET

This chapter provides a background and overview for the Walnut Cove Main Street Revitalization planning effort. Described are specific plan objectives and the planning process used by town leaders as well as the planning & design consultant team. This chapter concludes with an overview of the Main Street Revitalization Plan public workshop held on December 4, 2015.

IN THIS CHAPTER» Background and Purpose

» Plan Objectives

» Plan Process

» Public Engagement

INTRODUCTION

»I

Page 10: Onward Walnut Cove NC Main Street Revitalization Plan

2

I N T R O D U C T I O N

WALNUT COVE: A NORTH CAROLINA SMALL TOWN MAIN STREET COMMUNITYSince 2005, Walnut Cove has been recognized by the NC Department of Commerce as an NC Small Town Main Street Community. With this designation comes a responsibility to work toward an ever-improving Main Street. The Walnut Cove Main Street Committee has worked tirelessly to improve downtown aesthetics and conduct community events. This planning effort will further support of the work of this Committee.

THE MAIN STREET FOUR POINT APPROACHThe NC Small Town Main Street Program recognizes the National Main Street Center’s Four Point Approach, which includes Organization, Promotion, Design, and Economic Restructuring. Each of these elements is critical for ensuring that Main Street remains vibrant and suitable for small business growth and development. Although this plan addresses, to some extent, all elements of the Main Street Four Point Approach, this plan’s core focus is design and specifically Walnut Cove’s streetscape and public space.

From August 2013 to May 2015, the Town of Walnut Cove worked alongside Stokes County and its other municipal jurisdictions to create a unified vision -- the Stokes 2035 Vision Plan. After a series of public visioning workshops and intensive focus groups throughout the planning process, there was clear consensus among local leaders and citizens that any economic development strategy must include the revitalization of Downtown Walnut Cove.

After adopting the Stokes 2035 Vision Plan, the Walnut Cove Town Commissioners pursued and successfully secured grant funding from the NC Department of Commerce to develop the Main Street Revitalization Plan. This plan represents the first initiative as part of the Stokes 2035 Vision Plan to be implemented by a local governing body. This plan and its process is critical for developing consensus among downtown landowners and NCDOT, as well as to communicate to potential grant funding agencies that can help provide financial assistance to implement proposed streetscape and other downtown improvements.

STOKESCOUNTYSTOKESSTOKES 203520352035COUNTYCOUNTYm o v i n g t o g e t h e r

Public workshops during the Stokes 2035 vision plan revealed a need for an in-depth plan to revitalize Downtown Walnut Cove.

stokes 2035 vision plan

#1AESTHETICSImprove the

aesthetic appearance and

economic welfare of the downtown.

#2PRESERVATION

Encourage the rehabilitation of existing historic

structures.

#3SAFETY

Address existing safety concerns associated with

deteriorated buildings.

#4COMPATIBILITY

Ensure the compatibility of

development and redevelopment.

#5FINANCING

Provide recommendations

for financing public improvements.

#6INVESTMENT

Identify strategic public-private partnerships

opportunities.

PLAN OBJECTIVES

Although this plan addresses to some extent all elements of the Main Street Four Point Approach, this plan’'s core focus is design and

specifically Walnut Cove’s streetscape and public space.

THE

NO

RTH C

AROLINA MAIN STREET PROG

RA

M

FOUR POINT APPROACH

BACKGROUND AND PURPOSE

Page 11: Onward Walnut Cove NC Main Street Revitalization Plan

3

I N T R O D U C T I O N

PLANNING PROCESS

» Finalize the study areaboundary

» Develop plan informationmaterials: Project Brandand Fact Sheet

» Town Commissionpresentation and requestto proceed

» Existing Conditions DataCollection

» Property and StructuralEvaluation

» Framework Plan

» NCDOT, USDA meeting

» Streetscape Plan

» Façade Plan

» Landowner Outreach

» Final Plan Preparation

» Financing and GrantDocumentation

» Final Plan Presentation

MARCH-AUGUST, 2015 AUGUST-SEPTEMBER, 2015 SEPTEMBER - DECEMBER, 2015 DECEMBER-FEBRUARY, 2015-16

DIREC

TION S

ETTING

analy

sis &

fram

ewor

k pla

n

plan

deve

lopm

ent

final

plan

deve

lopm

ent

MAIN STREET REVITALIZATION PLAN

ONWARDNORTHCAROLINA

» Landowner & PublicWorkshop

» Plan revisions based uponpublic input

DECEMBER, 2015

publ

ic en

gage

ment

Page 12: Onward Walnut Cove NC Main Street Revitalization Plan
Page 13: Onward Walnut Cove NC Main Street Revitalization Plan

LET'’S CONSIDER WALNUT COVE’'S OPPORTUNITIES AND CONSTRAINTS TO HELP ESTABLISH CLEAR AND PRACTICAL SOLUTIONS FOR IMPROVING ITS INFRASTRUCTURE.

This chapter provides a snapshot of Walnut Cove’s existing conditions and their implications for future development and redevelopment. Here we explore the town’s regional context, land use patterns, zoning, and sidewalk network. Walnut Cove’s Main Street has both opportunities and constraints that when considered, provide a foundation for establishing clear and practical solutions for improving its infrastructure.

IN THIS CHAPTER » A brief overview of Downtown Walnut Cove

» Opportunities and Challenges

» Existing Conditions Photograph Series

» Analysis Map Series

existing conditions & analysis

1

Page 14: Onward Walnut Cove NC Main Street Revitalization Plan

6

C H A P T E R O N E

THE BIG VISION: CREATE A WELCOMING DOWNTOWN ENVIRONMENT THAT WILL ATTRACT LOCALS AND VISITORS MORNING, DAY, AND NIGHT.

OPPORTUNITIES » Walnut Cove has a traditional street grid layout and historical buildings worthy of revitalization.

» A significant number of buildings and tracts are vacant or undeveloped leaving opportunities for new construction and infill development.

» More than 11,000 cars travel Main Street each day.

» With a major public infrastructure investment, new businesses will be attracted to Walnut Cove.

CHALLENGES » A significant amount of

traffic travels through Walnut Cove, but a small percentage of these travelers stop to visit Main Street.

» Several historic structures need major repair.

» Major streetscape improvements will require a significant financial investment from the town.

OUR ROOTS RUN DEEP…THE BIG PICTURE

vacancies & repairs

Several buildings are in need of repair or lay vacant.

One current opportunity for Walnut Cove is its existing network of

neighborhood blocks that, with the addition of sidewalks, would create

a walkable community.

11,000 CARS / DAYcars & NEIGHBORHOOD BLOCKS

Search “Walnut Cove North Carolina in the 1940’s” on YouTube.

Stills from the video “Walnut Cove North Carolina in the 1940’s”.

SEE WALNUT COVE OF THE 40S

Page 15: Onward Walnut Cove NC Main Street Revitalization Plan

E X I S T I N G C O N D I T I O N S & A N A L Y S I S

7

EXISTING CONDITIONS

1

4

6

5

2 3

PHOTOS:(1) Parking to the sides or rear of buildings, rather than the front, makes for a more comfortable pedestrian experience.

(2) The Old Theater is a significant cultural asset and worthy of renovation.

(3) Downtown Main Street has a wide right-of-way, providing an opportunity for an enhanced streetscape.

(4) Fowler Park and the library serve as community spaces; Fowler Park could be improved to provide for more community programs.

(5) Antique stores along Main St. help to build upon the downtown’s character and attract visitors to Walnut Cove.

(6) Some buildings on Main St. are unfortunately beyond repair.

Page 16: Onward Walnut Cove NC Main Street Revitalization Plan

8

C H A P T E R O N EC H A P T E R O N E

8

89

311

311

65

LAKE SIDE

SPR

ING

DA

LE

OA

K

OLD

TOW

N

COUNTRY MEADOW

S

CLU

BSUM

MIT

FLINCHUM FARM

OLD TOWN

RID

GE

SUMMIT

MAIN ST.

WINDMILL

BROAD

RE

GE

NC

Y A

PTS

SMIT

H

HER

ITA

GE

FOWLER

WELLINGTON

REGENCY

MILLBROOK

MITCHELL

HAIRSTON

SCHOOLGREENWAY OPPORTUNITY

WASTEWATER TREATMENT

PLANT

PROPOSED TRUCK ROUTE

SEV

EN

TH

NIN

TH

SIX

TH

FIF

TH

EIG

HT

HIGH

FO

UR

TH

TH

IRD

SEC

ON

D

DEPOT

BR

OO

K C

OV

E

WW

TP

WELL HO

USE

TOWN FORK CREEK

MIL

LS C

REEK

10MINUTEWALK

5MINUTEWALK

LEGE

ND

GREENWAY OPPORTUNITY

EXISTING SIDEWALK CONNECTOR

PROPOSED TRUCK ROUTE

COMMERCIAL NODE

MEADOW BROOK FIELD

SCHOOL

POST OFFICE

TOWN HALL

FOWLER PARK

LIBRARY

FIRE STATION

POINTS OF INTEREST

TRANSPORTATION

NORT

H

SCAL

E

0 125 250 500 FEET

20MINUTE DRIVE

TOHANGING ROCK

STATE PARK

30MINUTE DRIVE

TOWINSTON -

SALEM

Walnut Cove is situated within a unique geographic context. Let’s consider the following:

» The town is well-positioned between a major city (Winston-Salem) and North Carolina’s most visited state park (Hanging Rock).

» More than 11,000 cars each day can utilize Highway 311/89 through the heart of downtown.

» Oldtown Road could potentially serve as a route for large trucks so they might avoid downtown.

» Creeks, streams, and their floodplains surround Walnut Cove’s downtown, creating an ideal opportunity for establishing a network of multi-use trails and greenways.

context

HANGING ROCK STATE PARK

WINSTON SALEM

Page 17: Onward Walnut Cove NC Main Street Revitalization Plan

E X I S T I N G C O N D I T I O N S & A N A L Y S I S

9

MAIN

HIGH

SUMMITFO

UR

TH

SIX

TH

THIR

D

WINDMILL

MITCHELL

SE

CO

ND

FIFT

H

RID

GE

DEPOT

VALLEY

FIRST/OLDTOWN

BROAD

HAIRSTON

BRO

OK C

OVE

SIXTH

FIRS

T/OLD

TOW

N

NC OneMap, NC Center for Geographic Information and Analysis, NC 911 Board

´

DEPOT

BR

OO

K C

OV

E

MITCHELL

WINDMILLPROJECT STUDY A

REA

SUMMIT

HIGH

RID

GE

HAIRSTON

BROAD

5TH 6TH4TH3RD2ND1ST

MAIN ST. MAIN ST.

ALLEY’S

JUST PLAIN COUNTRY

TUTTLE HARDWARE

ROLLERMILLS

SAM’SPIZZA

TOWN F

ORK C

REEK

MILLS C

REEK

LEGE

ND

NORT

H

SCAL

E

COMMERCIAL - RETAIL

COMMERCIAL - SERVICE

GOVERNMENT & INSTITUTIONAL

LIGHT INDUSTRY

MULTI FAMILY

SINGLE FAMILY

UNDEVELOPED

VACANT

POST OFFICE

TOWN HALL

FOWLER PARK

LIBRARY

FIRE STATION

ASSETS LAND USE

0 125 250 500 FEET

MAIN

HIGH

SUMMIT

FOU

RTH

SIX

TH

THIR

D

WINDMILL

MITCHELL

SE

CO

ND

FIFT

H

RID

GE

DEPOT

VALLEY

FIRST/OLDTOWN

BROAD

HAIRSTON

K CO

VE

SIXTH

FIRS

T/OLD

TOW

NNC OneMap, NC Center for Geographic Information and Analysis, NC 911 Board

´

DEPOT

BR

OO

K C

OV

E

MITCHELL

WINDMILLPROJECT STUDY A

REA

SUMMIT

HIGHR

IDG

E

HAIRSTON

BROAD

5TH 6TH4TH3RD2ND1ST

MAIN ST. MAIN ST.

ALLEY’S

JUST PLAIN COUNTRY

TUTTLE HARDWARE

ROLLERMILLS

SAM’SPIZZA

TOWN F

ORK C

REEK

MILLS C

REEK

LEGE

ND

NORT

H

SCAL

E

MIXED-USE

CIVIC

OPEN SPACE

POST OFFICE

TOWN HALL

FOWLER PARK

LIBRARY

FIRE STATION

ASSETS ZONING

0 125 250 500 FEET

Walnut Cove is a classic small town Main Street community. Let’s consider the following:

» The town has three government/ institutional areas including, the post office, town hall, and the northwest block that includes the library, Fowler Park, and the fire station.

» Main Street provides for a mix of commercial retail and service businesses.

» There are three single-family homes and one multi-family complex within the study area; there are no active residences above retail downtown.

» There are several vacant properties that provide an opportunity for in-fill development.

Walnut Cove’s ordinance provides for mixed-use zoning in its downtown. However, the town must ensure the following are required within this zoning district:

» 75% of Main Street frontage should be occupied by a building

» Parking areas should be placed on side or rear and must be appropriately screened

» Building fronts should contain approximately 60% windows on Main Street.

» Entrances must face Main Street.

*Recommended zoning changes are outlined in Chapter 3

land use existing zoning

Page 18: Onward Walnut Cove NC Main Street Revitalization Plan

10

C H A P T E R O N E

MAIN

HIGH

SUMMIT

FOU

RTH

SIX

TH

THIR

D

WINDMILL

MITCHELL

SE

CO

ND

FIFT

H

RID

GE

DEPOT

VALLEY

FIRST/OLDTOWN

BROAD

HAIRSTON

SIXTH

FIRS

T/OLD

TOW

N

NC OneMap, NC Center for Geographic Information and Analysis, NC 911 Board

´

DEPOT

K C

OV

E

MITCHELL

WINDMILLPROJECT STUDY A

REA

SUMMIT

HIGH

RID

GE

HAIRSTON

BROAD

5TH 6TH4TH3RD2ND1ST

MAIN ST. MAIN ST.

TUTTLE HARDWARE

ROLLERMILLS

SAM’SPIZZA

ALLEY’S

JUST PLAIN COUNTRY

TOWN F

ORK C

REEK

MILLS C

REEK

LEGE

ND

NORT

H

SCAL

E

POST OFFICE

TOWN HALL

FOWLER PARK

LIBRARY

FIRE STATION

UNDEVELOPED(no buildings)

VACANT(closed buildings)

ASSETS OPPORTUNITIES FOR NEW CONSTRUCTION

0 125 250 500 FEET

opportunities for new constructionAlthough Walnut Cove is anchored with a historic downtown infrastructure, there exists opportunities for new in-fill mixed-use development. Let’s consider the following:

» The town has control of two significant properties, including the old hotel site at 2nd and Main and a vacant lot adjacent to the old dentist building at 5th and Main. This plan provides specific recommendations for the old hotel property.

» The downtown’s main intersection, located at 3rd and Main, has two undeveloped corners. These properties currently provide for parking and outdoor storage, but the town should welcome new and appropriate development at these locations.

» An opportunity exists along Windmill Street between 4th and 5th streets. One parcel is fully vacant, while the tract along 5th is underutilized. These locations would serve as prime locations for dense multi-family housing.

INTERSECTION OF 3RD & MAIN ST

INTERSECTION NEAR 2ND & MAIN ST

Page 19: Onward Walnut Cove NC Main Street Revitalization Plan

11

E X I S T I N G C O N D I T I O N S & A N A L Y S I S

MAIN

HIGH

SUMMIT

FOU

RTH

SIX

TH

THIR

D

WINDMILL

MITCHELL

SE

CO

ND

FIFT

H

RID

GE

DEPOT

VALLEY

FIRST/OLDTOWN

BROAD

HAIRSTON

BRO

OK C

OVE

SIXTH

FIRS

T/OLD

TOW

N

NC OneMap, NC Center for Geographic Information and Analysis, NC 911 Board

´

DEPOT

BR

OO

K C

OV

E

MITCHELL

WINDMILLPROJECT STUDY A

REA

SUMMIT

HIGH

RID

GE

HAIRSTON

BROAD

5TH 6TH4TH3RD2ND1ST

MAIN ST. MAIN ST.

ALLEY’S

JUST PLAIN COUNTRY

TUTTLE HARDWARE

ROLLERMILLS

SAM’SPIZZA

TOWN F

ORK C

REEK

MILLS C

REEK1

2

LEGE

ND

NORT

H

SCAL

E

GATEWAY

100% INTERSECTION

EXISTING SIDEWALKS

OLD HOTEL

FOWLER PARK

POST OFFICE

TOWN HALL

FOWLER PARK

LIBRARY

FIRE STATION

ASSETS EXISTING STREETSCAPE INFRASTRUCTURE

SITE STUDY AREAS

120 125 250 500 FEET

framework planWith strategic public infrastructure investments and strong leadership, Walnut Cove can generate small business growth on Main Street. Let’s consider the following:

1. ATTRACTIVE GATEWAYS

» The south and north gateways into downtown provide opportunities to slow traffic, welcome locals and visitors, and begin “telling the story” of Walnut Cove.

2. ENHANCE FOWLER PARK

» An enhanced Fowler Park, which is located at the downtown’s north gateway, can provide unique programming opportunities that can regularly attract downtown visitors.

3. IMPROVE WALKABILITY

» The downtown sidewalk system currently has some gaps, which are the result of extensive parking lot and driveway “cuts.” Design improvements within these areas should signal motorists of the likelihood of pedestrian users.

Page 20: Onward Walnut Cove NC Main Street Revitalization Plan

C H A P T E R O N E

12

On December 3rd, the planning consultant team presented multiple concepts for improving Walnut Cove’s Main Street and other town properties. This meeting was advertised through the newspaper and property owners

within the study area were sent a meeting invitation.

December 3rd, 2015 public meeting

PUBLIC ENGAGEMENT

Page 21: Onward Walnut Cove NC Main Street Revitalization Plan

A TOOLBOX TO HELP THE TOWN AND PRIVATE BUSINESSES ENSURE A LIVELY AND PEDESTRIAN-ORIENTED MAIN STREET

The design guidelines chapter begins with a brief description of the pedestrian triangle - the most critical area for influencing the pedestrian experience. Following this introduction, specific guidelines are set forth for the public sector and private businesses with a central goal: generate economic activity in downtown Walnut Cove.

IN THIS CHAPTER » The Pedestrian Triangle

» Design Guidelines for the Public Sector

» Design Guidelines for Private Businesses

DESIGN GUIDELINESpriv

ate

public

SHOP

2

Page 22: Onward Walnut Cove NC Main Street Revitalization Plan

14

C H A P T E R T W O

THE REVITALIZATION OF WALNUT COVE WILL REQUIRE A SUBSTANTIAL EFFORT FROM BOTH THE PUBLIC AND PRIVATE REALMS.

priv

ate

public

PEDESTRIAN SCALE LIGHTING

ON-STREET PARKING

STRATEGICALLY PLACED STREET TREES

SITE FURNISHINGSWIDE

SIDEWALKS

CROSSWALKS

a public & private relationship

RESIDENTIAL/ OFFICE UPPER STORIES

ACTIVE GROUND FLOOR

SIDEWALK INTEREST

SEASONAL PLANTERS

MANY DOORS & WINDOWS

The pedestrian triangle is where the public and private realms meet. Within this “triangle,”,

Walnut Cove must create a safe and inviting space.

pedestrian triangle

Page 23: Onward Walnut Cove NC Main Street Revitalization Plan

15

D E S I G N G U I D E L I N E S

#1PARKS, OPEN

SPACES & “THIRD PLACES”

#2LANDSCAPING &

STREET TREES

#3SIDEWALKS

#4PARKING

#5SITE

FURNISHINGS & INFRASTRUCTURE

#6BUILDINGS

#7BRANDING

#8PROGRAMMING

PUBLIC Let’s talk economic development, tourism, and

community development; there is absolutely, positively

NOTHING THAT’S MORE IMPORTANT THAN YOUR DOWNTOWN.

THE SUBSEQUENT PAGES DESCRIBE EIGHT CONSIDERATIONS THAT WILL BE THE RESPONSIBILITY OF THE TOWN OF WALNUT COVE.

pu

blic

Page 24: Onward Walnut Cove NC Main Street Revitalization Plan

C H A P T E R T W O

16

PARKS, OPEN SPACES & THIRD PLACES”

public spaces and parksPublic spaces and parks attract people downtown.

Farmers marketCreate a downtown Farmers Market. The downtown shopping atmosphere and farmers market can attract customers downtown to spend money.

alleywaysAlleyways are an asset. They provide a unique opportunities for smaller retail spaces; building owners can subdivide their building interiors and provide for an entry into the alleyway. Consider making an alleyway pedestrian-only and inviting for the public by using lighting, ground plane materials, and public art.

“third places“In contrast to first places (home) and second places (work),

third places provide space for community gatherings.

#1Farmers markets

alleyways

Farmers markets are great “third places” to meet other community members outside of home and work.

Alleyways are an often overlooked public space.

Downtown parks are great places for the community to gather for

holidays and events.

Downtown parks

Page 25: Onward Walnut Cove NC Main Street Revitalization Plan

17

D E S I G N G U I D E L I N E S

LANDSCAPING & STREET TREESlandscapingAdding landscaping to public areas makes a community more vibrant and inviting. Simple features like hanging baskets on light posts can have a big impact.

street treesThe use of trees and landscaping helps to separate pedestrians from motor vehicle traffic. Plants also provide interest; they soften the appearance of hard surfaces and provide color, fragrance, and seasonal decor. Other benefits of street trees include providing shade in areas where there is extensive pavement.

#2

street trees

Public landscaping along Main Street can significantly improve

the pedestrian experience.

Street trees frame the street and provide pedestrian refuge from vehicles.

public landscaping

pu

blic

Page 26: Onward Walnut Cove NC Main Street Revitalization Plan

C H A P T E R T W O

18

SIDEWALKSdesign for people first!Pedestrian infrastructure is critical. Streetscape design elements, such as curb extensions and colored concrete crosswalks, create safer pedestrian environments.

MAKE IT WIDE!A wide sidewalk provides ample room for downtown activity including outdoor dining areas, street furniture, and small gatherings.

#3

Wide sidewalks are desirable and provide opportunities for a range

of activities.

A continuous network of sidewalks and crosswalks establish a pedestrian-oriented environment.

Curb extension “bump outs” allow pedestrians to cross the street in a

shorter distance and help slow traffic.

wide sidewalks

crosswalks

curb extensions

Page 27: Onward Walnut Cove NC Main Street Revitalization Plan

19

D E S I G N G U I D E L I N E S

PARKINGon-street parking On-street parking provides consumers with easy access to downtown businesses and creates a buffer between traffic and sidewalks.

take it out back! (Or at least to the side)Parking lots in front of downtown businesses disrupt a continuous building street wall, which is more inviting to pedestrians. Locate surface parking areas behind (preferable) or to the side of the principal building line and buffer the lot from the sidewalk with landscaping or low walls and fences.

retrofit existing lotsExisting parking lots can be enhanced by landscaping and/or low retaining walls.

shade treesWhere possible, provide shade trees for larger parking lots.

#4

Existing parking lots can be screened with seat walls,

landscaping, and public art.

On-street parking helps to create a barrier between pedestrians and motorists.

existing parking lots

on-street parking

pu

blic

Page 28: Onward Walnut Cove NC Main Street Revitalization Plan

C H A P T E R T W O

20

SITE FURNISHINGS & INFRASTRUCTURE

if you build it, they will come!Provide the necessary infrastructure to support a vibrant downtown.

» LIGHTING. Consider both pedestrian and vehicular lighting.

» SEATING. Benches, seatwalls, rocking chairs, and artistic yet functional seating should all be considered.

» LITTER RECEPTACLES. Litter receptacles can be installed along with other street furniture in a similar style to help create continuity.

» DRINKING FOUNTAINS. These can be creative. Also, don’t forget about dogs!

» RESTROOMS. Public restrooms are a great downtown asset.

» SIGNAGE AND WAYFINDING. Town banners and directional signs help navigate downtown visitors.

» BASE FOR PUBLIC ART. Provide the structural base for art exhibits.

» BICYCLE RACKS. Bike racks can be a work of art!

#5

Lighting and trash receptacles can add to community character.

Artful drinking fountains can provide a creative touch to downtown.

Provide a permanent base

for art exhibits.

drinking fountains

public art

wayfinding signsWayfinding helps customers find downtown businesses!

lighting & trash receptacles

Page 29: Onward Walnut Cove NC Main Street Revitalization Plan

21

D E S I G N G U I D E L I N E S

BUILDINGSThe ““Street wallA “street wall” is created when buildings are located next to one another without any disruption. Extended street walls are critical for a healthy downtown. For this reason, parking lots should be placed on the side or rear of buildings and In-fill development is strongly encouraged.

mixed-useEncourage multi-story buildings that provide for mixed-uses. Healthy downtowns provide for a mix of land uses that allow both commercial spaces, such as retail shops, galleries and restaurants, and residential units, such as loft apartments and townhouses. Greater density and mixed-uses are achieved through zoning that allows and provides incentives for residential uses in downtowns. Maximum setbacks will be required to ensure that buildings front along the street and adjacent to sidewalks or low retaining walls.

façade improvement programVoluntary Façade Improvement Programs reimburse businesses for a portion of the façade improvement costs.

#6

street wall

mixed use

Maintain and continue the street wall as it is one of the principal defining characteristics of the downtown district.

Mixed use buildings can utilize the ground floor for commerce and upper levels for residential housing. People living downtown is what makes downtown come alive!

MAINTA IN THE STREET WALL !

LIVE HERE

WORK HERE

pu

blic

Page 30: Onward Walnut Cove NC Main Street Revitalization Plan

C H A P T E R T W O

22

BRANDINGWho is walnut cove? Create a unique, recognizable brand for Walnut Cove. Having a community brand helps create a perception that the locale is business-friendly, innovative, energetic, etc. The theme of the brand can be utilized on:

» Gateways;

» Monument Signs;

» Banners; and

» Wayfinding Signage.

#7

PROPOSED BRANDING FOR WALNUT COVE

Create a unique, recognizable brand for Walnut Cove.

create a unique brand

Monument signs are often the first thing visitors see and signify the

gateway to your town.

MONUMENT SIGNS

CREATIVE BANNERS

banner concept

Banners help tell the story of your town and can be custom designed

to highlight festivals, events and seasons.

ENJOYSummertimein Our Town

Our Roots Run Deep

proposed town logo & slogan

Page 31: Onward Walnut Cove NC Main Street Revitalization Plan

23

D E S I G N G U I D E L I N E S

PROGRAMMINGCREATE YEAR-ROUND DOWNTOWN ACTIVITIESSchedule civic activities, such as street festivals and outdoor concerts, in public areas. These activities not only attract patrons, but also provide a chance for people to explore their downtown.

#8

SPRING

FALL

SUMMER

WINTER

Street festivals, outdoor concerts, and other events held downtown are a great way to create excitement on Main St. and attract customers. These events should be held year-round.

pu

blic

Page 32: Onward Walnut Cove NC Main Street Revitalization Plan

PRIVATECreate an inviting pedestrian experience. It’s not just a nice thing to do; it can help

INCREASE RETAIL SALES.

priv

ate

#1BE INVITING

#2SCREENING

#3PARKING & DRIVEWAYS

#4SITE

FURNISHINGS

#5SIGNAGE

#6RETAIL DISPLAYS

#7LANDSCAPING

#8BUILDINGS

THE SUBSEQUENT PAGES DESCRIBE EIGHT CONSIDERATIONS WHICH WILL BE THE RESPONSIBILITY OF THE TOWN OF WALNUT COVE.

Page 33: Onward Walnut Cove NC Main Street Revitalization Plan

25

D E S I G N G U I D E L I N E S

BE INVITINGKEEP YOUR DOORS OPENOpen your doors. Consider an air curtain that would allow you to keep your door open during cooler months.

EXTEND your business INTO THE STREETAnything you would put in a window display can be extended into the street. Avoid the garage sale look of clothes racks and cardboard boxes. Positive ways to extend into the street include dressing manikins in merchandise or hanging quilts on railings.

#1OPEN YOUR DOORS!

Customers are more likely to enter your business if the door is open.

Extend your business into the street with dining spaces or retail

merchandise.

EXTEND INTO THE STREET

Avoid the garage sale look.

PRIV

ATE

no clothes racks

Page 34: Onward Walnut Cove NC Main Street Revitalization Plan

C H A P T E R T W O

26

SCREENINGDumpsters are not focal point materialLocate your dumpster in a hidden area. If this is not possible, screen your dumpster. Utility equipment, HVAC and similar mechanical equipment should be treated in the same manner.

Screen Parking lots & service areasParking lots and loading docks can be a necessary part of a business, but often times these areas are neglected or unappealing. Screening these areas with walls or landscaping can increase curb appeal for your business and generally improve community character. Just remember:

INCREASED CURB APPEAL = INCREASED VISITORS = INCREASE SALES.

#2screen dumpsters

Screen Parking

Dumpsters should be hidden or screened.

Screening walls can be softened with landscaping. In this example, historical photos of the town provide visual interest.

HVAC systems should be located on the side or rear of buildings

and be screened.

Screen HVAC

Page 35: Onward Walnut Cove NC Main Street Revitalization Plan

27

D E S I G N G U I D E L I N E S

Landscaping buffers separate parking areas from pedestrian areas and help beautify downtown.

PARKING & DRIVEWAYSdesign for people first!Locate parking areas behind or to the side of the principal building line and buffer the lot from the sidewalk with landscaping and/ or low walls and fences less than 3 1/2’ in height. If retrofitting a building with a parking in front, consider this newfound space an asset! Outdoor dining, a plaza, a landscaped streetyard; re all great opportunities to attract pedestrians to your business!

sharing is caring when it comes to

driveways on main streetSharing driveways reduces the number of times the sidewalk is interrupted. The longer a continuous sidewalk, the better the pedestrian experience.

#3

Shared parking lots reduce the number of curb cuts creating a more walkable downtown. More sidewalks = more people walking = stronger downtown economy.

share lots & reduce curb cuts

Parking in front of buildings effects the downtown charm by disrupting the “street wall.” In addition, parking

lots located in front of buildings make pedestrians feel uncomfortable and unprotected.

NO PARKING IN FRONT

landscape along the street

PRIV

ATE

Page 36: Onward Walnut Cove NC Main Street Revitalization Plan

C H A P T E R T W O

28

SITE FURNISHINGSthe “husband bench”Husbands, and other shoppers, enjoy having a place to sit while others are shopping inside.

Café dining / outside diningAdd tables and chairs outside in front of your business, if possible, even if you’re not a restaurant or coffee shop.

Functional art Everyday furnishings, like benches and bike racks, can be art pieces.

On-street dining can help create a lively downtown.

Bike racks assist with beautification efforts.

Outdoor dining

functional art

the husband benchEvery retail shop should include at least one outdoor bench flanked by planters.

#4

Page 37: Onward Walnut Cove NC Main Street Revitalization Plan

29

D E S I G N G U I D E L I N E S

SIGNAGEPedestrian scaleSignage must be oriented and sized appropriately for pedestrians.

small is beautifulSigns do not have to be large and overbearing or cluttered with excess information; they should be fairly simple and keep with the character of high-quality neighboring signs. Internally illuminated signs and electronic message board signs are discouraged.

Menus and chalk boardsAdd menus and chalk boards to exterior spaces to give pedestrians more information about what’s inside your business.

blade signsBlade signs are hung perpendicular to the building. These types of signs are directed at pedestrians.

#5blade signs

menu boards

“Blade signs” are oriented towards pedestrians.

Menu boards can be exhibited outside.

Chalk boards can be used for menus or daily messages.

chalk boards

PRIV

ATE

Page 38: Onward Walnut Cove NC Main Street Revitalization Plan

C H A P T E R T W O

30

RETAIL DISPLAYSExtend retail into the streetExtend window displays to exterior spaces. If you display it in your windows, consider displaying it outside, as well.

What not to do: Avoid the garage-sale look. No exterior merchandising; no cardboard boxes filled with piles of merchandise, nor any clothes racks, should be displayed outside.

window displaysWindow displays should frequently showcase new items. Keep them current and changing with seasonal decor.

#6

Catch window shoppers’ attention while giving them a glimpse into your store.

keep it simple

street appealWindow displays can tastefully extend into the street.

Page 39: Onward Walnut Cove NC Main Street Revitalization Plan

31

D E S I G N G U I D E L I N E S

LANDSCAPINGLOTS AND LOTS OF PLANTS AND POTSUse a combination of window boxes, planters, and landscape areas. Plants provide interest; they soften the appearance of hard surfaces and provide color, fragrance, and seasonal decor. Larger pots are more eye-catching than smaller ones.

#7

hanging baskets

window boxes

planters

PRIV

ATE

Page 40: Onward Walnut Cove NC Main Street Revitalization Plan

C H A P T E R T W O

32

BUILDINGS entranceComplement the streetscape and established building presence with welcoming and noticeable entrances. Consider using architectural features, such as transoms and sidelights, changes in roof line, different massing, and/or unique materials.

orientationOrient principal façades and principal entrances toward the street. Where buildings front on two streets, a single entrance may be located on the corner.

windows and doorsThe building architecture should create interest through significant glass; approximately 60% of building fronts should incorporate glass.

ground floor Buildings should be organized so the ground floor has the tallest apparent height with shorter upper stories.

#8the entrance

ground floor

This entrance is easily identifiable and flanked by two planters.

Using different colors and materials helps to distinguish the ground floor from the upper story.

Glass in windows and doors lets people see

what you have for sale and provides a

welcoming feel to your building.

GLASS!

Page 41: Onward Walnut Cove NC Main Street Revitalization Plan

THIS CHAPTER SERVES AS THE HEART OF THE MAIN STREET REVITALIZATION PLAN.

This chapter provides recommendations for the plan’s three core areas: facades; streetscapes; and site specific study areas. These recommendations cast a vision for a future and vibrant Walnut Cove.

IN THIS CHAPTER » Façade Considerations

» Façades

» Streetscape

» Site Study Areas

recommendations

3

Page 42: Onward Walnut Cove NC Main Street Revitalization Plan

34

C H A P T E R T H R E E

1

2

7

56

4

8

3

FAÇADESThe consultant team conducted a thorough photographic inventory of the entire building frontage along Main Street. The purpose was to show how comprehensive façade improvements could enhance the main street business district. The intention is to show care, enduring materials, strong rooflines, a more inviting shopping environment through greater number of windows, and greater consistency among sign bands.

EXISTING

#1 façade considerationsTHE FOLLOWING FAÇADE TREATMENTS ILLUSTRATE GENERAL PATTERNS, RATHER THAN SPECIFIC PRESCRIPTIONS.

Page 43: Onward Walnut Cove NC Main Street Revitalization Plan

35

R E C O M M E N D A T I O N S

WATER TABLEThe water table provides a clear demarcation of the building’s façade base using materials that contrast with the primary façade material.

STOREFRONT: THREE PART SYSTEMA. A resilient "water table" band, such as masonry or cementitious panel;

B. A clear glazed view/display band; and

C. A clear or translucent glazed transom band, or crosspiece above a window.

SIGNAGEThe signage, if applied to the façade, should act as an architectural "header" over the storefront. If the signage is turned perpendicular to the façade, then it might be located directly above the façade's main entry point.

AWNING / CANOPYAwnings or canopy roofs may be constructed of light metal roofing materials and supported by light steel or heavy timber framing.

UPPER LEVELGlazed and blind window treatments should possess a clear articulation of trim around the opening. The trim should be of contrasting color to the material used on the primary façade. If the trim is the same material as the primary façade, then the articulation should provide a sense of depth and shadow.

CORNICEDevelop a clear and strong cornice line at the top of the façade with integrated brackets.

STRUCTUREDevelop a clear articulation of implied structural support and rhythm in each unique façade.

ORNAMENTBlind window openings and other architectural accessories, such as the roundel included in the 1-story building in the sketch at left, provide opportunities for small, unadorned buildings to "punch above their weight" in the overall façade plan for relatively little cost.

1

2

3

4

5

6

7

8

faça

des

Page 44: Onward Walnut Cove NC Main Street Revitalization Plan

36

C H A P T E R T H R E E

#2 façadesLOOKING EAST ALONG MAIN STREETThe intent of the façade treatments is to show:

» care, enduring materials, strong rooflines,

» a more inviting shopping environment through greater number of windows, and;

» greater consistency among sign bands.

3rd4th

EXISTING

FAÇADE CONCEPT

Page 45: Onward Walnut Cove NC Main Street Revitalization Plan

37

R E C O M M E N D A T I O N S

faça

des

2nd

Page 46: Onward Walnut Cove NC Main Street Revitalization Plan

38

C H A P T E R T H R E E

#2 façadesLOOKING WEST ALONG MAIN STREETFaçade improvement programs are a critical tool for advancing downtown revitalization efforts. Basic and inexpensive façade treatments can drastically improve the downtown image.

3rd

EXISTING

FAÇADE CONCEPT

2nd

Page 47: Onward Walnut Cove NC Main Street Revitalization Plan

39

R E C O M M E N D A T I O N S

TOWN HALLThe concept to the right represents one of the many ways general façade treatments could be applied to this building.

faça

des

4th

4th

alley gateway

2 story building w/ parking behind

restore theater w/ new store front

Page 48: Onward Walnut Cove NC Main Street Revitalization Plan

40

C H A P T E R T H R E E

#3 streetscape_45 degree parking concept

streetscape PLAN

Page 49: Onward Walnut Cove NC Main Street Revitalization Plan

41

R E C O M M E N D A T I O N S

streetsca

pe

Page 50: Onward Walnut Cove NC Main Street Revitalization Plan

42

C H A P T E R T H R E E

#3 streetscape_45 degree parking concept

ROUNDABOUT GATEWAYA roundabout at 1st Street will slow traffic and “set the stage” for a vibrant Walnut Cove Main Street. Furthermore, roundabouts keep traffic moving steadily while calming speeds.

45 DEGREE PARKING45 degree parking provides for a significant increase in on-street parking, but could present some safety concerns because drivers will need to back into traffic. Another option, reverse angle parking, would require drivers to back into the angled parking space. Although this requires education, it does allow drivers to safely pull forward when going back into traffic.

a bstreetscape EXHIBITS

Angle parking would slow traffic down as vehicles

back out of spaces.

This option shows how Main Street could be re-striped to provide angle parking on the west side of the street. Curb extensions, crosswalks, and pedestrian refuge islands create a safer, more walkable downtown. Street trees, pedestrian street lights, banners, and gateways provide an improved aesthetic to the downtown.

Page 51: Onward Walnut Cove NC Main Street Revitalization Plan

43

R E C O M M E N D A T I O N S

BUMP OUTSBump outs are a critical streetscape component. Located at intersections or mid-block crossings, this feature makes for a more comfortable pedestrian experience.

BANNERSBanners can be a fun and creative way to beautify the Town of Walnut Cove. In the concept illustrated below, walnut tree leaflets are utilized on each seasonal banner to maintain a common theme.

C D

Our Roots Run Deep

ENJOYSummertimein Our Town

Our Roots Run DeepOur Roots Run Deep

ENJOYSummertimein Our Town

Our Roots Run Deep

streetsca

pe

Page 52: Onward Walnut Cove NC Main Street Revitalization Plan

44

C H A P T E R T H R E E

#3 streetscape_parallel parking concept

OLD HOTEL SITE

streetscape PLAN

Page 53: Onward Walnut Cove NC Main Street Revitalization Plan

45

R E C O M M E N D A T I O N S

streetsca

pe

Page 54: Onward Walnut Cove NC Main Street Revitalization Plan

46

C H A P T E R T H R E E

#3 streetscape_parallel parking concept

ALLEYWAY TO PUBLIC PARKINGThe alleyway between the old livery and Walnut Cove Motor Co. currently serves as the only access to the “back of house” of these buildings. The Town of Walnut Cove could explore a creating a public parking lot behind these buildings and make the alleyway either pedestrian-only or to accommodate vehicles, as well.

MAIN STREET DINER A decorative sidewalk treatment and pedestrian-scale signage create a safer environment near Main Street Diner.

a b

EXISTING EXISTING

This street design maintains the existing configuration of parallel parking on both sides of Main Street while adding amenities that would significantly improve the downtown as a shopping district. Planted medians are strategically placed to maintain critical left turns. Medians help to calm traffic, improve the aesthetic of the street, and provide a pedestrian refuge island for people crossing Main Street. Curb extensions create a shorter travel distance for pedestrians. Curbs only extend as wide as the parallel parking lanes, thereby not intruding on the travel lanes and turning radii. Mid-block pedestrian crossings make it easier and safer for pedestrian movement. All of these improvements are aimed at keeping traffic flowing while calming it significantly. Study after study suggests that a walkable and inviting downtown is a more successful downtown.

streetscape EXHIBITS

Page 55: Onward Walnut Cove NC Main Street Revitalization Plan

47

R E C O M M E N D A T I O N S

A “parklet” is a sidewalk extension that provides

more space and amenities for people

using the street. Parklets are typically installed on parking

lanes and use several parking spaces.

Outdoor gathering areas are an important part of a successful Main Street. Consider sacrificing some on-street parking to create significant sidewalk extensions that provide retail and/or outdoor dining space.

cEXISTING

OUTDOOR DINING CONCEPT

EXPANDED RETAIL CONCEPT

streetsca

pe

DUNLAP “PARKLET”

Page 56: Onward Walnut Cove NC Main Street Revitalization Plan

C H A P T E R T H R E E

48

#4 SITE STUDY AREAS1. OLD HOTEL SITE

The Town of Walnut Cove should consider a public-private partnership to develop the old hotel site located at the intersection of 2nd St. and Main St. This partnership would help to ensure that key parcels would be developed in accordance with other downtown revitalization efforts.

Although the site is small, a mixture of uses can be combined to provide for a dense & active area that supports downtown economic development. This 1/2 acre tract can provide for 11,700 sq. ft. of residential and 4,300 sq. ft. of commercial space.

vicinity map

OLD HOTEL

SITE

FOWLERPARK

8

15

MAIN

STRE

ET

2ND STREET

SITE STUDY AREA

PLAZA WITHOUTDOORDINING

TOWN HOMETOWN HOMETOWN HOMEMIXED-USE

MIXED-USEMIXED-USEOPEN BELOW

1 OLD HOTEL SITESITE PLAN

PARKING 15 SPACES

Page 57: Onward Walnut Cove NC Main Street Revitalization Plan

49

R E C O M M E N D A T I O N S

#4 SITE STUDY AREAS

THIS 1/2 ACRE TRACT CAN PROVIDE FOR 11,700 SQ. FT. OF RESIDENTIAL AND 4,300 SQ. FT. OF COMMERCIAL SPACE.

PERSPECTIVE

{

2ND STREET

MAIN S

TREET

Page 58: Onward Walnut Cove NC Main Street Revitalization Plan

C H A P T E R T H R E E

50

#4 SITE STUDY AREAS2.”THE COVE” @ FOWLER PARK

Utilizing Fowler Park’s unique topography, this site could be re-purposed as an amphitheater where the town could host regular events and concerts. This asset would help foster a greater sense of community and attract consumers to downtown businesses.

vicinity map

OLD HOTEL

SITE

FOWLERPARK

SITE PLAN

(FOWLER PARK) CAN ATTRACT CONSUMERS TO DOWNTOWN BUSINESSES.{

Page 59: Onward Walnut Cove NC Main Street Revitalization Plan

51

R E C O M M E N D A T I O N S

#4 SITE STUDY AREAS

STREAM BANK ENHANCEMENT ADVENTURE PLAYGROUND

STAGE AMPHITHEATER

SITE FEATURES

Page 60: Onward Walnut Cove NC Main Street Revitalization Plan
Page 61: Onward Walnut Cove NC Main Street Revitalization Plan

WITH STRONG LEADERSHIP, PATIENCE, AND PERSEVERANCE, THIS PLAN CAN FUNDAMENTALLY IMPROVE THE ECONOMIC POSITION OF WALNUT COVE.

This chapter serves a guide for strategically and fiscally realizing the plan recommendations. Because of the cost of improvements, it will be important to implement the plan in phases. Also, there are specific grant opportunities available to the town, but the town must position itself to compete for this limited funding opportunities.

IN THIS CHAPTER » Phasing Plan

» Implementation Strategies

» Estimate of Probable Costs

» Zoning Ordinance Changes

Implementation

4

Page 62: Onward Walnut Cove NC Main Street Revitalization Plan

61

C H A P T E R F O U R

PHASING PLANstreetscape Phasing

PHASE 3 PHASE 2 PHASE 1

PHASE 1 THE NORTHERN GATEWAY (2016-2021)Phase 1 includes the renovation of Fowler Park and streetscape improvements that establish an explicit northern gateway into downtown Walnut Cove. This phase includes improvements for the entire intersection (all four corners) of 5th and Main Street. Fowler Park is included because this project was well-received at the public workshop. The northern gateway serves as an ideal pilot project – this project is relatively inexpensive, contains many of the key elements proposed throughout the entire streetscape plan, and will significantly improve the town’s character as an independent project.

PHASE 2THE SOUTHERN GATEWAY (2021-2026)Phase 2 extends from the roundabout at Old Town Road to 2nd and Main Street. This phase includes improvements for the entire intersection (all four corners) of 2nd and Main Street. Similar to the northern gateway, this phase will significantly improve the town’s character as an independent project and complete a “bookends” approach to implementing the overall master plan.

PHASE 3 THE HEART OF MAIN (2026-2031)With Phase 1 and 2 complete, Phase 3 will link these sections and extend from 2nd to 5th street. The success of previously completed phases should establish public support to realize the entire streetscape plan. If the final phase is not complete, the two gateways will independently serve as significant enhancements to Walnut Cove’s commercial center.

Page 63: Onward Walnut Cove NC Main Street Revitalization Plan

62

I M P L E M E N T A T I O N

Estimate of probable costPhase I : Fowler Park & Northern Gateway to Downtown

Material Unit Quantity*Cost /

Unit ($) Total ($)Fowler Park

Adventure Playground ea 1 42,000.00$ 42,000.00$ Amphitheater ea 1 250,000.00$ 250,000.00$ Design, Engineering & Surveying 75,000.00$ Grading for Amphitheater ea 1 60,000.00$ 60,000.00$ Landscaping ea 1 45,000.00$ 45,000.00$ Monument Sign ea 1 3,500.00$ 3,500.00$ Stairs ea 1 4,500.00$ 4,500.00$ Stream Enhancement ea 1 20,000.00$ 20,000.00$ Subtotal 500,000.00$

Northern "Gateway" into DowntownPrep Costs: Engineering, Surveying & Permitting 73,000.00$ Mobilization 34,024.59$ Bump Outs (Curb Extenstions) ea. 4 21,000.00$ 84,000.00$ Crosswalks (signalized) ea. 8 7,500.00$ 60,000.00$ Crosswalks (unsignalized) ea. 3 2,500.00$ 7,500.00$ Lighting ea. 8 3,500.00$ 28,000.00$ Maintenance of Traffic ea 1 7,000.00$ 7,000.00$ Mid-Block Refuge Island and Crossing ea. 1 7,500.00$ 7,500.00$ Other Landscaping ea. 11 250.00$ 2,750.00$ Pavement Marking lin. ft. 650 12.00$ 7,800.00$ Planted Median sq. ft. 1820 10.00$ 18,200.00$ Re-striping roadway and parallel parking lin. ft. 2000 12.00$ 24,000.00$ Sidewalk Re-construction sf 6800 8.00$ 54,400.00$ Street Trees ea. 5 300.00$ 1,500.00$ Traffic Signage/Rapid Flash Beacon ea. 1 14,000.00$ 14,000.00$ Wayfinding Signage and Banners ea. 8 650.00$ 5,200.00$ Subtotal 428,874.59$

Total for Both Areas 928,874.59$ Construction Contractor Overhead & Profit, etc. (18%) 167,197.43$ Contingency (20%) 185,774.92$ Grand Total 1,281,846.93$

Phase II: Southern Gateway Into Downtown

Material Unit Quantity*Cost /

Unit ($) Total ($)Prep Costs

Construction Staking 3,500.00$ Demolition 40,000.00$ Engineering (Civil, Geotechnical, Electrical), Surveying & Permitting 203,500.00$ Geotechnical Testing 7,500.00$ Incidental Grading 25,000.00$ Mobilization 31,785.00$ Subtotal 311,285.00$

Streetscape Elements

Bump Outs (Curb Extenstions) ea. 8 21,000.00$ 168,000.00$ Crosswalks (unsignalized) ea. 2 2,500.00$ 5,000.00$ Lighting ea. 18 3,500.00$ 63,000.00$ Mid-Block Refuge Island and Crossing ea. 1 7,500.00$ 7,500.00$ Maintenance of Traffic ea 1 7,000.00$ 5,000.00$ Other Landscaping ea. 1 25,000.00$ 25,000.00$ Planted Median sq. ft. 2610 10.00$ 26,100.00$ Re-striping roadway and parallel parking lin. ft. 300 12.00$ 3,600.00$

Round-a-bout ea. 1 194,000.00$ 194,000.00$ Sidewalk Re-construction sf 5408 8.00$ 43,264.00$ Street Trees ea. 11 450.00$ 4,950.00$ Traffic Signage/Rapid Flash Beacon ea. 1 14,000.00$ 14,000.00$ Wayfinding Signage and Banners ea. 19 650.00$ 12,350.00$ Subtotal Hardscape Elements 571,764.00$

Subtotal 883,049.00$ Construction Contractor Overhead & Profit, etc. (18%) 158,948.82$ Contingency (20%) 176,609.80$ Grand Total 1,218,607.62$

Phase II: Southern Gateway Into Downtown

Material Unit Quantity*Cost /

Unit ($) Total ($)Prep Costs

Construction Staking 3,500.00$ Demolition 40,000.00$ Engineering (Civil, Geotechnical, Electrical), Surveying & Permitting 203,500.00$ Geotechnical Testing 7,500.00$ Incidental Grading 25,000.00$ Mobilization 31,785.00$ Subtotal 311,285.00$

Streetscape Elements

Bump Outs (Curb Extenstions) ea. 8 21,000.00$ 168,000.00$ Crosswalks (unsignalized) ea. 2 2,500.00$ 5,000.00$ Lighting ea. 18 3,500.00$ 63,000.00$ Mid-Block Refuge Island and Crossing ea. 1 7,500.00$ 7,500.00$ Maintenance of Traffic ea 1 7,000.00$ 5,000.00$ Other Landscaping ea. 1 25,000.00$ 25,000.00$ Planted Median sq. ft. 2610 10.00$ 26,100.00$ Re-striping roadway and parallel parking lin. ft. 300 12.00$ 3,600.00$

Round-a-bout ea. 1 194,000.00$ 194,000.00$ Sidewalk Re-construction sf 5408 8.00$ 43,264.00$ Street Trees ea. 11 450.00$ 4,950.00$ Traffic Signage/Rapid Flash Beacon ea. 1 14,000.00$ 14,000.00$ Wayfinding Signage and Banners ea. 19 650.00$ 12,350.00$ Subtotal Hardscape Elements 571,764.00$

Subtotal 883,049.00$ Construction Contractor Overhead & Profit, etc. (18%) 158,948.82$ Contingency (20%) 176,609.80$ Grand Total 1,218,607.62$

Phase III: Streetscape & Off Street Parking 2nd-5th Streets

Material Unit Quantity*Cost /

Unit ($) Total ($)Prep Costs

Construction Staking 3,500.00$ Demolition 60,000.00$ Engineering (Civil, Geotechnical, Electrical), Surveying & Permitting 301,621.00$ Geotechnical Testing 7,500.00$ Incidental Grading 25,000.00$ Maintenance of Traffic 7,500.00$ Mobilization 53,817.00$

Subtotal 458,938.00$

Streetscape Elements

Bump Outs (Curb Extenstions) ea. 8 21,000.00$ 168,000.00$ Crosswalks (signalized) ea. 4 7,500.00$ 30,000.00$ Crosswalks (unsignalized) ea. 4 2,500.00$ 10,000.00$ Lighting ea. 38 3,500.00$ 133,000.00$ Maintenance of Traffic ea 1 7,000.00$ 7,000.00$ Mid-Block Refuge Island and Crossing ea. 2 7,500.00$ 15,000.00$ New Community Parking Lots ea. 2 50,000.00$ 100,000.00$ Other Landscaping ea. 1 35,000.00$ 35,000.00$ Pavement Marking (in lieu of sidewalk) lin. ft. 650 12.00$ 7,800.00$ Planted Median sq. ft. 2960 10.00$ 29,600.00$ Resetting Street Signs ea. 1 12,000.00$ 12,000.00$ Re-striping roadway and parallel parking lin. ft. 1381 12.00$ 16,572.00$ Sidewalk Re-construction sf 22096 8.00$ 176,768.00$ Stormwater Infrastructure ea. 1 150,000.00$ 150,000.00$ Street Trees ea. 30 450.00$ 13,500.00$ Traffic Light on Decorative Pole & Mast Arm ea. 4 25,000.00$ 100,000.00$ Traffic Signage/Rapid Flash Beacon ea. 2 14,000.00$ 28,000.00$ Wayfinding Signage and Banners ea. 38 650.00$ 24,700.00$

Subtotal Hardscape Elements 1,056,940.00$

Subtotal 1,515,878.00$ Construction Contractor Overhead & Profit, etc. (18%) 272,858.04$ Contingency (20%) 303,175.60$ Grand Total 2,091,911.64$

PHASE 1: FOWLER PARK & NORTHERN GATEWAY PHASE 2: SOUTHERN GATEWAY INTO DOWNTOWN PHASE 3: STREETSCAPE & OFF STREET PARKING

Page 64: Onward Walnut Cove NC Main Street Revitalization Plan

63

C H A P T E R F O U R

OLD HOTEL SITEThe Town of Walnut Cove currently owns and controls the Old Hotel Site. The town must be patient as it considers when and how it releases this property to a private developer. This property has the potential to serve as the downtown’s newest private development and become a catalyst for spawning additional new development. The conceptual plan for Old Hotel Site presents a mixed-use (commercial and residential) concept for this site, but the town should remain open to all types of development would adhere to the recommended building form provided within this plan. The town should consider utilizing NC’s Public-Private Partnership (P3) legislation that allows the town to “shop” for potential developers. The town should be willing to provide incentives to the “right” developer that might include a significant, if not complete, reduction in land costs and improved surrounding public streetscapes.

FOWLER PARKThe concept plan for a renovated Fowler Park was well-received at the public workshop. Should elected officials wish to pursue development of this facility, there should be consideration to apply to the NC Parks and Recreation Trust Fund (PARTF) for grant support. PARTF is currently recommending projects up to $250,000 and applicants must provide a 50% cash match for the total project cost. PARTF accepts applications in May of each year. In addition, this grant fund is highly competitive and projects are primarily selected through a point system. To ensure competitiveness, the town should consider the following before submitting a PARTF application:

implementation strategiessite study areas

1. Develop a Site Specific Master Plan for Fowler Park. This element is worth 10/115 points. See PARTF plan requirements within Appendix. Furthermore, this plan will need to make strategic recommendations, such as providing a certain number of new facilities, in order to maximize other points within the PARTF application.

2. Adopt a 3-5 year capital improvement plan for parks and recreation. This element is worth 3/115 points and will demonstrate the town’s committed cash grant match. PARTF projects can be developed over a three year period.

3. Conduct public meetings in accordance with the grant requirement. This requirement demon-strates public knowledge and input within the project development process. This element is worth 5/115 points.

4. Ensure that the county’s existing recre-ation survey (completed in 2009) will be accepted by PARTF. This element is worth 5/115 points. The survey complet-ed by Stokes County in 2009 should be accepted by PARTF although this survey did not reference Fowler Park explicitly.

5. Receive a formal endorsement from at least two local community groups. This item is worth 3/115 points and can include civic groups, neighborhood associations, advisory boards, etc.

6. Create a Parks and Recreation Board. An endorsement from this board or a similar board is worth 2/115 points.

Page 65: Onward Walnut Cove NC Main Street Revitalization Plan

64

I M P L E M E N T A T I O N

INTENT1. Promote the sustainable development of

Walnut Cove’s Main Street corridor.

2. Preserve and protect the public health, safety and welfare of the citizens and work-ers of the city.

3. Promote efficient utilization of land for business, housing, and multi-use develop-ment along Main Street.

4. Improve the function and appearance of Main Street, and enhance the convenience, ease and enjoyment of walking, shopping, and public gathering.

5. Clearly define and activate the public realm by locating buildings to form street edges and corners, and locating entrances and windows to activate the street level.

6. Define building forms to be compatible with their context.

7. Provide appropriate buffers between in-compatible uses and site elements.

8. Establish flexible parking standards that respond to zone lot sizes, the pedestrian oriented nature of Main Street, and support the adaptive reuse of historic resources and buildings that meet Main Street forms.

USESThe town’s B-1 zoning district shall encourages a strong mix of housing, office and commercial uses with flexible use requirements.

PARKING1. Standard parking requirement

• One (1) parking space per five hundred (1:500) square feet of nonresidential uses.

• One (1) parking space per unit of market rate housing.

• One (1) parking space per four (4) units for: senior housing; housing that is affordable for persons with forty percent (40%) area median income and below; units under five hundred and fifty (550) square feet; single room occupancy housing; boarding or rooming homes; and other special needs housing.

2. Exceptions provided for small lots, adaptive reuse of historic structures and buildings that meet the form standards built prior to the existing parking code.

3. Allows parking requirements to be met off-site or as provided by an operational park-ing plan.

BUILDING PLACEMENT » Main Street structures

must be built to within 1’ 6” of the zone lot line

» 75% of Main Street front-age must be occupied by a building

» 25% of Side Street front-age must be occupied by a building; 40% of the Side Street front-

age shall be encouraged to be occupied by a building

SETBACK FROM RESIDENTIAL ZONES » Five (5’) foot setback

required between Main Street and residentially zoned lots

LOCATION AND SCREENING OF PARKING AND DRIVE AISLES

» Parking lots and drive aisles must be screened by a 36”-48” solid screening device such as a masonry wall or solid evergreen hedge

» A five (5’) foot wide landscape buffer area with a six (6’) foot tall solid screen-ing wall (such as a privacy fence) required between a Main Street lot and a resi-dentially zoned lot (this buffer area may double as the required setback)

HEIGHT & UPPER STORY SETBACKS » Main Street Example #1

• Maximum height: 38’ (approximately 3 stories)

• Minimum height: 12’ -- two-stories

• No upper story setback required

» Main Street Example #2

• Maximum height: 52’ (approximately 4 stories)

• Minimum height: 24’• Upper story setback: maximum building

height must be setback 25’ from a zone lot line adjacent to a residentially zoned lot with no structure in excess of 38’ (within this setback the maximum building height is 38’)

ZONE OF TRANSPARENCY » 60% of the area between

3.5’ and 8.5’ above grade must contain windows on the Main Street

» 25% of the area between 3.5’ and 8.5’ above grade must contain windows on the Side Street

RESIDENTIAL STRUCTURE EXCEPTIONS » Two options exist for

structures used solely for residential occupancy

• Option A: The zone of transparency rests between 4’ and 10’ above grade, 40% of this area must be glazed on the Main Street and 25% on the Side Street

• Option B: the structure may be setback between 5-10’ from the property line and the area of the setback must be enclosed by a screening device (certain architectural features or elements may protrude into this setback such as balconies)

» The exceptions allow the residential struc-tures to have a sense of privacy yet main-tain a strong relationship between the building and the activity at street level.

ENTRANCES » Primary entrances are

required to face Main Streets

» •A primary street facing entrance may be angled on the corner or the may be setback no more than 10’ from the Main Street property

zoning ordinance recommendations

 

 

 

 

 

 

 

 

 

 

 

     

Parking capacity of small parcels

   

Typical parking modules – land area requirements

Page 66: Onward Walnut Cove NC Main Street Revitalization Plan

IN THIS CHAPTER » PARTF Plan Requirements

» Public Private Partnerships

Appendix

Page 67: Onward Walnut Cove NC Main Street Revitalization Plan

A P P E N D I X

» Site analysis - Describe and evaluate the site’s natural, historic, and man-made features. These include items such as topography, soils, vegetation, hydrology, significant natural communities, wetlands, existing structures, and public access.

» Recreational needs - Identify the recreational opportunities that the public prefers using meetings or a survey. Describe how the recreational opportunities being proposed by the master plan relate to existing recreational facilities and services in the jurisdiction (this may be a part of the system-wide comprehensive plan).

» Program description - Identify the main purposes of the park including a description of the how the local government will design the park to be used by the public.

» Physical needs - Identify the physical needs of the park’s site. Include any land the local government will acquire and any capital improvements (buildings, recreation facilities, roads, utilities). All land and capital improvements proposed in the PARTF application must be included in the master plan.

» Project costs - Include project cost for property acquisition and capital improvements, divided into phases if necessary. The cost information can be provided in a separate document that is submitted with the master plan.

» Site Plans - Site plans and illustrations depicting the boundaries of land to be acquired and the location of facilities.

» Public Involvement - Describe how the local government involved a broad range of the citizens in its jurisdiction as the master plan was being developed. Examples include public meetings or advisory committee meetings. This description can also be provided in a separate document that is submitted with the master plan.

PARKS AND RECREATION TRUST FUND Requirements for a Site Specific Master Plan for the Park

S i t e S p e c i f i c M a s t e r P l a n f o r t h e P a r k : A l o n g- r a n g e p l a n f o r o n e p a r k t h a t c o n t a i n s a s i t e a n a ly s i s ; a d e s c r i p t i o n o f t h e c o m m u n i t y ’ s r e c r e a t i o n a l n e e d s ; p r o p e r t y a c q u i s i t i o n b o u n d a r i e s ; a n d t h e p r o p o s e d l o c a t i o n o f a l l c a p i t a l i m p r o v e m e n t s .

A m a s t e r p l a n d o c u m e n t m u s t a d e q u a t e ly a d d r e s s a l l o f t h e f o l l o w i n g i t e m s :

partf

Page 68: Onward Walnut Cove NC Main Street Revitalization Plan

A P P E N D I X

p-3

Public-Private Partnerships

O t h e r K e y E l e m e n t s o f P - 3

» One single contract with owner/developer

» Shared costs and responsibilities

» Flexible contracting authority for construction, financing, and operation of public-private project

» Developer selected based on qualifications

» Developer must finance at least 50% of project cost

» Development agreement establishes roles and responsibilities of unit and developer

» Local Government Commission (LGC) must approve capital or operating lease

p - 3 d e v e l o p m e n t a g r e e m e n t r e q u i r e m e n t s

MUST INCLUDE:

» Property interests of unit and developer

» Development responsibilities of unit and developer

» Financing obligations of unit and developer (developer responsible for at least 50% of cost)

» HUB good faith efforts responsibilities

MAY REQUIRE DEVELOPER TO:

» Construct (or reconstruct) some or all of the project

» Construct additions to the projects

» Perform renovations to some or all of the project

» Purchase some or all of the equipment or materials for the project (both initial and subsequent)

» Ensure HUB compliance

c h a r a c t e r i s t i c s o f a p u b l i c- p r i v a t e p a r t n e r s h i p 1 ) A C a p i t a l i m p r o v e m e n t p r o j e c t 2 ) B e n e f i t s b o t h a g o v e r n m e n t a l e n t i t y a n d a p r i v a t e d e v e l o p e r 3 ) C o n t r a c t e d t h r o u g h a d e v e l o p m e n t a g r e e m e n t 4 ) I n v o l v e s c o n s t r u c t i o n o f a p u b l i c f a c i l i t y o r o t h e r i m p r o v e m e n t s i n c l u d i n g : a . P a v i n g a n d gr a d i n g b . U t i l i t i es c . I n f r a st r u ct u r e d . R e c o n st r u ct i o n or r e p a i r e . M a y i n c lu d e b ot h p u b l i c a n d p r i v at e f a c i l i t i es

For complete information about Public-Private Partnerships: NCGS 143.128.1C

Page 69: Onward Walnut Cove NC Main Street Revitalization Plan

“OUR ROOTS RUN DEEP“