Illustrative Only Appendix 5 Illinois Power Agency 2014 Spring Procurement Events Bid Form - General Information Monday, April 28, 2014 General Information: In addition to this 'General Information ' sheet, this Bid Form contains the following ten (10) sheets: 1) Ameren On-Peak Bids 2014-2015 7) ComEd On-Peak Bids 2014-2015 2) Ameren Off-Peak Bids 2014-2015 8) ComEd Off-Peak Bids 2014-2015 3) Ameren On-Peak Bids 2015-2016 9) ComEd On-Peak Bids 2015-2016 4) Ameren Off-Peak Bids 2015-2016 10) ComEd Off-Peak Bids 2015-2016 5) Ameren On-Peak Bids 2016-2017 6) Ameren Off-Peak Bids 2016-2017 Bidder Information: Company Name Contact Name Phone Number Email Bidder information is incomplete. All fields are mandatory Product Information: Block Information - Ameren: Table 1: Table 2: Target for each Product Blocks Available for Each Combination (in blocks of 25MW each) (in blocks of 25MW each) On-Peak Off-Peak On-Peak Off-Peak Jun-2014 8 0 Jul-Aug 2014 11 4 Jul-2014 12 6 Jul-Aug 2015 7 4 Aug-2014 11 4 Jan-Feb 2016 3 2 Jun-2015 5 2 Jul-Aug 2016 7 5 Jul-2015 8 5 Oct-Nov-Dec 2016 2 2 Aug-2015 7 4 Jan-Feb 2017 4 4 Sep-2015 2 1 Mar-Apr 2017 2 1 Dec-2015 3 2 Jun 2016 - May 2017 2 1 Jan-2016 3 3 Feb-2016 3 2 Jun-2016 5 4 Jul-2016 7 6 Aug-2016 7 5 Sep-2016 5 3 Oct-2016 2 2 Nov-2016 3 2 Dec-2016 4 4 Jan-2017 4 4 Feb-2017 4 4 Mar-2017 3 2 Apr-2017 2 1 May-2017 3 2 Block Information - ComEd: Table 3: Table 4: Target for each Product Blocks Available for Each Combination (in blocks of 25MW each) (in blocks of 25MW each) On-Peak Off-Peak On-Peak Off-Peak Jun-2014 49 38 Jul-Aug 2014 56 42 Jul-2014 57 44 Oct-Nov-Dec 2014 20 13 Aug-2014 56 42 Jan-Feb 2015 23 17 Sep-2014 44 29 Mar-Apr 2015 15 7 Oct-2014 35 22 Jun 2014-May 2015 15 7 Nov-2014 20 13 Jul-Aug 2015 18 8 Dec-2014 24 20 Oct-Nov-Dec 2015 4 0 Jan-2015 24 20 Jan-Feb 2016 8 3 Feb-2015 23 17 Mar-Apr 2015 1 0 Mar-2015 20 11 Jun 2014-May 2015 1 0 Apr-2015 15 7 May-2015 15 9 Jun-2015 13 5 Jul-2015 20 10 Aug-2015 18 8 Sep-2015 9 2 Oct-2015 4 0 Nov-2015 4 0 Dec-2015 11 5 Jan-2016 10 4 Feb-2016 8 3 Mar-2016 5 0 Apr-2016 1 0 May-2016 1 0 Complete and Sign Certification: I, , certify under penalty of perjury that I am authorized to submit these Company Name Signature Please enter your Name and Electronic Signature. The Target for each Product is the quantity of each Product that this RFP seeks to procure expressed in number of 25 MW blocks. The Targets for Ameren are given in Table 1 and the Targets for ComEd are given in Table 3 below. This RFP seeks to procure forty-three (43) Products for Ameren and fourty-three (43) Products for ComEd. Each sheet contains two sections. Section 1 is for entering Bids. Section 2 is for entering a Maximum Willingness to Supply for each month and Segment. Section 2 is optional. This RFP solicits suppliers to deliver specific quantities of on-peak and off-peak energy in various months over the period June 1, 2014 through May 31, 2017. All on-peak hours in a given month constitute the on-peak Segment for that month and all off-peak hours constitute the off-peak Segment for that month. A Product is a constant quantity of energy to be delivered at the applicable company zone (either the Ameren Illinois Company Load Zone or the ComEd Zone) in either the on-peak Segment or the off-peak Segment of a specific month. A Bidder may bid on any number of Combinations and may bid on all Combinations. For each Combination, a Bidder may bid on any number of blocks up to and including the number of blocks available for each Combination. The number of blocks available for each Combination are provided for Ameren in Table 2 and for ComEd in Table 4. A Combination is a grouping of two or more Products. A Bidder may bid on one or more of the sixteen (16) Combinations for Ameren and the seventeen (17) Combinations for ComEd. A Bidder may bid on any number of Products and may bid on all Products. For each Product, a Bidder may bid on any number of blocks up to and including the Target for that Product. Bids. By affixing my electronic signature below I understand and agree to the following: Any Bid on any Product or any Combination submitted in response to this RFP is binding until nine (9) business days after the Bid Date. Each Bid constitutes a binding and irrevocable offer to supply a block of a Product or a block of the Combination at the price provided as the Bid and under the terms of the applicable supplier contract. All Bids together constitute a binding and irrevocable offer to supply, under the terms of the applicable supplier contract, the number of blocks of each Product at each price submitted and the number of blocks of each Combination at each price submitted up to the maximum willingness to supply for each Segment of each month. 0 Page 1 General Information

Upload: others

Post on 05-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Only Illustrative€¦ · Feb-2017 4 4 Mar-2017 3 2 Apr-2017 2 1 May-2017 3 2 Block Information - ComEd: Table 3: Table 4: Target for each Product Blocks Available for Each Combination

Illustr

ative

Only

Appendix 5Illinois Power Agency 2014 Spring Procurement Events

Bid Form - General InformationMonday, April 28, 2014

General Information:

In addition to this 'General Information' sheet, this Bid Form contains the following ten (10) sheets:

1) Ameren On-Peak Bids 2014-2015 7) ComEd On-Peak Bids 2014-20152) Ameren Off-Peak Bids 2014-2015 8) ComEd Off-Peak Bids 2014-20153) Ameren On-Peak Bids 2015-2016 9) ComEd On-Peak Bids 2015-20164) Ameren Off-Peak Bids 2015-2016 10) ComEd Off-Peak Bids 2015-20165) Ameren On-Peak Bids 2016-20176) Ameren Off-Peak Bids 2016-2017

Bidder Information:

Company Name Contact Name Phone Number Email

Bidder information is incomplete. All fields are mandatory

Product Information:

Block Information - Ameren:

Table 1: Table 2:Target for each Product Blocks Available for Each Combination

(in blocks of 25MW each) (in blocks of 25MW each)

On-Peak Off-Peak On-Peak Off-PeakJun-2014 8 0 Jul-Aug 2014 11 4Jul-2014 12 6 Jul-Aug 2015 7 4

Aug-2014 11 4 Jan-Feb 2016 3 2Jun-2015 5 2 Jul-Aug 2016 7 5Jul-2015 8 5 Oct-Nov-Dec 2016 2 2

Aug-2015 7 4 Jan-Feb 2017 4 4Sep-2015 2 1 Mar-Apr 2017 2 1Dec-2015 3 2 Jun 2016 - May 2017 2 1Jan-2016 3 3Feb-2016 3 2Jun-2016 5 4Jul-2016 7 6

Aug-2016 7 5Sep-2016 5 3Oct-2016 2 2Nov-2016 3 2Dec-2016 4 4Jan-2017 4 4Feb-2017 4 4Mar-2017 3 2Apr-2017 2 1

May-2017 3 2

Block Information - ComEd:

Table 3: Table 4:Target for each Product Blocks Available for Each Combination

(in blocks of 25MW each) (in blocks of 25MW each)

On-Peak Off-Peak On-Peak Off-PeakJun-2014 49 38 Jul-Aug 2014 56 42Jul-2014 57 44 Oct-Nov-Dec 2014 20 13

Aug-2014 56 42 Jan-Feb 2015 23 17Sep-2014 44 29 Mar-Apr 2015 15 7Oct-2014 35 22 Jun 2014-May 2015 15 7Nov-2014 20 13 Jul-Aug 2015 18 8Dec-2014 24 20 Oct-Nov-Dec 2015 4 0Jan-2015 24 20 Jan-Feb 2016 8 3Feb-2015 23 17 Mar-Apr 2015 1 0Mar-2015 20 11 Jun 2014-May 2015 1 0Apr-2015 15 7

May-2015 15 9Jun-2015 13 5Jul-2015 20 10

Aug-2015 18 8Sep-2015 9 2Oct-2015 4 0Nov-2015 4 0Dec-2015 11 5Jan-2016 10 4Feb-2016 8 3Mar-2016 5 0Apr-2016 1 0

May-2016 1 0

Complete and Sign Certification:

I, , certify under penalty of perjury that I am authorized to submit these

Company NameSignature

Please enter your Name and Electronic Signature.

The Target for each Product is the quantity of each Product that this RFP seeks to procure expressed in number of 25 MW blocks. The Targets for Ameren are given in Table 1 and the Targets for ComEd are given in Table 3 below. This RFP seeks to procure forty-three (43) Products for Ameren and fourty-three (43) Products for ComEd.

Each sheet contains two sections. Section 1 is for entering Bids. Section 2 is for entering a Maximum Willingness to Supply for each month and Segment. Section 2 is optional.

This RFP solicits suppliers to deliver specific quantities of on-peak and off-peak energy in various months over the period June 1, 2014 through May 31, 2017. All on-peak hours in a given month constitute the on-peak Segment for that month and all off-peak hours constitute the off-peak Segment for that month. A Product is a constant quantity of energy to be delivered at the applicable company zone (either the Ameren Illinois Company Load Zone or the ComEd Zone) in either the on-peak Segment or the off-peak Segment of a specific month.

A Bidder may bid on any number of Combinations and may bid on all Combinations. For each Combination, a Bidder may bid on any number of blocks up to and including the number of blocks available for each Combination. The number of blocks available for each Combination are provided for Ameren in Table 2 and for ComEd in Table 4.

A Combination is a grouping of two or more Products. A Bidder may bid on one or more of the sixteen (16) Combinations for Ameren and the seventeen (17) Combinations for ComEd.

A Bidder may bid on any number of Products and may bid on all Products. For each Product, a Bidder may bid on any number of blocks up to and including the Target for that Product.

Bids. By affixing my electronic signature below I understand and agree to the following:Any Bid on any Product or any Combination submitted in response to this RFP is binding until nine (9) business days after the Bid Date. Each Bid constitutes a binding and irrevocable offer to supply a block of a Product or a block of the Combination at the price provided as the Bid and under the terms of the applicable supplier contract. All Bids together constitute a binding and irrevocable offer to supply, under the terms of the applicable supplier contract, the number of blocks of each Product at each price submitted and the number of blocks of each Combination at each price submitted up to the maximum willingness to supply for each Segment of each month.

0

Page 1 General Information

Page 2: Only Illustrative€¦ · Feb-2017 4 4 Mar-2017 3 2 Apr-2017 2 1 May-2017 3 2 Block Information - ComEd: Table 3: Table 4: Target for each Product Blocks Available for Each Combination

Illustr

ative

Only

Illinois Power Agency 2014 Spring Procurement EventsBid Proposal Template - Ameren On-Peak Bids 2014-2015

Monday, April 28, 2014

Section 1. On-Peak Bids

Notes:

Jun-14 Jul-14 Aug-14 Sep-14 Oct-14 Nov-14 Dec-14 Jan-15 Feb-15 Mar-15 Apr-15 May-15

Jul-Aug 2014

Products

1 2 3 4 5 6 7 8 9

10 11

12

1 2 3 4 5 6 7 8 9

10

11

Section 2. Maximum Willingness to Supply ("MWS")

Jun-14 Jul-14 Aug-14 Sep-14 Oct-14 Nov-14 Dec-14 Jan-15 Feb-15 Mar-15 Apr-15 May-15

Default MWS - - -

MWS - - -

-A Bid is a price in $/MWh rounded to the nearest cent for one (1) block of a Product or one (1) block of a Combination.-An RFP Bidder may bid on any number of Products and may bid on all Products.-For each Product, an RFP Bidder may bid on any number of blocks up to and including the Target for that Product.-An RFP Bidder may bid on any number of Combinations and may bid on all Combinations. -For each Combination, an RFP Bidder may bid on any number of blocks up to and including the number of blocks available for each Combination.-Bids should be entered from top to bottom.

The Bidder may, but is not required to, specify a Maximum Willingness to Supply for a Segment and a month. The Maximum Willingness to Supply for a Segment and month is the maximum number of blocks that a bidder may win for that Segment and that month. The Maximum Willingness to Supply is set at its default value, which is the number of blocks bid for that Segment and that month, unless the Bidder specifies otherwise below. The default values for the Maximum Willingness to Supply are given in the "Default MWS" row below. The Bidder may specify another value in the "MWS" row below.

If a Bidder submits a Maximum Willingness to Supply that is greater than the number of blocks bid, this value will be ignored and discarded. The default Maximum Willingness to Supply will be used.

Combinations

Page 2 Ameren On-Peak Bids 2014-2015

Page 3: Only Illustrative€¦ · Feb-2017 4 4 Mar-2017 3 2 Apr-2017 2 1 May-2017 3 2 Block Information - ComEd: Table 3: Table 4: Target for each Product Blocks Available for Each Combination

Illustr

ative

Only

Illinois Power Agency 2014 Spring Procurement EventsBid Proposal Template - Ameren Off-Peak Bids 2014-2015

Monday, April 28, 2014

Section 1. Off-Peak Bids

Notes:

Jun-14 Jul-14 Aug-14 Sep-14 Oct-14 Nov-14 Dec-14 Jan-15 Feb-15 Mar-15 Apr-15 May-15

Jul-Aug 2014

Products1 2 3 4 5 6

1 2 3 4

Section 2. Maximum Willingness to Supply ("MWS")

Jun-14 Jul-14 Aug-14 Sep-14 Oct-14 Nov-14 Dec-14 Jan-15 Feb-15 Mar-15 Apr-15 May-15

Default MWS - -

MWS - -

-A Bid is a price in $/MWh rounded to the nearest cent for one (1) block of a Product or one (1) block of a Combination.-An RFP Bidder may bid on any number of Products and may bid on all Products.-For each Product, an RFP Bidder may bid on any number of blocks up to and including the Target for that Product. -There are no Combinations available over the June 1, 2014 to May 31, 2015 Off-Peak period. -Bids should be entered from top to bottom.

The Bidder may, but is not required to, specify a Maximum Willingness to Supply for a Segment and a month. The Maximum Willingness to Supply for a Segment and month is the maximum number of blocks that a bidder may win for that Segment and that month. The Maximum Willingness to Supply is set at its default value, which is the number of blocks bid for that Segment and that month, unless the Bidder specifies otherwise below. The default values for the Maximum Willingness to Supply are given in the "Default MWS" row below. The Bidder may specify another value in the "MWS" row below.

If a Bidder submits a Maximum Willingness to Supply that is greater than the number of blocks bid, this value will be ignored and discarded. The default Maximum Willingness to Supply will be used.

Combinations

Page 3 Ameren Off-Peak Bids 2014-2015

Page 4: Only Illustrative€¦ · Feb-2017 4 4 Mar-2017 3 2 Apr-2017 2 1 May-2017 3 2 Block Information - ComEd: Table 3: Table 4: Target for each Product Blocks Available for Each Combination

Illustr

ative

Only

Illinois Power Agency 2014 Spring Procurement EventsBid Proposal Template - Ameren On-Peak Bids 2015-2016

Monday, April 28, 2014

Section 1. On-Peak Bids

Notes:

Jun-15 Jul-15 Aug-15 Sep-15 Oct-15 Nov-15 Dec-15 Jan-16 Feb-16 Mar-16 Apr-16 May-16

Jul-Aug 2015 Jan-Feb 2016

Products1 2 3 4 5 6 7

8

1 2

3

4 5 6

7

Section 2. Maximum Willingness to Supply ("MWS")

Jun-15 Jul-15 Aug-15 Sep-15 Oct-15 Nov-15 Dec-15 Jan-16 Feb-16 Mar-16 Apr-16 May-16

Default MWS - - - - - - -

MWS - - - - - - -

If a Bidder submits a Maximum Willingness to Supply that is greater than the number of blocks bid, this value will be ignored and discarded. The default Maximum Willingness to Supply will be used.

Combinations

The Bidder may, but is not required to, specify a Maximum Willingness to Supply for a Segment and a month. The Maximum Willingness to Supply for a Segment and month is the maximum number of blocks that a bidder may win for that Segment and that month. Unless the Bidder specifies otherwise, the Maximum Willingness to Supply is set at its default value, which is the minimum of: (i) the number of blocks bid for that Segment and that month; and (ii) the target for that Segment and that month. The default values for the Maximum Willingness to Supply are given in the "Default MWS" row below. The Bidder may specify another value in the "MWS" row below.

-A Bid is a price in $/MWh rounded to the nearest cent for one (1) block of a Product or one (1) block of a Combination.-An RFP Bidder may bid on any number of Products and may bid on all Products.-For each Product, an RFP Bidder may bid on any number of blocks up to and including the Target for that Product.-An RFP Bidder may bid on any number of Combinations and may bid on all Combinations. -For each Combination, an RFP Bidder may bid on any number of blocks up to and including the number of blocks available for each Combination.-Bids should be entered from top to bottom.

Page 4 Ameren On-Peak Bids 2015-2016

Page 5: Only Illustrative€¦ · Feb-2017 4 4 Mar-2017 3 2 Apr-2017 2 1 May-2017 3 2 Block Information - ComEd: Table 3: Table 4: Target for each Product Blocks Available for Each Combination

Illustr

ative

Only

Illinois Power Agency 2014 Spring Procurement EventsBid Proposal Template - Ameren Off-Peak Bids 2015-2016

Monday, April 28, 2014

Section 1. Off-Peak Bids

Notes:

Jun-15 Jul-15 Aug-15 Sep-15 Oct-15 Nov-15 Dec-15 Jan-16 Feb-16 Mar-16 Apr-16 May-16

Jul-Aug 2015 Jan-Feb 2016

Products

1 2 3 4

5

1

2

3

4

Section 2. Maximum Willingness to Supply ("MWS")

Jun-15 Jul-15 Aug-15 Sep-15 Oct-15 Nov-15 Dec-15 Jan-16 Feb-16 Mar-16 Apr-16 May-16

Default MWS - - - - - - -

MWS - - - - - - -

If a Bidder submits a Maximum Willingness to Supply that is greater than the number of blocks bid, this value will be ignored and discarded. The default Maximum Willingness to Supply will be used.

-A Bid is a price in $/MWh rounded to the nearest cent for one (1) block of a Product or one (1) block of a Combination.-An RFP Bidder may bid on any number of Products and may bid on all Products.-For each Product, an RFP Bidder may bid on any number of blocks up to and including the Target for that Product.-An RFP Bidder may bid on any number of Combinations and may bid on all Combinations. -For each Combination, an RFP Bidder may bid on any number of blocks up to and including the number of blocks available for each Combination.-Bids should be entered from top to bottom.

Combinations

The Bidder may, but is not required to, specify a Maximum Willingness to Supply for a Segment and a month. The Maximum Willingness to Supply for a Segment and month is the maximum number of blocks that a bidder may win for that Segment and that month. Unless the Bidder specifies otherwise, the Maximum Willingness to Supply is set at its default value, which is the minimum of: (i) the number of blocks bid for that Segment and that month; and (ii) the target for that Segment and that month. the default values for the Maximum Willingness to Supply are given in the "Default MWS" row below. The Bidder may specify another value in the "MWS" row below.

Page 5 Ameren Off-Peak Bids 2015-2016

Page 6: Only Illustrative€¦ · Feb-2017 4 4 Mar-2017 3 2 Apr-2017 2 1 May-2017 3 2 Block Information - ComEd: Table 3: Table 4: Target for each Product Blocks Available for Each Combination

Illustr

ative

Only

Illinois Power Agency 2014 Spring Procurement EventsBid Proposal Template - Ameren On-Peak Bids 2016-2017

Monday, April 28, 2014

Section 1. On-Peak Bids

Notes:

Jun-16 Jul-16 Aug-16 Sep-16 Oct-16 Nov-16 Dec-16 Jan-17 Feb-17 Mar-17 Apr-17 May-17

Jul-Aug 2016 Oct-Nov-Dec 2016 Jan-Feb 2017 Mar-Apr 2017

Jun 2016 - May 2017

Products1 2 3 4 5 6

7

1

2

3

4

5 6

7

1

2

Section 2. Maximum Willingness to Supply ("MWS")

Jun-16 Jul-16 Aug-16 Sep-16 Oct-16 Nov-16 Dec-16 Jan-17 Feb-17 Mar-17 Apr-17 May-17

Default MWS - - - - - - - - - - - -

MWS - - - - - - - - - - - -

-A Bid is a price in $/MWh rounded to the nearest cent for one (1) block of a Product or one (1) block of a Combination.-An RFP Bidder may bid on any number of Products and may bid on all Products -For each Product, an RFP Bidder may bid on any number of blocks up to and including the Target for that Product.-An RFP Bidder may bid on any number of Combinations and may bid on all Combinations. -For each Combination, an RFP Bidder may bid on any number of blocks up to and including the number of blocks available for each Combination.-Bids should be entered from top to bottom.

Combinations

The Bidder may, but is not required to, specify a Maximum Willingness to Supply for a Segment and a month. The Maximum Willingness to Supply for a Segment and month is the maximum number of blocks that a bidder may win for that Segment and that month. Unless the Bidder specifies otherwise, the Maximum Willingness to Supply is set at its default value, which is the minimum of: (i) the number of blocks bid for that Segment and that month; and (ii) the target for that Segment and that month. The default values for the Maximum Willingness to Supply are given in the "Default MWS" row below. The Bidder may specify another value in the "MWS" row below.

If a Bidder submits a Maximum Willingness to Supply that is greater than the number of blocks bid, this value will be ignored and discarded. The default Maximum Willingness to Supply will be used.

Page 4 Ameren On-Peak Bids 2016-2017

Page 7: Only Illustrative€¦ · Feb-2017 4 4 Mar-2017 3 2 Apr-2017 2 1 May-2017 3 2 Block Information - ComEd: Table 3: Table 4: Target for each Product Blocks Available for Each Combination

Illustr

ative

Only

Illinois Power Agency 2014 Spring Procurement EventsBid Proposal Template - Ameren Off-Peak Bids 2016-2017

Monday, April 28, 2014

Section 1. Off-Peak Bids

Notes:

Jun-16 Jul-16 Aug-16 Sep-16 Oct-16 Nov-16 Dec-16 Jan-17 Feb-17 Mar-17 Apr-17 May-17

Jul-Aug 2016 Oct-Nov-Dec 2016 Jan-Feb 2017 Mar-Apr 2017

Jun 2016 - May 2017

Products

1 2 3 4 5

6

1

2

3

4

5

1

Section 2. Maximum Willingness to Supply ("MWS")

Jun-16 Jul-16 Aug-16 Sep-16 Oct-16 Nov-16 Dec-16 Jan-17 Feb-17 Mar-17 Apr-17 May-17

Default MWS - - - - - - - - - - - -

MWS - - - - - - - - - - - -

If a Bidder submits a Maximum Willingness to Supply that is greater than the number of blocks bid, this value will be ignored and discarded. The default Maximum Willingness to Supply will be used.

-A Bid is a price in $/MWh rounded to the nearest cent for one (1) block of a Product or one (1) block of a Combination.-An RFP Bidder may bid on any number of Products and may bid on all Products -For each Product, an RFP Bidder may bid on any number of blocks up to and including the Target for that Product.-An RFP Bidder may bid on any number of Combinations and may bid on all Combinations. -For each Combination, an RFP Bidder may bid on any number of blocks up to and including the number of blocks available for each Combination.-Bids should be entered from top to bottom.

Combinations

The Bidder may, but is not required to, specify a Maximum Willingness to Supply for a Segment and a month. The Maximum Willingness to Supply for a Segment and month is the maximum number of blocks that a bidder may win for that Segment and that month. Unless the Bidder specifies otherwise, the Maximum Willingness to Supply is set at its default value, which is the minimum of: (i) the number of blocks bid for that Segment and that month; and (ii) the target for that Segment and that month. the default values for the Maximum Willingness to Supply are given in the "Default MWS" row below. The Bidder may specify another value in the "MWS" row below.

Page 5 Ameren Off-Peak Bids 2016-2017

Page 8: Only Illustrative€¦ · Feb-2017 4 4 Mar-2017 3 2 Apr-2017 2 1 May-2017 3 2 Block Information - ComEd: Table 3: Table 4: Target for each Product Blocks Available for Each Combination

Illustr

ative

Only

Illinois Power Agency 2014 Spring Procurement EventsBid Proposal Template - ComEd On-Peak Bids 2014-2015

Monday, April 28, 2014

Section 1. On-Peak Bids

Notes:

Jun-14 Jul-14 Aug-14 Sep-14 Oct-14 Nov-14 Dec-14 Jan-15 Feb-15 Mar-15 Apr-15 May-15Jul-Aug 2014 Oct-Nov-Dec 2014 Jan-Feb 2015 Mar-Apr 2015

Jun 2014 - May 2015Products

1 2 3 4 5 6 7 8 9

10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49

-A Bid is a price in $/MWh rounded to the nearest cent for one (1) block of a Product or one (1) block of a Combination.-An RFP Bidder may bid on any number of Products and may bid on all Products -For each Product, an RFP Bidder may bid on any number of blocks up to and including the Target for that Product.-An RFP Bidder may bid on any number of Combinations and may bid on all Combinations. -For each Combination, an RFP Bidder may bid on any number of blocks up to and including the number of blocks available for each Combination.-Bids should be entered from top to bottom.

Page 4 ComEd On-Peak Bids 2014-2015

Page 9: Only Illustrative€¦ · Feb-2017 4 4 Mar-2017 3 2 Apr-2017 2 1 May-2017 3 2 Block Information - ComEd: Table 3: Table 4: Target for each Product Blocks Available for Each Combination

Illustr

ative

Only

Illinois Power Agency 2014 Spring Procurement EventsBid Proposal Template - ComEd On-Peak Bids 2014-2015

Monday, April 28, 2014

Section 1. On-Peak Bids

Notes:

Jun-14 Jul-14 Aug-14 Sep-14 Oct-14 Nov-14 Dec-14 Jan-15 Feb-15 Mar-15 Apr-15 May-15Jul-Aug 2014 Oct-Nov-Dec 2014 Jan-Feb 2015 Mar-Apr 2015

-A Bid is a price in $/MWh rounded to the nearest cent for one (1) block of a Product or one (1) block of a Combination.-An RFP Bidder may bid on any number of Products and may bid on all Products -For each Product, an RFP Bidder may bid on any number of blocks up to and including the Target for that Product.-An RFP Bidder may bid on any number of Combinations and may bid on all Combinations. -For each Combination, an RFP Bidder may bid on any number of blocks up to and including the number of blocks available for each Combination.-Bids should be entered from top to bottom.

50 51 52 53 54 55 56 57

1 2 3 4 5 6 7 8 9

10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42

Combinations

Page 4 ComEd On-Peak Bids 2014-2015

Page 10: Only Illustrative€¦ · Feb-2017 4 4 Mar-2017 3 2 Apr-2017 2 1 May-2017 3 2 Block Information - ComEd: Table 3: Table 4: Target for each Product Blocks Available for Each Combination

Illustr

ative

Only

Illinois Power Agency 2014 Spring Procurement EventsBid Proposal Template - ComEd On-Peak Bids 2014-2015

Monday, April 28, 2014

Section 1. On-Peak Bids

Notes:

Jun-14 Jul-14 Aug-14 Sep-14 Oct-14 Nov-14 Dec-14 Jan-15 Feb-15 Mar-15 Apr-15 May-15Jul-Aug 2014 Oct-Nov-Dec 2014 Jan-Feb 2015 Mar-Apr 2015

-A Bid is a price in $/MWh rounded to the nearest cent for one (1) block of a Product or one (1) block of a Combination.-An RFP Bidder may bid on any number of Products and may bid on all Products -For each Product, an RFP Bidder may bid on any number of blocks up to and including the Target for that Product.-An RFP Bidder may bid on any number of Combinations and may bid on all Combinations. -For each Combination, an RFP Bidder may bid on any number of blocks up to and including the number of blocks available for each Combination.-Bids should be entered from top to bottom.

43 44 45 46 47 48 49 50 51 52 53 54 55 56 1 2 3 4 5 6 7 8 9

10 11 12 13 14 15

Section 2. Maximum Willingness to Supply ("MWS")

Jun-14 Jul-14 Aug-14 Sep-14 Oct-14 Nov-14 Dec-14 Jan-15 Feb-15 Mar-15 Apr-15 May-15

Default MWS - - - - - - - - - - - -

MWS - - - - - - - - - - - -

The Bidder may, but is not required to, specify a Maximum Willingness to Supply for a Segment and a month. The Maximum Willingness to Supply for a Segment and month is the maximum number of blocks that a bidder may win for that Segment and that month. Unless the Bidder specifies otherwise, the Maximum Willingness to Supply is set at its default value, which is the minimum of: (i) the number of blocks bid for that Segment and that month; and (ii) the target for that Segment and that month. The default values for the Maximum Willingness to Supply are given in the "Default MWS" row below. The Bidder may specify another value in the "MWS" row below.

If a Bidder submits a Maximum Willingness to Supply that is greater than the number of blocks bid, this value will be ignored and discarded. The default Maximum Willingness to Supply will be used.

Page 4 ComEd On-Peak Bids 2014-2015

Page 11: Only Illustrative€¦ · Feb-2017 4 4 Mar-2017 3 2 Apr-2017 2 1 May-2017 3 2 Block Information - ComEd: Table 3: Table 4: Target for each Product Blocks Available for Each Combination

Illustr

ative

Only

Illinois Power Agency 2014 Spring Procurement EventsBid Proposal Template - ComEd Off-Peak Bids 2014-2015

Monday, April 28, 2014

Section 1. Off-Peak Bids

Notes:

Jun-14 Jul-14 Aug-14 Sep-14 Oct-14 Nov-14 Dec-14 Jan-15 Feb-15 Mar-15 Apr-15 May-15Jul-Aug 2014 Oct-Nov-Dec 2014 Jan-Feb 2015 Mar-Apr 2015

Jun 2014 - May 2015Products

1 2 3 4 5 6 7 8 9

10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39

-A Bid is a price in $/MWh rounded to the nearest cent for one (1) block of a Product or one (1) block of a Combination.-An RFP Bidder may bid on any number of Products and may bid on all Products -For each Product, an RFP Bidder may bid on any number of blocks up to and including the Target for that Product.-An RFP Bidder may bid on any number of Combinations and may bid on all Combinations. -For each Combination, an RFP Bidder may bid on any number of blocks up to and including the number of blocks available for each Combination.-Bids should be entered from top to bottom.

Page 5 ComEd Off-Peak Bids 2014-2015

Page 12: Only Illustrative€¦ · Feb-2017 4 4 Mar-2017 3 2 Apr-2017 2 1 May-2017 3 2 Block Information - ComEd: Table 3: Table 4: Target for each Product Blocks Available for Each Combination

Illustr

ative

Only

Illinois Power Agency 2014 Spring Procurement EventsBid Proposal Template - ComEd Off-Peak Bids 2014-2015

Monday, April 28, 2014

Section 1. Off-Peak Bids

Notes:

Jun-14 Jul-14 Aug-14 Sep-14 Oct-14 Nov-14 Dec-14 Jan-15 Feb-15 Mar-15 Apr-15 May-15Jul-Aug 2014 Oct-Nov-Dec 2014 Jan-Feb 2015 Mar-Apr 2015

-A Bid is a price in $/MWh rounded to the nearest cent for one (1) block of a Product or one (1) block of a Combination.-An RFP Bidder may bid on any number of Products and may bid on all Products -For each Product, an RFP Bidder may bid on any number of blocks up to and including the Target for that Product.-An RFP Bidder may bid on any number of Combinations and may bid on all Combinations. -For each Combination, an RFP Bidder may bid on any number of blocks up to and including the number of blocks available for each Combination.-Bids should be entered from top to bottom.

40 41 42 43 44

1 2 3 4 5 6 7 8 9

10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34

Combinations

Page 5 ComEd Off-Peak Bids 2014-2015

Page 13: Only Illustrative€¦ · Feb-2017 4 4 Mar-2017 3 2 Apr-2017 2 1 May-2017 3 2 Block Information - ComEd: Table 3: Table 4: Target for each Product Blocks Available for Each Combination

Illustr

ative

Only

Illinois Power Agency 2014 Spring Procurement EventsBid Proposal Template - ComEd Off-Peak Bids 2014-2015

Monday, April 28, 2014

Section 1. Off-Peak Bids

Notes:

Jun-14 Jul-14 Aug-14 Sep-14 Oct-14 Nov-14 Dec-14 Jan-15 Feb-15 Mar-15 Apr-15 May-15Jul-Aug 2014 Oct-Nov-Dec 2014 Jan-Feb 2015 Mar-Apr 2015

-A Bid is a price in $/MWh rounded to the nearest cent for one (1) block of a Product or one (1) block of a Combination.-An RFP Bidder may bid on any number of Products and may bid on all Products -For each Product, an RFP Bidder may bid on any number of blocks up to and including the Target for that Product.-An RFP Bidder may bid on any number of Combinations and may bid on all Combinations. -For each Combination, an RFP Bidder may bid on any number of blocks up to and including the number of blocks available for each Combination.-Bids should be entered from top to bottom.

35 36 37 38 39 40 41 42 1 2 3 4 5 6 7

Section 2. Maximum Willingness to Supply ("MWS")

Jun-14 Jul-14 Aug-14 Sep-14 Oct-14 Nov-14 Dec-14 Jan-15 Feb-15 Mar-15 Apr-15 May-15

Default MWS - - - - - - - - - - - -

MWS - - - - - - - - - - - -

If a Bidder submits a Maximum Willingness to Supply that is greater than the number of blocks bid, this value will be ignored and discarded. The default Maximum Willingness to Supply will be used.

The Bidder may, but is not required to, specify a Maximum Willingness to Supply for a Segment and a month. The Maximum Willingness to Supply for a Segment and month is the maximum number of blocks that a bidder may win for that Segment and that month. Unless the Bidder specifies otherwise, the Maximum Willingness to Supply is set at its default value, which is the minimum of: (i) the number of blocks bid for that Segment and that month; and (ii) the target for that Segment and that month. the default values for the Maximum Willingness to Supply are given in the "Default MWS" row below. The Bidder may specify another value in the "MWS" row below.

Page 5 ComEd Off-Peak Bids 2014-2015

Page 14: Only Illustrative€¦ · Feb-2017 4 4 Mar-2017 3 2 Apr-2017 2 1 May-2017 3 2 Block Information - ComEd: Table 3: Table 4: Target for each Product Blocks Available for Each Combination

Illustr

ative

Only

Illinois Power Agency 2014 Spring Procurement EventsBid Proposal Template - ComEd On-Peak Bids 2015-2016

Monday, April 28, 2014

Section 1. On-Peak Bids

Notes:

Jun-15 Jul-15 Aug-15 Sep-15 Oct-15 Nov-15 Dec-15 Jan-16 Feb-16 Mar-16 Apr-16 May-16Jul-Aug 2015 Oct-Nov-Dec 2015 Jan-Feb 2016 Mar-Apr 2016

Jun 2015 - May 2016Products

1 2 3 4 5 6 7 8 9

10 11 12 13 14 15 16 17 18 19 20

1 2 3 4 5 6 7 8 9

10 11 12 13 14 15 16 17 18 1

-A Bid is a price in $/MWh rounded to the nearest cent for one (1) block of a Product or one (1) block of a Combination.-An RFP Bidder may bid on any number of Products and may bid on all Products -For each Product, an RFP Bidder may bid on any number of blocks up to and including the Target for that Product.-An RFP Bidder may bid on any number of Combinations and may bid on all Combinations. -For each Combination, an RFP Bidder may bid on any number of blocks up to and including the number of blocks available for each Combination.-Bids should be entered from top to bottom.

Combinations

Page 4 ComEd On-Peak Bids 2015-2016

Page 15: Only Illustrative€¦ · Feb-2017 4 4 Mar-2017 3 2 Apr-2017 2 1 May-2017 3 2 Block Information - ComEd: Table 3: Table 4: Target for each Product Blocks Available for Each Combination

Illustr

ative

Only

Illinois Power Agency 2014 Spring Procurement EventsBid Proposal Template - ComEd On-Peak Bids 2015-2016

Monday, April 28, 2014

Section 1. On-Peak Bids

Notes:

Jun-15 Jul-15 Aug-15 Sep-15 Oct-15 Nov-15 Dec-15 Jan-16 Feb-16 Mar-16 Apr-16 May-16Jul-Aug 2015 Oct-Nov-Dec 2015 Jan-Feb 2016 Mar-Apr 2016

-A Bid is a price in $/MWh rounded to the nearest cent for one (1) block of a Product or one (1) block of a Combination.-An RFP Bidder may bid on any number of Products and may bid on all Products -For each Product, an RFP Bidder may bid on any number of blocks up to and including the Target for that Product.-An RFP Bidder may bid on any number of Combinations and may bid on all Combinations. -For each Combination, an RFP Bidder may bid on any number of blocks up to and including the number of blocks available for each Combination.-Bids should be entered from top to bottom.

Section 2. Maximum Willingness to Supply ("MWS")

Jun-16 Jul-16 Aug-16 Sep-16 Oct-16 Nov-16 Dec-16 Jan-17 Feb-17 Mar-17 Apr-17 May-17

Default MWS - - - - - - - - - - - -

MWS - - - - - - - - - - - -

The Bidder may, but is not required to, specify a Maximum Willingness to Supply for a Segment and a month. The Maximum Willingness to Supply for a Segment and month is the maximum number of blocks that a bidder may win for that Segment and that month. Unless the Bidder specifies otherwise, the Maximum Willingness to Supply is set at its default value, which is the minimum of: (i) the number of blocks bid for that Segment and that month; and (ii) the target for that Segment and that month. The default values for the Maximum Willingness to Supply are given in the "Default MWS" row below. The Bidder may specify another value in the "MWS" row below.

If a Bidder submits a Maximum Willingness to Supply that is greater than the number of blocks bid, this value will be ignored and discarded. The default Maximum Willingness to Supply will be used.

Page 4 ComEd On-Peak Bids 2015-2016

Page 16: Only Illustrative€¦ · Feb-2017 4 4 Mar-2017 3 2 Apr-2017 2 1 May-2017 3 2 Block Information - ComEd: Table 3: Table 4: Target for each Product Blocks Available for Each Combination

Illustr

ative

Only

Illinois Power Agency 2014 Spring Procurement EventsBid Proposal Template - ComEd Off-Peak Bids 2015-2016

Monday, April 28, 2014

Section 1. Off-Peak Bids

Notes:

Jun-15 Jul-15 Aug-15 Sep-15 Oct-15 Nov-15 Dec-15 Jan-16 Feb-16 Mar-16 Apr-16 May-16

Jul-Aug 2015 Jan-Feb 2016

Products

1 2 3 4 5 6 7 8 9

10

1 2

3

4 5 6 7

8

Section 2. Maximum Willingness to Supply ("MWS")

Jun-15 Jul-15 Aug-15 Sep-15 Oct-15 Nov-15 Dec-15 Jan-16 Feb-16 Mar-16 Apr-16 May-16

Default MWS - - - - - - -

MWS - - - - - - -

If a Bidder submits a Maximum Willingness to Supply that is greater than the number of blocks bid, this value will be ignored and discarded. The default Maximum Willingness to Supply will be used.

The Bidder may, but is not required to, specify a Maximum Willingness to Supply for a Segment and a month. The Maximum Willingness to Supply for a Segment and month is the maximum number of blocks that a bidder may win for that Segment and that month. Unless the Bidder specifies otherwise, the Maximum Willingness to Supply is set at its default value, which is the minimum of: (i) the number of blocks bid for that Segment and that month; and (ii) the target for that Segment and that month. the default values for the Maximum Willingness to Supply are given in the "Default MWS" row below. The Bidder may specify another value in the "MWS" row below.

-A Bid is a price in $/MWh rounded to the nearest cent for one (1) block of a Product or one (1) block of a Combination.-An RFP Bidder may bid on any number of Products and may bid on all Products -For each Product, an RFP Bidder may bid on any number of blocks up to and including the Target for that Product.-An RFP Bidder may bid on any number of Combinations and may bid on all Combinations. -For each Combination, an RFP Bidder may bid on any number of blocks up to and including the number of blocks available for each Combination.-Bids should be entered from top to bottom.

Combinations

Page 5 ComEd Off-Peak Bids 2015-2016