Page 1: ONEIA Don Forbes Presentation

West Don Lands

Pan Am Athletes’Village Project

March 3, 2011

Page 2: ONEIA Don Forbes Presentation

2

Site Background and History

• Former Industrial Lands

• Subject to Historical Infilling

• Past Environmental Work

Page 3: ONEIA Don Forbes Presentation

Redevelopment Partners

• Ontario Realty Corporation

• Waterfront Toronto

• Toronto & Region Conservation Authority

• City of Toronto

3

Page 4: ONEIA Don Forbes Presentation

Redevelopment Vision

• Waterfront Toronto’s Precinct Plan

4

Page 5: ONEIA Don Forbes Presentation

Obstacles to Redevelopment

• The West Don Lands is Situated on a Flood Plain

5

Page 6: ONEIA Don Forbes Presentation

Obstacles to Redevelopment

• Solution for Redevelopment - The Flood Protection Landform (FPL)

6

Page 7: ONEIA Don Forbes Presentation

Obstacles to Redevelopment

• Environmental Approvals to Convey Lands, Change Land Use and Obtain Building Permits for Construction– Procurement of Environmental Consulting

Services– Staged Approach for Approvals

7

Page 8: ONEIA Don Forbes Presentation

Let The Games Begin!

• Announcement of Toronto as the Winning Bid for the 2015 Pan American/Parapan American Games

• New Partners in the Redevelopment– Ministry of Health Promotion– Toronto 2015– Infrastructure Ontario

8

Page 9: ONEIA Don Forbes Presentation

Proposed Pan Am Athletes’ Village

• Village

• Overlay

9

Page 10: ONEIA Don Forbes Presentation

Delivery Schedule

• 2015 Pan American Games– July 2015

• 2015 Parapan American Games– August 2015

• Handover to Toronto 2015– March 2015

• Handover to Project Co.– July 2011

10

Page 11: ONEIA Don Forbes Presentation

The Environmental Team

• Selection of ORC’s Environmental Consultant for the Project

11

Page 12: ONEIA Don Forbes Presentation

The Environmental Team

• ORC Resources Dedicated to the Project– Tom Guoth & Warren Croft

– Cecile Willert

– David Hutchinson

12

Page 13: ONEIA Don Forbes Presentation

Complementary Due Diligence

• Geotechnical• Hydrogeological• Geophysics• Geothermal• Archaeological• ORC Resources Dedicated to the Project

– John Brisbois

13

Page 14: ONEIA Don Forbes Presentation

Geotechnical & Hydrogeological

• Geotechnical Program

• Hydrogeology Program

14

Page 15: ONEIA Don Forbes Presentation

Hydrogeological Assessment

• Hydrogeology Conditions

15

Page 16: ONEIA Don Forbes Presentation

Geophysical Assessment

• Seismic Profiling

• Ground Penetrating Radar

16

Page 17: ONEIA Don Forbes Presentation

Geothermal Assessment

• Geothermal Potential

17

Page 18: ONEIA Don Forbes Presentation

Archaeological Component

• Archaeology Results

18

Page 19: ONEIA Don Forbes Presentation

Environmental Objective

• Obtain Regulatory Approvals Necessary to Support the Redevelopment of the West Don Lands as the Pan Am Athletes’ Village Within the Accelerated Schedule

19

Page 20: ONEIA Don Forbes Presentation

Environmental Work Flow

20

Phase I /II ESA

Finalize Phase II

ESA report

Risk Assessment Accepted by

MOE

Risk Assessment

File Record of Site

Condition (RSC)

RSC Acknowledged

by MOE

Removal of Soil

Exceeding PSS

Certificate of Property Use Issued for RA

Property

Project Co Implements

Conditions of CPU

Page 21: ONEIA Don Forbes Presentation

Environmental Approach

• Risk Assessment vs. Generic Remediation– Accelerated Schedule– Cost Effectiveness– Treatment Options Ruled Out Early– Sustainability– Certainty

21

Page 22: ONEIA Don Forbes Presentation

Obstacles Identified

• Accelerated Schedule• Volume of Work• Implications of Amendments to O.Reg.

153/04• City of Toronto Review Process• MOE Review Periods and Resubmission

of Risk Assessments

22

Page 23: ONEIA Don Forbes Presentation

Mitigation Strategies

• Expand the Team by Drawing on the Resources Available Within CH2M Hill

• Engage the MOE and City Early• Integrate the Review Process with the

Drafting Process• Complete Activities Concurrently

23

Page 24: ONEIA Don Forbes Presentation

Mitigation Strategy Response

• CH2M Hill

• City of Toronto

• Ministry of Environment

24

Page 25: ONEIA Don Forbes Presentation

Phase I ESA

• Four Phase I ESA’s Completed for the West Don Lands

• Three Cover the PAAV

25

Page 26: ONEIA Don Forbes Presentation

Phase II ESA

• Nine Phase II ESAs for the West Don Lands

• Five Cover the PAAV

26

Page 27: ONEIA Don Forbes Presentation

Site Characterization

• Over 1000 Historical BH/MW/TP/Exc.

• Over 500 Additional Completed

– 1400+ Soil Samples– 185 MW’s & 317 GW

Samples

27

Page 28: ONEIA Don Forbes Presentation

Site Characterization

28

Page 29: ONEIA Don Forbes Presentation

Site Characterization

• Nature and Extent of Impacts – Soil

• Impacts sporadically distributed across Site • Typically limited to shallow soil

(fill and upper native soil)• Categories of chemicals found above MOE

Generic Standards: Metals/inorganics, VOCs, PHCs, PAHs, PCBs, Phenols, and Dioxins/Furans

29

Page 30: ONEIA Don Forbes Presentation

Site Characterization

• Nature and Extent of Impacts – Groundwater

• Impacts sporadically distributed• No evidence of plumes identified• Categories of chemicals found above MOE

Generic Standards: Metals/inorganics, VOCs, PHCs, PAHs, and PCBs

30

Page 31: ONEIA Don Forbes Presentation

Risk Assessment

• Subdivision of The West Don Lands into Logical, Manageable Groupings– Nine RA

Groups, Five Cover PAAV

31

Page 32: ONEIA Don Forbes Presentation

Risk Assessment

• Primary Exposure Pathways– Dermal Contact

• Soil and Groundwater– Inhalation

• Vapour Intrusion• Managing Risk of Exposure

– PSS Remediation– Risk Management Measures

32

Page 33: ONEIA Don Forbes Presentation

Risk Assessment

• Identify Contaminants of Concern• Develop Conceptual Site Model• Evaluate Exposure Scenarios• Create Property Specific Standards• Identify Necessary RMM’s to Support

Redevelopment• Remove Soils Exceeding PSS• Implement RMM’s During Construction

33

Page 34: ONEIA Don Forbes Presentation

PSS Remediation Areas

• Limited PSS Remediation Necessary to Support RSC Filing

34

Page 35: ONEIA Don Forbes Presentation

Slab on Grade Construction RMM

35

Page 36: ONEIA Don Forbes Presentation

Basement Construction RMM

36

Page 37: ONEIA Don Forbes Presentation

Road Construction RMM

37

Page 38: ONEIA Don Forbes Presentation

Service &Utility Fill Zone RMM

38

Page 39: ONEIA Don Forbes Presentation

Hard Cap Barrier RMM

39

Page 40: ONEIA Don Forbes Presentation

Soft Cap Barrier RMM

40

Page 41: ONEIA Don Forbes Presentation

Environmental Requirements

• Actions for Future Developers– Manage Soil, GW, Sediment– Design & Install Necessary RMM’s– Implement O&M Requirements of RMM’s– Implement GW Monitoring

41

Page 42: ONEIA Don Forbes Presentation

Where Are We Now?

• Risk Assessments Accepted by the MOE

• Remaining Approvals are On-going

42

Page 43: ONEIA Don Forbes Presentation

Where Are We Now?

• Procurement of PSS Remediation Contractor Underway

• Reviewing Certificates of Property Use for Posting to the EBR

• Finalizing Phase II ESA’s• Preparing to File RSC’s• Looking at the Next Areas of the WDL to

Investigate43

Page 44: ONEIA Don Forbes Presentation

Impacts of Pan Am Athletes’ Village

• Original Schedule for the Build Out of the West Don Lands – 15-20 Years

• Pan Am Athletes’ Village Comprises Almost Half of the WDL – Complete for 2015

• Public Initiative to Spur Private Investment

44

Page 45: ONEIA Don Forbes Presentation

Additional Information

Ontario Realty Corporationwww.ontariorealty.ca

Infrastructure Ontariowww.infrastructureontario.ca

Waterfront Torontowww.waterfrontoronto.ca

Toronto 2015www.toronto2015.org

45

Page 46: ONEIA Don Forbes Presentation

Thanks

Many Thanks to the Following for Their Assistance in the Preparation of the Material

Used in the PresentationCH2M Hill – www.ch2mhill.com

LVM – www.lvm.caWESA – www.wesa.ca

Waterfront Toronto – www.waterfrontoronto.ca

46

Page 47: ONEIA Don Forbes Presentation

Questions?

47