olmsted locks & dam construction status
TRANSCRIPT
![Page 1: Olmsted Locks & Dam Construction Status](https://reader035.vdocuments.mx/reader035/viewer/2022081623/6156fba1a097e25c764fb409/html5/thumbnails/1.jpg)
BUILDING STRONG 1Louisville District
Olmsted Locks & DamConstruction Status
Inland Waterways User BoardChicago, IL
18 November 2008
![Page 2: Olmsted Locks & Dam Construction Status](https://reader035.vdocuments.mx/reader035/viewer/2022081623/6156fba1a097e25c764fb409/html5/thumbnails/2.jpg)
BUILDING STRONG 2
August 2008 Aerial View
![Page 3: Olmsted Locks & Dam Construction Status](https://reader035.vdocuments.mx/reader035/viewer/2022081623/6156fba1a097e25c764fb409/html5/thumbnails/3.jpg)
BUILDING STRONG 3
Gantry Crane
Features Include:
Lifting Capacity- 5,100 tons
Clearance Dimensions –100-foot vertical and 130-
foot horizontal
![Page 4: Olmsted Locks & Dam Construction Status](https://reader035.vdocuments.mx/reader035/viewer/2022081623/6156fba1a097e25c764fb409/html5/thumbnails/4.jpg)
BUILDING STRONG 4
Lower Marine Skidway
![Page 5: Olmsted Locks & Dam Construction Status](https://reader035.vdocuments.mx/reader035/viewer/2022081623/6156fba1a097e25c764fb409/html5/thumbnails/5.jpg)
BUILDING STRONG 5
Stilling Basin Shell Bearing Wall Erection
![Page 6: Olmsted Locks & Dam Construction Status](https://reader035.vdocuments.mx/reader035/viewer/2022081623/6156fba1a097e25c764fb409/html5/thumbnails/6.jpg)
BUILDING STRONG 6
Lower Pier Shell Base Support Structure
![Page 7: Olmsted Locks & Dam Construction Status](https://reader035.vdocuments.mx/reader035/viewer/2022081623/6156fba1a097e25c764fb409/html5/thumbnails/7.jpg)
BUILDING STRONG 7
Ringer Barge and Crane
Features Include: A Manitowoc 60-foot diameter platform ringer crane with 660 ton capacity, 200-
foot boom & 1,200,000 lbs of counterweight mounted on a
200-foot by 100-foot by 12-foot deep flat deck barge.
![Page 8: Olmsted Locks & Dam Construction Status](https://reader035.vdocuments.mx/reader035/viewer/2022081623/6156fba1a097e25c764fb409/html5/thumbnails/8.jpg)
BUILDING STRONG 8
Catamaran Lift BargeFeatures Include: 4500 Ton Capacity, Clear
opening of 130’, Starboard & Port Barges 90’x 200’ x 15’, Gantry beam 15’ deep and 63’
above deck, Design Draft 11’, Overall Dimensions 200’ by 310’
![Page 9: Olmsted Locks & Dam Construction Status](https://reader035.vdocuments.mx/reader035/viewer/2022081623/6156fba1a097e25c764fb409/html5/thumbnails/9.jpg)
BUILDING STRONG 9
Dam in River Activities
![Page 10: Olmsted Locks & Dam Construction Status](https://reader035.vdocuments.mx/reader035/viewer/2022081623/6156fba1a097e25c764fb409/html5/thumbnails/10.jpg)
BUILDING STRONG 10
Excavator BargeFeatures Include:
3 Legged Jacking Spuds –Capable of Lifting the barge out
of buoyancy to allow the GPS System to be accurately located, which will allow the excavator’s
electronic system to excavate within plus 0” , minus 6”
tolerance.
![Page 11: Olmsted Locks & Dam Construction Status](https://reader035.vdocuments.mx/reader035/viewer/2022081623/6156fba1a097e25c764fb409/html5/thumbnails/11.jpg)
BUILDING STRONG 11
Filling Grout Mat
![Page 12: Olmsted Locks & Dam Construction Status](https://reader035.vdocuments.mx/reader035/viewer/2022081623/6156fba1a097e25c764fb409/html5/thumbnails/12.jpg)
BUILDING STRONG 12
Dam in River Activities
![Page 13: Olmsted Locks & Dam Construction Status](https://reader035.vdocuments.mx/reader035/viewer/2022081623/6156fba1a097e25c764fb409/html5/thumbnails/13.jpg)
BUILDING STRONG 13
Construction Schedule
1993
1994
1995
1996
1997
1998
1999
2000
2001
2002
2003
2004
2005
2006
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
Demo L&D 52 & 53
Dam
Bldgs & Grounds
DS Mooring Cells
Gate Storage
Bulkheads
Approach Walls
Boat Ramp
BWMA
Lock
Prototype
Cofferdam
Road & Office
![Page 14: Olmsted Locks & Dam Construction Status](https://reader035.vdocuments.mx/reader035/viewer/2022081623/6156fba1a097e25c764fb409/html5/thumbnails/14.jpg)
BUILDING STRONG 14
Dam Contract Funding
FY- 09 $12,000,000 (Thru 31 Oct 2008)FY- 08 $92,309,809FY- 07 $95,000,000FY- 06 $78,866,827FY- 05 $44,521,000FY- 04 $4,050,000
Total Obligated to Contract = $326,747,636Most Likely Cost of Dam = $1,058,700,000
![Page 15: Olmsted Locks & Dam Construction Status](https://reader035.vdocuments.mx/reader035/viewer/2022081623/6156fba1a097e25c764fb409/html5/thumbnails/15.jpg)
BUILDING STRONG 15