  • 1. Welcome to the Oxfordshire Site Toursfrom the organisers of

2. Biogas (Anaerobic Digestion)Good returns where waste processingCapital costs highWin Win Win: Renewable Energy, plus low carbonfertiliser and soil conditioner, reduced smells, betterfertiliser value, better nutrient controlReduces Methane (23 times as warming as CO2)Great transport fuel: zero GHG and no particulates!Choose nature of operation - Inputs from ownresources or import waste (and pasteurise) 3. Numbers of UK biogas plantsType of plant Number Tonnes Capacity Outputs (MWe)Farm Waste 43 602,259tpa 21.6Food Waste 63 4.8Mtpa* 70.75Total 106 5.4Mtpa92.35This represents an overall increase of 19 plants operatingin the UK since November 2012 4. Numbers of UK biogas plants 5. Larger scale biogasBedfordia FarmsInputs12,000T pig slurry(1200 pigs)30,000T food wasteAnnual outputsElectricity 1MW30,000m3/year Bio-fertiliser (typically 4-5kg/m3 nitrogen, 1.3kg/m3 of phosphorousand 1.9kg/m3 of potassium)worth 2.50/m3 6. Smaller scale biogas:Copys Farm, Norfolk190kWe200kWthFeedstocks:ManureSilageFodder beetWhey 7. Farm based biogasFlexibility of use of feedstock betweenlivestock and digesterFull fertiliser value of digestate retainedReduction in potential for diffuse pollutionLots of free heat for use on site or saleAssured income over extended period withROCs or FITsEnhances green image of farmingHigh capital cost but payback in 7-8 yearsBut: Cost and delay in grid connection 8. Issues to be addressedPlanning and environmentalconsentsOptimising the energy useGrid connectionsLandlord/tenant issuesBusiness models 9. Construction costs of biogasplants 10. BankingDue diligence Feedstock assurance Construction warranties Operator experience Cashflow issuesBanks not willing to lend withoutsecurity 11. Project planningTimescalesLong lead times for planning consent (EIAetc)Long lead times for equipment supplyGrid connection quotes only valid 3 monthsCashCash goes out before income flows: plan foritBank will want manufacturer and installerwarranties 12. Typical project cashflow-1400-1200-1000-800-600-400-20001 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24Series1 13. ROCs FITs and RHIROC: Double ROCs worth 9p/kW (min 081.42p/kW plusoverage)FIT: >250kW 15.16 p/kWh250 - 500kW 14.02 p/kWh( >500kW 9.24 p/kWhRHIBiogas direct heat