old dominion’s new central utility plant reigns as a … · old dominion university central...

12
Stichting Stedenband Haarlem Mutare Postbus 5508 2000 GM Haarlem Tel. 023 - 5324008 e-mail: [email protected] website: www.haarlem-mutare.nl bezoekadres: Mondiaal Centrum Lange Herenvest 122 Haarlem No. 75, december 2010 - Verschijnt 4 x per jaar STEDENBANDKRANT

Upload: others

Post on 08-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: OLD DOMINION’S NEW CENTRAL UTILITY PLANT REIGNS AS A … · Old Dominion University Central Utility Plant, HVAC PRODUCTS: aquatherm blue pipe® LOCATION/DATE: Norfolk, VA Winter

PROJECT NUMBER

DRAWING TITLE

SCALEDATE

FABRICATION DRAWINGS

825 W 600 NLINDON, UTAH 84042

[email protected] 801.805.6657

FABRICATION SERVICES

FABRICATION ESTIMATE RHETT COLES

PROPRIETARY AND CONFINDENTIAL

THE INFORMATION CONTAINED IN THIS

DRAWINGS IS THE SOLE PROPERTY OF

AQUATHERM. ANY REPRODUCTION IN PART

OR AS A WHOLE WITHOUT THE WRITTEN

PERMISSION OF AQUATHERM IS

PROHIBITED.

PAGE NUMBER

CONTRACTOR

JERRY CHIZMADIAAQUATHERM RSM

FABRICATION DRAWINGS NEED TO BE SIGNED FOR

APPROVAL PRIOR TO FABRICATION

MICHAEL SEGALA

OVERALL

2019-6350

07/01/19

M100

JRC

• Using Aquatherm’s Scan-to-Fab service and Fabrication Service on this project enabled the installation crews to maximize their time and meet a very tight schedule

• Thanks to virtually leak-free heat-fusion connections, the installed system easily passed its pressure test and qualified for Aquatherm’s multimillion-dollar warranty

• In day-to-day use, Aquatherm pipe significantly reduces or eliminates the problems that corrosion and scaling can cause over the life of a system

AQUATHERM ADVANTAGES

801-805-6657www.aquatherm.com

OLD DOMINION’S NEW CENTRAL UTILITY PLANT REIGNS AS A FAST-TRACK MASTERPIECE

THE CHALLENGEA tight construction schedule because of the number and type of campus buildings affected left no margin for error on this piping project’s completion date

THE SOLUTIONThanks to Aquatherm’s Scan-to-Fab, Fabrication Service, and fast installation, a project that would have taken four months with steel pipe was completed in five weeks

PROJECT:Old Dominion University Central Utility Plant, HVAC

PRODUCTS:aquatherm blue pipe®

LOCATION/DATE:Norfolk, VAWinter 2019

Aquatherm’s Scan-to-Fab and Fabrication Services teamed up to provide a custom-fit solution in Old Dominion University’ central utility plant.

“Aquatherm came into the existing building and scanned it completely. We took the cloud points from the scan and sent the model drawings to Aquatherm’s fabrication group in Lindon, Utah, and they used the information to custom fabricate the pipe for this facility.” — Richard Goad, Project Executive, JRC Mechanical, Chesapeake, VA