Page 1: OLD AGE HOME FINAL PROJECT - #PearlPortfolio › assets › site › ... · OLD AGE HOME FINAL PROJECT – LEVEL 3 SURBHI GUPTA COHORT – 2012-2016 29 APRIL 2016 PEARL ACADEMY –

OLD AGE HOME

FINAL PROJECT – LEVEL 3

SURBHI GUPTA

COHORT – 2012-2016

29 APRIL 2016

PEARL ACADEMY – SCHOOL OF DESIGN

B.A. (Hons) Interior Architecture and Design – Jaipur

Page 2: OLD AGE HOME FINAL PROJECT - #PearlPortfolio › assets › site › ... · OLD AGE HOME FINAL PROJECT – LEVEL 3 SURBHI GUPTA COHORT – 2012-2016 29 APRIL 2016 PEARL ACADEMY –

Content:

1. Introduction

2. Site Plan

3. Site Photographs

4. Site Existing Plan

5. Client

6. Case Studies

7. Research

8. Zoning

9. Design Strategy

10. Site Plan

11. Elevations

12. Detailed Area

13. 3D Renders

14. Material Board

Page 3: OLD AGE HOME FINAL PROJECT - #PearlPortfolio › assets › site › ... · OLD AGE HOME FINAL PROJECT – LEVEL 3 SURBHI GUPTA COHORT – 2012-2016 29 APRIL 2016 PEARL ACADEMY –

Introduction:

Why this project?

The way we consider our living surroundings as we age is evolving. We should also look after the surrounding and needs of old age people as the

trend is changing both male and female member of family are working at that time parents or grand parents live alone at home so, in that time

they should be entertain, get refresh and live with their age group. At one place they all should club together and enjoy that time or more time

according to their mood. We know from examination that individuals with dementia require a invigorating environment and chances to meet

other people. It is not only the homes themselves that are imperative to keeping up freedom: a nearby situation with available shops and

administrations is fundamental, as well.

Why this Site?

The condition of building is very bad and MP government has given them notice to reconstruct it.

The location were it is situated is calm, silent, green and close to nature.

That building is more than 100 year old so it is not constructed as per old age home requirement.

The people live their face problem with building (Supported by Questioner)

Aim:

To design barrier free environment by establishing certain principals to create functional, safe and convenient built environment for the old age

people. By adopting following principals:

1. Accessibility

2. Reachability

3. Usability

4. Orientation

5. Workability

6. Safety

Objective:

• To design an environment or space which should be physically comfortable, safe and accessible.

• To develop a sensitivity designed environment within this home which make elderly independent and not isolated.

• Barrier free design and utilizing certain design principals to create functional and convenient environment for elderly/

• To integrate design purpose between the indoor spaces as well as outdoor spaces by enabling physical environment coupled with services

and activities.

Page 4: OLD AGE HOME FINAL PROJECT - #PearlPortfolio › assets › site › ... · OLD AGE HOME FINAL PROJECT – LEVEL 3 SURBHI GUPTA COHORT – 2012-2016 29 APRIL 2016 PEARL ACADEMY –

Site Plan:

Page 5: OLD AGE HOME FINAL PROJECT - #PearlPortfolio › assets › site › ... · OLD AGE HOME FINAL PROJECT – LEVEL 3 SURBHI GUPTA COHORT – 2012-2016 29 APRIL 2016 PEARL ACADEMY –

Photograph of exterior of building Photograph of interior of building

LOCATION CONTEXT:

• It is residential area and in centre of city.

• Surrounded by trees and area is Full of Greenery

• It is on Primary Road

Page 6: OLD AGE HOME FINAL PROJECT - #PearlPortfolio › assets › site › ... · OLD AGE HOME FINAL PROJECT – LEVEL 3 SURBHI GUPTA COHORT – 2012-2016 29 APRIL 2016 PEARL ACADEMY –

Floor Plan:

Page 7: OLD AGE HOME FINAL PROJECT - #PearlPortfolio › assets › site › ... · OLD AGE HOME FINAL PROJECT – LEVEL 3 SURBHI GUPTA COHORT – 2012-2016 29 APRIL 2016 PEARL ACADEMY –

Floor Plan:

Page 8: OLD AGE HOME FINAL PROJECT - #PearlPortfolio › assets › site › ... · OLD AGE HOME FINAL PROJECT – LEVEL 3 SURBHI GUPTA COHORT – 2012-2016 29 APRIL 2016 PEARL ACADEMY –

Client:

Why did I choose this client?

Care of older adult (60+) is necessary but migration of younger generation, lack of proper care in the family, insufficient housing, economic

hardship and break-up of joint family have increased this is the reason they don't get proper care and attention because of which they lose their

self confidence and the inner motivation that had till date driven them through all the phases of life. With the additional burden of physical

problem to handle at this time it becomes extremely difficult and harsh reality for them.

I want to create a barrier free environment where they should get proper health care including physical and mental care. As at this time they lose

hopes but to enlighten their lives with a new enthusiasm they should be rejuvenated, recuperated and clubbed together at one place which will

lead their life free of all barriers as somebody wisely said that "Strengthening the old is strengthening the Nation indeed".

Function:

• Barrier free environment for Old Age People.

• Environment friendly Design.

• Interesting spaces for entertainment with safety.

• Keeping in mind the colour scheme.

• Using of Sign boards etc.

• More open space keeping in mind their early age

• More of Ground Floor coverage with less stairs and ramp

SPACE Sq. Ft. PERCENTAGE AREA

Bed Rooms 8,000 40%

Medical 2,000 10%

Wash Room 2,000 10%

Indoor Playing Area 2,000 10%

Worship Area 1,000 10%

Kitchen & Dining 2,500 10%

Common Lobby & Reception 2,500 10%

Total Area 20,000 10%

Area Analysis

Page 9: OLD AGE HOME FINAL PROJECT - #PearlPortfolio › assets › site › ... · OLD AGE HOME FINAL PROJECT – LEVEL 3 SURBHI GUPTA COHORT – 2012-2016 29 APRIL 2016 PEARL ACADEMY –

Case Study 1_Prem Niketan – Subh Shanti Nwas_Ashram Marg, Jawahar Circle, Jaimbe Colony Jaipur

Photographs

Page 10: OLD AGE HOME FINAL PROJECT - #PearlPortfolio › assets › site › ... · OLD AGE HOME FINAL PROJECT – LEVEL 3 SURBHI GUPTA COHORT – 2012-2016 29 APRIL 2016 PEARL ACADEMY –

Understanding of Case Study

1. More area of Ground Floor should be used

2. More open space should be left

3. Corridor Space should be provided

4. Common meeting room should be their

5. Separate room for Couple should be their

6. Attach bathroom with room should be provided

7. Small pantry should be provided in each room

8. Proper ventilation and natural light should be their

DO’S DON’T’S

• Proper Lighting in full Campus • Colour Scheme

• Wide corridor all around the building • Marble Flooring

• Central courtyard with garden

• Cover only Ground Floor Area

• Less use of stairs & Ramp

Hierarchy:

Page 11: OLD AGE HOME FINAL PROJECT - #PearlPortfolio › assets › site › ... · OLD AGE HOME FINAL PROJECT – LEVEL 3 SURBHI GUPTA COHORT – 2012-2016 29 APRIL 2016 PEARL ACADEMY –

Case Study 2_Aasra Old Age Home_Shajanabad, Bhopal

Photographs

Page 12: OLD AGE HOME FINAL PROJECT - #PearlPortfolio › assets › site › ... · OLD AGE HOME FINAL PROJECT – LEVEL 3 SURBHI GUPTA COHORT – 2012-2016 29 APRIL 2016 PEARL ACADEMY –

Understanding of Case Study

1. More area of Ground Floor should be used

2. More open space should be left

3. Corridor Space should be provided

4. Common meeting room should be their

5. Small pantry should be provided in each room

6. Proper ventilation and natural light should be their which is not

their

Hierarchy::

DO’S DON’T’S

• Proper Ventilation and

Lighting in full Campus

• Colour Scheme

• Central courtyard • Marble Flooring

• Cover only Ground Floor

Area

• Common wash room

• Green Area & Plantation • Excess use of stairs and ramp

• Riser of Stair case was 8.5”

Page 13: OLD AGE HOME FINAL PROJECT - #PearlPortfolio › assets › site › ... · OLD AGE HOME FINAL PROJECT – LEVEL 3 SURBHI GUPTA COHORT – 2012-2016 29 APRIL 2016 PEARL ACADEMY –

Online Case Study 1_Croftspar, Springboig Avenue, Glasgow

A small, specialised scheme of seven supported houses for people with dementia. A partnership between public sector provider Cube Housing

Association and Alzheimer Scotland. Cube builds housing and leases it to care providers, but does not provide care services itself. Capital

funding was from Communities Scotland. Staff are on site 24 hours a day, one on duty at night, and one sleeping over. The architects were

Chris Stewart Architects (now Collective Architecture) and the scheme was completed in 2005.

Key features

A group of small, individual houses around a landscaped courtyard with a warden alarm system and movement sensors in the bedrooms. The

scheme is designed with level access and to maximise solar gain. The circular layout helps people with dementia to find their way around the

scheme and the small scale appeals to residents. However, the residents do not like the open plan design of their homes and the modern

bathroom furniture and under floor heating is confusing for people with dementia.

Design and architectural features

• Group of small, individual houses around a landscaped courtyard

• Warden alarm system and movement sensors in the bedrooms

• Maximises solar gain

• Level access.

Points for residents

• Circular layout helps orientation of people with dementia

• Small scale appeals to residents but cost effectiveness needs to be considered

• Residents don’t like open plan of homes

• Modern bathroom furniture and under floor heating are confusing for people with dementia.

Photographs

Page 14: OLD AGE HOME FINAL PROJECT - #PearlPortfolio › assets › site › ... · OLD AGE HOME FINAL PROJECT – LEVEL 3 SURBHI GUPTA COHORT – 2012-2016 29 APRIL 2016 PEARL ACADEMY –

Online Case Study 2_Barton Mews, Barton-Under-Nedwood, Staffordshire

A private development of 29 extra care apartments for sale, aimed at affluent, older local buyers, or buyers with local family connections.

Built, sold and managed by private sector provider Shaw Homes. The scheme, designed by Pentan architects, was completed in 2008

Design and planning

The architect was inspired by the Arts and Crafts movement and this can be traced in the project, although its scale has nevitably

compromised its architectural qualities.

Design and architectural features

• Extra care scheme above doctor’s surgery and

• cottage hospital with separate entry for each

• Accommodation extends round a courtyard.

Points for residents

• Broad range of services

• Aspirational design features

• Accessible and adaptable flats and corridors.

Management issues

• Some flats bought by children stand empty because parents do not want to move in.

Page 15: OLD AGE HOME FINAL PROJECT - #PearlPortfolio › assets › site › ... · OLD AGE HOME FINAL PROJECT – LEVEL 3 SURBHI GUPTA COHORT – 2012-2016 29 APRIL 2016 PEARL ACADEMY –

Background Research:

Design Development

Page 16: OLD AGE HOME FINAL PROJECT - #PearlPortfolio › assets › site › ... · OLD AGE HOME FINAL PROJECT – LEVEL 3 SURBHI GUPTA COHORT – 2012-2016 29 APRIL 2016 PEARL ACADEMY –

Zoning:

Hierarchy:

Page 17: OLD AGE HOME FINAL PROJECT - #PearlPortfolio › assets › site › ... · OLD AGE HOME FINAL PROJECT – LEVEL 3 SURBHI GUPTA COHORT – 2012-2016 29 APRIL 2016 PEARL ACADEMY –

Conceptual Mood Board:

Page 18: OLD AGE HOME FINAL PROJECT - #PearlPortfolio › assets › site › ... · OLD AGE HOME FINAL PROJECT – LEVEL 3 SURBHI GUPTA COHORT – 2012-2016 29 APRIL 2016 PEARL ACADEMY –

Daily Routine:

Page 19: OLD AGE HOME FINAL PROJECT - #PearlPortfolio › assets › site › ... · OLD AGE HOME FINAL PROJECT – LEVEL 3 SURBHI GUPTA COHORT – 2012-2016 29 APRIL 2016 PEARL ACADEMY –

3D Zoning:

Page 20: OLD AGE HOME FINAL PROJECT - #PearlPortfolio › assets › site › ... · OLD AGE HOME FINAL PROJECT – LEVEL 3 SURBHI GUPTA COHORT – 2012-2016 29 APRIL 2016 PEARL ACADEMY –

Design Strategy:

Page 21: OLD AGE HOME FINAL PROJECT - #PearlPortfolio › assets › site › ... · OLD AGE HOME FINAL PROJECT – LEVEL 3 SURBHI GUPTA COHORT – 2012-2016 29 APRIL 2016 PEARL ACADEMY –

Final Zoning:

Page 22: OLD AGE HOME FINAL PROJECT - #PearlPortfolio › assets › site › ... · OLD AGE HOME FINAL PROJECT – LEVEL 3 SURBHI GUPTA COHORT – 2012-2016 29 APRIL 2016 PEARL ACADEMY –

Plan:

Page 23: OLD AGE HOME FINAL PROJECT - #PearlPortfolio › assets › site › ... · OLD AGE HOME FINAL PROJECT – LEVEL 3 SURBHI GUPTA COHORT – 2012-2016 29 APRIL 2016 PEARL ACADEMY –

Section Through & Through:

Page 24: OLD AGE HOME FINAL PROJECT - #PearlPortfolio › assets › site › ... · OLD AGE HOME FINAL PROJECT – LEVEL 3 SURBHI GUPTA COHORT – 2012-2016 29 APRIL 2016 PEARL ACADEMY –

Multi Purpose Hall:

Page 25: OLD AGE HOME FINAL PROJECT - #PearlPortfolio › assets › site › ... · OLD AGE HOME FINAL PROJECT – LEVEL 3 SURBHI GUPTA COHORT – 2012-2016 29 APRIL 2016 PEARL ACADEMY –

Multi Purpose Hall Working Drawing:

Page 26: OLD AGE HOME FINAL PROJECT - #PearlPortfolio › assets › site › ... · OLD AGE HOME FINAL PROJECT – LEVEL 3 SURBHI GUPTA COHORT – 2012-2016 29 APRIL 2016 PEARL ACADEMY –

3D Render of Multipurpose Hall:

Page 27: OLD AGE HOME FINAL PROJECT - #PearlPortfolio › assets › site › ... · OLD AGE HOME FINAL PROJECT – LEVEL 3 SURBHI GUPTA COHORT – 2012-2016 29 APRIL 2016 PEARL ACADEMY –

3D Render of Multipurpose Hall:

Page 28: OLD AGE HOME FINAL PROJECT - #PearlPortfolio › assets › site › ... · OLD AGE HOME FINAL PROJECT – LEVEL 3 SURBHI GUPTA COHORT – 2012-2016 29 APRIL 2016 PEARL ACADEMY –

Dormitory:

Page 29: OLD AGE HOME FINAL PROJECT - #PearlPortfolio › assets › site › ... · OLD AGE HOME FINAL PROJECT – LEVEL 3 SURBHI GUPTA COHORT – 2012-2016 29 APRIL 2016 PEARL ACADEMY –

3D Render of Dormitory:

Page 30: OLD AGE HOME FINAL PROJECT - #PearlPortfolio › assets › site › ... · OLD AGE HOME FINAL PROJECT – LEVEL 3 SURBHI GUPTA COHORT – 2012-2016 29 APRIL 2016 PEARL ACADEMY –

3D Render of Dormitory:

Page 31: OLD AGE HOME FINAL PROJECT - #PearlPortfolio › assets › site › ... · OLD AGE HOME FINAL PROJECT – LEVEL 3 SURBHI GUPTA COHORT – 2012-2016 29 APRIL 2016 PEARL ACADEMY –

Material Board For Multipurpose Hall:

Page 32: OLD AGE HOME FINAL PROJECT - #PearlPortfolio › assets › site › ... · OLD AGE HOME FINAL PROJECT – LEVEL 3 SURBHI GUPTA COHORT – 2012-2016 29 APRIL 2016 PEARL ACADEMY –

Material Board:

Page 33: OLD AGE HOME FINAL PROJECT - #PearlPortfolio › assets › site › ... · OLD AGE HOME FINAL PROJECT – LEVEL 3 SURBHI GUPTA COHORT – 2012-2016 29 APRIL 2016 PEARL ACADEMY –

Material Board

Page 34: OLD AGE HOME FINAL PROJECT - #PearlPortfolio › assets › site › ... · OLD AGE HOME FINAL PROJECT – LEVEL 3 SURBHI GUPTA COHORT – 2012-2016 29 APRIL 2016 PEARL ACADEMY –

PHYSICAL MODEL:

Page 35: OLD AGE HOME FINAL PROJECT - #PearlPortfolio › assets › site › ... · OLD AGE HOME FINAL PROJECT – LEVEL 3 SURBHI GUPTA COHORT – 2012-2016 29 APRIL 2016 PEARL ACADEMY –

PHYSICAL MODEL:

MULTIPURPOSE Hall

MEDICAL BLOCK

DORMITORY

SITE MODEL