STEPS TO HARDFACE SUCCESSFULLY
Dr. H. Riegger
www.cementechnology.ir
cement technology magazine: 021-22883306, 22861343
www.cemen
techn
ology
.ir
f i gh t s w e a r
RCoal mill
www.cementechnology.ir
cement technology magazine: 021-22883306, 22861343
www.cemen
techn
ology
.ir
f i g h t s w e a r
R
LOESCHE MILL Comparison life time after 4000 h
Ni-Hard 4 With VAUTID 100
www.cementechnology.ir
cement technology magazine: 021-22883306, 22861343
www.cemen
techn
ology
.ir
f i g h t s w e a r
RMicrostructure Wear Resistance Castings
www.cementechnology.ir
cement technology magazine: 021-22883306, 22861343
www.cemen
techn
ology
.ir
f i g h t s w e a r
RTypical microstructure VAUTID 100
www.cementechnology.ir
cement technology magazine: 021-22883306, 22861343
www.cemen
techn
ology
.ir
VAUTIDf i g h t s w e a r
RWELDING PROCESS
Standard welding processfor difficil welding materials
Welding process for rollers
Normaly procedure
Clean weld areaPreheat alloy steels to 250°CHigh carbon steels 300-400°CUse short arc lengthPeen whilst still hot, slow coolOn ferritc and martensitic steelsdeposit a buttering layer CrNi 29/9On alloy and carbon steels Ni-Base
Procedure for rollers
Clean weld areaPreheat only 70 - 80°CWelding speed >1m/minCooling with compressed airInterpasstemperature <140°CHeat input 4800 J/cmCross check every 10-12 mm
www.cementechnology.ir
cement technology magazine: 021-22883306, 22861343
www.cemen
techn
ology
.ir
VAUTIDf i g h t s w e a r
RBASE MATERIALS OF THE ROLLERS
Steel casting
Cast ironGGGGGL
Chromium casting
Ni-Hard alloys
www.cementechnology.ir
cement technology magazine: 021-22883306, 22861343
www.cemen
techn
ology
.ir
VAUTIDR
f i g h t s w e a r
System Fe-Cr-C at 1000°Caccording to K.Bungardt, E. Kunze and E. Horn
0,5 1,0 1,5 2,0 2,5 3,0 3,5 %C
35
30
25
20
15
10
5
%Cr
γ+Kcγ
α… Ferrit
α
γ…. Austenit
K1.. M23 C6K2.. M7 C3Kc.. M3 C
α+K1
α+γγ+K2
www.cementechnology.ir
cement technology magazine: 021-22883306, 22861343
www.cemen
techn
ology
.ir
VAUTIDf i g h t s w e a r
R
Ni Cr C Si MnNi-Hard 1ASTM A53 I A
3.3 - 5.0 1.4 - 4.0 3.0 – 3.6 0.8 max 1.3 max
Ni-Hard 2ASTM A53 I B
3.3 - 5.0 1.4 - 4.0 2.9 max. 0.8 max 1.3 max
Ni-Hard 3ASTM A53 I C
2.7 - 4.0 1.1 - 5.0 2.9 – 3.7 0.8 max 1.3 max
Ni-Hard 4ASTM A53 I D
5.0 - 7.0 7.0 - 11.0 2.5 – 3.6 1.0 – 2.2 1.3 max
Ni-Hard alloys
www.cementechnology.ir
cement technology magazine: 021-22883306, 22861343
www.cemen
techn
ology
.ir
VAUTIDf i g h t s w e a r
RDelivery of used bandages
www.cementechnology.ir
cement technology magazine: 021-22883306, 22861343
www.cemen
techn
ology
.ir
VAUTIDf i g h t s w e a r
RPROCEDURE FOR NIHARD ROLLERS
Before welding, the rollers are connected to a turning device or lathe since the procedureshould be performed in automatic mode according to the following steps.
www.cementechnology.ir
cement technology magazine: 021-22883306, 22861343
www.cemen
techn
ology
.ir
VAUTIDf i g h t s w e a r
RPROCEDURE FOR NIHARD ROLLERS
1. Visual inspection of the parts to determine the degree of the wear. Maximum surfacing to an area 50 mm diameter is recommended.Parts with deep fractures (over 30 mm) should not be surfaced. Analysis with penetrating liquids is required for this initial inspection.
www.cementechnology.ir
cement technology magazine: 021-22883306, 22861343
www.cemen
techn
ology
.ir
VAUTIDf i g h t s w e a r
R
Inspection using dye penetrants to ensurethat no cracks are in the material
www.cementechnology.ir
cement technology magazine: 021-22883306, 22861343
www.cemen
techn
ology
.ir
VAUTIDf i g h t s w e a r
RVisual inspection
www.cementechnology.ir
cement technology magazine: 021-22883306, 22861343
www.cemen
techn
ology
.ir
VAUTIDf i g h t s w e a r
RPROCEDURE FOR NIHARD ROLLERS
2. Once the possible small cracks and chips have been located, these should be removed by grinding, never by air arc gouging to avoid crack propagation by thermal stresses. The edges of the part should also be rounded off.
www.cementechnology.ir
cement technology magazine: 021-22883306, 22861343
www.cemen
techn
ology
.ir
VAUTIDf i g h t s w e a r
RPROCEDURE FOR NIHARD ROLLERS
3. Pre-heating to approximately 70/80°C. This pre-heating must be done slowly and thoroughly, with the help of propane burners. The temperature must be controlled throughout the entire process so that the surface temperature of the part never exceeds 140°C.
www.cementechnology.ir
cement technology magazine: 021-22883306, 22861343
www.cemen
techn
ology
.ir
VAUTIDf i g h t s w e a r
RPROCEDURE FOR NIHARD ROLLERS
4. Positioning of the welding torch and the cooling air nozzle. Adjust the welding nozzle stick-out, the air nozzle clearance and the position of both in relation to the vertical axis of the part.
www.cementechnology.ir
cement technology magazine: 021-22883306, 22861343
www.cemen
techn
ology
.ir
VAUTIDf i g h t s w e a r
RPOSITIONING FOR WELDING
www.cementechnology.ir
cement technology magazine: 021-22883306, 22861343
www.cemen
techn
ology
.ir
VAUTIDf i g h t s w e a r
R
NozzleAir
POSITIONING FOR WELDING
www.cementechnology.ir
cement technology magazine: 021-22883306, 22861343
www.cemen
techn
ology
.ir
VAUTIDf i g h t s w e a r
RPROCEDURE FOR NIHARD ROLLERS
5. With the part rotating and the air flow open, continuous welding with VAUTID 100 can begin. Recommended rotation and feed parameters should be respected.
www.cementechnology.ir
cement technology magazine: 021-22883306, 22861343
www.cemen
techn
ology
.ir
VAUTIDf i g h t s w e a r
RWELDING PARAMETERSSCHWEISSEINSTELLUNG
First layer following layersWelding product VAUTID 100 Ø 2,80 mmCurrent [A] 350 350 - 450(Stromstärke)Voltage [V] 30 30 – 38(Spannung)Stick out [mm] 30 – 35 30 - 35(Freies Drahtende)Weld speed [cm/min] 100 120 (Schweissgeschw.)Interpass temperature [°C] max. 140(Zwischenlagentemperatur)
www.cementechnology.ir
cement technology magazine: 021-22883306, 22861343
www.cemen
techn
ology
.ir
VAUTIDf i g h t s w e a r
RHeat InputStreckenenergie
Schweissstrom I [A] 400Schweissspannung U [V] 30Wärmeeinwirkungsgrad [n] 0,8Schweissgeschwindigkeit [v] [cm/sec] 2 120
9600[J/cm] 4800
U*I*nvES = [J/cm]
www.cementechnology.ir
cement technology magazine: 021-22883306, 22861343
www.cemen
techn
ology
.ir
VAUTIDf i g h t s w e a r
RHardfacing of a roller for a
cement plant
www.cementechnology.ir
cement technology magazine: 021-22883306, 22861343
www.cemen
techn
ology
.ir
VAUTIDf i g h t s w e a r
RPROCEDURE FOR NIHARD ROLLERS
6. To prevent localised overheating, the welding position can be changed at times. This step must be taken if the maximum temperature of 140°C cannot be respected in the welding area.
www.cementechnology.ir
cement technology magazine: 021-22883306, 22861343
www.cemen
techn
ology
.ir
VAUTIDf i g h t s w e a r
RPROCEDURE FOR NIHARD ROLLERS
7. It is important to match the original roller contour in the initial resurfacing run, in order to subsequently obtain layer by layer a final appearance as regular as possible and near to the finish size required within a reasonable tolerance (3/4 mm), as a final machining operation is unfeasible.
www.cementechnology.ir
cement technology magazine: 021-22883306, 22861343
www.cemen
techn
ology
.ir
VAUTIDf i g h t s w e a r
RControl the finish size
www.cementechnology.ir
cement technology magazine: 021-22883306, 22861343
www.cemen
techn
ology
.ir
VAUTIDf i g h t s w e a r
RPROCEDURE FOR NIHARD ROLLERS
8. After slow cooling protected from air currents, the part is ready for service.
www.cementechnology.ir
cement technology magazine: 021-22883306, 22861343
www.cemen
techn
ology
.ir
VAUTIDf i g h t s w e a r
R
www.cementechnology.ir
cement technology magazine: 021-22883306, 22861343
www.cemen
techn
ology
.ir
VAUTIDf i g h t s w e a r
R
www.cementechnology.ir
cement technology magazine: 021-22883306, 22861343
www.cemen
techn
ology
.ir
VAUTIDf i g h t s w e a r
R
www.cementechnology.ir
cement technology magazine: 021-22883306, 22861343
www.cemen
techn
ology
.ir
VAUTIDf i g h t s w e a r
R
www.cementechnology.ir
cement technology magazine: 021-22883306, 22861343
www.cemen
techn
ology
.ir
VAUTIDf i g h t s w e a r
R
www.cementechnology.ir
cement technology magazine: 021-22883306, 22861343
www.cemen
techn
ology
.ir
VAUTIDf i g h t s w e a r
R
www.cementechnology.ir
cement technology magazine: 021-22883306, 22861343
www.cemen
techn
ology
.ir
www.cementechnology.ir
cement technology magazine: 021-22883306, 22861343
www.cemen
techn
ology
.ir