Know the flow of radio network planning Grasp the key parts of the stages of radio network planning Make the radio network planning be more standard and controllableTRANSCRIPT
HUAWEI TECHNOLOGIES CO., LTD.
www.huawei.com
HUAWEI Confidential
Security Level:
Service Flow of Radio Network Planning
Radio Cases training Center
ISSUE 1.1
HUAWEI TECHNOLOGIES CO., LTD. Page 2HUAWEI Confidential
Objective
Know the flow of radio network planning
Grasp the key parts of the stages of radio network planning
Make the radio network planning be more standard and controllable
HUAWEI TECHNOLOGIES CO., LTD. Page 3HUAWEI Confidential
Building up Mobile Network
Network Planning
Project Execution
Network Optimization
Network Objective
HUAWEI TECHNOLOGIES CO., LTD. Page 4HUAWEI Confidential
Introduction to Radio Network Planning Flow
HUAWEI TECHNOLOGIES CO., LTD. Page 5HUAWEI Confidential
Overview of radio Network Planning Flow
HUAWEI TECHNOLOGIES CO., LTD. Page 6HUAWEI Confidential
Attention:• Before the project is started,
be acquainted with related
information• Confirm the information with
the users for several times• Pay attention to VIPs
• Related information from the marketRelated information from the market• Project documents output before theProject documents output before the
network planning is sold network planning is sold• Information about destination areaInformation about destination area• Object of network constructionObject of network construction• Plan of network scale and stage Plan of network scale and stage
construction construction• Available sites and frequencies toAvailable sites and frequencies to
the carriers the carriers• Digital mapDigital map• MapInfo mapMapInfo map• VIP user surveyVIP user survey
Collects detailed information about the network planning to meet the requirements of network estimation and emulation input. It prepares for satisfactory planning result.
Collects detailed information about the network planning to meet the requirements of network estimation and emulation input. It prepares for satisfactory planning result.
001 Information Collection Confirmation/Analysis
OutputNetwork Planning Information
Collection CHECKLIST
• Recent optimization report
• Carrier’s network configur
ation information• Carrier’s drive test analysi
s• Carrier’s network traffic a
nalysis• User complaint analysis• Related guide
For expansion, move or change, the collected information includes
HUAWEI TECHNOLOGIES CO., LTD. Page 7HUAWEI Confidential
Overview of radio Network Planning Flow
HUAWEI TECHNOLOGIES CO., LTD. Page 8HUAWEI Confidential
Output
• Link budget result• Works out the iterative result based on the capacity and coverage• Network estimation report
002 radio Network Estimation
Through the estimation, to perform a quantitative analysis and know the construction scale. Thus, the construction period and cost budget can be worked out.
• Scenario division and transmit mod
el confirmation• Quality of the capacity of scenario
s’ coverage• Traffic model and service model• Other related parameters• Estimation tool software• Related guide
Monitors the Following:Network input parameters, estimation RND documents and the result of the estimation.
The network estimation report needs to be reviewed.
Attention:• When the parameters cannot be typed, refer to the
company planning principle to provide values for the
carrier to confirm• For improper parameters, communicate with and
guide the carrier on site. Besides, notify the
customer service center and market of the regional
office. The result need to be reviewed.
HUAWEI TECHNOLOGIES CO., LTD. Page 9HUAWEI Confidential
Overview of radio Network Planning Flow
HUAWEI TECHNOLOGIES CO., LTD. Page 10HUAWEI Confidential
CW Test and Model Rectification (Optional) The transmit model is the basis of the cell planning. Whether the m
odel is correct affects the planning and affects whether the needs of the users can be met in an economic and proper investment.
• Scenario division and classification confirmation
• Selecting typical test points
• Testing instrument and
related software
• Related guide
•Adjusting Report of Transmit ModelOutput
Attention:• For years’ development,
the company has a complete
model library. It is
recommended to obtain the
model from the model
library.• For the needs of the market
or customers, you can test
the typical area based on the
actual reconnaissance. Then,
rectify the model based on
the test result.
HUAWEI TECHNOLOGIES CO., LTD. Page 11HUAWEI Confidential
Overview of Radio Network Planning Flow
HUAWEI TECHNOLOGIES CO., LTD. Page 12HUAWEI Confidential
Network base station topology
• Network estimation result• Available site resources• Electronic map• Local administrative map (Paper)• Related guide
003 Map Assistant Planning and Original Site Selection
Select and plan the area on the map based on the available site resources of the carrier, destination coverage need, the carrier’s network analysis and network estimation result.
Attention:• Set the theoretic site
as the center and R/8
as the semidiameter to
search. Besides, there
are some restriction o
n the height.• It is recommended t
o mark the to-be recon
noitered on the paper
map.
HUAWEI TECHNOLOGIES CO., LTD. Page 13HUAWEI Confidential
Overview of Radio Network Planning Flow
HUAWEI TECHNOLOGIES CO., LTD. Page 14HUAWEI Confidential
004 Reconnoitering Base StationCollect network planning information and environment description to confirm whether the site meet the requirements
• Topology and map
of network base
stations• Reconnaissance tool• Related guide
Monitoring point:• The following needed to be reviewed: project parameter table, base station topology, device setting, antenna feeder• Check some base station reconnaissance
• Project parameter table• Radio on site reconnaissance report (xxx base station)• On site reconnaissance table• Base station reconnaissance memo
Attention:• For proper sites, confirm the project parameters; for improper sites, give the replacing suggestion and verify the emulation• For sites cannot be reconnoitered caused by customers, sign the reconnaissance memo• For sites have the same addresses, guarantee the independence• Factors of on site reconnaissance
HUAWEI TECHNOLOGIES CO., LTD. Page 15HUAWEI Confidential
Overview of Radio Network Planning Flow
HUAWEI TECHNOLOGIES CO., LTD. Page 16HUAWEI Confidential
Testing Electromagnetic Background (Optional) To make sure that the electromagnetic background of the selected site is available, you need to test on site by using electromagnetic interference device. Generally, the network planning reconnaissance personnel test it.
• Test instruments and fittings
• Related guide
•EM Interference Test Table•EM Background Test ReportOutput
Attention:• For experiment network
of large scale, you can
select and test sites based
on the actual work volume.
• The downlink band of
the area needs to be tested.
You need to arrange the
vehicles to test the road.
HUAWEI TECHNOLOGIES CO., LTD. Page 17HUAWEI Confidential
Overview of Radio Planning Flow
HUAWEI TECHNOLOGIES CO., LTD. Page 18HUAWEI Confidential
005 System Emulation Based on the previous information, you need to emulate the system of the reconnoitered site. The emulation is a process to adjust the planning configuration to meet the needs of the customers.
• Project parameter table• Transmit model• Parameters needed in emulation• Emulation software• Digital map• Related guide
XXX Project Network Emulation ReportXXX Project Network Emulation Report
Attention:• When the theoretical site do not meet the requirements, you need to determine whether to select a new site.• When the emulation does not meet the needs of the customer. Reconnoiter and emulate the system again to achieve the goal and export the network emulation report.
HUAWEI TECHNOLOGIES CO., LTD. Page 19HUAWEI Confidential
Overview of Radio Planning Flow
HUAWEI TECHNOLOGIES CO., LTD. Page 20HUAWEI Confidential
XXX Project Network Preplanning Report
W Network Pre-planning Scheme and Report Review Self-Checking
Input
• Template of the network pre-planning report• Input information of the network planning• Network estimation report• Reconnaissance report of the base station• Output information of the system emulation
006 Pre-Planning of Radio Network Based on the previous collected information, network estimation, site selection, and system emulation to summarize the network pre-planning.
Attention:• The pre-planning report after
review needs to be submit to the
market of the regional office for
improvement. Then, it can be
submitted to the customer.• When exporting the emulation
result, submitting the result in the
report template as soon as possible
to promote the progress of the
project.
The following needs to be monitored:Pre-planning result and pre-planning report review
HUAWEI TECHNOLOGIES CO., LTD. Page 21HUAWEI Confidential
Overview of Radio Network Planning Flow
HUAWEI TECHNOLOGIES CO., LTD. Page 22HUAWEI Confidential
Cell Parameter Design Report or Network Design Report
Output
007 Designing Cell Parameter Set the base stations and cells exported from thepreplanning into a connected network to guide the later project
• Network pre-planning report• Project parameter table• Table of network planning information collection• Default parameter comparison table• For GSM, Important Parameter Comparison Table of Dual Band Network• Related guide
Attention:• The cell naming rule and coding rule, frequency
range, multiplexing mode and code planning rule• For the GSM network, focus on the cooperation of
the dual band data• For the network supports both 2G and 3G, focus on
the cooperation of mutual operation of different
system parameters
The cell parameters include the following:LAC/RAC RNC area, neighborhood tables, frequency/scramble,
power division, switchover and permitted parameters
HUAWEI TECHNOLOGIES CO., LTD. Page 23HUAWEI Confidential
Overview of Radio Network Planning Flow
HUAWEI TECHNOLOGIES CO., LTD. Page 24HUAWEI Confidential
008 Processing Office Data Send the parameter designing data of the network planning cell to the data center. Combine the designing data with the project parameters to generate DBF data
• Cell Parameter Design
Report or Network Planning
Design Report
• DBF file or the script file that can be loaded
Attention:• The generated DBF file or the script file that can be loaded must be consistent with the network planning parameters
HUAWEI TECHNOLOGIES CO., LTD. Page 25HUAWEI Confidential
Overview of Radio Network Planning Flow
HUAWEI TECHNOLOGIES CO., LTD. Page 26HUAWEI Confidential
009 Radio Network Planning Based on the integrated network planning report and the cell parameter design, write the Network Planning Report. Submit the report to the regional office of the technical support for users to exchange and report ideas.
• Radio Network Pre-Planning Report• Cell Parameter planning Report or Radio
Network Planning Report • Radio Network Planning Report
• Network Planning Scheme
• Radio Network Planning
Communication Report
Attention:• The planning rule of all
parameters must be embodied in the
Planning Scheme for the
convenience of other person and
guide the later network
optimization.
The following needs to be monitored:Review the report of the radio network planning
and planning scheme
HUAWEI TECHNOLOGIES CO., LTD. Page 27HUAWEI Confidential
Retrospect of Radio Network Planning Flow
HUAWEI TECHNOLOGIES CO., LTD. Page 28HUAWEI Confidential
Case Analysis
A carrier bided for setting up a new radio network. Our company received the bidding on Sep.24, and asked to on Oct.2. The market personnel sent the to a network planning pre-sales engineer on Sep.29 and required them to complete the pre-planning and post-planning of the network based on the bidding. The pre-sales engineer found out that the traffic model condition and network quality requirements are not clear. Besides, the on-site market personnel cannot provide the correct information about the local geographical environment, economy, population, mobile market, customer and market strategy. The pre-sales engineer finished the base station estimation and network planning construction suggestions on Oct.2. The engineer made the estimation of 45 base stations in the first period and 80 base stations in the second period for the market to quote. The market personnel denied the estimation and thought that the estimations do not accord with the actual situation because the number of the base stations are too many, the pressure of the service is heavy and the customers do not accept the estimation. Besides, the estimation does not adapt to the economy development of the country and the actual situation of the customers is not taken into account. The technical suggestions had not embody the network planning scheme.