Page 1: OFFSHORE WIND ENGINEERING · Itaparica › Cable stayed bridge with 70 m clearance and a main span of nearly 600 m. Salvador -Itaparica bridge, Brazil. 09-03-2015 9 DANISH WIND INDUSTRY

09-03-2015DANISH WIND INDUSTRY ASSOCIATION1

OFFSHORE WIND ENGINEERING

Jan Rønberg Market Director

Jasmin Bejdic Project Manager

Page 2: OFFSHORE WIND ENGINEERING · Itaparica › Cable stayed bridge with 70 m clearance and a main span of nearly 600 m. Salvador -Itaparica bridge, Brazil. 09-03-2015 9 DANISH WIND INDUSTRY

09-03-2015DANISH WIND INDUSTRY ASSOCIATION2

AGENDA

Introduction- COWI as Design Consultant

Offshore Wind Farms- Foundation Design - BTM

Offshore Wind- Processes - Energy & Industry

Page 3: OFFSHORE WIND ENGINEERING · Itaparica › Cable stayed bridge with 70 m clearance and a main span of nearly 600 m. Salvador -Itaparica bridge, Brazil. 09-03-2015 9 DANISH WIND INDUSTRY

09-03-2015DANISH WIND INDUSTRY ASSOCIATION3

ABOUT US

709 MILLION EUR IN TURNOVER

MORE THAN 80 YEARS OF HISTORY

WORKING IN 124 COUNTRIES

OVER 6,100 EMPLOYEES

17,000 ONGOING PROJECTS

COWI IN NUMBERS

Page 4: OFFSHORE WIND ENGINEERING · Itaparica › Cable stayed bridge with 70 m clearance and a main span of nearly 600 m. Salvador -Itaparica bridge, Brazil. 09-03-2015 9 DANISH WIND INDUSTRY

09-03-2015DANISH WIND INDUSTRY ASSOCIATION4

OUR SERVICES

WORLD-CLASS COMPETENCIES

INDUSTRY AND ENERGY (1000)

BUILDINGS (1000)

RAILWAYS, ROADS AND AIRPORTS (800)

PLANNING AND ECONOMICS (300) BRIDGE, TUNNEL AND

MARINE STRUCTURES (1000)

WATER AND ENVIRONMENT (600)

Page 5: OFFSHORE WIND ENGINEERING · Itaparica › Cable stayed bridge with 70 m clearance and a main span of nearly 600 m. Salvador -Itaparica bridge, Brazil. 09-03-2015 9 DANISH WIND INDUSTRY

OUR SERVICES IS DELIVEREDIN TWO WAYS

09-03-2015DANISH WIND INDUSTRY ASSOCIATION5

REGIONS

› Denmark

› Sweden

› Norway

INTERNATIONAL BUSINESS LINES

› Tunnels

› Major bridges

› Marine structures

› Airports, roads and railways

› Mapping

Page 6: OFFSHORE WIND ENGINEERING · Itaparica › Cable stayed bridge with 70 m clearance and a main span of nearly 600 m. Salvador -Itaparica bridge, Brazil. 09-03-2015 9 DANISH WIND INDUSTRY

DANISH WIND INDUSTRY ASSOCIATION6

COWI projects

09-03-2015

Page 7: OFFSHORE WIND ENGINEERING · Itaparica › Cable stayed bridge with 70 m clearance and a main span of nearly 600 m. Salvador -Itaparica bridge, Brazil. 09-03-2015 9 DANISH WIND INDUSTRY

09-03-2015DANISH WIND INDUSTRY ASSOCIATION7

Design of Doha metro Red Line North

› The Red Line North is the first of four underground packages which is a part of a wide-ranging plan to realize a new transportation infrastructure in Qatar.

› The Red Line North extends over a distance of approximately 13 km from Mushaireb station in the Qatari capital.

› The scope of work includes design of 11.6 km of twin bored tunnels and design of 7 new underground stations.

Doha metro, Qatar

Page 8: OFFSHORE WIND ENGINEERING · Itaparica › Cable stayed bridge with 70 m clearance and a main span of nearly 600 m. Salvador -Itaparica bridge, Brazil. 09-03-2015 9 DANISH WIND INDUSTRY

09-03-2015DANISH WIND INDUSTRY ASSOCIATION8

Design of the second longest bridge in South America

› The 12 km long Salvador-Itaparica Bridge will connect metropolitan Salvador with the island Itaparica

› Cable stayed bridge with 70 m clearance and a main span of nearly 600 m.

Salvador - Itaparicabridge, Brazil

Page 9: OFFSHORE WIND ENGINEERING · Itaparica › Cable stayed bridge with 70 m clearance and a main span of nearly 600 m. Salvador -Itaparica bridge, Brazil. 09-03-2015 9 DANISH WIND INDUSTRY

09-03-2015DANISH WIND INDUSTRY ASSOCIATION9

Client consultancy on Northern Europe's largest aquarium

› With its 9,000 m², the Blue Planet is Northern Europe's largest and most modern aquarium

› The Blue Planet is one of the few aquariums in the world that can show wildlife from all around the world. This is due to the extensive water treatment systems that can deliver hot and cold saltwater as well as freshwater

› The visitors can therefore experience changing organic expressions as they move through the vortex building, with a variety of exotic themed exhibitions.

The Blue Planet, Denmark

Page 10: OFFSHORE WIND ENGINEERING · Itaparica › Cable stayed bridge with 70 m clearance and a main span of nearly 600 m. Salvador -Itaparica bridge, Brazil. 09-03-2015 9 DANISH WIND INDUSTRY

09-03-2015DANISH WIND INDUSTRY ASSOCIATION10

Oslo International Airport, Norway

COWI in a Joint Venture designs a major expansion of the Oslo International Airport.

› The Gardermoen airport is extending the passenger terminal building, and building a new pier with 19 new aircraft stands, a new taxiway system and a redesign of the forecourt areas.

› The major expansion brings the capacity from 20 to 28 million passengers in the first phase and further

› The requirement regarding energy consumption is a 50% reduction compared with the existing passenger terminal from 1998.

Page 11: OFFSHORE WIND ENGINEERING · Itaparica › Cable stayed bridge with 70 m clearance and a main span of nearly 600 m. Salvador -Itaparica bridge, Brazil. 09-03-2015 9 DANISH WIND INDUSTRY

DANISH WIND INDUSTRY ASSOCIATION11

Marine market segments

09-03-2015

MARINE TERMINALS

PORTS AND HARBOURS

COASTAL ENGINEERING AND WATERFRONT DEVELOPMENT

OFFSHORE WIND FARMS

COOLING WATER SYSTEMS

LOCKS AND DAMS

Page 12: OFFSHORE WIND ENGINEERING · Itaparica › Cable stayed bridge with 70 m clearance and a main span of nearly 600 m. Salvador -Itaparica bridge, Brazil. 09-03-2015 9 DANISH WIND INDUSTRY

09-03-2015DANISH WIND INDUSTRY ASSOCIATION12

COWI's key marine and coastal engineering offices

Page 13: OFFSHORE WIND ENGINEERING · Itaparica › Cable stayed bridge with 70 m clearance and a main span of nearly 600 m. Salvador -Itaparica bridge, Brazil. 09-03-2015 9 DANISH WIND INDUSTRY

DANISH WIND INDUSTRY ASSOCIATION14

Our OWF services

09-03-2015

Page 14: OFFSHORE WIND ENGINEERING · Itaparica › Cable stayed bridge with 70 m clearance and a main span of nearly 600 m. Salvador -Itaparica bridge, Brazil. 09-03-2015 9 DANISH WIND INDUSTRY

Different services

09-03-2015DANISH WIND INDUSTRY ASSOCIATION15

HYDRAULIC STUDIES

GEOTECHNICAL DESIGN &

INVESTIGATIONS

FEASIBILITY STUDIES

DESIGN(FEED, PRELIM, BASIC

DETAILED

PREPARATION OF TENDER

DOCUMENTSCONSTRUCTION SUPERVISION

CONSTRUCTION MANAGEMENT

(PMC)

Page 15: OFFSHORE WIND ENGINEERING · Itaparica › Cable stayed bridge with 70 m clearance and a main span of nearly 600 m. Salvador -Itaparica bridge, Brazil. 09-03-2015 9 DANISH WIND INDUSTRY

09-03-2015DANISH WIND INDUSTRY ASSOCIATION16

General offshore wind foundation

Page 16: OFFSHORE WIND ENGINEERING · Itaparica › Cable stayed bridge with 70 m clearance and a main span of nearly 600 m. Salvador -Itaparica bridge, Brazil. 09-03-2015 9 DANISH WIND INDUSTRY

09-03-2015DANISH WIND INDUSTRY ASSOCIATION17

General offshore wind foundation

Page 17: OFFSHORE WIND ENGINEERING · Itaparica › Cable stayed bridge with 70 m clearance and a main span of nearly 600 m. Salvador -Itaparica bridge, Brazil. 09-03-2015 9 DANISH WIND INDUSTRY

OFFSHORE WIND FARMS

09-03-2015DANISH WIND INDUSTRY ASSOCIATION18

› London Array offshore wind farm, UK

› Wikinger offshore wind farm, Germany

› Rentel offshore wind farm, Belgium

› Thornton Bank offshore wind farm - phase 1, Belgium

› DanTysk offshore wind farm, Germany

› Horns Rev C, Kriegers Flak A and B, Transformer platforms, Denmark

› Formosa 1 offshore wind farm, Taiwan

› Rødsand 1 and 2 offshore wind farms, Denmark

Page 18: OFFSHORE WIND ENGINEERING · Itaparica › Cable stayed bridge with 70 m clearance and a main span of nearly 600 m. Salvador -Itaparica bridge, Brazil. 09-03-2015 9 DANISH WIND INDUSTRY

09-03-2015DANISH WIND INDUSTRY ASSOCIATION19

London Array 630 MW offshore wind farm, UK

Page 19: OFFSHORE WIND ENGINEERING · Itaparica › Cable stayed bridge with 70 m clearance and a main span of nearly 600 m. Salvador -Itaparica bridge, Brazil. 09-03-2015 9 DANISH WIND INDUSTRY

09-03-2015DANISH WIND INDUSTRY ASSOCIATION20

London Array 630 MW offshore wind farm, UK

Page 20: OFFSHORE WIND ENGINEERING · Itaparica › Cable stayed bridge with 70 m clearance and a main span of nearly 600 m. Salvador -Itaparica bridge, Brazil. 09-03-2015 9 DANISH WIND INDUSTRY

09-03-2015DANISH WIND INDUSTRY ASSOCIATION21

Wikinger 400 MW offshore wind farm, Germany

Page 21: OFFSHORE WIND ENGINEERING · Itaparica › Cable stayed bridge with 70 m clearance and a main span of nearly 600 m. Salvador -Itaparica bridge, Brazil. 09-03-2015 9 DANISH WIND INDUSTRY

09-03-2015DANISH WIND INDUSTRY ASSOCIATION22

DanTysk 288 MW offshore wind farm, Germany

Page 22: OFFSHORE WIND ENGINEERING · Itaparica › Cable stayed bridge with 70 m clearance and a main span of nearly 600 m. Salvador -Itaparica bridge, Brazil. 09-03-2015 9 DANISH WIND INDUSTRY

09-03-2015DANISH WIND INDUSTRY ASSOCIATION23

Thornton Bank 30 MW offshore wind farm, Belgium

Page 23: OFFSHORE WIND ENGINEERING · Itaparica › Cable stayed bridge with 70 m clearance and a main span of nearly 600 m. Salvador -Itaparica bridge, Brazil. 09-03-2015 9 DANISH WIND INDUSTRY

09-03-2015DANISH WIND INDUSTRY ASSOCIATION24

Kårehamn 48 MW offshore wind farm, Sweden

Page 24: OFFSHORE WIND ENGINEERING · Itaparica › Cable stayed bridge with 70 m clearance and a main span of nearly 600 m. Salvador -Itaparica bridge, Brazil. 09-03-2015 9 DANISH WIND INDUSTRY

09-03-2015DANISH WIND INDUSTRY ASSOCIATION25

Rødsand 1&2 372 MW offshore wind farm, Denmark

Page 25: OFFSHORE WIND ENGINEERING · Itaparica › Cable stayed bridge with 70 m clearance and a main span of nearly 600 m. Salvador -Itaparica bridge, Brazil. 09-03-2015 9 DANISH WIND INDUSTRY

09-03-2015DANISH WIND INDUSTRY ASSOCIATION26

Horns Rev C, Kriegers Flak A and B, Transformer Platforms, Denmark

Page 26: OFFSHORE WIND ENGINEERING · Itaparica › Cable stayed bridge with 70 m clearance and a main span of nearly 600 m. Salvador -Itaparica bridge, Brazil. 09-03-2015 9 DANISH WIND INDUSTRY

DANISH WIND INDUSTRY ASSOCIATION27

XL Monopiles

09-03-2015

Page 27: OFFSHORE WIND ENGINEERING · Itaparica › Cable stayed bridge with 70 m clearance and a main span of nearly 600 m. Salvador -Itaparica bridge, Brazil. 09-03-2015 9 DANISH WIND INDUSTRY

09-03-2015DANISH WIND INDUSTRY ASSOCIATION28

XL Monopiles

95 95 95 95

105 105

120

125

130 130 130

9095

100105110115120125130135

2006 2008 2010 2012 2014 2016 2018 2020

Can thickness vs. Time

Can Thickness vs. Time

100 100 100 100

110

120 120

130 130 130 130

95

100

105

110

115

120

125

130

135

2006 2008 2010 2012 2014 2016 2018 2020

D/t ratio vs. Time

D/t ratio vs. Time

Norsok N-004: D/tmax = 120ISO 19902: D/tmax = 120DNV OS-J101: D/tmax = 100 (ref to Norsok, EC3, API only)

Page 28: OFFSHORE WIND ENGINEERING · Itaparica › Cable stayed bridge with 70 m clearance and a main span of nearly 600 m. Salvador -Itaparica bridge, Brazil. 09-03-2015 9 DANISH WIND INDUSTRY

09-03-2015DANISH WIND INDUSTRY ASSOCIATION29

› Upending tool under development by IHC (during Race Bank OWF)› Designed for 6.5m MPs, whats next?

XL Monopiles

Below: Lifting of MPs to shore ontomultiwheelers.

Above: RB OWF, Upending tool from IHC develped for Race Bank (OD=6.8m).

Left: RB OWF, Upending tool from IHC developed for Race Bank (OD=6.8m).

Page 29: OFFSHORE WIND ENGINEERING · Itaparica › Cable stayed bridge with 70 m clearance and a main span of nearly 600 m. Salvador -Itaparica bridge, Brazil. 09-03-2015 9 DANISH WIND INDUSTRY

Agenda

09-03-2015DANISH WIND INDUSTRY ASSOCIATION31

Monopiles

- DONG asked COWI to investigate whether local shell buckling of MPs during installation (impact driving) was an issue

- Offshore guideline limitations:

- NORSOK N004: D/t<120

- ISO19902: D/t≤120

- EN 1993-1-6: 20≤r/t≤5000

- (LBA, MNA, GNIA, GMNIA)

Buckling analysis

Page 30: OFFSHORE WIND ENGINEERING · Itaparica › Cable stayed bridge with 70 m clearance and a main span of nearly 600 m. Salvador -Itaparica bridge, Brazil. 09-03-2015 9 DANISH WIND INDUSTRY

09-03-2015DANISH WIND INDUSTRY ASSOCIATION32

- Non-linear geometry

- Elastic-perfectly-plastic material behaviour for structural steel

- Non-linear boundary conditions (soil) including viscous damping

- Imperfections explicitly modelled when applying GMNIA method

Buckling analysis

Page 31: OFFSHORE WIND ENGINEERING · Itaparica › Cable stayed bridge with 70 m clearance and a main span of nearly 600 m. Salvador -Itaparica bridge, Brazil. 09-03-2015 9 DANISH WIND INDUSTRY

09-03-2015DANISH WIND INDUSTRY ASSOCIATION34

Offshore Foundation Driller (OFD) Alternative(upgraded) BSD3000 for soft soils?

under construction by Hochtief GmbH

XL Monopiles

Key Issues:

- Developed for MPs above OD=7.0m

- Reduction in noise compared to driving

Deeper waters seems to be required due to height of the OFD?

The trend for future for Offshore

Above: OFD drill bitRight: Full OFD machine

Page 32: OFFSHORE WIND ENGINEERING · Itaparica › Cable stayed bridge with 70 m clearance and a main span of nearly 600 m. Salvador -Itaparica bridge, Brazil. 09-03-2015 9 DANISH WIND INDUSTRY

DANISH WIND INDUSTRY ASSOCIATION35

Offshore Substations

09-03-2015

Page 33: OFFSHORE WIND ENGINEERING · Itaparica › Cable stayed bridge with 70 m clearance and a main span of nearly 600 m. Salvador -Itaparica bridge, Brazil. 09-03-2015 9 DANISH WIND INDUSTRY

09-03-2015DANISH WIND INDUSTRY ASSOCIATION36

Offshore Substations

Page 34: OFFSHORE WIND ENGINEERING · Itaparica › Cable stayed bridge with 70 m clearance and a main span of nearly 600 m. Salvador -Itaparica bridge, Brazil. 09-03-2015 9 DANISH WIND INDUSTRY

Horns Rev C – Topside and Jacket (HRC Spin)

09-03-2015DANISH WIND INDUSTRY ASSOCIATION37

› 400 MW OWF

› Beam/Column concept

› External escape routes

› Jacket substructure

› Detailed Design

Top: Horns Rev C Topside/Jacket (Copyright COWI A/S)

Left: Horns Rev C Topside Cellar deck (Copyright COWI A/S)

Page 35: OFFSHORE WIND ENGINEERING · Itaparica › Cable stayed bridge with 70 m clearance and a main span of nearly 600 m. Salvador -Itaparica bridge, Brazil. 09-03-2015 9 DANISH WIND INDUSTRY

Kriegers Flak A Topside

09-03-2015DANISH WIND INDUSTRY ASSOCIATION38

› 200 MW OWF

› Beam/Column concept

› External escape routes

› Substructure (TBD)

› Detailed Design

Kriegers Flak A Topside(Copyright COWI A/S)

Page 36: OFFSHORE WIND ENGINEERING · Itaparica › Cable stayed bridge with 70 m clearance and a main span of nearly 600 m. Salvador -Itaparica bridge, Brazil. 09-03-2015 9 DANISH WIND INDUSTRY

Kriegers Flak B Topside

09-03-2015DANISH WIND INDUSTRY ASSOCIATION39

› 400 MW OWF

› Beam/Column concept

› External escape routes

› Substructure (TBD)

› Detailed Design

Kriegers Flak B Topside, Boat landing and cellar deck view(Copyright COWI A/S)

Page 37: OFFSHORE WIND ENGINEERING · Itaparica › Cable stayed bridge with 70 m clearance and a main span of nearly 600 m. Salvador -Itaparica bridge, Brazil. 09-03-2015 9 DANISH WIND INDUSTRY

Kriegers Flak A and B Substructures (KF Spin)

09-03-2015DANISH WIND INDUSTRY ASSOCIATION40

› 200/400 MW OWF

› Beam/Column concept

› External escape routes

› Substructure (TBD)

› Basic Design

Kriegers Flak (proposed substructure)(Copyright COWI A/S)

Page 38: OFFSHORE WIND ENGINEERING · Itaparica › Cable stayed bridge with 70 m clearance and a main span of nearly 600 m. Salvador -Itaparica bridge, Brazil. 09-03-2015 9 DANISH WIND INDUSTRY

Rød Sand 2 - Topside

09-03-2015DANISH WIND INDUSTRY ASSOCIATION41

› OWF 200 MW

› Beam/Column concept

› External escape routes

› GBF substructure

› DD

Page 39: OFFSHORE WIND ENGINEERING · Itaparica › Cable stayed bridge with 70 m clearance and a main span of nearly 600 m. Salvador -Itaparica bridge, Brazil. 09-03-2015 9 DANISH WIND INDUSTRY

Hohe See Topside and Jacket

09-03-2015DANISH WIND INDUSTRY ASSOCIATION42

› 492 MW OWF

› Beam/Column concept

› External escape routes

› Jacket substructure

› CD

Top: Typical elevation

Right: Iso view (ARSA)

Top: Typical longitudinal section

Page 40: OFFSHORE WIND ENGINEERING · Itaparica › Cable stayed bridge with 70 m clearance and a main span of nearly 600 m. Salvador -Itaparica bridge, Brazil. 09-03-2015 9 DANISH WIND INDUSTRY

DANISH WIND INDUSTRY ASSOCIATION44

Design Process

09-03-2015

Page 41: OFFSHORE WIND ENGINEERING · Itaparica › Cable stayed bridge with 70 m clearance and a main span of nearly 600 m. Salvador -Itaparica bridge, Brazil. 09-03-2015 9 DANISH WIND INDUSTRY

09-03-2015DANISH WIND INDUSTRY ASSOCIATION45

› Objectives:› Consistent design

› Data consistency

› Reduction of time and resources needed for each location

› Solutions:› One central project database – only one reference source

› CAQ-procedures to support standard QA

› Automatic generation of input to design software

› Automatic generation of documentation (design drawings, result sheets, overview maps/tables etc.)

Design Process

Page 42: OFFSHORE WIND ENGINEERING · Itaparica › Cable stayed bridge with 70 m clearance and a main span of nearly 600 m. Salvador -Itaparica bridge, Brazil. 09-03-2015 9 DANISH WIND INDUSTRY

09-03-2015DANISH WIND INDUSTRY ASSOCIATION49

› Tools:

› Perl-scripts for generation of MP drawings

› Perl-scripts for generation of diagrams

› Perl-scripts for generation of result sheets

› Perl-scripts for generation of overviewdrawings

› Matlab routines for geotechnical checks / generation of p-y-curves

Design ProcessOWF Galloper – Design Process

Database

Perl-scriptMonopile drawing (PDF)

Page 43: OFFSHORE WIND ENGINEERING · Itaparica › Cable stayed bridge with 70 m clearance and a main span of nearly 600 m. Salvador -Itaparica bridge, Brazil. 09-03-2015 9 DANISH WIND INDUSTRY

DANISH WIND INDUSTRY ASSOCIATION50

Example for automatically generated drawing

09-03-2015

Page 44: OFFSHORE WIND ENGINEERING · Itaparica › Cable stayed bridge with 70 m clearance and a main span of nearly 600 m. Salvador -Itaparica bridge, Brazil. 09-03-2015 9 DANISH WIND INDUSTRY

WHAT IS COWI?

09-03-2015DANISH WIND INDUSTRY ASSOCIATION58

Experience, Reliability, Innovation

Page 45: OFFSHORE WIND ENGINEERING · Itaparica › Cable stayed bridge with 70 m clearance and a main span of nearly 600 m. Salvador -Itaparica bridge, Brazil. 09-03-2015 9 DANISH WIND INDUSTRY

09-03-2015DANISH WIND INDUSTRY ASSOCIATION59

WE WANT TO BE:

› A solution to your problem

› Our partners first choice for assistance

› The most skilled people

› World-class international specialists

› Excellent operations.

We create coherencein tomorrow’s sustainable societies.

OUR VISION

Page 46: OFFSHORE WIND ENGINEERING · Itaparica › Cable stayed bridge with 70 m clearance and a main span of nearly 600 m. Salvador -Itaparica bridge, Brazil. 09-03-2015 9 DANISH WIND INDUSTRY

09-03-2015DANISH WIND INDUSTRY ASSOCIATION60

Reducing Risk

Experience reduces risk

- Highly experienced people in all key positions with including experience in working with contractors

- Consistent data handling ensures consistent output and reduced time for computation

- Computer Aided QA of information ensures confidence in output, in particular with DB changes

- Automated drawing production reduces time and errors at time-critical project completion

Page 47: OFFSHORE WIND ENGINEERING · Itaparica › Cable stayed bridge with 70 m clearance and a main span of nearly 600 m. Salvador -Itaparica bridge, Brazil. 09-03-2015 9 DANISH WIND INDUSTRY

09-03-2015DANISH WIND INDUSTRY ASSOCIATION61

Reliability

High reliability

- Highly experienced staff with broad and relevant working background

- Versatile background of staff with experience from contractors, utility companies and academia

- Company network ensures services within all adjacent areas

- Company set-up framed for large scale projects ensures appropriate processes and monitoring

Page 48: OFFSHORE WIND ENGINEERING · Itaparica › Cable stayed bridge with 70 m clearance and a main span of nearly 600 m. Salvador -Itaparica bridge, Brazil. 09-03-2015 9 DANISH WIND INDUSTRY

09-03-2015DANISH WIND INDUSTRY ASSOCIATION62

Innovation

Optimizing design

- Project specific design solutions based on large and versatile experience

- Participation in broad range of innovation projects with multiple different OWF entities

- Flexible and open-minded approach to design – paradigms but no standard solutions

LONDON ARRAY – NEW GROUTED CONNECTION – LONDON ARRAY – NEW CAGE SOLUTION FOR CATHODIC PROTECTION - THORNTON BANK OFFSHORE WIND FARM – NEW INNOVATIVE CONICAL SHELL STRUCTURE - WIKINGER OFFSHORE WIND FARM – USE OF PLUG-IN EFFECT IN PILES – LONDON ARRAY OFFSHORE WIND FARM – NEW BOAT LANDING FRAME – LONDON ARRAY – NEW GEOTECHNICAL FORMULATIONS FOR SOIL DESCRIPTION – DONG – NEW JACKET STRUCTURE WITH WIRED BRACES –CARBON TRUST – DESIGN OPTIMIZATION FOR MAINTENANCE REDUCTION – DONG – DYNAMIC BUCKLING ANALYSIS FOR HIGH D/T RATIOS – RACE BANK – BOLTED MP/TP CONNECTIONS – ARCADIS – JACKET TP OPTIMIZATION

Page 49: OFFSHORE WIND ENGINEERING · Itaparica › Cable stayed bridge with 70 m clearance and a main span of nearly 600 m. Salvador -Itaparica bridge, Brazil. 09-03-2015 9 DANISH WIND INDUSTRY

DANISH WIND INDUSTRY ASSOCIATION

Thank You for your time

63