of planning forpersonal.cityu.edu.hk/bswmwong/contents/resources/construction_planning.pdf · •...

50
Review of Construction Planning for LargeScale Building and Civil Works Prepared by Raymond Wong (CityU) for a training seminar February 2015 The scope of planning covered in this seminar mainly include: 1. Understanding of the construction detail including the technology and process involved 2. Site facilities and other basic logistic to support the needed construction operations 3. Site layout planning 4. Idea about resources and cost planning 5. Use of method statement in the planning process 6. Highlight of some major planning setup and their cost implication 7. Other contingency situations and concerns Note: program and scheduling as a form of planning will be covered under separate talk.

Upload: others

Post on 23-Jan-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: of Planning forpersonal.cityu.edu.hk/bswmwong/contents/resources/Construction_Planning.pdf · • Structural steel or composite structure ... HKCEC‐roof erection, Festival Walk

Review of Construction Planning for Large‐Scale Building and Civil Works

Prepared by Raymond Wong (CityU) for a training seminar February 2015

The scope of planning covered in this seminar mainly include:1. Understanding of the construction detail including 

the technology and process involved

2. Site facilities and other basic logistic to support the needed construction operations

3. Site layout planning

4. Idea about resources and cost planning

5. Use of method statement in the planning process

6. Highlight of some major planning set‐up and their cost implication

7. Other contingency situations and concerns

Note: program and scheduling as a form of planning will be covered under separate talk.

Page 2: of Planning forpersonal.cityu.edu.hk/bswmwong/contents/resources/Construction_Planning.pdf · • Structural steel or composite structure ... HKCEC‐roof erection, Festival Walk
Page 3: of Planning forpersonal.cityu.edu.hk/bswmwong/contents/resources/Construction_Planning.pdf · • Structural steel or composite structure ... HKCEC‐roof erection, Festival Walk

Hysan Place

Page 4: of Planning forpersonal.cityu.edu.hk/bswmwong/contents/resources/Construction_Planning.pdf · • Structural steel or composite structure ... HKCEC‐roof erection, Festival Walk

The Belcher’s,a residential development in Fokfulam Road

The Belcher’s after completion

Page 5: of Planning forpersonal.cityu.edu.hk/bswmwong/contents/resources/Construction_Planning.pdf · • Structural steel or composite structure ... HKCEC‐roof erection, Festival Walk

Construction of Public Estates

Building project incorporating significant amount of site formation work

Page 6: of Planning forpersonal.cityu.edu.hk/bswmwong/contents/resources/Construction_Planning.pdf · • Structural steel or composite structure ... HKCEC‐roof erection, Festival Walk

Reclamation projects

Reclamation projects

Page 7: of Planning forpersonal.cityu.edu.hk/bswmwong/contents/resources/Construction_Planning.pdf · • Structural steel or composite structure ... HKCEC‐roof erection, Festival Walk

Marine works

Transportation project, Tuen Mun Station of West Rail

Page 8: of Planning forpersonal.cityu.edu.hk/bswmwong/contents/resources/Construction_Planning.pdf · • Structural steel or composite structure ... HKCEC‐roof erection, Festival Walk

Project of very large‐scale, construction of the airport terminal building 

Page 9: of Planning forpersonal.cityu.edu.hk/bswmwong/contents/resources/Construction_Planning.pdf · • Structural steel or composite structure ... HKCEC‐roof erection, Festival Walk

Construction within a difficult site with sensitive slope and topographic environment, the case of Celestial Height at To Kwa Wan

Construction within a difficult site with sensitive slope and topographic environment, the case of Celestial Height at To Kwa Wan

Page 10: of Planning forpersonal.cityu.edu.hk/bswmwong/contents/resources/Construction_Planning.pdf · • Structural steel or composite structure ... HKCEC‐roof erection, Festival Walk

the case of Celestial Height

The case of Celestial Height

Page 11: of Planning forpersonal.cityu.edu.hk/bswmwong/contents/resources/Construction_Planning.pdf · • Structural steel or composite structure ... HKCEC‐roof erection, Festival Walk

Site adjacent to existing seawall, the redevelopment of the New World Centre, with deep basement

Site with very limited access, located within a pedestrian street

Page 12: of Planning forpersonal.cityu.edu.hk/bswmwong/contents/resources/Construction_Planning.pdf · • Structural steel or composite structure ... HKCEC‐roof erection, Festival Walk

With the understanding of the above situation, then a detail construction planning can be able to prepare with better reliability.The below elements should have adequate input in order to achieve a reliable construction planning:

• Identify all basic work components within the contract, example : what is the essential works need to be done for a 4‐level basement within a congested site?

• List/foresee the major construction process, example: the detail work process for a building project involving large amount of slope‐cut (Case example, the Celestial Height)

• Any other associate operation need to be worked together or with close concern with other planning issues?   Example: site formation and sub‐structure work at the same time by different contractors. Or, partial hand‐over situation.

what is the essential works need to be done for a 4‐level basement within a congested site?

Page 13: of Planning forpersonal.cityu.edu.hk/bswmwong/contents/resources/Construction_Planning.pdf · • Structural steel or composite structure ... HKCEC‐roof erection, Festival Walk

Construction of basement using Bottom-up approach - Extension for St Paul Hospital

Basement excavation/support – example: Ho Man tin Residential development

Page 14: of Planning forpersonal.cityu.edu.hk/bswmwong/contents/resources/Construction_Planning.pdf · • Structural steel or composite structure ... HKCEC‐roof erection, Festival Walk

what is the essential works need to be done for a 4‐level basement within a congested site?

Below are some very basic work provisions need to be done in case a basement of this nature is to be constructed:

• Ground stabilization provisions

• Cut‐off walling provisions

• Lateral soil support provisions

• Excavation arrangement

• Dewatering arrangement 

• Spoil removal arrangement

• Basement construction arrangement

The question is: how and to what extent these are to be done?

Can you foresee the major construction process when doing these complicated projects?

Page 15: of Planning forpersonal.cityu.edu.hk/bswmwong/contents/resources/Construction_Planning.pdf · • Structural steel or composite structure ... HKCEC‐roof erection, Festival Walk

HKU Centennial Campus – condition of site before redevelopment

Page 16: of Planning forpersonal.cityu.edu.hk/bswmwong/contents/resources/Construction_Planning.pdf · • Structural steel or composite structure ... HKCEC‐roof erection, Festival Walk

Site of HKU Centennial Campus, November 2010

Page 17: of Planning forpersonal.cityu.edu.hk/bswmwong/contents/resources/Construction_Planning.pdf · • Structural steel or composite structure ... HKCEC‐roof erection, Festival Walk

Using of construction techniques. Some advance technologies may be required to tackle some special projects, such as:

• Project involving deep underground or the associated works

• Building involving a great portion of civil elements

• Structural steel or composite structure

• Structure involving very heavy lifting operation

• Super long‐span or high headroom structures

• Projects involving multi‐disciplinary operations. Example, intelligent building, facilities with highly sensitive E&M or other logistic services ….

• A&A works for properties with high commercial value

• Conversion/preservation of building with high heritage value

• Special plant and industrial facilities

• Other facilities with highly specialized function. Example hospital or even prison, site in restricted area like the airport.

Page 18: of Planning forpersonal.cityu.edu.hk/bswmwong/contents/resources/Construction_Planning.pdf · • Structural steel or composite structure ... HKCEC‐roof erection, Festival Walk

Project involving deep underground involving a great portion of civil elements,          

the Express Rail Terminus at West Kowloon 

the Express Rail Terminus at West Kowloon 

Page 19: of Planning forpersonal.cityu.edu.hk/bswmwong/contents/resources/Construction_Planning.pdf · • Structural steel or composite structure ... HKCEC‐roof erection, Festival Walk

Project involving deep underground involving a great portion of civil elements,          

the Express Rail Terminus at West Kowloon 

Page 20: of Planning forpersonal.cityu.edu.hk/bswmwong/contents/resources/Construction_Planning.pdf · • Structural steel or composite structure ... HKCEC‐roof erection, Festival Walk

What message this image gives?

Page 21: of Planning forpersonal.cityu.edu.hk/bswmwong/contents/resources/Construction_Planning.pdf · • Structural steel or composite structure ... HKCEC‐roof erection, Festival Walk

Large-scale basement project involved very complex phasing planning

What message this image gives?

Page 22: of Planning forpersonal.cityu.edu.hk/bswmwong/contents/resources/Construction_Planning.pdf · • Structural steel or composite structure ... HKCEC‐roof erection, Festival Walk

Construction of basement using Bottom-up approach - A much complicated case for large area site with

multi-phases to speed-up worksJuly 2010

Page 23: of Planning forpersonal.cityu.edu.hk/bswmwong/contents/resources/Construction_Planning.pdf · • Structural steel or composite structure ... HKCEC‐roof erection, Festival Walk

Working with Structural steel or composite structure

Working with Structural steel or composite structure

Page 24: of Planning forpersonal.cityu.edu.hk/bswmwong/contents/resources/Construction_Planning.pdf · • Structural steel or composite structure ... HKCEC‐roof erection, Festival Walk
Page 25: of Planning forpersonal.cityu.edu.hk/bswmwong/contents/resources/Construction_Planning.pdf · • Structural steel or composite structure ... HKCEC‐roof erection, Festival Walk

Working with Structural steel or composite structure, with complicated geometry and heavy members

Chow Tai Fook Centre in Guangzhou 

Page 26: of Planning forpersonal.cityu.edu.hk/bswmwong/contents/resources/Construction_Planning.pdf · • Structural steel or composite structure ... HKCEC‐roof erection, Festival Walk
Page 27: of Planning forpersonal.cityu.edu.hk/bswmwong/contents/resources/Construction_Planning.pdf · • Structural steel or composite structure ... HKCEC‐roof erection, Festival Walk
Page 28: of Planning forpersonal.cityu.edu.hk/bswmwong/contents/resources/Construction_Planning.pdf · • Structural steel or composite structure ... HKCEC‐roof erection, Festival Walk
Page 29: of Planning forpersonal.cityu.edu.hk/bswmwong/contents/resources/Construction_Planning.pdf · • Structural steel or composite structure ... HKCEC‐roof erection, Festival Walk

A steel column, 5m x 3m in measure

Structure involving very heavy lifting operation, Super long‐span or high headroom,

The case of Hong Kong Convention and Exhibition Center

Page 30: of Planning forpersonal.cityu.edu.hk/bswmwong/contents/resources/Construction_Planning.pdf · • Structural steel or composite structure ... HKCEC‐roof erection, Festival Walk
Page 31: of Planning forpersonal.cityu.edu.hk/bswmwong/contents/resources/Construction_Planning.pdf · • Structural steel or composite structure ... HKCEC‐roof erection, Festival Walk
Page 32: of Planning forpersonal.cityu.edu.hk/bswmwong/contents/resources/Construction_Planning.pdf · • Structural steel or composite structure ... HKCEC‐roof erection, Festival Walk
Page 33: of Planning forpersonal.cityu.edu.hk/bswmwong/contents/resources/Construction_Planning.pdf · • Structural steel or composite structure ... HKCEC‐roof erection, Festival Walk
Page 34: of Planning forpersonal.cityu.edu.hk/bswmwong/contents/resources/Construction_Planning.pdf · • Structural steel or composite structure ... HKCEC‐roof erection, Festival Walk

Other facilities with highly specialized function

Hanger facility for the HK Aircraft Engineering Co. Ltd.

Page 35: of Planning forpersonal.cityu.edu.hk/bswmwong/contents/resources/Construction_Planning.pdf · • Structural steel or composite structure ... HKCEC‐roof erection, Festival Walk

Working with heritage properties

Page 36: of Planning forpersonal.cityu.edu.hk/bswmwong/contents/resources/Construction_Planning.pdf · • Structural steel or composite structure ... HKCEC‐roof erection, Festival Walk
Page 37: of Planning forpersonal.cityu.edu.hk/bswmwong/contents/resources/Construction_Planning.pdf · • Structural steel or composite structure ... HKCEC‐roof erection, Festival Walk
Page 38: of Planning forpersonal.cityu.edu.hk/bswmwong/contents/resources/Construction_Planning.pdf · • Structural steel or composite structure ... HKCEC‐roof erection, Festival Walk

Concern 2

Site facilities and other basic logistic to support the needed construction operations. The followings are some essential facilities for various kind of construction jobs:

For general building works

• Hoarding , work fence, office and workers’ facilities

• Internal site access

• Provisions for temporary working, loading and storage

• Same, but in the form of elevated platform or alike

• Lifting provisions

• Concreting provision

• Safety provisions

• Re‐provision these facilities in appropriate stages of work

• Advance works especially for basement, marine or slope works

Page 39: of Planning forpersonal.cityu.edu.hk/bswmwong/contents/resources/Construction_Planning.pdf · • Structural steel or composite structure ... HKCEC‐roof erection, Festival Walk

Concern 2

For civil engineering works. Similar to building works but sometimes with the incorporation of the following kinds of special provisions 

• Large amount of cutting and/or filling works to provide rooms for temporary access. Example: slope and site formation works

• Provision of barging or ferry service. Example: marine works

• Extra working space for pre‐assembly or preparation of prefabricated components

• Temporary storage of large amount of construction materials. Example: precast elements, semi‐assembled components, excavated material for disposal or re‐use.

• Large amount of power and water supply of temporary nature in remote site/s

• Need of temporary traffic arrangement to facilitate works

Concern 3 ‐ Site layout planning 

The main concern is to plan and prepare an efficient layout base on the limited space of site to support all the needed construction operations. There are also other features of site layout need to be noted when planning the layout, that is:

• The dynamic nature of site works

• The practicality of site works (satisfy the basic requirement, provide on time, or over‐provided)

• Close coordination between frontline and planning which may have a time‐lag sometimes more than a year.

• Many of the site layout facilities are to provide/support as work access and/or site safety.

• Delivery/transporting equipment of special nature (e.g. Chiller, transformer, escalator, extremely heavy components)

• Relationship/differences between site layout and temp works

• Layout to fit complicated construction planning, examples: HKCEC‐roof erection, Festival Walk site formation, HMT Station

Page 40: of Planning forpersonal.cityu.edu.hk/bswmwong/contents/resources/Construction_Planning.pdf · • Structural steel or composite structure ... HKCEC‐roof erection, Festival Walk

Dynamic nature of site work

An example for a residential project with several critical stages of works within a  24‐month time‐line

Po Lam Road Phase 1 80

CONSTRUCTION STAGE 11ST TO 4TH MONTH

S/C SITE OFFICE

GBD SITE OFFICE

GFD/GCD SITE OFFICE

GFD REBAR BENDING YARD & STEEL CASING EQUIPMENT STORAGE

GCD TEMPORARY PLATFORM GCD STEEL

YARD & GROUTING STATION

GBD REBAR BENDING YARD

Page 41: of Planning forpersonal.cityu.edu.hk/bswmwong/contents/resources/Construction_Planning.pdf · • Structural steel or composite structure ... HKCEC‐roof erection, Festival Walk

Po Lam Road Phase 1 81

CONSTRUCTION STAGE 25TH TO 6TH MONTH

S/C SITE OFFICE

GBD SITE OFFICE

GFD/GCD SITE OFFICE

GFD REBAR BENDING YARD & STEEL CASING EQUIPMENT STORAGE

GCD TEMPORARY PLATFORM

GBD REBAR BENDING YARDRETAINGING WALL EXCAVATION & CONSTRUCTION

GCD STEEL YARD & GROUTING STATION

5

ELEVATED DECK CONSTRUCTION

PODIUM COMPLEX CONSTRUCTION

Po Lam Road Phase 1 82

CONSTRUCTION STAGE 37TH TO 8TH MONTH

S/C SITE OFFICE

GBD SITE OFFICE

GBD REBAR BENDING YARD

GBD REBAR BENDING YARD

23

45

67

89

20

1011

12

1314

15

16

LATE CAST STRUCTURE PG/F - P2/F FOR UNLOADING/REBAR BENDING

FOOTBRIDGE TOWER 2 CONSTRUCTION

PODIUM COMPLEX CONSTRUCTION+

ELEVATED DECK CONSTRUCTION10

2

3

4

5

6

9

1213

14

151617

18

19

Page 42: of Planning forpersonal.cityu.edu.hk/bswmwong/contents/resources/Construction_Planning.pdf · • Structural steel or composite structure ... HKCEC‐roof erection, Festival Walk

Po Lam Road Phase 1 83

CONSTRUCTION STAGE 49TH TO 11TH MONTH

S/C SITE OFFICE

GBD SITE OFFICE

GBD REBAR BENDING YARD

FOOTBRIDGE ERECTION

18

17

20

19

13

ELEVATED DECK CONSTRUCTION

LEFT OUT PODIUM PG/F -P2/F CONSTRUCTION

6

54

3

1

REBAR BENDING YARD AT PODIUM ROOF

S.A.B 1/F TRANSFER SLAB CONSTRUCTION

1817

161514

2

Po Lam Road Phase 1 84

CONSTUCTION STAGE 512TH to 14TH MONTH

30m jib

40m jib

50m jib

ELEVATED ROAD DECK CONSTRUCTION

REBAR BENDING YARD AT PODIUM ROOF

S.A.B. CONSTRUCTION

1

23

4

5

6

PC FAÇADE STORAGE YARD & UNLOADING AREA FOR SLAB CONSTRUCTION

Page 43: of Planning forpersonal.cityu.edu.hk/bswmwong/contents/resources/Construction_Planning.pdf · • Structural steel or composite structure ... HKCEC‐roof erection, Festival Walk

Po Lam Road Phase 1 85

CONSTUCTION STAGE 615TH to 17TH MONTH

30m jib

40m jib

50m jib

REBAR BENDING YARD AT PODIUM ROOF

SLAB CONSTRUCTION

1

23

4

5

6

PC FAÇADE STORAGE YARD & UNLOADING AREA FOR SLAB CONSTRUCTION

SETCION 1 COMPLETED AND HANDED OVER

Po Lam Road Phase 1 86

CONSTUCTION STAGE 718TH to 24TH MONTH

SETCION 1 COMPLETED AND HANDED OVER

SAB FINISHING WORKS

SECTION 2 COMPLETED AND HANDED OVER EXCEPT PODIUM ROOF

ACCESS TO PODIUM ROOF VIA CARPARK RAMP

Page 44: of Planning forpersonal.cityu.edu.hk/bswmwong/contents/resources/Construction_Planning.pdf · • Structural steel or composite structure ... HKCEC‐roof erection, Festival Walk

Concern 4

Idea about resources and cost planning

Construction Resources usually refer to human operatives, materials and plants. All these elements involve some kinds of layout support, such as for:

• Human operatives – welfare, accommodation, access and safety

• Materials – access/delivery to the required spot, storage, handling etc.

• Plants – delivering the plant to the spot, accommodation, mounting/dismantling of the plant, powering the plant, movement of the plant, operator access to the plant, choice of equipment and construction methods.

Cost planning issues

Provision of these resources having a cost implication. Cost planning needs to be incorporated when concerning these items.

Concern 5

The use of method statement in construction planning.

The basic information needed to be specified in a method statement should include:

• Purpose and scope of the operation 

• Identify the work components involved in the carrying out of the operation

• State clearly the sequence & time‐line of all involved works

• State the resources required for works (including the quantity and the time that those resources are needed)

• State the needed facilities/logistic that are required to support the works/operation. Very often the setting up of some kinds of temporary works may be required.

• Other specific requirement needed. Example, engineering inspection, waiting for special permit, handing over of works by other parties etc.

Page 45: of Planning forpersonal.cityu.edu.hk/bswmwong/contents/resources/Construction_Planning.pdf · • Structural steel or composite structure ... HKCEC‐roof erection, Festival Walk

Concern 6

Highlight of some major planning set‐up that have significant cost implication

• Large‐size working platform

• Long distance/difficult access‐way required

• Large‐scale falsework erection. Example: falseworkfor long‐span/high‐headroom in‐situ concrete works

• Provision for heavy lifting. Example: erecting and dismantling of large‐size tower crane, HKCEC Extension, route 3 (KC) lifting gantry, IFC link bridges

• Power supply for site of mega‐size. Example: situation for the site of Terminal building of the Express Rail in West Kowloon.

The temporary access‐way erected on the Deep Bay for the Western Corridor Project

Page 46: of Planning forpersonal.cityu.edu.hk/bswmwong/contents/resources/Construction_Planning.pdf · • Structural steel or composite structure ... HKCEC‐roof erection, Festival Walk

The temporary access‐way for the Tuen Mun Highway Widening Project

Page 47: of Planning forpersonal.cityu.edu.hk/bswmwong/contents/resources/Construction_Planning.pdf · • Structural steel or composite structure ... HKCEC‐roof erection, Festival Walk

Advance work for the Celestial Height Project

Page 48: of Planning forpersonal.cityu.edu.hk/bswmwong/contents/resources/Construction_Planning.pdf · • Structural steel or composite structure ... HKCEC‐roof erection, Festival Walk

Concern 7

Other contingency situations and concerns

Many projects of more complicated nature often have situations out of usual expectation though some kinds of contingency plans may already be incorporated. Examples of these can be:

• Unknown underground obstacles when doing large‐scale ground works (Festival Walk, Express Rail Terminus, Admiralty Station of South Island Line)

• Accident, e.g. TBM damaged by flood

• Progress of very complicated work operation cannot cope with other associate works, e.g. IFC project, retrospective outrigger installation and the core wall

Concern 7

Besides possible emergency/contingency situations, there may have some other concerns that need to be taken into account when planning projects of relative complicated nature, for examples.

• Occurring of out‐of‐control work operation. Examples: ground movement beyond allowable limit

• The delivery of mile‐stone equipment that form part of the critical path of project. examples: emergency generator, transformer, ….

• Projects with shifting over arrangement. Examples: the delivery of an advanced/compensating facilities before the removing of the old facilities 

Page 49: of Planning forpersonal.cityu.edu.hk/bswmwong/contents/resources/Construction_Planning.pdf · • Structural steel or composite structure ... HKCEC‐roof erection, Festival Walk

Wall moved inward exceeding MTR allowable limit.

Jack block was used to push back the wall

Delay caused by the inward moving of the diaphragm wall near the MTR tunnel, the Pioneer Centre Basement construction in early 1990s.

The old Wanchai ferry pierThe new pier to replace the old one

Example: the delivery of an advanced/compensating facilities before the removing of the old facilities, the Wanchai Ferry Pier for the Wanchai Development Phase 2

Page 50: of Planning forpersonal.cityu.edu.hk/bswmwong/contents/resources/Construction_Planning.pdf · • Structural steel or composite structure ... HKCEC‐roof erection, Festival Walk

There are many other challenging examples in the real world. This presentation only provides some highlights to give a wider vision in order to make construction planning more realistic and down to the ground. 

Thanks.