Page 1: ODPS 1200B-48-4_MPS_en_01

832019 ODPS 1200B-48-4_MPS_en_01

httpslidepdfcomreaderfullodps-1200b-48-4mpsen01 114

Energy Systems

odps 1200b-48-4_mps_en_01doc2006-09-05

Installation and Commissioning

OUTDOOR DC POWER SYSTEMS

ODPS 1200B-48-4 MPS

832019 ODPS 1200B-48-4_MPS_en_01

httpslidepdfcomreaderfullodps-1200b-48-4mpsen01 214

832019 ODPS 1200B-48-4_MPS_en_01

httpslidepdfcomreaderfullodps-1200b-48-4mpsen01 314

Energy Systems INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS

TABLE OF CONTENTS

1 DOCUMENT INFORMATION5 11 Version control5

2 INSTALLATION7 21 Before you begin 7 22 Unpacking the system 7

3 SYSTEM CONFIGURATION 8 4 INSTALLATION10

41 System cabinet10 42 Electrical connections10 421 Grounding10 422 AC input -connection 11 423 DC outputs -connection 12 424 Alarm connection13 425 Battery connections13 426 Rectifiers installation13

5 COMMISSIONING 14 51 Starting up the system14

2006-09-05 3

832019 ODPS 1200B-48-4_MPS_en_01

httpslidepdfcomreaderfullodps-1200b-48-4mpsen01 414

Energy Systems INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS

This page is intentionally left blank

2006-09-054

832019 ODPS 1200B-48-4_MPS_en_01

httpslidepdfcomreaderfullodps-1200b-48-4mpsen01 514

Energy Systems INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS

1 DOCUMENT INFORMATION

11 Version control

Document number Document description

ODPS 1200B-48-4_MPS_en_01doc

ODPS 1200B-48-4 MPSDC Power Supply System Installation andCommissioning

Previous version Description of changes

Controlled by Date

Andrzej Chaberek 2006-09-05

2006-09-05 5

832019 ODPS 1200B-48-4_MPS_en_01

httpslidepdfcomreaderfullodps-1200b-48-4mpsen01 614

Energy Systems INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS

This page is intentionally left blank

2006-09-056

832019 ODPS 1200B-48-4_MPS_en_01

httpslidepdfcomreaderfullodps-1200b-48-4mpsen01 714

Energy Systems INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS

2 INSTALLATION

21 Before you begin

Step 1 Ensure that you have all the equipment needed to make a properinstallation of the system

Step 2 Also ensure that grounding terminals AC-distributions are properlyavailable

Step 3 Take care that the regulations of IEC 60364 and CENELEC HD384concerning installation and assembling of telecommunication andelectrical equipment have been noticed The local regulations andspecial instructions must also be noticed during the work Whenchoosing the place of the installation please notice that the cooling air

must flow without restrictions through the ventilation holes The systemmust have enough space in front of it for operation and service functionsNotice the direction of the cabling and the required space of the otherequipment

22 Unpacking the system

Step 1 Check that the received cargo is according to the packing list

Step 2 Ensure that the cabinet and the equipment are not damaged duringtransportation

Step 4 Check that proper documents are delivered with the system andnecessary contact information for technical support is included

2006-09-05 7

832019 ODPS 1200B-48-4_MPS_en_01

httpslidepdfcomreaderfullodps-1200b-48-4mpsen01 814

Energy Systems INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS

3 SYSTEM CONFIGURATION

Figure 1 System from the front

2006-09-058

832019 ODPS 1200B-48-4_MPS_en_01

httpslidepdfcomreaderfullodps-1200b-48-4mpsen01 914

Energy Systems INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS

Figure 2 AC distribution (the cover removed)

2006-09-05 9

832019 ODPS 1200B-48-4_MPS_en_01

httpslidepdfcomreaderfullodps-1200b-48-4mpsen01 1014

Energy Systems INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS

4 INSTALLATION

41 System cabinet

Step 1 Set the system cabinet standing in its place and straighten it if neededby adjusting the base

Step 2 Fasten the plinth of the cabinet to the ground base with the four screws(M12) The dimension of the fixing holes are shown bellow

Figure 3 The plinth of the cabinet and dimensioning of fixing screws (holes)

42 Electrical connections

Remove the front cover from the AC distribution

Note Check if the all appropriate protection elements to supply the system in

the AC site main distribution are switched OFF

421 Grounding

Connect the protective-grounding terminal of the cabinet mechanics to the maingrounding bus bar of the site by proper cable

Step 1 Bring in the PE cable through input sleeve packing on the back of thecabinet so that there is enough length to make the connections

Step 2 Connect the PE cable to the protective-grounding terminal of the cabinet

2006-09-0510

832019 ODPS 1200B-48-4_MPS_en_01

httpslidepdfcomreaderfullodps-1200b-48-4mpsen01 1114

Energy Systems INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS

Figure 4 The cabinet protective grounding terminal (PE)

422 AC input -connection

Below in the table 1 are the recommended mains fuse sizes for the protection of thesupply line and cable cross sections for 1 phase AC input

1 phase AC-connection

Mains fuse 1 x 25 A

Cable 3 x 4 mm2

Table 1 AC-input recommendation for ODPS 1200-48-4 MPS outdoor

Step 1 Bring in the AC input and output cables through input sleeves packing

on the back of the cabinet so that there is enough length to make theconnections To make this easier you could open the side doors (leftandor right) For that two screws in each side (accessible from the front)have to be unscrewed

Step 2 Connect AC input cables ndash PE cable to the PE terminal phase cable (L)to the phase connection and the neutral (N) cable to the N-connection ofthe input MCB breaker F0 in the AC distribution (Figure 5)

2006-09-05 11

832019 ODPS 1200B-48-4_MPS_en_01

httpslidepdfcomreaderfullodps-1200b-48-4mpsen01 1214

Energy Systems INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS

Figure 5 The cables connection

Note Check the AC-connections from the wiring diagram and the illustration of AC-connections to the system attached to this user manual

423 DC outputs -connection

Step 1 Bring in the DC output cables through input sleeves packing on the backof the cabinet so that there is enough length to make the connectionsTo make this easier you could open the side doors (left andor right) Forthat two screws in each side (accessible from the front) have to beunscrewed

Step 2 Connect DC output cables - minus cable (-) to terminal of the load circuitbreaker 1F11F4 plus to plus bus bar (see user manual for DPS 1200Bsystem)

2006-09-0512

832019 ODPS 1200B-48-4_MPS_en_01

httpslidepdfcomreaderfullodps-1200b-48-4mpsen01 1314

Energy Systems INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS

424 Alarm connection

Step 3 Bring in the alarm output cables through input sleeves packing on the

back of the cabinet so that there is enough length to make theconnections To make this easier you could open the side doors (leftandor right) For that two screws in each side (accessible from the front)have to be unscrewed

Step 4 Connect alarm output cables to alarms terminals (Figure 5) Connectionsbetween user alarm terminals and alarm connectors of PSC1 controllerboard is presented bellow

Alarmterminals

(distribution)

Alarms Relay contacts(normal state ndash

without alarms)

Outputterminals

on the PSC11 NC DO1-1

2 C DO1-2

3

UA ndash Urgentalarm

NO DO1-3

4 NC DO2-1

5 C DO2-2

6

NUA ndash Noturgent alarm

NO DO2-3

425 Battery connections

Step 1 Make sure that batteries circuits breakers BF11 and BF12 in DPS1200B-48-4 power system are in the OFF-position

Step 2 Install the batteries on their shelves

Step 3 Connect the internal battery cables so that the total nominal voltage ofeach battery string is 48 V Connect the systemrsquos pre-installed batteryconnection cable marked as ldquo+rdquo to the free plus-pole of the battery stringand the cable marked as ldquo-rdquo to the free negative pole The battery strings

are numbered according to the battery fuse it is connected to

Fasten the all cables to the cable supporter behind AC distribution in the cabinet

Install the front cover from the AC distribution on their position

426 Rectifiers installation

Step 1 Install the DPR 1200B -48 rectifiers in the DPS 1200B-48-4 powersystem (see details in DPS 1200B-48-4 user manual)

2006-09-05 13

832019 ODPS 1200B-48-4_MPS_en_01

httpslidepdfcomreaderfullodps-1200b-48-4mpsen01 1414

Energy Systems INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS

5 COMMISSIONING

51 Starting up the system

Taking the system into use is presented below step-by-step

Step 1 Check that the all connections are made according to the installationinstructions and the wiring diagram

Step 2 Check that the all circuit breakers in AC distribution and DPS 1200B-48-4 system are in ldquoOFFrdquo-position

Step 3 Power on the outdoor system by switching ON the appropriate switch inthe AC site distribution

Step 4 Power on the DPS 1200B-48-4 system by switching ON the circuitbreaker F0

Step 5 Switch ON the batteries circuits breakers BF11 and or BF12 in DPS1200B-48-4 system

Step 6 Check if DPS 1200B-48-4 system work properly (see details in DPS1200B-48-4 user manual)

Step 7 Power on the output loads by switching ON the 1F1 divide 1F4 output circuitbreakers accordingly

Step 8 Start the Air Conditioner by switching on the circuit breaker FAC

Step 9 Check if Air Conditioner work properly (see details in air conditioner user

manual ndash the factory setting for the start cooling temperature is 25 ordmC)

2006 09 0514

Page 2: ODPS 1200B-48-4_MPS_en_01

832019 ODPS 1200B-48-4_MPS_en_01

httpslidepdfcomreaderfullodps-1200b-48-4mpsen01 214

832019 ODPS 1200B-48-4_MPS_en_01

httpslidepdfcomreaderfullodps-1200b-48-4mpsen01 314

Energy Systems INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS

TABLE OF CONTENTS

1 DOCUMENT INFORMATION5 11 Version control5

2 INSTALLATION7 21 Before you begin 7 22 Unpacking the system 7

3 SYSTEM CONFIGURATION 8 4 INSTALLATION10

41 System cabinet10 42 Electrical connections10 421 Grounding10 422 AC input -connection 11 423 DC outputs -connection 12 424 Alarm connection13 425 Battery connections13 426 Rectifiers installation13

5 COMMISSIONING 14 51 Starting up the system14

2006-09-05 3

832019 ODPS 1200B-48-4_MPS_en_01

httpslidepdfcomreaderfullodps-1200b-48-4mpsen01 414

Energy Systems INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS

This page is intentionally left blank

2006-09-054

832019 ODPS 1200B-48-4_MPS_en_01

httpslidepdfcomreaderfullodps-1200b-48-4mpsen01 514

Energy Systems INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS

1 DOCUMENT INFORMATION

11 Version control

Document number Document description

ODPS 1200B-48-4_MPS_en_01doc

ODPS 1200B-48-4 MPSDC Power Supply System Installation andCommissioning

Previous version Description of changes

Controlled by Date

Andrzej Chaberek 2006-09-05

2006-09-05 5

832019 ODPS 1200B-48-4_MPS_en_01

httpslidepdfcomreaderfullodps-1200b-48-4mpsen01 614

Energy Systems INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS

This page is intentionally left blank

2006-09-056

832019 ODPS 1200B-48-4_MPS_en_01

httpslidepdfcomreaderfullodps-1200b-48-4mpsen01 714

Energy Systems INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS

2 INSTALLATION

21 Before you begin

Step 1 Ensure that you have all the equipment needed to make a properinstallation of the system

Step 2 Also ensure that grounding terminals AC-distributions are properlyavailable

Step 3 Take care that the regulations of IEC 60364 and CENELEC HD384concerning installation and assembling of telecommunication andelectrical equipment have been noticed The local regulations andspecial instructions must also be noticed during the work Whenchoosing the place of the installation please notice that the cooling air

must flow without restrictions through the ventilation holes The systemmust have enough space in front of it for operation and service functionsNotice the direction of the cabling and the required space of the otherequipment

22 Unpacking the system

Step 1 Check that the received cargo is according to the packing list

Step 2 Ensure that the cabinet and the equipment are not damaged duringtransportation

Step 4 Check that proper documents are delivered with the system andnecessary contact information for technical support is included

2006-09-05 7

832019 ODPS 1200B-48-4_MPS_en_01

httpslidepdfcomreaderfullodps-1200b-48-4mpsen01 814

Energy Systems INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS

3 SYSTEM CONFIGURATION

Figure 1 System from the front

2006-09-058

832019 ODPS 1200B-48-4_MPS_en_01

httpslidepdfcomreaderfullodps-1200b-48-4mpsen01 914

Energy Systems INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS

Figure 2 AC distribution (the cover removed)

2006-09-05 9

832019 ODPS 1200B-48-4_MPS_en_01

httpslidepdfcomreaderfullodps-1200b-48-4mpsen01 1014

Energy Systems INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS

4 INSTALLATION

41 System cabinet

Step 1 Set the system cabinet standing in its place and straighten it if neededby adjusting the base

Step 2 Fasten the plinth of the cabinet to the ground base with the four screws(M12) The dimension of the fixing holes are shown bellow

Figure 3 The plinth of the cabinet and dimensioning of fixing screws (holes)

42 Electrical connections

Remove the front cover from the AC distribution

Note Check if the all appropriate protection elements to supply the system in

the AC site main distribution are switched OFF

421 Grounding

Connect the protective-grounding terminal of the cabinet mechanics to the maingrounding bus bar of the site by proper cable

Step 1 Bring in the PE cable through input sleeve packing on the back of thecabinet so that there is enough length to make the connections

Step 2 Connect the PE cable to the protective-grounding terminal of the cabinet

2006-09-0510

832019 ODPS 1200B-48-4_MPS_en_01

httpslidepdfcomreaderfullodps-1200b-48-4mpsen01 1114

Energy Systems INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS

Figure 4 The cabinet protective grounding terminal (PE)

422 AC input -connection

Below in the table 1 are the recommended mains fuse sizes for the protection of thesupply line and cable cross sections for 1 phase AC input

1 phase AC-connection

Mains fuse 1 x 25 A

Cable 3 x 4 mm2

Table 1 AC-input recommendation for ODPS 1200-48-4 MPS outdoor

Step 1 Bring in the AC input and output cables through input sleeves packing

on the back of the cabinet so that there is enough length to make theconnections To make this easier you could open the side doors (leftandor right) For that two screws in each side (accessible from the front)have to be unscrewed

Step 2 Connect AC input cables ndash PE cable to the PE terminal phase cable (L)to the phase connection and the neutral (N) cable to the N-connection ofthe input MCB breaker F0 in the AC distribution (Figure 5)

2006-09-05 11

832019 ODPS 1200B-48-4_MPS_en_01

httpslidepdfcomreaderfullodps-1200b-48-4mpsen01 1214

Energy Systems INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS

Figure 5 The cables connection

Note Check the AC-connections from the wiring diagram and the illustration of AC-connections to the system attached to this user manual

423 DC outputs -connection

Step 1 Bring in the DC output cables through input sleeves packing on the backof the cabinet so that there is enough length to make the connectionsTo make this easier you could open the side doors (left andor right) Forthat two screws in each side (accessible from the front) have to beunscrewed

Step 2 Connect DC output cables - minus cable (-) to terminal of the load circuitbreaker 1F11F4 plus to plus bus bar (see user manual for DPS 1200Bsystem)

2006-09-0512

832019 ODPS 1200B-48-4_MPS_en_01

httpslidepdfcomreaderfullodps-1200b-48-4mpsen01 1314

Energy Systems INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS

424 Alarm connection

Step 3 Bring in the alarm output cables through input sleeves packing on the

back of the cabinet so that there is enough length to make theconnections To make this easier you could open the side doors (leftandor right) For that two screws in each side (accessible from the front)have to be unscrewed

Step 4 Connect alarm output cables to alarms terminals (Figure 5) Connectionsbetween user alarm terminals and alarm connectors of PSC1 controllerboard is presented bellow

Alarmterminals

(distribution)

Alarms Relay contacts(normal state ndash

without alarms)

Outputterminals

on the PSC11 NC DO1-1

2 C DO1-2

3

UA ndash Urgentalarm

NO DO1-3

4 NC DO2-1

5 C DO2-2

6

NUA ndash Noturgent alarm

NO DO2-3

425 Battery connections

Step 1 Make sure that batteries circuits breakers BF11 and BF12 in DPS1200B-48-4 power system are in the OFF-position

Step 2 Install the batteries on their shelves

Step 3 Connect the internal battery cables so that the total nominal voltage ofeach battery string is 48 V Connect the systemrsquos pre-installed batteryconnection cable marked as ldquo+rdquo to the free plus-pole of the battery stringand the cable marked as ldquo-rdquo to the free negative pole The battery strings

are numbered according to the battery fuse it is connected to

Fasten the all cables to the cable supporter behind AC distribution in the cabinet

Install the front cover from the AC distribution on their position

426 Rectifiers installation

Step 1 Install the DPR 1200B -48 rectifiers in the DPS 1200B-48-4 powersystem (see details in DPS 1200B-48-4 user manual)

2006-09-05 13

832019 ODPS 1200B-48-4_MPS_en_01

httpslidepdfcomreaderfullodps-1200b-48-4mpsen01 1414

Energy Systems INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS

5 COMMISSIONING

51 Starting up the system

Taking the system into use is presented below step-by-step

Step 1 Check that the all connections are made according to the installationinstructions and the wiring diagram

Step 2 Check that the all circuit breakers in AC distribution and DPS 1200B-48-4 system are in ldquoOFFrdquo-position

Step 3 Power on the outdoor system by switching ON the appropriate switch inthe AC site distribution

Step 4 Power on the DPS 1200B-48-4 system by switching ON the circuitbreaker F0

Step 5 Switch ON the batteries circuits breakers BF11 and or BF12 in DPS1200B-48-4 system

Step 6 Check if DPS 1200B-48-4 system work properly (see details in DPS1200B-48-4 user manual)

Step 7 Power on the output loads by switching ON the 1F1 divide 1F4 output circuitbreakers accordingly

Step 8 Start the Air Conditioner by switching on the circuit breaker FAC

Step 9 Check if Air Conditioner work properly (see details in air conditioner user

manual ndash the factory setting for the start cooling temperature is 25 ordmC)

2006 09 0514

Page 3: ODPS 1200B-48-4_MPS_en_01

832019 ODPS 1200B-48-4_MPS_en_01

httpslidepdfcomreaderfullodps-1200b-48-4mpsen01 314

Energy Systems INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS

TABLE OF CONTENTS

1 DOCUMENT INFORMATION5 11 Version control5

2 INSTALLATION7 21 Before you begin 7 22 Unpacking the system 7

3 SYSTEM CONFIGURATION 8 4 INSTALLATION10

41 System cabinet10 42 Electrical connections10 421 Grounding10 422 AC input -connection 11 423 DC outputs -connection 12 424 Alarm connection13 425 Battery connections13 426 Rectifiers installation13

5 COMMISSIONING 14 51 Starting up the system14

2006-09-05 3

832019 ODPS 1200B-48-4_MPS_en_01

httpslidepdfcomreaderfullodps-1200b-48-4mpsen01 414

Energy Systems INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS

This page is intentionally left blank

2006-09-054

832019 ODPS 1200B-48-4_MPS_en_01

httpslidepdfcomreaderfullodps-1200b-48-4mpsen01 514

Energy Systems INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS

1 DOCUMENT INFORMATION

11 Version control

Document number Document description

ODPS 1200B-48-4_MPS_en_01doc

ODPS 1200B-48-4 MPSDC Power Supply System Installation andCommissioning

Previous version Description of changes

Controlled by Date

Andrzej Chaberek 2006-09-05

2006-09-05 5

832019 ODPS 1200B-48-4_MPS_en_01

httpslidepdfcomreaderfullodps-1200b-48-4mpsen01 614

Energy Systems INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS

This page is intentionally left blank

2006-09-056

832019 ODPS 1200B-48-4_MPS_en_01

httpslidepdfcomreaderfullodps-1200b-48-4mpsen01 714

Energy Systems INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS

2 INSTALLATION

21 Before you begin

Step 1 Ensure that you have all the equipment needed to make a properinstallation of the system

Step 2 Also ensure that grounding terminals AC-distributions are properlyavailable

Step 3 Take care that the regulations of IEC 60364 and CENELEC HD384concerning installation and assembling of telecommunication andelectrical equipment have been noticed The local regulations andspecial instructions must also be noticed during the work Whenchoosing the place of the installation please notice that the cooling air

must flow without restrictions through the ventilation holes The systemmust have enough space in front of it for operation and service functionsNotice the direction of the cabling and the required space of the otherequipment

22 Unpacking the system

Step 1 Check that the received cargo is according to the packing list

Step 2 Ensure that the cabinet and the equipment are not damaged duringtransportation

Step 4 Check that proper documents are delivered with the system andnecessary contact information for technical support is included

2006-09-05 7

832019 ODPS 1200B-48-4_MPS_en_01

httpslidepdfcomreaderfullodps-1200b-48-4mpsen01 814

Energy Systems INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS

3 SYSTEM CONFIGURATION

Figure 1 System from the front

2006-09-058

832019 ODPS 1200B-48-4_MPS_en_01

httpslidepdfcomreaderfullodps-1200b-48-4mpsen01 914

Energy Systems INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS

Figure 2 AC distribution (the cover removed)

2006-09-05 9

832019 ODPS 1200B-48-4_MPS_en_01

httpslidepdfcomreaderfullodps-1200b-48-4mpsen01 1014

Energy Systems INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS

4 INSTALLATION

41 System cabinet

Step 1 Set the system cabinet standing in its place and straighten it if neededby adjusting the base

Step 2 Fasten the plinth of the cabinet to the ground base with the four screws(M12) The dimension of the fixing holes are shown bellow

Figure 3 The plinth of the cabinet and dimensioning of fixing screws (holes)

42 Electrical connections

Remove the front cover from the AC distribution

Note Check if the all appropriate protection elements to supply the system in

the AC site main distribution are switched OFF

421 Grounding

Connect the protective-grounding terminal of the cabinet mechanics to the maingrounding bus bar of the site by proper cable

Step 1 Bring in the PE cable through input sleeve packing on the back of thecabinet so that there is enough length to make the connections

Step 2 Connect the PE cable to the protective-grounding terminal of the cabinet

2006-09-0510

832019 ODPS 1200B-48-4_MPS_en_01

httpslidepdfcomreaderfullodps-1200b-48-4mpsen01 1114

Energy Systems INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS

Figure 4 The cabinet protective grounding terminal (PE)

422 AC input -connection

Below in the table 1 are the recommended mains fuse sizes for the protection of thesupply line and cable cross sections for 1 phase AC input

1 phase AC-connection

Mains fuse 1 x 25 A

Cable 3 x 4 mm2

Table 1 AC-input recommendation for ODPS 1200-48-4 MPS outdoor

Step 1 Bring in the AC input and output cables through input sleeves packing

on the back of the cabinet so that there is enough length to make theconnections To make this easier you could open the side doors (leftandor right) For that two screws in each side (accessible from the front)have to be unscrewed

Step 2 Connect AC input cables ndash PE cable to the PE terminal phase cable (L)to the phase connection and the neutral (N) cable to the N-connection ofthe input MCB breaker F0 in the AC distribution (Figure 5)

2006-09-05 11

832019 ODPS 1200B-48-4_MPS_en_01

httpslidepdfcomreaderfullodps-1200b-48-4mpsen01 1214

Energy Systems INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS

Figure 5 The cables connection

Note Check the AC-connections from the wiring diagram and the illustration of AC-connections to the system attached to this user manual

423 DC outputs -connection

Step 1 Bring in the DC output cables through input sleeves packing on the backof the cabinet so that there is enough length to make the connectionsTo make this easier you could open the side doors (left andor right) Forthat two screws in each side (accessible from the front) have to beunscrewed

Step 2 Connect DC output cables - minus cable (-) to terminal of the load circuitbreaker 1F11F4 plus to plus bus bar (see user manual for DPS 1200Bsystem)

2006-09-0512

832019 ODPS 1200B-48-4_MPS_en_01

httpslidepdfcomreaderfullodps-1200b-48-4mpsen01 1314

Energy Systems INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS

424 Alarm connection

Step 3 Bring in the alarm output cables through input sleeves packing on the

back of the cabinet so that there is enough length to make theconnections To make this easier you could open the side doors (leftandor right) For that two screws in each side (accessible from the front)have to be unscrewed

Step 4 Connect alarm output cables to alarms terminals (Figure 5) Connectionsbetween user alarm terminals and alarm connectors of PSC1 controllerboard is presented bellow

Alarmterminals

(distribution)

Alarms Relay contacts(normal state ndash

without alarms)

Outputterminals

on the PSC11 NC DO1-1

2 C DO1-2

3

UA ndash Urgentalarm

NO DO1-3

4 NC DO2-1

5 C DO2-2

6

NUA ndash Noturgent alarm

NO DO2-3

425 Battery connections

Step 1 Make sure that batteries circuits breakers BF11 and BF12 in DPS1200B-48-4 power system are in the OFF-position

Step 2 Install the batteries on their shelves

Step 3 Connect the internal battery cables so that the total nominal voltage ofeach battery string is 48 V Connect the systemrsquos pre-installed batteryconnection cable marked as ldquo+rdquo to the free plus-pole of the battery stringand the cable marked as ldquo-rdquo to the free negative pole The battery strings

are numbered according to the battery fuse it is connected to

Fasten the all cables to the cable supporter behind AC distribution in the cabinet

Install the front cover from the AC distribution on their position

426 Rectifiers installation

Step 1 Install the DPR 1200B -48 rectifiers in the DPS 1200B-48-4 powersystem (see details in DPS 1200B-48-4 user manual)

2006-09-05 13

832019 ODPS 1200B-48-4_MPS_en_01

httpslidepdfcomreaderfullodps-1200b-48-4mpsen01 1414

Energy Systems INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS

5 COMMISSIONING

51 Starting up the system

Taking the system into use is presented below step-by-step

Step 1 Check that the all connections are made according to the installationinstructions and the wiring diagram

Step 2 Check that the all circuit breakers in AC distribution and DPS 1200B-48-4 system are in ldquoOFFrdquo-position

Step 3 Power on the outdoor system by switching ON the appropriate switch inthe AC site distribution

Step 4 Power on the DPS 1200B-48-4 system by switching ON the circuitbreaker F0

Step 5 Switch ON the batteries circuits breakers BF11 and or BF12 in DPS1200B-48-4 system

Step 6 Check if DPS 1200B-48-4 system work properly (see details in DPS1200B-48-4 user manual)

Step 7 Power on the output loads by switching ON the 1F1 divide 1F4 output circuitbreakers accordingly

Step 8 Start the Air Conditioner by switching on the circuit breaker FAC

Step 9 Check if Air Conditioner work properly (see details in air conditioner user

manual ndash the factory setting for the start cooling temperature is 25 ordmC)

2006 09 0514

Page 4: ODPS 1200B-48-4_MPS_en_01

832019 ODPS 1200B-48-4_MPS_en_01

httpslidepdfcomreaderfullodps-1200b-48-4mpsen01 414

Energy Systems INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS

This page is intentionally left blank

2006-09-054

832019 ODPS 1200B-48-4_MPS_en_01

httpslidepdfcomreaderfullodps-1200b-48-4mpsen01 514

Energy Systems INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS

1 DOCUMENT INFORMATION

11 Version control

Document number Document description

ODPS 1200B-48-4_MPS_en_01doc

ODPS 1200B-48-4 MPSDC Power Supply System Installation andCommissioning

Previous version Description of changes

Controlled by Date

Andrzej Chaberek 2006-09-05

2006-09-05 5

832019 ODPS 1200B-48-4_MPS_en_01

httpslidepdfcomreaderfullodps-1200b-48-4mpsen01 614

Energy Systems INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS

This page is intentionally left blank

2006-09-056

832019 ODPS 1200B-48-4_MPS_en_01

httpslidepdfcomreaderfullodps-1200b-48-4mpsen01 714

Energy Systems INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS

2 INSTALLATION

21 Before you begin

Step 1 Ensure that you have all the equipment needed to make a properinstallation of the system

Step 2 Also ensure that grounding terminals AC-distributions are properlyavailable

Step 3 Take care that the regulations of IEC 60364 and CENELEC HD384concerning installation and assembling of telecommunication andelectrical equipment have been noticed The local regulations andspecial instructions must also be noticed during the work Whenchoosing the place of the installation please notice that the cooling air

must flow without restrictions through the ventilation holes The systemmust have enough space in front of it for operation and service functionsNotice the direction of the cabling and the required space of the otherequipment

22 Unpacking the system

Step 1 Check that the received cargo is according to the packing list

Step 2 Ensure that the cabinet and the equipment are not damaged duringtransportation

Step 4 Check that proper documents are delivered with the system andnecessary contact information for technical support is included

2006-09-05 7

832019 ODPS 1200B-48-4_MPS_en_01

httpslidepdfcomreaderfullodps-1200b-48-4mpsen01 814

Energy Systems INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS

3 SYSTEM CONFIGURATION

Figure 1 System from the front

2006-09-058

832019 ODPS 1200B-48-4_MPS_en_01

httpslidepdfcomreaderfullodps-1200b-48-4mpsen01 914

Energy Systems INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS

Figure 2 AC distribution (the cover removed)

2006-09-05 9

832019 ODPS 1200B-48-4_MPS_en_01

httpslidepdfcomreaderfullodps-1200b-48-4mpsen01 1014

Energy Systems INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS

4 INSTALLATION

41 System cabinet

Step 1 Set the system cabinet standing in its place and straighten it if neededby adjusting the base

Step 2 Fasten the plinth of the cabinet to the ground base with the four screws(M12) The dimension of the fixing holes are shown bellow

Figure 3 The plinth of the cabinet and dimensioning of fixing screws (holes)

42 Electrical connections

Remove the front cover from the AC distribution

Note Check if the all appropriate protection elements to supply the system in

the AC site main distribution are switched OFF

421 Grounding

Connect the protective-grounding terminal of the cabinet mechanics to the maingrounding bus bar of the site by proper cable

Step 1 Bring in the PE cable through input sleeve packing on the back of thecabinet so that there is enough length to make the connections

Step 2 Connect the PE cable to the protective-grounding terminal of the cabinet

2006-09-0510

832019 ODPS 1200B-48-4_MPS_en_01

httpslidepdfcomreaderfullodps-1200b-48-4mpsen01 1114

Energy Systems INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS

Figure 4 The cabinet protective grounding terminal (PE)

422 AC input -connection

Below in the table 1 are the recommended mains fuse sizes for the protection of thesupply line and cable cross sections for 1 phase AC input

1 phase AC-connection

Mains fuse 1 x 25 A

Cable 3 x 4 mm2

Table 1 AC-input recommendation for ODPS 1200-48-4 MPS outdoor

Step 1 Bring in the AC input and output cables through input sleeves packing

on the back of the cabinet so that there is enough length to make theconnections To make this easier you could open the side doors (leftandor right) For that two screws in each side (accessible from the front)have to be unscrewed

Step 2 Connect AC input cables ndash PE cable to the PE terminal phase cable (L)to the phase connection and the neutral (N) cable to the N-connection ofthe input MCB breaker F0 in the AC distribution (Figure 5)

2006-09-05 11

832019 ODPS 1200B-48-4_MPS_en_01

httpslidepdfcomreaderfullodps-1200b-48-4mpsen01 1214

Energy Systems INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS

Figure 5 The cables connection

Note Check the AC-connections from the wiring diagram and the illustration of AC-connections to the system attached to this user manual

423 DC outputs -connection

Step 1 Bring in the DC output cables through input sleeves packing on the backof the cabinet so that there is enough length to make the connectionsTo make this easier you could open the side doors (left andor right) Forthat two screws in each side (accessible from the front) have to beunscrewed

Step 2 Connect DC output cables - minus cable (-) to terminal of the load circuitbreaker 1F11F4 plus to plus bus bar (see user manual for DPS 1200Bsystem)

2006-09-0512

832019 ODPS 1200B-48-4_MPS_en_01

httpslidepdfcomreaderfullodps-1200b-48-4mpsen01 1314

Energy Systems INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS

424 Alarm connection

Step 3 Bring in the alarm output cables through input sleeves packing on the

back of the cabinet so that there is enough length to make theconnections To make this easier you could open the side doors (leftandor right) For that two screws in each side (accessible from the front)have to be unscrewed

Step 4 Connect alarm output cables to alarms terminals (Figure 5) Connectionsbetween user alarm terminals and alarm connectors of PSC1 controllerboard is presented bellow

Alarmterminals

(distribution)

Alarms Relay contacts(normal state ndash

without alarms)

Outputterminals

on the PSC11 NC DO1-1

2 C DO1-2

3

UA ndash Urgentalarm

NO DO1-3

4 NC DO2-1

5 C DO2-2

6

NUA ndash Noturgent alarm

NO DO2-3

425 Battery connections

Step 1 Make sure that batteries circuits breakers BF11 and BF12 in DPS1200B-48-4 power system are in the OFF-position

Step 2 Install the batteries on their shelves

Step 3 Connect the internal battery cables so that the total nominal voltage ofeach battery string is 48 V Connect the systemrsquos pre-installed batteryconnection cable marked as ldquo+rdquo to the free plus-pole of the battery stringand the cable marked as ldquo-rdquo to the free negative pole The battery strings

are numbered according to the battery fuse it is connected to

Fasten the all cables to the cable supporter behind AC distribution in the cabinet

Install the front cover from the AC distribution on their position

426 Rectifiers installation

Step 1 Install the DPR 1200B -48 rectifiers in the DPS 1200B-48-4 powersystem (see details in DPS 1200B-48-4 user manual)

2006-09-05 13

832019 ODPS 1200B-48-4_MPS_en_01

httpslidepdfcomreaderfullodps-1200b-48-4mpsen01 1414

Energy Systems INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS

5 COMMISSIONING

51 Starting up the system

Taking the system into use is presented below step-by-step

Step 1 Check that the all connections are made according to the installationinstructions and the wiring diagram

Step 2 Check that the all circuit breakers in AC distribution and DPS 1200B-48-4 system are in ldquoOFFrdquo-position

Step 3 Power on the outdoor system by switching ON the appropriate switch inthe AC site distribution

Step 4 Power on the DPS 1200B-48-4 system by switching ON the circuitbreaker F0

Step 5 Switch ON the batteries circuits breakers BF11 and or BF12 in DPS1200B-48-4 system

Step 6 Check if DPS 1200B-48-4 system work properly (see details in DPS1200B-48-4 user manual)

Step 7 Power on the output loads by switching ON the 1F1 divide 1F4 output circuitbreakers accordingly

Step 8 Start the Air Conditioner by switching on the circuit breaker FAC

Step 9 Check if Air Conditioner work properly (see details in air conditioner user

manual ndash the factory setting for the start cooling temperature is 25 ordmC)

2006 09 0514

Page 5: ODPS 1200B-48-4_MPS_en_01

832019 ODPS 1200B-48-4_MPS_en_01

httpslidepdfcomreaderfullodps-1200b-48-4mpsen01 514

Energy Systems INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS

1 DOCUMENT INFORMATION

11 Version control

Document number Document description

ODPS 1200B-48-4_MPS_en_01doc

ODPS 1200B-48-4 MPSDC Power Supply System Installation andCommissioning

Previous version Description of changes

Controlled by Date

Andrzej Chaberek 2006-09-05

2006-09-05 5

832019 ODPS 1200B-48-4_MPS_en_01

httpslidepdfcomreaderfullodps-1200b-48-4mpsen01 614

Energy Systems INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS

This page is intentionally left blank

2006-09-056

832019 ODPS 1200B-48-4_MPS_en_01

httpslidepdfcomreaderfullodps-1200b-48-4mpsen01 714

Energy Systems INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS

2 INSTALLATION

21 Before you begin

Step 1 Ensure that you have all the equipment needed to make a properinstallation of the system

Step 2 Also ensure that grounding terminals AC-distributions are properlyavailable

Step 3 Take care that the regulations of IEC 60364 and CENELEC HD384concerning installation and assembling of telecommunication andelectrical equipment have been noticed The local regulations andspecial instructions must also be noticed during the work Whenchoosing the place of the installation please notice that the cooling air

must flow without restrictions through the ventilation holes The systemmust have enough space in front of it for operation and service functionsNotice the direction of the cabling and the required space of the otherequipment

22 Unpacking the system

Step 1 Check that the received cargo is according to the packing list

Step 2 Ensure that the cabinet and the equipment are not damaged duringtransportation

Step 4 Check that proper documents are delivered with the system andnecessary contact information for technical support is included

2006-09-05 7

832019 ODPS 1200B-48-4_MPS_en_01

httpslidepdfcomreaderfullodps-1200b-48-4mpsen01 814

Energy Systems INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS

3 SYSTEM CONFIGURATION

Figure 1 System from the front

2006-09-058

832019 ODPS 1200B-48-4_MPS_en_01

httpslidepdfcomreaderfullodps-1200b-48-4mpsen01 914

Energy Systems INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS

Figure 2 AC distribution (the cover removed)

2006-09-05 9

832019 ODPS 1200B-48-4_MPS_en_01

httpslidepdfcomreaderfullodps-1200b-48-4mpsen01 1014

Energy Systems INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS

4 INSTALLATION

41 System cabinet

Step 1 Set the system cabinet standing in its place and straighten it if neededby adjusting the base

Step 2 Fasten the plinth of the cabinet to the ground base with the four screws(M12) The dimension of the fixing holes are shown bellow

Figure 3 The plinth of the cabinet and dimensioning of fixing screws (holes)

42 Electrical connections

Remove the front cover from the AC distribution

Note Check if the all appropriate protection elements to supply the system in

the AC site main distribution are switched OFF

421 Grounding

Connect the protective-grounding terminal of the cabinet mechanics to the maingrounding bus bar of the site by proper cable

Step 1 Bring in the PE cable through input sleeve packing on the back of thecabinet so that there is enough length to make the connections

Step 2 Connect the PE cable to the protective-grounding terminal of the cabinet

2006-09-0510

832019 ODPS 1200B-48-4_MPS_en_01

httpslidepdfcomreaderfullodps-1200b-48-4mpsen01 1114

Energy Systems INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS

Figure 4 The cabinet protective grounding terminal (PE)

422 AC input -connection

Below in the table 1 are the recommended mains fuse sizes for the protection of thesupply line and cable cross sections for 1 phase AC input

1 phase AC-connection

Mains fuse 1 x 25 A

Cable 3 x 4 mm2

Table 1 AC-input recommendation for ODPS 1200-48-4 MPS outdoor

Step 1 Bring in the AC input and output cables through input sleeves packing

on the back of the cabinet so that there is enough length to make theconnections To make this easier you could open the side doors (leftandor right) For that two screws in each side (accessible from the front)have to be unscrewed

Step 2 Connect AC input cables ndash PE cable to the PE terminal phase cable (L)to the phase connection and the neutral (N) cable to the N-connection ofthe input MCB breaker F0 in the AC distribution (Figure 5)

2006-09-05 11

832019 ODPS 1200B-48-4_MPS_en_01

httpslidepdfcomreaderfullodps-1200b-48-4mpsen01 1214

Energy Systems INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS

Figure 5 The cables connection

Note Check the AC-connections from the wiring diagram and the illustration of AC-connections to the system attached to this user manual

423 DC outputs -connection

Step 1 Bring in the DC output cables through input sleeves packing on the backof the cabinet so that there is enough length to make the connectionsTo make this easier you could open the side doors (left andor right) Forthat two screws in each side (accessible from the front) have to beunscrewed

Step 2 Connect DC output cables - minus cable (-) to terminal of the load circuitbreaker 1F11F4 plus to plus bus bar (see user manual for DPS 1200Bsystem)

2006-09-0512

832019 ODPS 1200B-48-4_MPS_en_01

httpslidepdfcomreaderfullodps-1200b-48-4mpsen01 1314

Energy Systems INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS

424 Alarm connection

Step 3 Bring in the alarm output cables through input sleeves packing on the

back of the cabinet so that there is enough length to make theconnections To make this easier you could open the side doors (leftandor right) For that two screws in each side (accessible from the front)have to be unscrewed

Step 4 Connect alarm output cables to alarms terminals (Figure 5) Connectionsbetween user alarm terminals and alarm connectors of PSC1 controllerboard is presented bellow

Alarmterminals

(distribution)

Alarms Relay contacts(normal state ndash

without alarms)

Outputterminals

on the PSC11 NC DO1-1

2 C DO1-2

3

UA ndash Urgentalarm

NO DO1-3

4 NC DO2-1

5 C DO2-2

6

NUA ndash Noturgent alarm

NO DO2-3

425 Battery connections

Step 1 Make sure that batteries circuits breakers BF11 and BF12 in DPS1200B-48-4 power system are in the OFF-position

Step 2 Install the batteries on their shelves

Step 3 Connect the internal battery cables so that the total nominal voltage ofeach battery string is 48 V Connect the systemrsquos pre-installed batteryconnection cable marked as ldquo+rdquo to the free plus-pole of the battery stringand the cable marked as ldquo-rdquo to the free negative pole The battery strings

are numbered according to the battery fuse it is connected to

Fasten the all cables to the cable supporter behind AC distribution in the cabinet

Install the front cover from the AC distribution on their position

426 Rectifiers installation

Step 1 Install the DPR 1200B -48 rectifiers in the DPS 1200B-48-4 powersystem (see details in DPS 1200B-48-4 user manual)

2006-09-05 13

832019 ODPS 1200B-48-4_MPS_en_01

httpslidepdfcomreaderfullodps-1200b-48-4mpsen01 1414

Energy Systems INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS

5 COMMISSIONING

51 Starting up the system

Taking the system into use is presented below step-by-step

Step 1 Check that the all connections are made according to the installationinstructions and the wiring diagram

Step 2 Check that the all circuit breakers in AC distribution and DPS 1200B-48-4 system are in ldquoOFFrdquo-position

Step 3 Power on the outdoor system by switching ON the appropriate switch inthe AC site distribution

Step 4 Power on the DPS 1200B-48-4 system by switching ON the circuitbreaker F0

Step 5 Switch ON the batteries circuits breakers BF11 and or BF12 in DPS1200B-48-4 system

Step 6 Check if DPS 1200B-48-4 system work properly (see details in DPS1200B-48-4 user manual)

Step 7 Power on the output loads by switching ON the 1F1 divide 1F4 output circuitbreakers accordingly

Step 8 Start the Air Conditioner by switching on the circuit breaker FAC

Step 9 Check if Air Conditioner work properly (see details in air conditioner user

manual ndash the factory setting for the start cooling temperature is 25 ordmC)

2006 09 0514

Page 6: ODPS 1200B-48-4_MPS_en_01

832019 ODPS 1200B-48-4_MPS_en_01

httpslidepdfcomreaderfullodps-1200b-48-4mpsen01 614

Energy Systems INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS

This page is intentionally left blank

2006-09-056

832019 ODPS 1200B-48-4_MPS_en_01

httpslidepdfcomreaderfullodps-1200b-48-4mpsen01 714

Energy Systems INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS

2 INSTALLATION

21 Before you begin

Step 1 Ensure that you have all the equipment needed to make a properinstallation of the system

Step 2 Also ensure that grounding terminals AC-distributions are properlyavailable

Step 3 Take care that the regulations of IEC 60364 and CENELEC HD384concerning installation and assembling of telecommunication andelectrical equipment have been noticed The local regulations andspecial instructions must also be noticed during the work Whenchoosing the place of the installation please notice that the cooling air

must flow without restrictions through the ventilation holes The systemmust have enough space in front of it for operation and service functionsNotice the direction of the cabling and the required space of the otherequipment

22 Unpacking the system

Step 1 Check that the received cargo is according to the packing list

Step 2 Ensure that the cabinet and the equipment are not damaged duringtransportation

Step 4 Check that proper documents are delivered with the system andnecessary contact information for technical support is included

2006-09-05 7

832019 ODPS 1200B-48-4_MPS_en_01

httpslidepdfcomreaderfullodps-1200b-48-4mpsen01 814

Energy Systems INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS

3 SYSTEM CONFIGURATION

Figure 1 System from the front

2006-09-058

832019 ODPS 1200B-48-4_MPS_en_01

httpslidepdfcomreaderfullodps-1200b-48-4mpsen01 914

Energy Systems INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS

Figure 2 AC distribution (the cover removed)

2006-09-05 9

832019 ODPS 1200B-48-4_MPS_en_01

httpslidepdfcomreaderfullodps-1200b-48-4mpsen01 1014

Energy Systems INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS

4 INSTALLATION

41 System cabinet

Step 1 Set the system cabinet standing in its place and straighten it if neededby adjusting the base

Step 2 Fasten the plinth of the cabinet to the ground base with the four screws(M12) The dimension of the fixing holes are shown bellow

Figure 3 The plinth of the cabinet and dimensioning of fixing screws (holes)

42 Electrical connections

Remove the front cover from the AC distribution

Note Check if the all appropriate protection elements to supply the system in

the AC site main distribution are switched OFF

421 Grounding

Connect the protective-grounding terminal of the cabinet mechanics to the maingrounding bus bar of the site by proper cable

Step 1 Bring in the PE cable through input sleeve packing on the back of thecabinet so that there is enough length to make the connections

Step 2 Connect the PE cable to the protective-grounding terminal of the cabinet

2006-09-0510

832019 ODPS 1200B-48-4_MPS_en_01

httpslidepdfcomreaderfullodps-1200b-48-4mpsen01 1114

Energy Systems INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS

Figure 4 The cabinet protective grounding terminal (PE)

422 AC input -connection

Below in the table 1 are the recommended mains fuse sizes for the protection of thesupply line and cable cross sections for 1 phase AC input

1 phase AC-connection

Mains fuse 1 x 25 A

Cable 3 x 4 mm2

Table 1 AC-input recommendation for ODPS 1200-48-4 MPS outdoor

Step 1 Bring in the AC input and output cables through input sleeves packing

on the back of the cabinet so that there is enough length to make theconnections To make this easier you could open the side doors (leftandor right) For that two screws in each side (accessible from the front)have to be unscrewed

Step 2 Connect AC input cables ndash PE cable to the PE terminal phase cable (L)to the phase connection and the neutral (N) cable to the N-connection ofthe input MCB breaker F0 in the AC distribution (Figure 5)

2006-09-05 11

832019 ODPS 1200B-48-4_MPS_en_01

httpslidepdfcomreaderfullodps-1200b-48-4mpsen01 1214

Energy Systems INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS

Figure 5 The cables connection

Note Check the AC-connections from the wiring diagram and the illustration of AC-connections to the system attached to this user manual

423 DC outputs -connection

Step 1 Bring in the DC output cables through input sleeves packing on the backof the cabinet so that there is enough length to make the connectionsTo make this easier you could open the side doors (left andor right) Forthat two screws in each side (accessible from the front) have to beunscrewed

Step 2 Connect DC output cables - minus cable (-) to terminal of the load circuitbreaker 1F11F4 plus to plus bus bar (see user manual for DPS 1200Bsystem)

2006-09-0512

832019 ODPS 1200B-48-4_MPS_en_01

httpslidepdfcomreaderfullodps-1200b-48-4mpsen01 1314

Energy Systems INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS

424 Alarm connection

Step 3 Bring in the alarm output cables through input sleeves packing on the

back of the cabinet so that there is enough length to make theconnections To make this easier you could open the side doors (leftandor right) For that two screws in each side (accessible from the front)have to be unscrewed

Step 4 Connect alarm output cables to alarms terminals (Figure 5) Connectionsbetween user alarm terminals and alarm connectors of PSC1 controllerboard is presented bellow

Alarmterminals

(distribution)

Alarms Relay contacts(normal state ndash

without alarms)

Outputterminals

on the PSC11 NC DO1-1

2 C DO1-2

3

UA ndash Urgentalarm

NO DO1-3

4 NC DO2-1

5 C DO2-2

6

NUA ndash Noturgent alarm

NO DO2-3

425 Battery connections

Step 1 Make sure that batteries circuits breakers BF11 and BF12 in DPS1200B-48-4 power system are in the OFF-position

Step 2 Install the batteries on their shelves

Step 3 Connect the internal battery cables so that the total nominal voltage ofeach battery string is 48 V Connect the systemrsquos pre-installed batteryconnection cable marked as ldquo+rdquo to the free plus-pole of the battery stringand the cable marked as ldquo-rdquo to the free negative pole The battery strings

are numbered according to the battery fuse it is connected to

Fasten the all cables to the cable supporter behind AC distribution in the cabinet

Install the front cover from the AC distribution on their position

426 Rectifiers installation

Step 1 Install the DPR 1200B -48 rectifiers in the DPS 1200B-48-4 powersystem (see details in DPS 1200B-48-4 user manual)

2006-09-05 13

832019 ODPS 1200B-48-4_MPS_en_01

httpslidepdfcomreaderfullodps-1200b-48-4mpsen01 1414

Energy Systems INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS

5 COMMISSIONING

51 Starting up the system

Taking the system into use is presented below step-by-step

Step 1 Check that the all connections are made according to the installationinstructions and the wiring diagram

Step 2 Check that the all circuit breakers in AC distribution and DPS 1200B-48-4 system are in ldquoOFFrdquo-position

Step 3 Power on the outdoor system by switching ON the appropriate switch inthe AC site distribution

Step 4 Power on the DPS 1200B-48-4 system by switching ON the circuitbreaker F0

Step 5 Switch ON the batteries circuits breakers BF11 and or BF12 in DPS1200B-48-4 system

Step 6 Check if DPS 1200B-48-4 system work properly (see details in DPS1200B-48-4 user manual)

Step 7 Power on the output loads by switching ON the 1F1 divide 1F4 output circuitbreakers accordingly

Step 8 Start the Air Conditioner by switching on the circuit breaker FAC

Step 9 Check if Air Conditioner work properly (see details in air conditioner user

manual ndash the factory setting for the start cooling temperature is 25 ordmC)

2006 09 0514

Page 7: ODPS 1200B-48-4_MPS_en_01

832019 ODPS 1200B-48-4_MPS_en_01

httpslidepdfcomreaderfullodps-1200b-48-4mpsen01 714

Energy Systems INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS

2 INSTALLATION

21 Before you begin

Step 1 Ensure that you have all the equipment needed to make a properinstallation of the system

Step 2 Also ensure that grounding terminals AC-distributions are properlyavailable

Step 3 Take care that the regulations of IEC 60364 and CENELEC HD384concerning installation and assembling of telecommunication andelectrical equipment have been noticed The local regulations andspecial instructions must also be noticed during the work Whenchoosing the place of the installation please notice that the cooling air

must flow without restrictions through the ventilation holes The systemmust have enough space in front of it for operation and service functionsNotice the direction of the cabling and the required space of the otherequipment

22 Unpacking the system

Step 1 Check that the received cargo is according to the packing list

Step 2 Ensure that the cabinet and the equipment are not damaged duringtransportation

Step 4 Check that proper documents are delivered with the system andnecessary contact information for technical support is included

2006-09-05 7

832019 ODPS 1200B-48-4_MPS_en_01

httpslidepdfcomreaderfullodps-1200b-48-4mpsen01 814

Energy Systems INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS

3 SYSTEM CONFIGURATION

Figure 1 System from the front

2006-09-058

832019 ODPS 1200B-48-4_MPS_en_01

httpslidepdfcomreaderfullodps-1200b-48-4mpsen01 914

Energy Systems INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS

Figure 2 AC distribution (the cover removed)

2006-09-05 9

832019 ODPS 1200B-48-4_MPS_en_01

httpslidepdfcomreaderfullodps-1200b-48-4mpsen01 1014

Energy Systems INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS

4 INSTALLATION

41 System cabinet

Step 1 Set the system cabinet standing in its place and straighten it if neededby adjusting the base

Step 2 Fasten the plinth of the cabinet to the ground base with the four screws(M12) The dimension of the fixing holes are shown bellow

Figure 3 The plinth of the cabinet and dimensioning of fixing screws (holes)

42 Electrical connections

Remove the front cover from the AC distribution

Note Check if the all appropriate protection elements to supply the system in

the AC site main distribution are switched OFF

421 Grounding

Connect the protective-grounding terminal of the cabinet mechanics to the maingrounding bus bar of the site by proper cable

Step 1 Bring in the PE cable through input sleeve packing on the back of thecabinet so that there is enough length to make the connections

Step 2 Connect the PE cable to the protective-grounding terminal of the cabinet

2006-09-0510

832019 ODPS 1200B-48-4_MPS_en_01

httpslidepdfcomreaderfullodps-1200b-48-4mpsen01 1114

Energy Systems INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS

Figure 4 The cabinet protective grounding terminal (PE)

422 AC input -connection

Below in the table 1 are the recommended mains fuse sizes for the protection of thesupply line and cable cross sections for 1 phase AC input

1 phase AC-connection

Mains fuse 1 x 25 A

Cable 3 x 4 mm2

Table 1 AC-input recommendation for ODPS 1200-48-4 MPS outdoor

Step 1 Bring in the AC input and output cables through input sleeves packing

on the back of the cabinet so that there is enough length to make theconnections To make this easier you could open the side doors (leftandor right) For that two screws in each side (accessible from the front)have to be unscrewed

Step 2 Connect AC input cables ndash PE cable to the PE terminal phase cable (L)to the phase connection and the neutral (N) cable to the N-connection ofthe input MCB breaker F0 in the AC distribution (Figure 5)

2006-09-05 11

832019 ODPS 1200B-48-4_MPS_en_01

httpslidepdfcomreaderfullodps-1200b-48-4mpsen01 1214

Energy Systems INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS

Figure 5 The cables connection

Note Check the AC-connections from the wiring diagram and the illustration of AC-connections to the system attached to this user manual

423 DC outputs -connection

Step 1 Bring in the DC output cables through input sleeves packing on the backof the cabinet so that there is enough length to make the connectionsTo make this easier you could open the side doors (left andor right) Forthat two screws in each side (accessible from the front) have to beunscrewed

Step 2 Connect DC output cables - minus cable (-) to terminal of the load circuitbreaker 1F11F4 plus to plus bus bar (see user manual for DPS 1200Bsystem)

2006-09-0512

832019 ODPS 1200B-48-4_MPS_en_01

httpslidepdfcomreaderfullodps-1200b-48-4mpsen01 1314

Energy Systems INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS

424 Alarm connection

Step 3 Bring in the alarm output cables through input sleeves packing on the

back of the cabinet so that there is enough length to make theconnections To make this easier you could open the side doors (leftandor right) For that two screws in each side (accessible from the front)have to be unscrewed

Step 4 Connect alarm output cables to alarms terminals (Figure 5) Connectionsbetween user alarm terminals and alarm connectors of PSC1 controllerboard is presented bellow

Alarmterminals

(distribution)

Alarms Relay contacts(normal state ndash

without alarms)

Outputterminals

on the PSC11 NC DO1-1

2 C DO1-2

3

UA ndash Urgentalarm

NO DO1-3

4 NC DO2-1

5 C DO2-2

6

NUA ndash Noturgent alarm

NO DO2-3

425 Battery connections

Step 1 Make sure that batteries circuits breakers BF11 and BF12 in DPS1200B-48-4 power system are in the OFF-position

Step 2 Install the batteries on their shelves

Step 3 Connect the internal battery cables so that the total nominal voltage ofeach battery string is 48 V Connect the systemrsquos pre-installed batteryconnection cable marked as ldquo+rdquo to the free plus-pole of the battery stringand the cable marked as ldquo-rdquo to the free negative pole The battery strings

are numbered according to the battery fuse it is connected to

Fasten the all cables to the cable supporter behind AC distribution in the cabinet

Install the front cover from the AC distribution on their position

426 Rectifiers installation

Step 1 Install the DPR 1200B -48 rectifiers in the DPS 1200B-48-4 powersystem (see details in DPS 1200B-48-4 user manual)

2006-09-05 13

832019 ODPS 1200B-48-4_MPS_en_01

httpslidepdfcomreaderfullodps-1200b-48-4mpsen01 1414

Energy Systems INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS

5 COMMISSIONING

51 Starting up the system

Taking the system into use is presented below step-by-step

Step 1 Check that the all connections are made according to the installationinstructions and the wiring diagram

Step 2 Check that the all circuit breakers in AC distribution and DPS 1200B-48-4 system are in ldquoOFFrdquo-position

Step 3 Power on the outdoor system by switching ON the appropriate switch inthe AC site distribution

Step 4 Power on the DPS 1200B-48-4 system by switching ON the circuitbreaker F0

Step 5 Switch ON the batteries circuits breakers BF11 and or BF12 in DPS1200B-48-4 system

Step 6 Check if DPS 1200B-48-4 system work properly (see details in DPS1200B-48-4 user manual)

Step 7 Power on the output loads by switching ON the 1F1 divide 1F4 output circuitbreakers accordingly

Step 8 Start the Air Conditioner by switching on the circuit breaker FAC

Step 9 Check if Air Conditioner work properly (see details in air conditioner user

manual ndash the factory setting for the start cooling temperature is 25 ordmC)

2006 09 0514

Page 8: ODPS 1200B-48-4_MPS_en_01

832019 ODPS 1200B-48-4_MPS_en_01

httpslidepdfcomreaderfullodps-1200b-48-4mpsen01 814

Energy Systems INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS

3 SYSTEM CONFIGURATION

Figure 1 System from the front

2006-09-058

832019 ODPS 1200B-48-4_MPS_en_01

httpslidepdfcomreaderfullodps-1200b-48-4mpsen01 914

Energy Systems INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS

Figure 2 AC distribution (the cover removed)

2006-09-05 9

832019 ODPS 1200B-48-4_MPS_en_01

httpslidepdfcomreaderfullodps-1200b-48-4mpsen01 1014

Energy Systems INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS

4 INSTALLATION

41 System cabinet

Step 1 Set the system cabinet standing in its place and straighten it if neededby adjusting the base

Step 2 Fasten the plinth of the cabinet to the ground base with the four screws(M12) The dimension of the fixing holes are shown bellow

Figure 3 The plinth of the cabinet and dimensioning of fixing screws (holes)

42 Electrical connections

Remove the front cover from the AC distribution

Note Check if the all appropriate protection elements to supply the system in

the AC site main distribution are switched OFF

421 Grounding

Connect the protective-grounding terminal of the cabinet mechanics to the maingrounding bus bar of the site by proper cable

Step 1 Bring in the PE cable through input sleeve packing on the back of thecabinet so that there is enough length to make the connections

Step 2 Connect the PE cable to the protective-grounding terminal of the cabinet

2006-09-0510

832019 ODPS 1200B-48-4_MPS_en_01

httpslidepdfcomreaderfullodps-1200b-48-4mpsen01 1114

Energy Systems INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS

Figure 4 The cabinet protective grounding terminal (PE)

422 AC input -connection

Below in the table 1 are the recommended mains fuse sizes for the protection of thesupply line and cable cross sections for 1 phase AC input

1 phase AC-connection

Mains fuse 1 x 25 A

Cable 3 x 4 mm2

Table 1 AC-input recommendation for ODPS 1200-48-4 MPS outdoor

Step 1 Bring in the AC input and output cables through input sleeves packing

on the back of the cabinet so that there is enough length to make theconnections To make this easier you could open the side doors (leftandor right) For that two screws in each side (accessible from the front)have to be unscrewed

Step 2 Connect AC input cables ndash PE cable to the PE terminal phase cable (L)to the phase connection and the neutral (N) cable to the N-connection ofthe input MCB breaker F0 in the AC distribution (Figure 5)

2006-09-05 11

832019 ODPS 1200B-48-4_MPS_en_01

httpslidepdfcomreaderfullodps-1200b-48-4mpsen01 1214

Energy Systems INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS

Figure 5 The cables connection

Note Check the AC-connections from the wiring diagram and the illustration of AC-connections to the system attached to this user manual

423 DC outputs -connection

Step 1 Bring in the DC output cables through input sleeves packing on the backof the cabinet so that there is enough length to make the connectionsTo make this easier you could open the side doors (left andor right) Forthat two screws in each side (accessible from the front) have to beunscrewed

Step 2 Connect DC output cables - minus cable (-) to terminal of the load circuitbreaker 1F11F4 plus to plus bus bar (see user manual for DPS 1200Bsystem)

2006-09-0512

832019 ODPS 1200B-48-4_MPS_en_01

httpslidepdfcomreaderfullodps-1200b-48-4mpsen01 1314

Energy Systems INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS

424 Alarm connection

Step 3 Bring in the alarm output cables through input sleeves packing on the

back of the cabinet so that there is enough length to make theconnections To make this easier you could open the side doors (leftandor right) For that two screws in each side (accessible from the front)have to be unscrewed

Step 4 Connect alarm output cables to alarms terminals (Figure 5) Connectionsbetween user alarm terminals and alarm connectors of PSC1 controllerboard is presented bellow

Alarmterminals

(distribution)

Alarms Relay contacts(normal state ndash

without alarms)

Outputterminals

on the PSC11 NC DO1-1

2 C DO1-2

3

UA ndash Urgentalarm

NO DO1-3

4 NC DO2-1

5 C DO2-2

6

NUA ndash Noturgent alarm

NO DO2-3

425 Battery connections

Step 1 Make sure that batteries circuits breakers BF11 and BF12 in DPS1200B-48-4 power system are in the OFF-position

Step 2 Install the batteries on their shelves

Step 3 Connect the internal battery cables so that the total nominal voltage ofeach battery string is 48 V Connect the systemrsquos pre-installed batteryconnection cable marked as ldquo+rdquo to the free plus-pole of the battery stringand the cable marked as ldquo-rdquo to the free negative pole The battery strings

are numbered according to the battery fuse it is connected to

Fasten the all cables to the cable supporter behind AC distribution in the cabinet

Install the front cover from the AC distribution on their position

426 Rectifiers installation

Step 1 Install the DPR 1200B -48 rectifiers in the DPS 1200B-48-4 powersystem (see details in DPS 1200B-48-4 user manual)

2006-09-05 13

832019 ODPS 1200B-48-4_MPS_en_01

httpslidepdfcomreaderfullodps-1200b-48-4mpsen01 1414

Energy Systems INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS

5 COMMISSIONING

51 Starting up the system

Taking the system into use is presented below step-by-step

Step 1 Check that the all connections are made according to the installationinstructions and the wiring diagram

Step 2 Check that the all circuit breakers in AC distribution and DPS 1200B-48-4 system are in ldquoOFFrdquo-position

Step 3 Power on the outdoor system by switching ON the appropriate switch inthe AC site distribution

Step 4 Power on the DPS 1200B-48-4 system by switching ON the circuitbreaker F0

Step 5 Switch ON the batteries circuits breakers BF11 and or BF12 in DPS1200B-48-4 system

Step 6 Check if DPS 1200B-48-4 system work properly (see details in DPS1200B-48-4 user manual)

Step 7 Power on the output loads by switching ON the 1F1 divide 1F4 output circuitbreakers accordingly

Step 8 Start the Air Conditioner by switching on the circuit breaker FAC

Step 9 Check if Air Conditioner work properly (see details in air conditioner user

manual ndash the factory setting for the start cooling temperature is 25 ordmC)

2006 09 0514

Page 9: ODPS 1200B-48-4_MPS_en_01

832019 ODPS 1200B-48-4_MPS_en_01

httpslidepdfcomreaderfullodps-1200b-48-4mpsen01 914

Energy Systems INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS

Figure 2 AC distribution (the cover removed)

2006-09-05 9

832019 ODPS 1200B-48-4_MPS_en_01

httpslidepdfcomreaderfullodps-1200b-48-4mpsen01 1014

Energy Systems INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS

4 INSTALLATION

41 System cabinet

Step 1 Set the system cabinet standing in its place and straighten it if neededby adjusting the base

Step 2 Fasten the plinth of the cabinet to the ground base with the four screws(M12) The dimension of the fixing holes are shown bellow

Figure 3 The plinth of the cabinet and dimensioning of fixing screws (holes)

42 Electrical connections

Remove the front cover from the AC distribution

Note Check if the all appropriate protection elements to supply the system in

the AC site main distribution are switched OFF

421 Grounding

Connect the protective-grounding terminal of the cabinet mechanics to the maingrounding bus bar of the site by proper cable

Step 1 Bring in the PE cable through input sleeve packing on the back of thecabinet so that there is enough length to make the connections

Step 2 Connect the PE cable to the protective-grounding terminal of the cabinet

2006-09-0510

832019 ODPS 1200B-48-4_MPS_en_01

httpslidepdfcomreaderfullodps-1200b-48-4mpsen01 1114

Energy Systems INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS

Figure 4 The cabinet protective grounding terminal (PE)

422 AC input -connection

Below in the table 1 are the recommended mains fuse sizes for the protection of thesupply line and cable cross sections for 1 phase AC input

1 phase AC-connection

Mains fuse 1 x 25 A

Cable 3 x 4 mm2

Table 1 AC-input recommendation for ODPS 1200-48-4 MPS outdoor

Step 1 Bring in the AC input and output cables through input sleeves packing

on the back of the cabinet so that there is enough length to make theconnections To make this easier you could open the side doors (leftandor right) For that two screws in each side (accessible from the front)have to be unscrewed

Step 2 Connect AC input cables ndash PE cable to the PE terminal phase cable (L)to the phase connection and the neutral (N) cable to the N-connection ofthe input MCB breaker F0 in the AC distribution (Figure 5)

2006-09-05 11

832019 ODPS 1200B-48-4_MPS_en_01

httpslidepdfcomreaderfullodps-1200b-48-4mpsen01 1214

Energy Systems INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS

Figure 5 The cables connection

Note Check the AC-connections from the wiring diagram and the illustration of AC-connections to the system attached to this user manual

423 DC outputs -connection

Step 1 Bring in the DC output cables through input sleeves packing on the backof the cabinet so that there is enough length to make the connectionsTo make this easier you could open the side doors (left andor right) Forthat two screws in each side (accessible from the front) have to beunscrewed

Step 2 Connect DC output cables - minus cable (-) to terminal of the load circuitbreaker 1F11F4 plus to plus bus bar (see user manual for DPS 1200Bsystem)

2006-09-0512

832019 ODPS 1200B-48-4_MPS_en_01

httpslidepdfcomreaderfullodps-1200b-48-4mpsen01 1314

Energy Systems INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS

424 Alarm connection

Step 3 Bring in the alarm output cables through input sleeves packing on the

back of the cabinet so that there is enough length to make theconnections To make this easier you could open the side doors (leftandor right) For that two screws in each side (accessible from the front)have to be unscrewed

Step 4 Connect alarm output cables to alarms terminals (Figure 5) Connectionsbetween user alarm terminals and alarm connectors of PSC1 controllerboard is presented bellow

Alarmterminals

(distribution)

Alarms Relay contacts(normal state ndash

without alarms)

Outputterminals

on the PSC11 NC DO1-1

2 C DO1-2

3

UA ndash Urgentalarm

NO DO1-3

4 NC DO2-1

5 C DO2-2

6

NUA ndash Noturgent alarm

NO DO2-3

425 Battery connections

Step 1 Make sure that batteries circuits breakers BF11 and BF12 in DPS1200B-48-4 power system are in the OFF-position

Step 2 Install the batteries on their shelves

Step 3 Connect the internal battery cables so that the total nominal voltage ofeach battery string is 48 V Connect the systemrsquos pre-installed batteryconnection cable marked as ldquo+rdquo to the free plus-pole of the battery stringand the cable marked as ldquo-rdquo to the free negative pole The battery strings

are numbered according to the battery fuse it is connected to

Fasten the all cables to the cable supporter behind AC distribution in the cabinet

Install the front cover from the AC distribution on their position

426 Rectifiers installation

Step 1 Install the DPR 1200B -48 rectifiers in the DPS 1200B-48-4 powersystem (see details in DPS 1200B-48-4 user manual)

2006-09-05 13

832019 ODPS 1200B-48-4_MPS_en_01

httpslidepdfcomreaderfullodps-1200b-48-4mpsen01 1414

Energy Systems INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS

5 COMMISSIONING

51 Starting up the system

Taking the system into use is presented below step-by-step

Step 1 Check that the all connections are made according to the installationinstructions and the wiring diagram

Step 2 Check that the all circuit breakers in AC distribution and DPS 1200B-48-4 system are in ldquoOFFrdquo-position

Step 3 Power on the outdoor system by switching ON the appropriate switch inthe AC site distribution

Step 4 Power on the DPS 1200B-48-4 system by switching ON the circuitbreaker F0

Step 5 Switch ON the batteries circuits breakers BF11 and or BF12 in DPS1200B-48-4 system

Step 6 Check if DPS 1200B-48-4 system work properly (see details in DPS1200B-48-4 user manual)

Step 7 Power on the output loads by switching ON the 1F1 divide 1F4 output circuitbreakers accordingly

Step 8 Start the Air Conditioner by switching on the circuit breaker FAC

Step 9 Check if Air Conditioner work properly (see details in air conditioner user

manual ndash the factory setting for the start cooling temperature is 25 ordmC)

2006 09 0514

Page 10: ODPS 1200B-48-4_MPS_en_01

832019 ODPS 1200B-48-4_MPS_en_01

httpslidepdfcomreaderfullodps-1200b-48-4mpsen01 1014

Energy Systems INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS

4 INSTALLATION

41 System cabinet

Step 1 Set the system cabinet standing in its place and straighten it if neededby adjusting the base

Step 2 Fasten the plinth of the cabinet to the ground base with the four screws(M12) The dimension of the fixing holes are shown bellow

Figure 3 The plinth of the cabinet and dimensioning of fixing screws (holes)

42 Electrical connections

Remove the front cover from the AC distribution

Note Check if the all appropriate protection elements to supply the system in

the AC site main distribution are switched OFF

421 Grounding

Connect the protective-grounding terminal of the cabinet mechanics to the maingrounding bus bar of the site by proper cable

Step 1 Bring in the PE cable through input sleeve packing on the back of thecabinet so that there is enough length to make the connections

Step 2 Connect the PE cable to the protective-grounding terminal of the cabinet

2006-09-0510

832019 ODPS 1200B-48-4_MPS_en_01

httpslidepdfcomreaderfullodps-1200b-48-4mpsen01 1114

Energy Systems INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS

Figure 4 The cabinet protective grounding terminal (PE)

422 AC input -connection

Below in the table 1 are the recommended mains fuse sizes for the protection of thesupply line and cable cross sections for 1 phase AC input

1 phase AC-connection

Mains fuse 1 x 25 A

Cable 3 x 4 mm2

Table 1 AC-input recommendation for ODPS 1200-48-4 MPS outdoor

Step 1 Bring in the AC input and output cables through input sleeves packing

on the back of the cabinet so that there is enough length to make theconnections To make this easier you could open the side doors (leftandor right) For that two screws in each side (accessible from the front)have to be unscrewed

Step 2 Connect AC input cables ndash PE cable to the PE terminal phase cable (L)to the phase connection and the neutral (N) cable to the N-connection ofthe input MCB breaker F0 in the AC distribution (Figure 5)

2006-09-05 11

832019 ODPS 1200B-48-4_MPS_en_01

httpslidepdfcomreaderfullodps-1200b-48-4mpsen01 1214

Energy Systems INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS

Figure 5 The cables connection

Note Check the AC-connections from the wiring diagram and the illustration of AC-connections to the system attached to this user manual

423 DC outputs -connection

Step 1 Bring in the DC output cables through input sleeves packing on the backof the cabinet so that there is enough length to make the connectionsTo make this easier you could open the side doors (left andor right) Forthat two screws in each side (accessible from the front) have to beunscrewed

Step 2 Connect DC output cables - minus cable (-) to terminal of the load circuitbreaker 1F11F4 plus to plus bus bar (see user manual for DPS 1200Bsystem)

2006-09-0512

832019 ODPS 1200B-48-4_MPS_en_01

httpslidepdfcomreaderfullodps-1200b-48-4mpsen01 1314

Energy Systems INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS

424 Alarm connection

Step 3 Bring in the alarm output cables through input sleeves packing on the

back of the cabinet so that there is enough length to make theconnections To make this easier you could open the side doors (leftandor right) For that two screws in each side (accessible from the front)have to be unscrewed

Step 4 Connect alarm output cables to alarms terminals (Figure 5) Connectionsbetween user alarm terminals and alarm connectors of PSC1 controllerboard is presented bellow

Alarmterminals

(distribution)

Alarms Relay contacts(normal state ndash

without alarms)

Outputterminals

on the PSC11 NC DO1-1

2 C DO1-2

3

UA ndash Urgentalarm

NO DO1-3

4 NC DO2-1

5 C DO2-2

6

NUA ndash Noturgent alarm

NO DO2-3

425 Battery connections

Step 1 Make sure that batteries circuits breakers BF11 and BF12 in DPS1200B-48-4 power system are in the OFF-position

Step 2 Install the batteries on their shelves

Step 3 Connect the internal battery cables so that the total nominal voltage ofeach battery string is 48 V Connect the systemrsquos pre-installed batteryconnection cable marked as ldquo+rdquo to the free plus-pole of the battery stringand the cable marked as ldquo-rdquo to the free negative pole The battery strings

are numbered according to the battery fuse it is connected to

Fasten the all cables to the cable supporter behind AC distribution in the cabinet

Install the front cover from the AC distribution on their position

426 Rectifiers installation

Step 1 Install the DPR 1200B -48 rectifiers in the DPS 1200B-48-4 powersystem (see details in DPS 1200B-48-4 user manual)

2006-09-05 13

832019 ODPS 1200B-48-4_MPS_en_01

httpslidepdfcomreaderfullodps-1200b-48-4mpsen01 1414

Energy Systems INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS

5 COMMISSIONING

51 Starting up the system

Taking the system into use is presented below step-by-step

Step 1 Check that the all connections are made according to the installationinstructions and the wiring diagram

Step 2 Check that the all circuit breakers in AC distribution and DPS 1200B-48-4 system are in ldquoOFFrdquo-position

Step 3 Power on the outdoor system by switching ON the appropriate switch inthe AC site distribution

Step 4 Power on the DPS 1200B-48-4 system by switching ON the circuitbreaker F0

Step 5 Switch ON the batteries circuits breakers BF11 and or BF12 in DPS1200B-48-4 system

Step 6 Check if DPS 1200B-48-4 system work properly (see details in DPS1200B-48-4 user manual)

Step 7 Power on the output loads by switching ON the 1F1 divide 1F4 output circuitbreakers accordingly

Step 8 Start the Air Conditioner by switching on the circuit breaker FAC

Step 9 Check if Air Conditioner work properly (see details in air conditioner user

manual ndash the factory setting for the start cooling temperature is 25 ordmC)

2006 09 0514

Page 11: ODPS 1200B-48-4_MPS_en_01

832019 ODPS 1200B-48-4_MPS_en_01

httpslidepdfcomreaderfullodps-1200b-48-4mpsen01 1114

Energy Systems INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS

Figure 4 The cabinet protective grounding terminal (PE)

422 AC input -connection

Below in the table 1 are the recommended mains fuse sizes for the protection of thesupply line and cable cross sections for 1 phase AC input

1 phase AC-connection

Mains fuse 1 x 25 A

Cable 3 x 4 mm2

Table 1 AC-input recommendation for ODPS 1200-48-4 MPS outdoor

Step 1 Bring in the AC input and output cables through input sleeves packing

on the back of the cabinet so that there is enough length to make theconnections To make this easier you could open the side doors (leftandor right) For that two screws in each side (accessible from the front)have to be unscrewed

Step 2 Connect AC input cables ndash PE cable to the PE terminal phase cable (L)to the phase connection and the neutral (N) cable to the N-connection ofthe input MCB breaker F0 in the AC distribution (Figure 5)

2006-09-05 11

832019 ODPS 1200B-48-4_MPS_en_01

httpslidepdfcomreaderfullodps-1200b-48-4mpsen01 1214

Energy Systems INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS

Figure 5 The cables connection

Note Check the AC-connections from the wiring diagram and the illustration of AC-connections to the system attached to this user manual

423 DC outputs -connection

Step 1 Bring in the DC output cables through input sleeves packing on the backof the cabinet so that there is enough length to make the connectionsTo make this easier you could open the side doors (left andor right) Forthat two screws in each side (accessible from the front) have to beunscrewed

Step 2 Connect DC output cables - minus cable (-) to terminal of the load circuitbreaker 1F11F4 plus to plus bus bar (see user manual for DPS 1200Bsystem)

2006-09-0512

832019 ODPS 1200B-48-4_MPS_en_01

httpslidepdfcomreaderfullodps-1200b-48-4mpsen01 1314

Energy Systems INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS

424 Alarm connection

Step 3 Bring in the alarm output cables through input sleeves packing on the

back of the cabinet so that there is enough length to make theconnections To make this easier you could open the side doors (leftandor right) For that two screws in each side (accessible from the front)have to be unscrewed

Step 4 Connect alarm output cables to alarms terminals (Figure 5) Connectionsbetween user alarm terminals and alarm connectors of PSC1 controllerboard is presented bellow

Alarmterminals

(distribution)

Alarms Relay contacts(normal state ndash

without alarms)

Outputterminals

on the PSC11 NC DO1-1

2 C DO1-2

3

UA ndash Urgentalarm

NO DO1-3

4 NC DO2-1

5 C DO2-2

6

NUA ndash Noturgent alarm

NO DO2-3

425 Battery connections

Step 1 Make sure that batteries circuits breakers BF11 and BF12 in DPS1200B-48-4 power system are in the OFF-position

Step 2 Install the batteries on their shelves

Step 3 Connect the internal battery cables so that the total nominal voltage ofeach battery string is 48 V Connect the systemrsquos pre-installed batteryconnection cable marked as ldquo+rdquo to the free plus-pole of the battery stringand the cable marked as ldquo-rdquo to the free negative pole The battery strings

are numbered according to the battery fuse it is connected to

Fasten the all cables to the cable supporter behind AC distribution in the cabinet

Install the front cover from the AC distribution on their position

426 Rectifiers installation

Step 1 Install the DPR 1200B -48 rectifiers in the DPS 1200B-48-4 powersystem (see details in DPS 1200B-48-4 user manual)

2006-09-05 13

832019 ODPS 1200B-48-4_MPS_en_01

httpslidepdfcomreaderfullodps-1200b-48-4mpsen01 1414

Energy Systems INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS

5 COMMISSIONING

51 Starting up the system

Taking the system into use is presented below step-by-step

Step 1 Check that the all connections are made according to the installationinstructions and the wiring diagram

Step 2 Check that the all circuit breakers in AC distribution and DPS 1200B-48-4 system are in ldquoOFFrdquo-position

Step 3 Power on the outdoor system by switching ON the appropriate switch inthe AC site distribution

Step 4 Power on the DPS 1200B-48-4 system by switching ON the circuitbreaker F0

Step 5 Switch ON the batteries circuits breakers BF11 and or BF12 in DPS1200B-48-4 system

Step 6 Check if DPS 1200B-48-4 system work properly (see details in DPS1200B-48-4 user manual)

Step 7 Power on the output loads by switching ON the 1F1 divide 1F4 output circuitbreakers accordingly

Step 8 Start the Air Conditioner by switching on the circuit breaker FAC

Step 9 Check if Air Conditioner work properly (see details in air conditioner user

manual ndash the factory setting for the start cooling temperature is 25 ordmC)

2006 09 0514

Page 12: ODPS 1200B-48-4_MPS_en_01

832019 ODPS 1200B-48-4_MPS_en_01

httpslidepdfcomreaderfullodps-1200b-48-4mpsen01 1214

Energy Systems INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS

Figure 5 The cables connection

Note Check the AC-connections from the wiring diagram and the illustration of AC-connections to the system attached to this user manual

423 DC outputs -connection

Step 1 Bring in the DC output cables through input sleeves packing on the backof the cabinet so that there is enough length to make the connectionsTo make this easier you could open the side doors (left andor right) Forthat two screws in each side (accessible from the front) have to beunscrewed

Step 2 Connect DC output cables - minus cable (-) to terminal of the load circuitbreaker 1F11F4 plus to plus bus bar (see user manual for DPS 1200Bsystem)

2006-09-0512

832019 ODPS 1200B-48-4_MPS_en_01

httpslidepdfcomreaderfullodps-1200b-48-4mpsen01 1314

Energy Systems INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS

424 Alarm connection

Step 3 Bring in the alarm output cables through input sleeves packing on the

back of the cabinet so that there is enough length to make theconnections To make this easier you could open the side doors (leftandor right) For that two screws in each side (accessible from the front)have to be unscrewed

Step 4 Connect alarm output cables to alarms terminals (Figure 5) Connectionsbetween user alarm terminals and alarm connectors of PSC1 controllerboard is presented bellow

Alarmterminals

(distribution)

Alarms Relay contacts(normal state ndash

without alarms)

Outputterminals

on the PSC11 NC DO1-1

2 C DO1-2

3

UA ndash Urgentalarm

NO DO1-3

4 NC DO2-1

5 C DO2-2

6

NUA ndash Noturgent alarm

NO DO2-3

425 Battery connections

Step 1 Make sure that batteries circuits breakers BF11 and BF12 in DPS1200B-48-4 power system are in the OFF-position

Step 2 Install the batteries on their shelves

Step 3 Connect the internal battery cables so that the total nominal voltage ofeach battery string is 48 V Connect the systemrsquos pre-installed batteryconnection cable marked as ldquo+rdquo to the free plus-pole of the battery stringand the cable marked as ldquo-rdquo to the free negative pole The battery strings

are numbered according to the battery fuse it is connected to

Fasten the all cables to the cable supporter behind AC distribution in the cabinet

Install the front cover from the AC distribution on their position

426 Rectifiers installation

Step 1 Install the DPR 1200B -48 rectifiers in the DPS 1200B-48-4 powersystem (see details in DPS 1200B-48-4 user manual)

2006-09-05 13

832019 ODPS 1200B-48-4_MPS_en_01

httpslidepdfcomreaderfullodps-1200b-48-4mpsen01 1414

Energy Systems INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS

5 COMMISSIONING

51 Starting up the system

Taking the system into use is presented below step-by-step

Step 1 Check that the all connections are made according to the installationinstructions and the wiring diagram

Step 2 Check that the all circuit breakers in AC distribution and DPS 1200B-48-4 system are in ldquoOFFrdquo-position

Step 3 Power on the outdoor system by switching ON the appropriate switch inthe AC site distribution

Step 4 Power on the DPS 1200B-48-4 system by switching ON the circuitbreaker F0

Step 5 Switch ON the batteries circuits breakers BF11 and or BF12 in DPS1200B-48-4 system

Step 6 Check if DPS 1200B-48-4 system work properly (see details in DPS1200B-48-4 user manual)

Step 7 Power on the output loads by switching ON the 1F1 divide 1F4 output circuitbreakers accordingly

Step 8 Start the Air Conditioner by switching on the circuit breaker FAC

Step 9 Check if Air Conditioner work properly (see details in air conditioner user

manual ndash the factory setting for the start cooling temperature is 25 ordmC)

2006 09 0514

Page 13: ODPS 1200B-48-4_MPS_en_01

832019 ODPS 1200B-48-4_MPS_en_01

httpslidepdfcomreaderfullodps-1200b-48-4mpsen01 1314

Energy Systems INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS

424 Alarm connection

Step 3 Bring in the alarm output cables through input sleeves packing on the

back of the cabinet so that there is enough length to make theconnections To make this easier you could open the side doors (leftandor right) For that two screws in each side (accessible from the front)have to be unscrewed

Step 4 Connect alarm output cables to alarms terminals (Figure 5) Connectionsbetween user alarm terminals and alarm connectors of PSC1 controllerboard is presented bellow

Alarmterminals

(distribution)

Alarms Relay contacts(normal state ndash

without alarms)

Outputterminals

on the PSC11 NC DO1-1

2 C DO1-2

3

UA ndash Urgentalarm

NO DO1-3

4 NC DO2-1

5 C DO2-2

6

NUA ndash Noturgent alarm

NO DO2-3

425 Battery connections

Step 1 Make sure that batteries circuits breakers BF11 and BF12 in DPS1200B-48-4 power system are in the OFF-position

Step 2 Install the batteries on their shelves

Step 3 Connect the internal battery cables so that the total nominal voltage ofeach battery string is 48 V Connect the systemrsquos pre-installed batteryconnection cable marked as ldquo+rdquo to the free plus-pole of the battery stringand the cable marked as ldquo-rdquo to the free negative pole The battery strings

are numbered according to the battery fuse it is connected to

Fasten the all cables to the cable supporter behind AC distribution in the cabinet

Install the front cover from the AC distribution on their position

426 Rectifiers installation

Step 1 Install the DPR 1200B -48 rectifiers in the DPS 1200B-48-4 powersystem (see details in DPS 1200B-48-4 user manual)

2006-09-05 13

832019 ODPS 1200B-48-4_MPS_en_01

httpslidepdfcomreaderfullodps-1200b-48-4mpsen01 1414

Energy Systems INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS

5 COMMISSIONING

51 Starting up the system

Taking the system into use is presented below step-by-step

Step 1 Check that the all connections are made according to the installationinstructions and the wiring diagram

Step 2 Check that the all circuit breakers in AC distribution and DPS 1200B-48-4 system are in ldquoOFFrdquo-position

Step 3 Power on the outdoor system by switching ON the appropriate switch inthe AC site distribution

Step 4 Power on the DPS 1200B-48-4 system by switching ON the circuitbreaker F0

Step 5 Switch ON the batteries circuits breakers BF11 and or BF12 in DPS1200B-48-4 system

Step 6 Check if DPS 1200B-48-4 system work properly (see details in DPS1200B-48-4 user manual)

Step 7 Power on the output loads by switching ON the 1F1 divide 1F4 output circuitbreakers accordingly

Step 8 Start the Air Conditioner by switching on the circuit breaker FAC

Step 9 Check if Air Conditioner work properly (see details in air conditioner user

manual ndash the factory setting for the start cooling temperature is 25 ordmC)

2006 09 0514

Page 14: ODPS 1200B-48-4_MPS_en_01

832019 ODPS 1200B-48-4_MPS_en_01

httpslidepdfcomreaderfullodps-1200b-48-4mpsen01 1414

Energy Systems INSTALLATION AND COMMISSIONING ODPS 1200B-48-4 MPS

5 COMMISSIONING

51 Starting up the system

Taking the system into use is presented below step-by-step

Step 1 Check that the all connections are made according to the installationinstructions and the wiring diagram

Step 2 Check that the all circuit breakers in AC distribution and DPS 1200B-48-4 system are in ldquoOFFrdquo-position

Step 3 Power on the outdoor system by switching ON the appropriate switch inthe AC site distribution

Step 4 Power on the DPS 1200B-48-4 system by switching ON the circuitbreaker F0

Step 5 Switch ON the batteries circuits breakers BF11 and or BF12 in DPS1200B-48-4 system

Step 6 Check if DPS 1200B-48-4 system work properly (see details in DPS1200B-48-4 user manual)

Step 7 Power on the output loads by switching ON the 1F1 divide 1F4 output circuitbreakers accordingly

Step 8 Start the Air Conditioner by switching on the circuit breaker FAC

Step 9 Check if Air Conditioner work properly (see details in air conditioner user

manual ndash the factory setting for the start cooling temperature is 25 ordmC)