![Page 1: October 25, 2018 Library/open... · at Ruby Lake Project Schedule Design Complete Phase 1 Construction Start Aug. 2018 End Mar. 2019. In-Design Road Projects Williamsburg Intersection:](https://reader034.vdocuments.mx/reader034/viewer/2022050522/5fa622e36f8476147c13f991/html5/thumbnails/1.jpg)
October 25, 2018
![Page 2: October 25, 2018 Library/open... · at Ruby Lake Project Schedule Design Complete Phase 1 Construction Start Aug. 2018 End Mar. 2019. In-Design Road Projects Williamsburg Intersection:](https://reader034.vdocuments.mx/reader034/viewer/2022050522/5fa622e36f8476147c13f991/html5/thumbnails/2.jpg)
• Opening Remarks and Introductions – Commissioner VanderLey
• Turnpike Authority Update – Christine Girardin
• Infrastructure Improvements – Brian Sanders (OC Transportation Planning)
• Traffic – Humberto Castillero (OC Traffic Engineering)
• Area Growth & Development – Eric Raasch (OC Planning)
• Parks & Recreation - Matt Suedmeyer
• Fire Rescue – Chief Drozd (OC Fire Rescue)
• Orange County Sheriff ’s Office – Captain Scutero (OCSO)
• Q&A
![Page 3: October 25, 2018 Library/open... · at Ruby Lake Project Schedule Design Complete Phase 1 Construction Start Aug. 2018 End Mar. 2019. In-Design Road Projects Williamsburg Intersection:](https://reader034.vdocuments.mx/reader034/viewer/2022050522/5fa622e36f8476147c13f991/html5/thumbnails/3.jpg)
![Page 4: October 25, 2018 Library/open... · at Ruby Lake Project Schedule Design Complete Phase 1 Construction Start Aug. 2018 End Mar. 2019. In-Design Road Projects Williamsburg Intersection:](https://reader034.vdocuments.mx/reader034/viewer/2022050522/5fa622e36f8476147c13f991/html5/thumbnails/4.jpg)
Beachline West Expressway Widening (406090-5) October 2018
Construction Update
Eastbound and westbound Beachline Expressway
outside lane widening and new ramp construction
nearly complete
Bridge construction nearly complete throughout the
project
New LED roadway lighting and sign installation
continues
Anticipated project completion is mid-2019
Exit 2 at Orangewood Boulevard will remain
un-tolled when work is complete
![Page 5: October 25, 2018 Library/open... · at Ruby Lake Project Schedule Design Complete Phase 1 Construction Start Aug. 2018 End Mar. 2019. In-Design Road Projects Williamsburg Intersection:](https://reader034.vdocuments.mx/reader034/viewer/2022050522/5fa622e36f8476147c13f991/html5/thumbnails/5.jpg)
Beachline West Expressway Widening (406090-5) October 2018
Future Landscaping at Orangewood
Concept plans are being prepared by design consultant
Designs for intersection with Beachline Expressway will
include plantings and irrigation where opportunities exist in
areas that do not conflict with roadway safety design criteria
Tentatively scheduled to begin in FY 2020
Widen roadway from 4 to 8 lanes
Add noise walls along residential communities
Widen six bridges
Reconstruct and raise bridges over Shingle Creek
Minor interchange improvements
Project Highlights
Orangewood Boulevard interchange
![Page 6: October 25, 2018 Library/open... · at Ruby Lake Project Schedule Design Complete Phase 1 Construction Start Aug. 2018 End Mar. 2019. In-Design Road Projects Williamsburg Intersection:](https://reader034.vdocuments.mx/reader034/viewer/2022050522/5fa622e36f8476147c13f991/html5/thumbnails/6.jpg)
![Page 7: October 25, 2018 Library/open... · at Ruby Lake Project Schedule Design Complete Phase 1 Construction Start Aug. 2018 End Mar. 2019. In-Design Road Projects Williamsburg Intersection:](https://reader034.vdocuments.mx/reader034/viewer/2022050522/5fa622e36f8476147c13f991/html5/thumbnails/7.jpg)
Williamsburg Town Hall MeetingRoadway Infrastructure Improvements
October 25th 2018
![Page 8: October 25, 2018 Library/open... · at Ruby Lake Project Schedule Design Complete Phase 1 Construction Start Aug. 2018 End Mar. 2019. In-Design Road Projects Williamsburg Intersection:](https://reader034.vdocuments.mx/reader034/viewer/2022050522/5fa622e36f8476147c13f991/html5/thumbnails/8.jpg)
HOW IS THE RCA PROCESS INITIATED?• Identification of deficiencies through the MPO/LRTP Model
• New corridors needed to mitigate transportation impacts
• Opportunities for Developer Partnership Projects
Roadway Production Schedule
![Page 9: October 25, 2018 Library/open... · at Ruby Lake Project Schedule Design Complete Phase 1 Construction Start Aug. 2018 End Mar. 2019. In-Design Road Projects Williamsburg Intersection:](https://reader034.vdocuments.mx/reader034/viewer/2022050522/5fa622e36f8476147c13f991/html5/thumbnails/9.jpg)
Funding Sources
Public Works CIP Total FY 18/19 Budget:
$83,646,998INVEST
26%
Impact Fees 34%
I Drive CRA 11%
Gas Taxes12%
Other 17%
![Page 10: October 25, 2018 Library/open... · at Ruby Lake Project Schedule Design Complete Phase 1 Construction Start Aug. 2018 End Mar. 2019. In-Design Road Projects Williamsburg Intersection:](https://reader034.vdocuments.mx/reader034/viewer/2022050522/5fa622e36f8476147c13f991/html5/thumbnails/10.jpg)
INVEST in Our Home for Life
$300 million total
*
**
![Page 11: October 25, 2018 Library/open... · at Ruby Lake Project Schedule Design Complete Phase 1 Construction Start Aug. 2018 End Mar. 2019. In-Design Road Projects Williamsburg Intersection:](https://reader034.vdocuments.mx/reader034/viewer/2022050522/5fa622e36f8476147c13f991/html5/thumbnails/11.jpg)
Roadway Status Briefing
1. County Road Projects:
• Completed
• Under construction
• In design
• Studied
• Future
2. Trail Projects
3. State Road Projects
Williamsburg
![Page 12: October 25, 2018 Library/open... · at Ruby Lake Project Schedule Design Complete Phase 1 Construction Start Aug. 2018 End Mar. 2019. In-Design Road Projects Williamsburg Intersection:](https://reader034.vdocuments.mx/reader034/viewer/2022050522/5fa622e36f8476147c13f991/html5/thumbnails/12.jpg)
Completed Road Projects
Williamsburg
InternationalDrive
![Page 13: October 25, 2018 Library/open... · at Ruby Lake Project Schedule Design Complete Phase 1 Construction Start Aug. 2018 End Mar. 2019. In-Design Road Projects Williamsburg Intersection:](https://reader034.vdocuments.mx/reader034/viewer/2022050522/5fa622e36f8476147c13f991/html5/thumbnails/13.jpg)
Construction ScheduleCompleted
Completed Road Projects
528
TOLL
4
Central Florida Parkway
![Page 14: October 25, 2018 Library/open... · at Ruby Lake Project Schedule Design Complete Phase 1 Construction Start Aug. 2018 End Mar. 2019. In-Design Road Projects Williamsburg Intersection:](https://reader034.vdocuments.mx/reader034/viewer/2022050522/5fa622e36f8476147c13f991/html5/thumbnails/14.jpg)
Completed Road Projects
Williamsburg
DestinationParkway
![Page 15: October 25, 2018 Library/open... · at Ruby Lake Project Schedule Design Complete Phase 1 Construction Start Aug. 2018 End Mar. 2019. In-Design Road Projects Williamsburg Intersection:](https://reader034.vdocuments.mx/reader034/viewer/2022050522/5fa622e36f8476147c13f991/html5/thumbnails/15.jpg)
4
Construction ScheduleCompleted
Destination Parkway– Tradeshow Boulevard to
East of Lake Cay
Completed Road Projects
528
TOLL
![Page 16: October 25, 2018 Library/open... · at Ruby Lake Project Schedule Design Complete Phase 1 Construction Start Aug. 2018 End Mar. 2019. In-Design Road Projects Williamsburg Intersection:](https://reader034.vdocuments.mx/reader034/viewer/2022050522/5fa622e36f8476147c13f991/html5/thumbnails/16.jpg)
Under Construction
Road Projects
Williamsburg
Daryl CarterParkway Extension
![Page 17: October 25, 2018 Library/open... · at Ruby Lake Project Schedule Design Complete Phase 1 Construction Start Aug. 2018 End Mar. 2019. In-Design Road Projects Williamsburg Intersection:](https://reader034.vdocuments.mx/reader034/viewer/2022050522/5fa622e36f8476147c13f991/html5/thumbnails/17.jpg)
Daryl Carter Parkway Extension– Apopka-Vineland Road
to Palm Parkway
– New 4-Lane Road for 1.1 miles
– Public/Private Project
– Two phases:
• Palm Pkwy to Hilton Driveway
• Hilton Driveway to A-V RdPublic-Private Partnership
Under Construction
Road Projects
4
Hilton Grand Vacation Clubat Ruby Lake
Project ScheduleDesign Complete Phase 1 Construction
Start Aug. 2018End Mar. 2019
![Page 18: October 25, 2018 Library/open... · at Ruby Lake Project Schedule Design Complete Phase 1 Construction Start Aug. 2018 End Mar. 2019. In-Design Road Projects Williamsburg Intersection:](https://reader034.vdocuments.mx/reader034/viewer/2022050522/5fa622e36f8476147c13f991/html5/thumbnails/18.jpg)
In-Design Road Projects
Williamsburg
Intersection:Vineland Avenueat SR 535
![Page 19: October 25, 2018 Library/open... · at Ruby Lake Project Schedule Design Complete Phase 1 Construction Start Aug. 2018 End Mar. 2019. In-Design Road Projects Williamsburg Intersection:](https://reader034.vdocuments.mx/reader034/viewer/2022050522/5fa622e36f8476147c13f991/html5/thumbnails/19.jpg)
In Design County Projects
Construction ScheduleDesign Complete Construction:
Start Feb 2020End Feb 2021
Vineland Avenue at SR 535– Add 2nd Right Turn Lane
from Vineland Avenue
– Add Auxiliary Right Turn Lane From Vineland Avenue to I-4 Ramp
– Signalization Upgrades
4
![Page 20: October 25, 2018 Library/open... · at Ruby Lake Project Schedule Design Complete Phase 1 Construction Start Aug. 2018 End Mar. 2019. In-Design Road Projects Williamsburg Intersection:](https://reader034.vdocuments.mx/reader034/viewer/2022050522/5fa622e36f8476147c13f991/html5/thumbnails/20.jpg)
In-Design Road Projects
Williamsburg
InternationalDrive TransitLanes
![Page 21: October 25, 2018 Library/open... · at Ruby Lake Project Schedule Design Complete Phase 1 Construction Start Aug. 2018 End Mar. 2019. In-Design Road Projects Williamsburg Intersection:](https://reader034.vdocuments.mx/reader034/viewer/2022050522/5fa622e36f8476147c13f991/html5/thumbnails/21.jpg)
4
International Drive Transit Lanes– Sand Lake Rd to
Destination Pkwy
– Adds transit/right turn Lane in Each Direction
– Relieves Congestion and Accommodates I-Ride Trolley and Buses
– 2.5 Miles
In-Design Road Projects
Sand Lake Road
Destination Parkway
Project ScheduleDesign Complete in Jan. 2019Construction
Start Aug. 2020End Aug. 2022
![Page 22: October 25, 2018 Library/open... · at Ruby Lake Project Schedule Design Complete Phase 1 Construction Start Aug. 2018 End Mar. 2019. In-Design Road Projects Williamsburg Intersection:](https://reader034.vdocuments.mx/reader034/viewer/2022050522/5fa622e36f8476147c13f991/html5/thumbnails/22.jpg)
Studied Road Projects
Williamsburg
I-Drive Transit Feasibility &AlternativesAnalysis
![Page 23: October 25, 2018 Library/open... · at Ruby Lake Project Schedule Design Complete Phase 1 Construction Start Aug. 2018 End Mar. 2019. In-Design Road Projects Williamsburg Intersection:](https://reader034.vdocuments.mx/reader034/viewer/2022050522/5fa622e36f8476147c13f991/html5/thumbnails/23.jpg)
4
International Drive Transit Feasibility and Alternative Technology Assessment– Sand Lake Rd to South of SR 528
– 4.3 Miles
– Includes Project Advisory Group
– Data Collection/Analysis
– Vehicle and Route Identification
– Federal Funding Eligibility
Studied Road Projects
528
TOLL
Sand Lake Road
Destination ParkwayStudy ScheduleFinalizing Consultant Contract14 Month Contract
Present
Potential Future
![Page 24: October 25, 2018 Library/open... · at Ruby Lake Project Schedule Design Complete Phase 1 Construction Start Aug. 2018 End Mar. 2019. In-Design Road Projects Williamsburg Intersection:](https://reader034.vdocuments.mx/reader034/viewer/2022050522/5fa622e36f8476147c13f991/html5/thumbnails/24.jpg)
Studied Road Projects
Williamsburg
Kirkman Road Extension
![Page 25: October 25, 2018 Library/open... · at Ruby Lake Project Schedule Design Complete Phase 1 Construction Start Aug. 2018 End Mar. 2019. In-Design Road Projects Williamsburg Intersection:](https://reader034.vdocuments.mx/reader034/viewer/2022050522/5fa622e36f8476147c13f991/html5/thumbnails/25.jpg)
Studied Road Projects
Kirkman Rd.– Sand Lake Rd to
Destination Pkwy.
– Public/Private Partnership
Destination Pkwy
Universal Blvd.
![Page 26: October 25, 2018 Library/open... · at Ruby Lake Project Schedule Design Complete Phase 1 Construction Start Aug. 2018 End Mar. 2019. In-Design Road Projects Williamsburg Intersection:](https://reader034.vdocuments.mx/reader034/viewer/2022050522/5fa622e36f8476147c13f991/html5/thumbnails/26.jpg)
Future County Road Projects
Lake Street: Apopka-Vineland Rd. to Palm Pkwy
Westwood Blvd. Extension: Wildwood Ave. to International Dr.
Lake Bryan Beach Blvd: SR-535 to Westwood Blvd. Extension
International Drive: SR 535 to World Center Drive Extension
![Page 27: October 25, 2018 Library/open... · at Ruby Lake Project Schedule Design Complete Phase 1 Construction Start Aug. 2018 End Mar. 2019. In-Design Road Projects Williamsburg Intersection:](https://reader034.vdocuments.mx/reader034/viewer/2022050522/5fa622e36f8476147c13f991/html5/thumbnails/27.jpg)
Trail Projects
Williamsburg
Shingle Creek Trail
![Page 28: October 25, 2018 Library/open... · at Ruby Lake Project Schedule Design Complete Phase 1 Construction Start Aug. 2018 End Mar. 2019. In-Design Road Projects Williamsburg Intersection:](https://reader034.vdocuments.mx/reader034/viewer/2022050522/5fa622e36f8476147c13f991/html5/thumbnails/28.jpg)
Trail Projects
Construction SchedulePhase 1Seg. 1 Construction Feb. 2018 – Dec. 2018Seg. 2 Construction Jul. 2021 – Jul. 2022Seg. 3 Construction Aug 2020 – Aug. 2021
Phase 2 Construction Jul. 2020 – Jan. 2022
Phase 3 Construction Jul. 2022 – Jan 2024
Shingle Creek Trail– Osceola County to Sand
Lake Road (8.5 Miles)
– Trail Recognized by US Department of Interior (Listed in Top 100 Trails, 2 From Each State)
4
Phase 1 Segment 1
Phase 1 Segment 2
Phase 2
Phase 1 Segment 3
Phase 3
Sand Lake Road
Destination Parkway
BeachLine Expwy
Taft Vineland Road
Town Loop Bv.
Osceola County Line
![Page 29: October 25, 2018 Library/open... · at Ruby Lake Project Schedule Design Complete Phase 1 Construction Start Aug. 2018 End Mar. 2019. In-Design Road Projects Williamsburg Intersection:](https://reader034.vdocuments.mx/reader034/viewer/2022050522/5fa622e36f8476147c13f991/html5/thumbnails/29.jpg)
County/State Road Projects
Williamsburg
Sand Lake Road
![Page 30: October 25, 2018 Library/open... · at Ruby Lake Project Schedule Design Complete Phase 1 Construction Start Aug. 2018 End Mar. 2019. In-Design Road Projects Williamsburg Intersection:](https://reader034.vdocuments.mx/reader034/viewer/2022050522/5fa622e36f8476147c13f991/html5/thumbnails/30.jpg)
Sand Lake Road– FDOT Portion
• 3.2 Miles widening
• New JY Parkway Interchange
• New Turnpike Interchange
County/State Road Projects
TURNPIKEFLORIDA’S
4
State ScheduleConstruction Began October 2016 Construction Complete in Fall 2020
County ScheduleDesign
Start Feb 2019End Oct 2019
Construction Start May 2021End May 2022
FDOT Construction NewInterchanges
![Page 31: October 25, 2018 Library/open... · at Ruby Lake Project Schedule Design Complete Phase 1 Construction Start Aug. 2018 End Mar. 2019. In-Design Road Projects Williamsburg Intersection:](https://reader034.vdocuments.mx/reader034/viewer/2022050522/5fa622e36f8476147c13f991/html5/thumbnails/31.jpg)
State Road Projects
Williamsburg
BeachlineWidening
![Page 32: October 25, 2018 Library/open... · at Ruby Lake Project Schedule Design Complete Phase 1 Construction Start Aug. 2018 End Mar. 2019. In-Design Road Projects Williamsburg Intersection:](https://reader034.vdocuments.mx/reader034/viewer/2022050522/5fa622e36f8476147c13f991/html5/thumbnails/32.jpg)
State Road Projects
Florida’s Turnpike – SR 528: I-4 to Consulate Drive
Construction ScheduleComplete in 2019
![Page 33: October 25, 2018 Library/open... · at Ruby Lake Project Schedule Design Complete Phase 1 Construction Start Aug. 2018 End Mar. 2019. In-Design Road Projects Williamsburg Intersection:](https://reader034.vdocuments.mx/reader034/viewer/2022050522/5fa622e36f8476147c13f991/html5/thumbnails/33.jpg)
State Road Projects
Williamsburg
Interstate 4Beyond theUltimate
![Page 34: October 25, 2018 Library/open... · at Ruby Lake Project Schedule Design Complete Phase 1 Construction Start Aug. 2018 End Mar. 2019. In-Design Road Projects Williamsburg Intersection:](https://reader034.vdocuments.mx/reader034/viewer/2022050522/5fa622e36f8476147c13f991/html5/thumbnails/34.jpg)
State Road Projects
528
TOLL
Sand Lake Road
4Sand Lake Interchange
Daryl Carter//Beachline Interchange
Interstate 4 Beyond the Ultimate– Kirkman Road to County
Line
– 101 miles of I-4 widening
– Sand Lake Interchange
– Key Interchange Projects:
• Sand Lake Interchange
• Daryl Carter/Beachline Complex
FDOT ScheduleStudy Completed Jun 2018Land Acquisition UnderwayConstruction TBD
![Page 35: October 25, 2018 Library/open... · at Ruby Lake Project Schedule Design Complete Phase 1 Construction Start Aug. 2018 End Mar. 2019. In-Design Road Projects Williamsburg Intersection:](https://reader034.vdocuments.mx/reader034/viewer/2022050522/5fa622e36f8476147c13f991/html5/thumbnails/35.jpg)
State Road Projects
Sand Lake Road Interchange (I-4 Beyond the Ultimate)
![Page 36: October 25, 2018 Library/open... · at Ruby Lake Project Schedule Design Complete Phase 1 Construction Start Aug. 2018 End Mar. 2019. In-Design Road Projects Williamsburg Intersection:](https://reader034.vdocuments.mx/reader034/viewer/2022050522/5fa622e36f8476147c13f991/html5/thumbnails/36.jpg)
State Road Projects
Interim Daryl Carter/Beachline (I-4 Beyond the Ultimate)
4
![Page 37: October 25, 2018 Library/open... · at Ruby Lake Project Schedule Design Complete Phase 1 Construction Start Aug. 2018 End Mar. 2019. In-Design Road Projects Williamsburg Intersection:](https://reader034.vdocuments.mx/reader034/viewer/2022050522/5fa622e36f8476147c13f991/html5/thumbnails/37.jpg)
State Road Projects
4
Complete Daryl Carter/Beachline (I-4 Beyond the Ultimate)
![Page 38: October 25, 2018 Library/open... · at Ruby Lake Project Schedule Design Complete Phase 1 Construction Start Aug. 2018 End Mar. 2019. In-Design Road Projects Williamsburg Intersection:](https://reader034.vdocuments.mx/reader034/viewer/2022050522/5fa622e36f8476147c13f991/html5/thumbnails/38.jpg)
Williamsburg Town Hall MeetingRoadway Infrastructure Improvements
October 25th 2018
![Page 39: October 25, 2018 Library/open... · at Ruby Lake Project Schedule Design Complete Phase 1 Construction Start Aug. 2018 End Mar. 2019. In-Design Road Projects Williamsburg Intersection:](https://reader034.vdocuments.mx/reader034/viewer/2022050522/5fa622e36f8476147c13f991/html5/thumbnails/39.jpg)
Williamsburg Town Hall
Orangewood Blvd./Gateway Ave. Roundabout
Universal Blvd. Pedestrian Safety Action Plan
Orange County – Public Works
October 25th, 2018
![Page 40: October 25, 2018 Library/open... · at Ruby Lake Project Schedule Design Complete Phase 1 Construction Start Aug. 2018 End Mar. 2019. In-Design Road Projects Williamsburg Intersection:](https://reader034.vdocuments.mx/reader034/viewer/2022050522/5fa622e36f8476147c13f991/html5/thumbnails/40.jpg)
Presentation Overview
Background Issues
Existing
Crash data
Signal Not Warranted
Roundabout Features
Roundabout Analysis
Safety
Benefits
Project Status
Orangewood Blvd at Gateway Ave
![Page 41: October 25, 2018 Library/open... · at Ruby Lake Project Schedule Design Complete Phase 1 Construction Start Aug. 2018 End Mar. 2019. In-Design Road Projects Williamsburg Intersection:](https://reader034.vdocuments.mx/reader034/viewer/2022050522/5fa622e36f8476147c13f991/html5/thumbnails/41.jpg)
Background Issues
High speeds on Orangewood Blvd.
High number of crashes
Need for additional signing and pavement markings
Stop Ahead and crosswalks
Speed Limit signs
Operational Analysis
Speed Study – 85th % at 45 MPH
Traffic Signal Warrant
Roundabout Justification
![Page 42: October 25, 2018 Library/open... · at Ruby Lake Project Schedule Design Complete Phase 1 Construction Start Aug. 2018 End Mar. 2019. In-Design Road Projects Williamsburg Intersection:](https://reader034.vdocuments.mx/reader034/viewer/2022050522/5fa622e36f8476147c13f991/html5/thumbnails/42.jpg)
Existing – 4-Way Stop Control
• Orangewood – 2 Ln + LT Ln• Gateway – 1 Ln + LT Ln + RT Ln• Special Emphasis Crosswalks• Sidewalks/Curb Ramps• Intersection Lighting
![Page 43: October 25, 2018 Library/open... · at Ruby Lake Project Schedule Design Complete Phase 1 Construction Start Aug. 2018 End Mar. 2019. In-Design Road Projects Williamsburg Intersection:](https://reader034.vdocuments.mx/reader034/viewer/2022050522/5fa622e36f8476147c13f991/html5/thumbnails/43.jpg)
5-Yr. Crash Data (2013 – 2018)
38 Total Crashes
No FatalitiesCrash Types
![Page 44: October 25, 2018 Library/open... · at Ruby Lake Project Schedule Design Complete Phase 1 Construction Start Aug. 2018 End Mar. 2019. In-Design Road Projects Williamsburg Intersection:](https://reader034.vdocuments.mx/reader034/viewer/2022050522/5fa622e36f8476147c13f991/html5/thumbnails/44.jpg)
Signal Analysis – Not Warranted
Warrant 1, Eight-Hour Vehicular Volume
Warrant 2, Four-Hour Vehicular Volume
Warrant 3, Peak Hour –Vehicular Volume
Warrant 4, Pedestrian Volume
Warrant 5, School Crossing
Warrant 6, Coordinated Signal System
Warrant 7, Crash Experience
Warrant 8, Roadway Network
Warrant 9, Intersection Near a Grade Crossing
![Page 45: October 25, 2018 Library/open... · at Ruby Lake Project Schedule Design Complete Phase 1 Construction Start Aug. 2018 End Mar. 2019. In-Design Road Projects Williamsburg Intersection:](https://reader034.vdocuments.mx/reader034/viewer/2022050522/5fa622e36f8476147c13f991/html5/thumbnails/45.jpg)
Roundabout Features – One Lane
![Page 46: October 25, 2018 Library/open... · at Ruby Lake Project Schedule Design Complete Phase 1 Construction Start Aug. 2018 End Mar. 2019. In-Design Road Projects Williamsburg Intersection:](https://reader034.vdocuments.mx/reader034/viewer/2022050522/5fa622e36f8476147c13f991/html5/thumbnails/46.jpg)
Roundabout Analysis (7 – 8 AM)
Intersection Level of Service ADelay per Vehicle - 9.4 seconds
![Page 47: October 25, 2018 Library/open... · at Ruby Lake Project Schedule Design Complete Phase 1 Construction Start Aug. 2018 End Mar. 2019. In-Design Road Projects Williamsburg Intersection:](https://reader034.vdocuments.mx/reader034/viewer/2022050522/5fa622e36f8476147c13f991/html5/thumbnails/47.jpg)
Roundabout Analysis ( 5 – 6 PM)
Intersection Level of Service CDelay per Vehicle - 24.0 seconds
![Page 48: October 25, 2018 Library/open... · at Ruby Lake Project Schedule Design Complete Phase 1 Construction Start Aug. 2018 End Mar. 2019. In-Design Road Projects Williamsburg Intersection:](https://reader034.vdocuments.mx/reader034/viewer/2022050522/5fa622e36f8476147c13f991/html5/thumbnails/48.jpg)
Roundabout Safety
![Page 49: October 25, 2018 Library/open... · at Ruby Lake Project Schedule Design Complete Phase 1 Construction Start Aug. 2018 End Mar. 2019. In-Design Road Projects Williamsburg Intersection:](https://reader034.vdocuments.mx/reader034/viewer/2022050522/5fa622e36f8476147c13f991/html5/thumbnails/49.jpg)
Benefits of Roundabout
Traffic Safety - Reduce injury crashes by 76%
Traffic Calming - Reduce vehicle speeds
Pedestrian Safety - Focus on one traffic stream
Operational Performance - Reduce overall delay
Operations and Maintenance – Reduce costs
Approach Roadway Width – Reduce impacts
Environmental Factors
Access Management and Land Use
Aesthetics
![Page 50: October 25, 2018 Library/open... · at Ruby Lake Project Schedule Design Complete Phase 1 Construction Start Aug. 2018 End Mar. 2019. In-Design Road Projects Williamsburg Intersection:](https://reader034.vdocuments.mx/reader034/viewer/2022050522/5fa622e36f8476147c13f991/html5/thumbnails/50.jpg)
Project Status
Design• 30% Plans completed
• 60% Plans - November 2018
• 100% Plans - Spring 2019
• Final Plans - Summer 2019
Construction• Bidding/Award - Fall 2019
• Construction Commencement - May 2020
Estimated Construction Cost• $2,500,000.00
![Page 51: October 25, 2018 Library/open... · at Ruby Lake Project Schedule Design Complete Phase 1 Construction Start Aug. 2018 End Mar. 2019. In-Design Road Projects Williamsburg Intersection:](https://reader034.vdocuments.mx/reader034/viewer/2022050522/5fa622e36f8476147c13f991/html5/thumbnails/51.jpg)
Roundabout User Tips
![Page 52: October 25, 2018 Library/open... · at Ruby Lake Project Schedule Design Complete Phase 1 Construction Start Aug. 2018 End Mar. 2019. In-Design Road Projects Williamsburg Intersection:](https://reader034.vdocuments.mx/reader034/viewer/2022050522/5fa622e36f8476147c13f991/html5/thumbnails/52.jpg)
Project Rendering
![Page 53: October 25, 2018 Library/open... · at Ruby Lake Project Schedule Design Complete Phase 1 Construction Start Aug. 2018 End Mar. 2019. In-Design Road Projects Williamsburg Intersection:](https://reader034.vdocuments.mx/reader034/viewer/2022050522/5fa622e36f8476147c13f991/html5/thumbnails/53.jpg)
Universal Blvd Pedestrian Safety
Williamsburg
![Page 54: October 25, 2018 Library/open... · at Ruby Lake Project Schedule Design Complete Phase 1 Construction Start Aug. 2018 End Mar. 2019. In-Design Road Projects Williamsburg Intersection:](https://reader034.vdocuments.mx/reader034/viewer/2022050522/5fa622e36f8476147c13f991/html5/thumbnails/54.jpg)
Universal Boulevard Pedestrian Safety Action Plan– Sand Lake Rd to SR 528
– Recommendations:
• Narrow traffic lanes and add bike lane
• Select intersection & ped crossing improvements
• Remove flashing beacons and install traffic signals with signalized ped crossings
• Replace mulch path with sidewalk
• Begin at UCF Rosen College of Hospitality
Universal Blvd Pedestrian Safety
528
TOLL
Sand Lake Road
Study ScheduleStudy Complete June 2018Future Funding I-Drive CRA
![Page 55: October 25, 2018 Library/open... · at Ruby Lake Project Schedule Design Complete Phase 1 Construction Start Aug. 2018 End Mar. 2019. In-Design Road Projects Williamsburg Intersection:](https://reader034.vdocuments.mx/reader034/viewer/2022050522/5fa622e36f8476147c13f991/html5/thumbnails/55.jpg)
Questions?
Humberto Castillero, PE, PTOE
Orange County Traffic Engineer
Public Works Department
(407) 836-7803
![Page 56: October 25, 2018 Library/open... · at Ruby Lake Project Schedule Design Complete Phase 1 Construction Start Aug. 2018 End Mar. 2019. In-Design Road Projects Williamsburg Intersection:](https://reader034.vdocuments.mx/reader034/viewer/2022050522/5fa622e36f8476147c13f991/html5/thumbnails/56.jpg)
![Page 57: October 25, 2018 Library/open... · at Ruby Lake Project Schedule Design Complete Phase 1 Construction Start Aug. 2018 End Mar. 2019. In-Design Road Projects Williamsburg Intersection:](https://reader034.vdocuments.mx/reader034/viewer/2022050522/5fa622e36f8476147c13f991/html5/thumbnails/57.jpg)
![Page 58: October 25, 2018 Library/open... · at Ruby Lake Project Schedule Design Complete Phase 1 Construction Start Aug. 2018 End Mar. 2019. In-Design Road Projects Williamsburg Intersection:](https://reader034.vdocuments.mx/reader034/viewer/2022050522/5fa622e36f8476147c13f991/html5/thumbnails/58.jpg)
• Parks and Recreation responded to a citizen request to research
senior recreation in Williamsburg
• Two solutions proposed by citizens:• Assign Parks and Rec staff to coordinate programs at the eight
Williamsburg clubhouses
• Lease space at local shopping plaza for new senior center
• Parks and Rec staff contacted the eight Williamsburg HOAs to
gauge interest • Received limited responses
• Responders listed several concerns (liability, security, wear and tear on
facilities)
• Orange County Parks serving Williamsburg: • Lester Mandell Park – 1.5 miles
• South Orange Youth Sports Complex – 6 miles
• Bear Creek Recreation Complex – 6.5 miles
• Dr. Phillips Community Park – 7 miles
Williamsburg Recreation
![Page 59: October 25, 2018 Library/open... · at Ruby Lake Project Schedule Design Complete Phase 1 Construction Start Aug. 2018 End Mar. 2019. In-Design Road Projects Williamsburg Intersection:](https://reader034.vdocuments.mx/reader034/viewer/2022050522/5fa622e36f8476147c13f991/html5/thumbnails/59.jpg)
![Page 60: October 25, 2018 Library/open... · at Ruby Lake Project Schedule Design Complete Phase 1 Construction Start Aug. 2018 End Mar. 2019. In-Design Road Projects Williamsburg Intersection:](https://reader034.vdocuments.mx/reader034/viewer/2022050522/5fa622e36f8476147c13f991/html5/thumbnails/60.jpg)
WilliamsburgCommunity Meeting
October 25, 2018Fire Chief Otto Drozd III
![Page 61: October 25, 2018 Library/open... · at Ruby Lake Project Schedule Design Complete Phase 1 Construction Start Aug. 2018 End Mar. 2019. In-Design Road Projects Williamsburg Intersection:](https://reader034.vdocuments.mx/reader034/viewer/2022050522/5fa622e36f8476147c13f991/html5/thumbnails/61.jpg)
• Quick Facts
• Scope of Services
• Station 57 & Station 54 Apparatus
• Performance Statistics
• Response Facts
• Community Outreach
• Acomplishments
Fire Rescue Department
![Page 62: October 25, 2018 Library/open... · at Ruby Lake Project Schedule Design Complete Phase 1 Construction Start Aug. 2018 End Mar. 2019. In-Design Road Projects Williamsburg Intersection:](https://reader034.vdocuments.mx/reader034/viewer/2022050522/5fa622e36f8476147c13f991/html5/thumbnails/62.jpg)
• 42 Fire Stations
• Over 124,423 Call Responses in FY18
• Over 68,773 EMS Transports
• 1346 Positions
• OCFRD is one of only 4 U.S. fire departments with population > 700K to hold:
• ISO Class-1
• CPSE Accredited Agency
Quick Facts
1. Houston, TX
2. Orange County, FL
3. Charlotte, NC
4. Cobb County, GA
![Page 63: October 25, 2018 Library/open... · at Ruby Lake Project Schedule Design Complete Phase 1 Construction Start Aug. 2018 End Mar. 2019. In-Design Road Projects Williamsburg Intersection:](https://reader034.vdocuments.mx/reader034/viewer/2022050522/5fa622e36f8476147c13f991/html5/thumbnails/63.jpg)
Scope of Services
Fire Suppression
• Residential
• Commercial
• Industrial
• Urban Interface
• Rural
EmergencyMedical
• ALS
• BLS
• Patient Transport
• MCI
• QA/QI
TechnicalRescue
• High Angle
• Confined Space
• USAR
• Vehicle Extrication
• Dive Rescue
Hazardous Materials
• State Regional Response Team
• Chemical
• WMD
• Response & Mitigation
![Page 64: October 25, 2018 Library/open... · at Ruby Lake Project Schedule Design Complete Phase 1 Construction Start Aug. 2018 End Mar. 2019. In-Design Road Projects Williamsburg Intersection:](https://reader034.vdocuments.mx/reader034/viewer/2022050522/5fa622e36f8476147c13f991/html5/thumbnails/64.jpg)
Scope of Services
911 Communications
• Call Answer/ Dispatch
• Pre-Arrival Instructions
• AVL/Mobile Data
• Notifications
• Municipal Services
Emergency Management
• Planning
• Disaster Response
• Homeland Security
• Citizens Corps
Fire Marshal
• Fire Inspections
• Plan Reviews
• Car Seat Checks
• Smoke Detector Distribution
Community Outreach
• Open House Events
• CPR/First Aid
• Special Events
• Education
![Page 65: October 25, 2018 Library/open... · at Ruby Lake Project Schedule Design Complete Phase 1 Construction Start Aug. 2018 End Mar. 2019. In-Design Road Projects Williamsburg Intersection:](https://reader034.vdocuments.mx/reader034/viewer/2022050522/5fa622e36f8476147c13f991/html5/thumbnails/65.jpg)
Primary Response AreaStation 54 & 57
![Page 66: October 25, 2018 Library/open... · at Ruby Lake Project Schedule Design Complete Phase 1 Construction Start Aug. 2018 End Mar. 2019. In-Design Road Projects Williamsburg Intersection:](https://reader034.vdocuments.mx/reader034/viewer/2022050522/5fa622e36f8476147c13f991/html5/thumbnails/66.jpg)
Area Coverage
![Page 67: October 25, 2018 Library/open... · at Ruby Lake Project Schedule Design Complete Phase 1 Construction Start Aug. 2018 End Mar. 2019. In-Design Road Projects Williamsburg Intersection:](https://reader034.vdocuments.mx/reader034/viewer/2022050522/5fa622e36f8476147c13f991/html5/thumbnails/67.jpg)
Station 57 Apparatus
Engine 57
• Advanced Life Support
Rescue 57
• Advanced Life Support
![Page 68: October 25, 2018 Library/open... · at Ruby Lake Project Schedule Design Complete Phase 1 Construction Start Aug. 2018 End Mar. 2019. In-Design Road Projects Williamsburg Intersection:](https://reader034.vdocuments.mx/reader034/viewer/2022050522/5fa622e36f8476147c13f991/html5/thumbnails/68.jpg)
Station 54 Apparatus
Truck 54• Basic Life Support
Squad 1• Advanced Life Support
Tactical Rescue Trailer
Rescue 54• Advanced Life Support
Battalion 3
![Page 69: October 25, 2018 Library/open... · at Ruby Lake Project Schedule Design Complete Phase 1 Construction Start Aug. 2018 End Mar. 2019. In-Design Road Projects Williamsburg Intersection:](https://reader034.vdocuments.mx/reader034/viewer/2022050522/5fa622e36f8476147c13f991/html5/thumbnails/69.jpg)
Total Response Time6:31 (Avg.) 10:35 (90%)
Station 57 Response Times2018
![Page 70: October 25, 2018 Library/open... · at Ruby Lake Project Schedule Design Complete Phase 1 Construction Start Aug. 2018 End Mar. 2019. In-Design Road Projects Williamsburg Intersection:](https://reader034.vdocuments.mx/reader034/viewer/2022050522/5fa622e36f8476147c13f991/html5/thumbnails/70.jpg)
Total Response Time6:48 (Avg.) 10:32 (90%)
Station 54 Response Times2018
![Page 71: October 25, 2018 Library/open... · at Ruby Lake Project Schedule Design Complete Phase 1 Construction Start Aug. 2018 End Mar. 2019. In-Design Road Projects Williamsburg Intersection:](https://reader034.vdocuments.mx/reader034/viewer/2022050522/5fa622e36f8476147c13f991/html5/thumbnails/71.jpg)
Station 57 Call Volume
TOTAL = 3,025 TOTAL = 2,964
![Page 72: October 25, 2018 Library/open... · at Ruby Lake Project Schedule Design Complete Phase 1 Construction Start Aug. 2018 End Mar. 2019. In-Design Road Projects Williamsburg Intersection:](https://reader034.vdocuments.mx/reader034/viewer/2022050522/5fa622e36f8476147c13f991/html5/thumbnails/72.jpg)
Station 54 Call Volume
TOTAL = 2,747 TOTAL = 2,736
![Page 73: October 25, 2018 Library/open... · at Ruby Lake Project Schedule Design Complete Phase 1 Construction Start Aug. 2018 End Mar. 2019. In-Design Road Projects Williamsburg Intersection:](https://reader034.vdocuments.mx/reader034/viewer/2022050522/5fa622e36f8476147c13f991/html5/thumbnails/73.jpg)
• 318 Unit responses in June including:
• 49 auto accidents
• 3 structure fires
• 2 vehicle fires
• 45 fire service calls
• 2 HazMat incidents
• 217 Emergency Medical Service (EMS) calls
• 171 patients transported to area hospitals
“A Month in the Life”Station 57
![Page 74: October 25, 2018 Library/open... · at Ruby Lake Project Schedule Design Complete Phase 1 Construction Start Aug. 2018 End Mar. 2019. In-Design Road Projects Williamsburg Intersection:](https://reader034.vdocuments.mx/reader034/viewer/2022050522/5fa622e36f8476147c13f991/html5/thumbnails/74.jpg)
• 319 Unit responses in July including:
• 22 auto accidents (1 with entrapment)
• 3 structure fires
• 3 vehicle fires
• 34 fire service calls
• 1 HazMat incident
• 256 Emergency Medical Service (EMS) calls
• 174 patients transported to area hospitals
“A Month in the Life”Station 54
![Page 75: October 25, 2018 Library/open... · at Ruby Lake Project Schedule Design Complete Phase 1 Construction Start Aug. 2018 End Mar. 2019. In-Design Road Projects Williamsburg Intersection:](https://reader034.vdocuments.mx/reader034/viewer/2022050522/5fa622e36f8476147c13f991/html5/thumbnails/75.jpg)
Station 57 Facts
![Page 76: October 25, 2018 Library/open... · at Ruby Lake Project Schedule Design Complete Phase 1 Construction Start Aug. 2018 End Mar. 2019. In-Design Road Projects Williamsburg Intersection:](https://reader034.vdocuments.mx/reader034/viewer/2022050522/5fa622e36f8476147c13f991/html5/thumbnails/76.jpg)
Station 54 Facts
![Page 77: October 25, 2018 Library/open... · at Ruby Lake Project Schedule Design Complete Phase 1 Construction Start Aug. 2018 End Mar. 2019. In-Design Road Projects Williamsburg Intersection:](https://reader034.vdocuments.mx/reader034/viewer/2022050522/5fa622e36f8476147c13f991/html5/thumbnails/77.jpg)
Williamsburg
![Page 78: October 25, 2018 Library/open... · at Ruby Lake Project Schedule Design Complete Phase 1 Construction Start Aug. 2018 End Mar. 2019. In-Design Road Projects Williamsburg Intersection:](https://reader034.vdocuments.mx/reader034/viewer/2022050522/5fa622e36f8476147c13f991/html5/thumbnails/78.jpg)
WilliamsburgCall Volume
FY2014-2018
![Page 79: October 25, 2018 Library/open... · at Ruby Lake Project Schedule Design Complete Phase 1 Construction Start Aug. 2018 End Mar. 2019. In-Design Road Projects Williamsburg Intersection:](https://reader034.vdocuments.mx/reader034/viewer/2022050522/5fa622e36f8476147c13f991/html5/thumbnails/79.jpg)
Community Outreach
• Open House Events
![Page 80: October 25, 2018 Library/open... · at Ruby Lake Project Schedule Design Complete Phase 1 Construction Start Aug. 2018 End Mar. 2019. In-Design Road Projects Williamsburg Intersection:](https://reader034.vdocuments.mx/reader034/viewer/2022050522/5fa622e36f8476147c13f991/html5/thumbnails/80.jpg)
Community Risk Reduction
![Page 81: October 25, 2018 Library/open... · at Ruby Lake Project Schedule Design Complete Phase 1 Construction Start Aug. 2018 End Mar. 2019. In-Design Road Projects Williamsburg Intersection:](https://reader034.vdocuments.mx/reader034/viewer/2022050522/5fa622e36f8476147c13f991/html5/thumbnails/81.jpg)
Community Risk Reduction
![Page 82: October 25, 2018 Library/open... · at Ruby Lake Project Schedule Design Complete Phase 1 Construction Start Aug. 2018 End Mar. 2019. In-Design Road Projects Williamsburg Intersection:](https://reader034.vdocuments.mx/reader034/viewer/2022050522/5fa622e36f8476147c13f991/html5/thumbnails/82.jpg)
Accomplishments
Dive Program
Station 67 Opening
UAV Program
Accreditation
Power Load
Exhaust Capture System
Hurricane Irma Response
![Page 83: October 25, 2018 Library/open... · at Ruby Lake Project Schedule Design Complete Phase 1 Construction Start Aug. 2018 End Mar. 2019. In-Design Road Projects Williamsburg Intersection:](https://reader034.vdocuments.mx/reader034/viewer/2022050522/5fa622e36f8476147c13f991/html5/thumbnails/83.jpg)
Dive Program
Station 67 Opening
UAV Program
Accreditation
Power Load
Exhaust Capture System
Hurricane Irma Response
Accomplishments
![Page 84: October 25, 2018 Library/open... · at Ruby Lake Project Schedule Design Complete Phase 1 Construction Start Aug. 2018 End Mar. 2019. In-Design Road Projects Williamsburg Intersection:](https://reader034.vdocuments.mx/reader034/viewer/2022050522/5fa622e36f8476147c13f991/html5/thumbnails/84.jpg)
Initial Dive Capable Stations
MunicipalityOrange County Fire Rescue JurisdictionTen Minute Travel From Dive Capable Stations
Accomplishments
![Page 85: October 25, 2018 Library/open... · at Ruby Lake Project Schedule Design Complete Phase 1 Construction Start Aug. 2018 End Mar. 2019. In-Design Road Projects Williamsburg Intersection:](https://reader034.vdocuments.mx/reader034/viewer/2022050522/5fa622e36f8476147c13f991/html5/thumbnails/85.jpg)
FY 19 Will Add Stations 20, 32, 76, and 84
MunicipalityOrange County Fire Rescue JurisdictionTen Minute Travel From Dive Capable Stations
Accomplishments
![Page 86: October 25, 2018 Library/open... · at Ruby Lake Project Schedule Design Complete Phase 1 Construction Start Aug. 2018 End Mar. 2019. In-Design Road Projects Williamsburg Intersection:](https://reader034.vdocuments.mx/reader034/viewer/2022050522/5fa622e36f8476147c13f991/html5/thumbnails/86.jpg)
Dive Program
Station 67 Opening
UAV Program
Accreditation
Power Load
Exhaust Capture System
Hurricane Irma Response
Accomplishments
![Page 87: October 25, 2018 Library/open... · at Ruby Lake Project Schedule Design Complete Phase 1 Construction Start Aug. 2018 End Mar. 2019. In-Design Road Projects Williamsburg Intersection:](https://reader034.vdocuments.mx/reader034/viewer/2022050522/5fa622e36f8476147c13f991/html5/thumbnails/87.jpg)
Dive Program
Station 67 Opening
UAV Program
Accreditation
Power Load
Exhaust Capture System
Hurricane Irma Response
Accomplishments
![Page 88: October 25, 2018 Library/open... · at Ruby Lake Project Schedule Design Complete Phase 1 Construction Start Aug. 2018 End Mar. 2019. In-Design Road Projects Williamsburg Intersection:](https://reader034.vdocuments.mx/reader034/viewer/2022050522/5fa622e36f8476147c13f991/html5/thumbnails/88.jpg)
Dive Program
Station 67 Opening
UAV Program
Accreditation
Power Load
Exhaust Capture System
Hurricane Irma Response
Accomplishments
![Page 89: October 25, 2018 Library/open... · at Ruby Lake Project Schedule Design Complete Phase 1 Construction Start Aug. 2018 End Mar. 2019. In-Design Road Projects Williamsburg Intersection:](https://reader034.vdocuments.mx/reader034/viewer/2022050522/5fa622e36f8476147c13f991/html5/thumbnails/89.jpg)
Dive Program
Station 67 Opening
UAV Program
Accreditation
Power Load
Exhaust Capture System
Hurricane Irma Response
Accomplishments
![Page 90: October 25, 2018 Library/open... · at Ruby Lake Project Schedule Design Complete Phase 1 Construction Start Aug. 2018 End Mar. 2019. In-Design Road Projects Williamsburg Intersection:](https://reader034.vdocuments.mx/reader034/viewer/2022050522/5fa622e36f8476147c13f991/html5/thumbnails/90.jpg)
Dive Program
Station 67 Opening
UAV Program
Accreditation
Power Load
Exhaust Capture System
Hurricane Irma Response
Accomplishments
![Page 91: October 25, 2018 Library/open... · at Ruby Lake Project Schedule Design Complete Phase 1 Construction Start Aug. 2018 End Mar. 2019. In-Design Road Projects Williamsburg Intersection:](https://reader034.vdocuments.mx/reader034/viewer/2022050522/5fa622e36f8476147c13f991/html5/thumbnails/91.jpg)
Dive Program
Station 67 Opening
UAV Program
Accreditation
Power Load
Exhaust Capture System
Hurricane Irma Response
Accomplishments
![Page 92: October 25, 2018 Library/open... · at Ruby Lake Project Schedule Design Complete Phase 1 Construction Start Aug. 2018 End Mar. 2019. In-Design Road Projects Williamsburg Intersection:](https://reader034.vdocuments.mx/reader034/viewer/2022050522/5fa622e36f8476147c13f991/html5/thumbnails/92.jpg)
WilliamsburgCommunity Meeting
October 25, 2018Fire Chief Otto Drozd III
![Page 93: October 25, 2018 Library/open... · at Ruby Lake Project Schedule Design Complete Phase 1 Construction Start Aug. 2018 End Mar. 2019. In-Design Road Projects Williamsburg Intersection:](https://reader034.vdocuments.mx/reader034/viewer/2022050522/5fa622e36f8476147c13f991/html5/thumbnails/93.jpg)
![Page 94: October 25, 2018 Library/open... · at Ruby Lake Project Schedule Design Complete Phase 1 Construction Start Aug. 2018 End Mar. 2019. In-Design Road Projects Williamsburg Intersection:](https://reader034.vdocuments.mx/reader034/viewer/2022050522/5fa622e36f8476147c13f991/html5/thumbnails/94.jpg)
![Page 95: October 25, 2018 Library/open... · at Ruby Lake Project Schedule Design Complete Phase 1 Construction Start Aug. 2018 End Mar. 2019. In-Design Road Projects Williamsburg Intersection:](https://reader034.vdocuments.mx/reader034/viewer/2022050522/5fa622e36f8476147c13f991/html5/thumbnails/95.jpg)
DEVELOPMENT UPDATE
Williamsburg Town Hall Meeting
1
ORANGE COUNTY PLANNING DIVISION
October 25, 2018
![Page 96: October 25, 2018 Library/open... · at Ruby Lake Project Schedule Design Complete Phase 1 Construction Start Aug. 2018 End Mar. 2019. In-Design Road Projects Williamsburg Intersection:](https://reader034.vdocuments.mx/reader034/viewer/2022050522/5fa622e36f8476147c13f991/html5/thumbnails/96.jpg)
AREA CONTEXT
![Page 97: October 25, 2018 Library/open... · at Ruby Lake Project Schedule Design Complete Phase 1 Construction Start Aug. 2018 End Mar. 2019. In-Design Road Projects Williamsburg Intersection:](https://reader034.vdocuments.mx/reader034/viewer/2022050522/5fa622e36f8476147c13f991/html5/thumbnails/97.jpg)
MEADOW
WOODS
MEADOW
WOODS
GINN
PROPERTY
FUTURE LAND USE MAP
![Page 98: October 25, 2018 Library/open... · at Ruby Lake Project Schedule Design Complete Phase 1 Construction Start Aug. 2018 End Mar. 2019. In-Design Road Projects Williamsburg Intersection:](https://reader034.vdocuments.mx/reader034/viewer/2022050522/5fa622e36f8476147c13f991/html5/thumbnails/98.jpg)
MEADOW
WOODS
MEADOW
WOODS
GINN
PROPERTY
ZONING
![Page 99: October 25, 2018 Library/open... · at Ruby Lake Project Schedule Design Complete Phase 1 Construction Start Aug. 2018 End Mar. 2019. In-Design Road Projects Williamsburg Intersection:](https://reader034.vdocuments.mx/reader034/viewer/2022050522/5fa622e36f8476147c13f991/html5/thumbnails/99.jpg)
MEADOW
WOODS
MEADOW
WOODS
GINN
PROPERTY
NEW PROJECTS
1
2
34
5
![Page 100: October 25, 2018 Library/open... · at Ruby Lake Project Schedule Design Complete Phase 1 Construction Start Aug. 2018 End Mar. 2019. In-Design Road Projects Williamsburg Intersection:](https://reader034.vdocuments.mx/reader034/viewer/2022050522/5fa622e36f8476147c13f991/html5/thumbnails/100.jpg)
6
1: Orangewood N-2 PD, Parcel 11D
Convert 507
single-family
residential units
to short-term
rental (423 units
proposed)
Not yet approved
by DRC
![Page 101: October 25, 2018 Library/open... · at Ruby Lake Project Schedule Design Complete Phase 1 Construction Start Aug. 2018 End Mar. 2019. In-Design Road Projects Williamsburg Intersection:](https://reader034.vdocuments.mx/reader034/viewer/2022050522/5fa622e36f8476147c13f991/html5/thumbnails/101.jpg)
Construct a new
attraction within
the existing park
Approved by DRC
on September 12,
2018
2: Shadow Wood PD
![Page 102: October 25, 2018 Library/open... · at Ruby Lake Project Schedule Design Complete Phase 1 Construction Start Aug. 2018 End Mar. 2019. In-Design Road Projects Williamsburg Intersection:](https://reader034.vdocuments.mx/reader034/viewer/2022050522/5fa622e36f8476147c13f991/html5/thumbnails/102.jpg)
Construct a 6,650
square foot day
club on 3.41 acres
Not yet approved
by DRC
3. Orangewood Center PD
![Page 103: October 25, 2018 Library/open... · at Ruby Lake Project Schedule Design Complete Phase 1 Construction Start Aug. 2018 End Mar. 2019. In-Design Road Projects Williamsburg Intersection:](https://reader034.vdocuments.mx/reader034/viewer/2022050522/5fa622e36f8476147c13f991/html5/thumbnails/103.jpg)
Construct 270
hotel rooms on
outparcels 7A and
7B totaling 6.23
acres
Approved by DRC
on September 26,
2018
4. Orangewood N-2 PD, Parcel 6
![Page 104: October 25, 2018 Library/open... · at Ruby Lake Project Schedule Design Complete Phase 1 Construction Start Aug. 2018 End Mar. 2019. In-Design Road Projects Williamsburg Intersection:](https://reader034.vdocuments.mx/reader034/viewer/2022050522/5fa622e36f8476147c13f991/html5/thumbnails/104.jpg)
328 multi-family
units
Approved by DRC
on September 26,
2018
5. Project ABC Multi-Family
![Page 105: October 25, 2018 Library/open... · at Ruby Lake Project Schedule Design Complete Phase 1 Construction Start Aug. 2018 End Mar. 2019. In-Design Road Projects Williamsburg Intersection:](https://reader034.vdocuments.mx/reader034/viewer/2022050522/5fa622e36f8476147c13f991/html5/thumbnails/105.jpg)
BCC engaged consultant
(AVCON, Inc.) to study
helitour operations in the I-
Drive area
BCC declined to update I-
Drive Overlay to permit
additional helicopters
HELICOPTERS