october 22, 2020 - gerald r. ford international airport

15
October 22, 2020

Upload: others

Post on 26-Feb-2022

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: October 22, 2020 - Gerald R. Ford International Airport

October 22, 2020

Page 2: October 22, 2020 - Gerald R. Ford International Airport

Gerald R. Ford International Airport Authority• 2nd Largest & Busiest

Airport in Michigan• 3.58 Million Passengers in

2019• Over 3,200 Acres of Land• Over $3.2 Billion in

Economic Output to West Michigan

Page 3: October 22, 2020 - Gerald R. Ford International Airport
Page 4: October 22, 2020 - Gerald R. Ford International Airport

GRR

DCABWI

PHL

BNA

AUS

DFW

DEN

AZA

LAS

LAX

DTW

SAV

PIE

CLT

SFB

ATL

MCO

SRQ

MDW/ORD

MSP

JAX

22 Non-Stop Destinations Post-COVID

Source: Diio-DOT Schedules, Destinations are presented as of Sept 2020

PHX

PGD

Page 5: October 22, 2020 - Gerald R. Ford International Airport
Page 6: October 22, 2020 - Gerald R. Ford International Airport

Gateway Transformation – Complete!

Page 7: October 22, 2020 - Gerald R. Ford International Airport
Page 8: October 22, 2020 - Gerald R. Ford International Airport

Program Management

Conceptual Plan Development

Phasing

Cost Estimates and Contracting

Design Development

Construction Phase Services

Project and Grant Closeout

Page 9: October 22, 2020 - Gerald R. Ford International Airport

FEDERAL INSPECTION STATION

AIR TRAFFICCONTROL TOWER

CONCOURSE A

9

Page 10: October 22, 2020 - Gerald R. Ford International Airport
Page 11: October 22, 2020 - Gerald R. Ford International Airport
Page 12: October 22, 2020 - Gerald R. Ford International Airport

RFQ 1071 – Pre-solicitation Conference attendee 10/22/20 – 2pm

Gregory S. Hulne - [email protected] Lance Olsen - [email protected] Blair Cox - [email protected] John Obleman - [email protected] Mary Shaffer - [email protected] Douglas S. Wendt - [email protected] Patterson, Nicholas - [email protected] Hugger, Eric - [email protected] Karen Dickerson - [email protected] Jonathan McCredie - [email protected] Evers, Ryan - [email protected] Barrero, Jorge - [email protected] Mike LaMontagne - [email protected] Richard Spies Janet Terry - [email protected] Michael Holdwick - [email protected] Eric Peterson - [email protected] Marybeth Bunker - [email protected] Tom Jennings - [email protected] Higdon, Jim - [email protected] Megumi Hice - [email protected] James Terada Andrea Ronk

Page 13: October 22, 2020 - Gerald R. Ford International Airport

Stephen W. Bennett - [email protected] Quinlan, Brian - [email protected] Frances Hill - [email protected] Meeker, Adam - [email protected] Matthew B. Shaw - [email protected] Nickolas Miller - [email protected] Hill, Jonathan - [email protected] Steve LaPorta Brittany Dymond - [email protected] Gretchen Koncan - [email protected] Sims, Nathan A - [email protected] Adam Oliver - [email protected] Boggus, Roddy Scott Brodsky - [email protected] Angie McHorse - [email protected] Joel T. Stromgren Vitone, Peter - [email protected] Pashanamaei, Bijan - [email protected] Krieger, Paul - [email protected] Matt Brown - [email protected] Yoges Warren - [email protected] Cantrell, Cyle R. - [email protected] Ghafari - [email protected] Chris Norton - [email protected]

Page 14: October 22, 2020 - Gerald R. Ford International Airport

Michael Zoia - [email protected] Askew, Pat - [email protected] Tim Close - [email protected] Simon, Shannon - [email protected] Nix, Keith - [email protected] Thomas Coyne Keith O'Connor - [email protected]

Page 15: October 22, 2020 - Gerald R. Ford International Airport

Questions:

Gregory S. Hulne Has TSA established a funding budget? GFIAA Answer – TSA has Budgeted $3.7M for project design. Boggus, Roddy Will the new CBIS connect to an existing Bag Make-up Area or will the system planning include Bag Makeup including project Elevate? GFIAA Answer – This is to be determined during the design process. Eric Peterson Is 3.7M for equipment or for equipment and building modification? GFIAA Answer - $3.7M is for design jonathan mccredie Has the Authority considered combining the proposed CBIS project with the consolidation of the two ticketing pods into a single (east) pod as a single combined project? GFIAA Answer – Yes, that is a consideration Boggus, Roddy Are there opportunities for ROW between the two ticket counters to connect them in place? GFIAA Answer – Ticketing is currently bisected by baggage claim which is served by a lower level. Stephen W. Bennett It doesn't sound like there is any funding for new sortation and makeup. Such would not be funded by TSA but by the Airport authority GFIAA Answer – That is true today.