Gerald R. Ford International Airport Authority• 2nd Largest & Busiest
Airport in Michigan• 3.58 Million Passengers in
2019• Over 3,200 Acres of Land• Over $3.2 Billion in
Economic Output to West Michigan
GRR
DCABWI
PHL
BNA
AUS
DFW
DEN
AZA
LAS
LAX
DTW
SAV
PIE
CLT
SFB
ATL
MCO
SRQ
MDW/ORD
MSP
JAX
22 Non-Stop Destinations Post-COVID
Source: Diio-DOT Schedules, Destinations are presented as of Sept 2020
PHX
PGD
Gateway Transformation – Complete!
Program Management
Conceptual Plan Development
Phasing
Cost Estimates and Contracting
Design Development
Construction Phase Services
Project and Grant Closeout
FEDERAL INSPECTION STATION
AIR TRAFFICCONTROL TOWER
CONCOURSE A
9
RFQ 1071 – Pre-solicitation Conference attendee 10/22/20 – 2pm
Gregory S. Hulne - [email protected] Lance Olsen - [email protected] Blair Cox - [email protected] John Obleman - [email protected] Mary Shaffer - [email protected] Douglas S. Wendt - [email protected] Patterson, Nicholas - [email protected] Hugger, Eric - [email protected] Karen Dickerson - [email protected] Jonathan McCredie - [email protected] Evers, Ryan - [email protected] Barrero, Jorge - [email protected] Mike LaMontagne - [email protected] Richard Spies Janet Terry - [email protected] Michael Holdwick - [email protected] Eric Peterson - [email protected] Marybeth Bunker - [email protected] Tom Jennings - [email protected] Higdon, Jim - [email protected] Megumi Hice - [email protected] James Terada Andrea Ronk
Stephen W. Bennett - [email protected] Quinlan, Brian - [email protected] Frances Hill - [email protected] Meeker, Adam - [email protected] Matthew B. Shaw - [email protected] Nickolas Miller - [email protected] Hill, Jonathan - [email protected] Steve LaPorta Brittany Dymond - [email protected] Gretchen Koncan - [email protected] Sims, Nathan A - [email protected] Adam Oliver - [email protected] Boggus, Roddy Scott Brodsky - [email protected] Angie McHorse - [email protected] Joel T. Stromgren Vitone, Peter - [email protected] Pashanamaei, Bijan - [email protected] Krieger, Paul - [email protected] Matt Brown - [email protected] Yoges Warren - [email protected] Cantrell, Cyle R. - [email protected] Ghafari - [email protected] Chris Norton - [email protected]
Michael Zoia - [email protected] Askew, Pat - [email protected] Tim Close - [email protected] Simon, Shannon - [email protected] Nix, Keith - [email protected] Thomas Coyne Keith O'Connor - [email protected]
Questions:
Gregory S. Hulne Has TSA established a funding budget? GFIAA Answer – TSA has Budgeted $3.7M for project design. Boggus, Roddy Will the new CBIS connect to an existing Bag Make-up Area or will the system planning include Bag Makeup including project Elevate? GFIAA Answer – This is to be determined during the design process. Eric Peterson Is 3.7M for equipment or for equipment and building modification? GFIAA Answer - $3.7M is for design jonathan mccredie Has the Authority considered combining the proposed CBIS project with the consolidation of the two ticketing pods into a single (east) pod as a single combined project? GFIAA Answer – Yes, that is a consideration Boggus, Roddy Are there opportunities for ROW between the two ticket counters to connect them in place? GFIAA Answer – Ticketing is currently bisected by baggage claim which is served by a lower level. Stephen W. Bennett It doesn't sound like there is any funding for new sortation and makeup. Such would not be funded by TSA but by the Airport authority GFIAA Answer – That is true today.