![Page 1: October 16, 2017 CERTIFICATE 26334 - New York...Oct 16, 2017 · Final approval is conditioned upon commencement of work before October 16, 2019 and submission of comprehensive photographic](https://reader034.vdocuments.mx/reader034/viewer/2022052003/6016c26f2c6ad44d8b3fc8ab/html5/thumbnails/1.jpg)
Laurie Hawkinson, Manuel Miranda, Richard Moore, Signe Nielsen, Ethel Sheffer,
Merryl H. Tisch, Hank Willis Thomas, Shin-pei Tsay, Mary Valverde, Commissioners
October 16, 2017
CERTIFICATE 26334
RESOLVED That the Design Commission, having considered designs for the reconstruction of
the courtyard, Building 92, Brooklyn Navy Yard Industrial Park, 63 Flushing Avenue between
Carlton Avenue and Adelphi Street, Brooklyn, submitted by the Brooklyn Navy Yard
Development Corporation, represented by exhibits 6063-LR, LS, LT & LU of record in this
matter, hereby gives to the same unanimous preliminary and final approval.
Final approval is conditioned upon commencement of work before October 16, 2019 and
submission of comprehensive photographic documentation of the completed project
consisting of 8” x 10” archival-quality color photographs.
A true copy of resolution adopted by
the Design Commission at its meeting
on October 16, 2017.
Justin Garrett Moore
Executive Director
![Page 2: October 16, 2017 CERTIFICATE 26334 - New York...Oct 16, 2017 · Final approval is conditioned upon commencement of work before October 16, 2019 and submission of comprehensive photographic](https://reader034.vdocuments.mx/reader034/viewer/2022052003/6016c26f2c6ad44d8b3fc8ab/html5/thumbnails/2.jpg)
Laurie Hawkinson, Manuel Miranda, Richard Moore, Signe Nielsen, Ethel Sheffer,
Merryl H. Tisch, Hank Willis Thomas, Shin-pei Tsay, Mary Valverde, Commissioners
October 16, 2017
CERTIFICATE 26335
RESOLVED That the Design Commission, having considered designs for the installation of
electrical equipment, fencing, security booth, and turnstile enclosure to accommodate citywide
ferry service, Dock 72, Brooklyn Navy Yard Industrial Park, 63 Flushing Avenue, Market Street
between 6th Street and Assembly Road, Brooklyn, submitted by the Brooklyn Navy Yard
Development Corporation, represented by exhibits 6063-LV, LW, LX, LY & LZ of record in this
matter, hereby gives to the same unanimous final approval with the understanding that the sea
rail proposal will be submitted with the amended Dock 72 proposal for formal PDC review.
Final approval is conditioned upon commencement of work before October 16, 2019 and
submission of comprehensive photographic documentation of the completed project
consisting of 8” x 10” archival-quality color photographs.
A true copy of resolution adopted by
the Design Commission at its meeting
on October 16, 2017.
Justin Garrett Moore
Executive Director
![Page 3: October 16, 2017 CERTIFICATE 26334 - New York...Oct 16, 2017 · Final approval is conditioned upon commencement of work before October 16, 2019 and submission of comprehensive photographic](https://reader034.vdocuments.mx/reader034/viewer/2022052003/6016c26f2c6ad44d8b3fc8ab/html5/thumbnails/3.jpg)
Laurie Hawkinson, Manuel Miranda, Richard Moore, Signe Nielsen, Ethel Sheffer,
Merryl H. Tisch, Hank Willis Thomas, Shin-pei Tsay, Mary Valverde, Commissioners
October 16, 2017
CERTIFICATE 26336
RESOLVED That the Design Commission, having considered designs for the installation of a
prototypical newsstand, 460 Park Avenue, northwest corner of East 57th Street and Park
Avenue, Manhattan, submitted by the Department of Consumer Affairs and the Department of
Transportation, represented by exhibits 6922-D, E & F of record in this matter, hereby gives to
the same unanimous preliminary and final approval.
Final approval is conditioned upon commencement of work before October 16, 2019 and
submission of comprehensive photographic documentation of the completed project
consisting of 8” x 10” archival-quality color photographs.
A true copy of resolution adopted by
the Design Commission at its meeting
on October 16, 2017.
Justin Garrett Moore
Executive Director
![Page 4: October 16, 2017 CERTIFICATE 26334 - New York...Oct 16, 2017 · Final approval is conditioned upon commencement of work before October 16, 2019 and submission of comprehensive photographic](https://reader034.vdocuments.mx/reader034/viewer/2022052003/6016c26f2c6ad44d8b3fc8ab/html5/thumbnails/4.jpg)
Laurie Hawkinson, Manuel Miranda, Richard Moore, Signe Nielsen, Ethel Sheffer,
Merryl H. Tisch, Hank Willis Thomas, Shin-pei Tsay, Mary Valverde, Commissioners
October 16, 2017
CERTIFICATE 26337
RESOLVED That the Design Commission, having considered designs for the installation of a
prototypical newsstand, 520 5th Avenue, northwest corner of 5th Avenue and West 43rd
Street, Manhattan, submitted by the Department of Consumer Affairs and the Department of
Transportation, represented by exhibits 7329-A, B & C of record in this matter, hereby gives to
the same unanimous preliminary and final approval.
Final approval is conditioned upon commencement of work before October 16, 2019 and
submission of comprehensive photographic documentation of the completed project
consisting of 8” x 10” archival-quality color photographs.
A true copy of resolution adopted by
the Design Commission at its meeting
on October 16, 2017.
Justin Garrett Moore
Executive Director
![Page 5: October 16, 2017 CERTIFICATE 26334 - New York...Oct 16, 2017 · Final approval is conditioned upon commencement of work before October 16, 2019 and submission of comprehensive photographic](https://reader034.vdocuments.mx/reader034/viewer/2022052003/6016c26f2c6ad44d8b3fc8ab/html5/thumbnails/5.jpg)
Laurie Hawkinson, Manuel Miranda, Richard Moore, Signe Nielsen, Ethel Sheffer,
Merryl H. Tisch, Hank Willis Thomas, Shin-pei Tsay, Mary Valverde, Commissioners
October 16, 2017
CERTIFICATE 26338
RESOLVED That the Design Commission, having considered designs for the installation of
signage, Sherwin Williams Paints, 2333 Cross Bronx Expressway, Bronx, submitted by the
Department of Citywide Administrative Services, represented by exhibits 7330-A, B & C of
record in this matter, hereby gives to the same unanimous preliminary and final approval.
Final approval is conditioned upon commencement of work before October 16, 2019 and
submission of comprehensive photographic documentation of the completed project
consisting of 8” x 10” archival-quality color photographs.
A true copy of resolution adopted by
the Design Commission at its meeting
on October 16, 2017.
Justin Garrett Moore
Executive Director
![Page 6: October 16, 2017 CERTIFICATE 26334 - New York...Oct 16, 2017 · Final approval is conditioned upon commencement of work before October 16, 2019 and submission of comprehensive photographic](https://reader034.vdocuments.mx/reader034/viewer/2022052003/6016c26f2c6ad44d8b3fc8ab/html5/thumbnails/6.jpg)
Laurie Hawkinson, Manuel Miranda, Richard Moore, Signe Nielsen, Ethel Sheffer,
Merryl H. Tisch, Hank Willis Thomas, Shin-pei Tsay, Mary Valverde, Commissioners
October 16, 2017
CERTIFICATE 26339
RESOLVED That the Design Commission, having considered final photographs for the
installation of Shapes by Allan McCollum, Elmhurst Community Library, 86-01 Broadway,
Queens, submitted by the Department of Cultural Affairs' Percent for Art Program, the
Department of Design and Construction, and Queens Library, represented by exhibits 1675-AV
& AW of record in this matter, hereby gives to the same unanimous final approval.
A true copy of resolution adopted by
the Design Commission at its meeting
on October 16, 2017.
Justin Garrett Moore
Executive Director
![Page 7: October 16, 2017 CERTIFICATE 26334 - New York...Oct 16, 2017 · Final approval is conditioned upon commencement of work before October 16, 2019 and submission of comprehensive photographic](https://reader034.vdocuments.mx/reader034/viewer/2022052003/6016c26f2c6ad44d8b3fc8ab/html5/thumbnails/7.jpg)
Laurie Hawkinson, Manuel Miranda, Richard Moore, Signe Nielsen, Ethel Sheffer,
Merryl H. Tisch, Shin-pei Tsay, Mary Valverde, Commissioners
October 16, 2017
CERTIFICATE 26340
RESOLVED That the Design Commission, having considered a proposal for the installation of
Unity by Hank Willis Thomas, Tillary Street, between Cadman Plaza East and Adams Street,
Brooklyn, submitted by the Department of Cultural Affairs' Percent for Art Program, the
Department of Transportation, and the Department of Design and Construction, represented by
exhibits 6589-BE, BF, BG, BH, BI & BJ of record in this matter, hereby gives to the same
unanimous preliminary approval with the understanding that (1) licensed structural and civil
engineers within DDC's Infrastructure division, the engineering consultant, and Polich Tallix
reviewed the drawings to ensure that the artwork can be installed as drawn; (2) notations were
added to the construction documents to ensure that the general contractor provides the
approved foundation; (3) the shop drawings must be approved by the artist and the Engineer of
Record prior to installation; and (4) the plaque design and location will be submitted for review
and approval before the plaque is fabricated. Commissioner Willis Thomas recused himself.
Preliminary approval is conditioned upon commencement of work before October 16, 2019
and submission of this project for final review and approval.
A true copy of resolution adopted by
the Design Commission at its meeting
on October 16, 2017.
Justin Garrett Moore
Executive Director
![Page 8: October 16, 2017 CERTIFICATE 26334 - New York...Oct 16, 2017 · Final approval is conditioned upon commencement of work before October 16, 2019 and submission of comprehensive photographic](https://reader034.vdocuments.mx/reader034/viewer/2022052003/6016c26f2c6ad44d8b3fc8ab/html5/thumbnails/8.jpg)
Laurie Hawkinson, Manuel Miranda, Richard Moore, Signe Nielsen, Ethel Sheffer,
Merryl H. Tisch, Shin-pei Tsay, Mary Valverde, Commissioners
October 16, 2017
CERTIFICATE 26341
RESOLVED That the Design Commission, having considered a final report for the conservation
of murals by Edwin Howland Blashfield, Kenyon Cox, Joseph Lauber, G.W. Maynard, William
Metcalf, Henry Siddons Mowbray, Robert Reid, E. Simmons, Charles Y. Turner, and H. O.
Walker, Appellate Courthouse, 35 East 25th Street at Madison Avenue, Manhattan, submitted
by the Department of Design and Construction and the Department of Citywide Administrative
Services, represented by exhibits 2814-AS, AT & AU of record in this matter, hereby gives to
the same unanimous final approval with the understanding that DCAS will implement the long-
term maintenance program as recommended by the conservator in the report. Specifically,
DCAS will (1) work with the Office of Court Administration to limit temperature and humidity
fluctuations outside of the recommended ranges; (2) in 2027, schedule a fine art conservator to
inspect the murals and provide a condition report with treatment recommendations; and (3)
submit the report to the Public Design Commission along with the agency’s plan for
implementing any recommendations.
A true copy of resolution adopted by
the Design Commission at its meeting
on October 16, 2017.
Justin Garrett Moore
Executive Director
![Page 9: October 16, 2017 CERTIFICATE 26334 - New York...Oct 16, 2017 · Final approval is conditioned upon commencement of work before October 16, 2019 and submission of comprehensive photographic](https://reader034.vdocuments.mx/reader034/viewer/2022052003/6016c26f2c6ad44d8b3fc8ab/html5/thumbnails/9.jpg)
Laurie Hawkinson, Manuel Miranda, Richard Moore, Signe Nielsen, Ethel Sheffer,
Merryl H. Tisch, Shin-pei Tsay, Mary Valverde, Commissioners
October 16, 2017
CERTIFICATE 26342
RESOLVED That the Design Commission, having considered designs for the repair and
replacement of the roof, Main Building, Africa Wing and Tropical Forest Wing, Staten Island
Zoo, 614 Broadway, Staten Island, submitted by the Department of Design and Construction,
the Department of Cultural Affairs, and the Department of Parks & Recreation, represented by
exhibits 4196-DB, DC, DD & DE of record in this matter, hereby gives to the same unanimous
preliminary and final approval.
Final approval is conditioned upon commencement of work before October 16, 2019 and
submission of comprehensive photographic documentation of the completed project
consisting of 8” x 10” archival-quality color photographs.
A true copy of resolution adopted by
the Design Commission at its meeting
on October 16, 2017.
Justin Garrett Moore
Executive Director
![Page 10: October 16, 2017 CERTIFICATE 26334 - New York...Oct 16, 2017 · Final approval is conditioned upon commencement of work before October 16, 2019 and submission of comprehensive photographic](https://reader034.vdocuments.mx/reader034/viewer/2022052003/6016c26f2c6ad44d8b3fc8ab/html5/thumbnails/10.jpg)
Laurie Hawkinson, Manuel Miranda, Richard Moore, Signe Nielsen, Ethel Sheffer,
Merryl H. Tisch, Hank Willis Thomas, Shin-pei Tsay, Mary Valverde, Commissioners
October 16, 2017
CERTIFICATE 26343
RESOLVED That the Design Commission, having considered designs for the construction of
the Clearview Pumping Station, Clearview Expressway exit ramp, Roe Place and the Cross
Island Parkway service road, Queens, submitted by the Department of Environmental
Protection, represented by exhibits 7205-H, I, J & K of record in this matter, hereby gives to the
same unanimous final approval.
Final approval is conditioned upon commencement of work before October 16, 2019 and
submission of comprehensive photographic documentation of the completed project
consisting of 8” x 10” archival-quality color photographs.
A true copy of resolution adopted by
the Design Commission at its meeting
on October 16, 2017.
Justin Garrett Moore
Executive Director
![Page 11: October 16, 2017 CERTIFICATE 26334 - New York...Oct 16, 2017 · Final approval is conditioned upon commencement of work before October 16, 2019 and submission of comprehensive photographic](https://reader034.vdocuments.mx/reader034/viewer/2022052003/6016c26f2c6ad44d8b3fc8ab/html5/thumbnails/11.jpg)
Laurie Hawkinson, Manuel Miranda, Richard Moore, Signe Nielsen, Ethel Sheffer,
Merryl H. Tisch, Hank Willis Thomas, Shin-pei Tsay, Mary Valverde, Commissioners
October 16, 2017
CERTIFICATE 26344
RESOLVED That the Design Commission, having considered designs for the installation of
green infrastructure including a bioswale, Carroll Park, President Street, Smith Street, Carroll
Street, and Court Street, Brooklyn, submitted by the Department of Environmental Protection
and the Department of Parks & Recreation, represented by exhibits 989-Z, AA, AB & AC of
record in this matter, hereby gives to the same unanimous preliminary and final approval.
Final approval is conditioned upon commencement of work before October 16, 2019 and
submission of comprehensive photographic documentation of the completed project
consisting of 8” x 10” archival-quality color photographs.
A true copy of resolution adopted by
the Design Commission at its meeting
on October 16, 2017.
Justin Garrett Moore
Executive Director
![Page 12: October 16, 2017 CERTIFICATE 26334 - New York...Oct 16, 2017 · Final approval is conditioned upon commencement of work before October 16, 2019 and submission of comprehensive photographic](https://reader034.vdocuments.mx/reader034/viewer/2022052003/6016c26f2c6ad44d8b3fc8ab/html5/thumbnails/12.jpg)
Laurie Hawkinson, Manuel Miranda, Richard Moore, Signe Nielsen, Ethel Sheffer,
Merryl H. Tisch, Hank Willis Thomas, Shin-pei Tsay, Mary Valverde, Commissioners
October 16, 2017
CERTIFICATE 26345
RESOLVED That the Design Commission, having considered designs for the reconstruction of
a portion of Park Slope Playground including green infrastructure, adjacent to P. S. 282,
Lincoln Place, 6th Avenue, Berkeley Place, and 5th Avenue, Brooklyn, submitted by the
Department of Environmental Protection and the Department of Parks & Recreation,
represented by exhibits 3555-J, K, L & M of record in this matter, hereby gives to the same
unanimous preliminary and final approval.
Final approval is conditioned upon commencement of work before October 16, 2019 and
submission of comprehensive photographic documentation of the completed project
consisting of 8” x 10” archival-quality color photographs.
A true copy of resolution adopted by
the Design Commission at its meeting
on October 16, 2017.
Justin Garrett Moore
Executive Director
![Page 13: October 16, 2017 CERTIFICATE 26334 - New York...Oct 16, 2017 · Final approval is conditioned upon commencement of work before October 16, 2019 and submission of comprehensive photographic](https://reader034.vdocuments.mx/reader034/viewer/2022052003/6016c26f2c6ad44d8b3fc8ab/html5/thumbnails/13.jpg)
Laurie Hawkinson, Manuel Miranda, Richard Moore, Signe Nielsen, Ethel Sheffer,
Merryl H. Tisch, Hank Willis Thomas, Shin-pei Tsay, Mary Valverde, Commissioners
October 16, 2017
CERTIFICATE 26346
RESOLVED That the Design Commission, having considered designs for the installation of a
distinctive sidewalk, The Paramount Building, 1501 Broadway, 43rd Street, between Broadway
and 8th Avenue, Manhattan, submitted by the Department of Transportation, represented by
exhibits 5538-D, E & F of record in this matter, hereby gives to the same unanimous
preliminary and final approval.
Final approval is conditioned upon commencement of work before October 16, 2019 and
submission of comprehensive photographic documentation of the completed project
consisting of 8” x 10” archival-quality color photographs.
A true copy of resolution adopted by
the Design Commission at its meeting
on October 16, 2017.
Justin Garrett Moore
Executive Director
![Page 14: October 16, 2017 CERTIFICATE 26334 - New York...Oct 16, 2017 · Final approval is conditioned upon commencement of work before October 16, 2019 and submission of comprehensive photographic](https://reader034.vdocuments.mx/reader034/viewer/2022052003/6016c26f2c6ad44d8b3fc8ab/html5/thumbnails/14.jpg)
Laurie Hawkinson, Manuel Miranda, Richard Moore, Signe Nielsen, Ethel Sheffer,
Merryl H. Tisch, Hank Willis Thomas, Shin-pei Tsay, Mary Valverde, Commissioners
October 16, 2017
CERTIFICATE 26347
RESOLVED That the Design Commission, having considered designs for the installation of
photocells on pedestrian light poles citywide, submitted by the Department of Transportation,
represented by exhibits 6816-GM, GN, GO & GP of record in this matter, hereby gives to the
same unanimous preliminary and final approval.
Final approval is conditioned upon commencement of work before October 16, 2019 and
submission of comprehensive photographic documentation of the completed project
consisting of 8” x 10” archival-quality color photographs.
A true copy of resolution adopted by
the Design Commission at its meeting
on October 16, 2017.
Justin Garrett Moore
Executive Director
![Page 15: October 16, 2017 CERTIFICATE 26334 - New York...Oct 16, 2017 · Final approval is conditioned upon commencement of work before October 16, 2019 and submission of comprehensive photographic](https://reader034.vdocuments.mx/reader034/viewer/2022052003/6016c26f2c6ad44d8b3fc8ab/html5/thumbnails/15.jpg)
Laurie Hawkinson, Manuel Miranda, Richard Moore, Signe Nielsen, Ethel Sheffer,
Merryl H. Tisch, Hank Willis Thomas, Shin-pei Tsay, Mary Valverde, Commissioners
October 16, 2017
CERTIFICATE 26348
RESOLVED That the Design Commission, having considered a proposal for the repainting of
the Sackett Street Bridge over the Brooklyn-Queens Expressway, Brooklyn, submitted by the
Department of Transportation, represented by exhibits 6623-CC, CD & CE of record in this
matter, hereby gives to the same unanimous preliminary and final approval.
Final approval is conditioned upon commencement of work before October 16, 2019 and
submission of comprehensive photographic documentation of the completed project
consisting of 8” x 10” archival-quality color photographs.
A true copy of resolution adopted by
the Design Commission at its meeting
on October 16, 2017.
Justin Garrett Moore
Executive Director
![Page 16: October 16, 2017 CERTIFICATE 26334 - New York...Oct 16, 2017 · Final approval is conditioned upon commencement of work before October 16, 2019 and submission of comprehensive photographic](https://reader034.vdocuments.mx/reader034/viewer/2022052003/6016c26f2c6ad44d8b3fc8ab/html5/thumbnails/16.jpg)
Laurie Hawkinson, Manuel Miranda, Richard Moore, Signe Nielsen, Ethel Sheffer,
Merryl H. Tisch, Hank Willis Thomas, Shin-pei Tsay, Mary Valverde, Commissioners
October 16, 2017
CERTIFICATE 26349
RESOLVED That the Design Commission, having considered a proposal for the installation of
an artwork by Siah Armajani, North Shore Esplanade, adjacent to the Staten Island Ferry
Terminal and former U.S. Coast Guard Light House Depot, Staten Island, submitted by the
Department of Transportation and the Department of Cultural Affairs' Percent for Art Program,
represented by exhibits 5623-U, V, W & X of record in this matter, hereby gives to the same
unanimous conceptual approval.
Conceptual approval is conditioned upon submission of this project for preliminary review and
approval before October 16, 2019.
A true copy of resolution adopted by
the Design Commission at its meeting
on October 16, 2017.
Justin Garrett Moore
Executive Director
![Page 17: October 16, 2017 CERTIFICATE 26334 - New York...Oct 16, 2017 · Final approval is conditioned upon commencement of work before October 16, 2019 and submission of comprehensive photographic](https://reader034.vdocuments.mx/reader034/viewer/2022052003/6016c26f2c6ad44d8b3fc8ab/html5/thumbnails/17.jpg)
Laurie Hawkinson, Manuel Miranda, Richard Moore, Signe Nielsen, Ethel Sheffer,
Merryl H. Tisch, Hank Willis Thomas, Shin-pei Tsay, Mary Valverde, Commissioners
October 16, 2017
CERTIFICATE 26350
RESOLVED That the Design Commission, having considered designs for the reconstruction of
the 17th Avenue Pedestrian Bridge over the Shore Belt Parkway, Brooklyn, submitted by the
Department of Transportation and the Department of Parks & Recreation, represented by
exhibits 6433-DU, DV, DW, DX & DY of record in this matter, hereby gives to the same
unanimous final approval.
Final approval is conditioned upon commencement of work before October 16, 2019 and
submission of comprehensive photographic documentation of the completed project
consisting of 8” x 10” archival-quality color photographs.
A true copy of resolution adopted by
the Design Commission at its meeting
on October 16, 2017.
Justin Garrett Moore
Executive Director
![Page 18: October 16, 2017 CERTIFICATE 26334 - New York...Oct 16, 2017 · Final approval is conditioned upon commencement of work before October 16, 2019 and submission of comprehensive photographic](https://reader034.vdocuments.mx/reader034/viewer/2022052003/6016c26f2c6ad44d8b3fc8ab/html5/thumbnails/18.jpg)
Laurie Hawkinson, Manuel Miranda, Richard Moore, Signe Nielsen, Ethel Sheffer,
Merryl H. Tisch, Hank Willis Thomas, Shin-pei Tsay, Mary Valverde, Commissioners
October 16, 2017
CERTIFICATE 26351
RESOLVED That the Design Commission, having considered designs for the reconstruction of
the 27th Avenue Pedestrian Bridge over the Shore Belt Parkway, Brooklyn, submitted by the
Department of Transportation and the Department of Parks & Recreation, represented by
exhibits 6433-DY, DZ, EA, EB & EC of record in this matter, hereby gives to the same
unanimous final approval.
Final approval is conditioned upon commencement of work before October 16, 2019 and
submission of comprehensive photographic documentation of the completed project
consisting of 8” x 10” archival-quality color photographs.
A true copy of resolution adopted by
the Design Commission at its meeting
on October 16, 2017.
Justin Garrett Moore
Executive Director
![Page 19: October 16, 2017 CERTIFICATE 26334 - New York...Oct 16, 2017 · Final approval is conditioned upon commencement of work before October 16, 2019 and submission of comprehensive photographic](https://reader034.vdocuments.mx/reader034/viewer/2022052003/6016c26f2c6ad44d8b3fc8ab/html5/thumbnails/19.jpg)
Laurie Hawkinson, Manuel Miranda, Richard Moore, Signe Nielsen, Ethel Sheffer,
Merryl H. Tisch, Hank Willis Thomas, Shin-pei Tsay, Mary Valverde, Commissioners
October 16, 2017
CERTIFICATE 26352
RESOLVED That the Design Commission, having considered designs for the construction of a
playground, plaza, and adjacent site work, Faber Park, Richmond Terrace between Sharpe
Avenue and Faber Street, Staten Island, submitted by the Department of Parks & Recreation,
represented by exhibits 1716-AI, AJ & AK of record in this matter, hereby gives to the same
unanimous preliminary approval with the understanding that the conservation of the George
Washington plaque (1932) will be submitted for review prior to returning for final review. The
committee notes that a future phase at the waterfront with new basketball courts would be
acceptable if fencing was located only at the back stops and a garden buffer with trees was
planted between the courts and waterfront promenade.
Preliminary approval is conditioned upon submission of this project for final review and
approval before October 16, 2019.
A true copy of resolution adopted by
the Design Commission at its meeting
on October 16, 2017.
Justin Garrett Moore
Executive Director
![Page 20: October 16, 2017 CERTIFICATE 26334 - New York...Oct 16, 2017 · Final approval is conditioned upon commencement of work before October 16, 2019 and submission of comprehensive photographic](https://reader034.vdocuments.mx/reader034/viewer/2022052003/6016c26f2c6ad44d8b3fc8ab/html5/thumbnails/20.jpg)
Laurie Hawkinson, Manuel Miranda, Richard Moore, Signe Nielsen, Ethel Sheffer,
Merryl H. Tisch, Hank Willis Thomas, Shin-pei Tsay, Mary Valverde, Commissioners
October 16, 2017
CERTIFICATE 26353
RESOLVED That the Design Commission, having considered designs for the reconstruction of
a playground, Rosemary's Playground, Woodward Avenue between Woodbine Street and
Madison Street, Ridgewood, Queens, submitted by the Department of Parks & Recreation,
represented by exhibits 3404-H & I of record in this matter, hereby gives to the same
unanimous preliminary approval.
Preliminary approval is conditioned upon submission of this project for final review and
approval before October 16, 2019.
A true copy of resolution adopted by
the Design Commission at its meeting
on October 16, 2017.
Justin Garrett Moore
Executive Director
![Page 21: October 16, 2017 CERTIFICATE 26334 - New York...Oct 16, 2017 · Final approval is conditioned upon commencement of work before October 16, 2019 and submission of comprehensive photographic](https://reader034.vdocuments.mx/reader034/viewer/2022052003/6016c26f2c6ad44d8b3fc8ab/html5/thumbnails/21.jpg)
Laurie Hawkinson, Manuel Miranda, Richard Moore, Signe Nielsen, Ethel Sheffer,
Merryl H. Tisch, Hank Willis Thomas, Shin-pei Tsay, Mary Valverde, Commissioners
October 16, 2017
CERTIFICATE 26354
RESOLVED That the Design Commission, having considered designs for the reconstruction of
the East River Esplanade, East 68th Street to East 70th Street, Manhattan, submitted by the
Department of Parks & Recreation, represented by exhibits 2238-NU, NV & NW of record in
this matter, hereby gives to the same unanimous preliminary approval.
Preliminary approval is conditioned upon submission of this project for final review and
approval before October 16, 2019.
A true copy of resolution adopted by
the Design Commission at its meeting
on October 16, 2017.
Justin Garrett Moore
Executive Director
![Page 22: October 16, 2017 CERTIFICATE 26334 - New York...Oct 16, 2017 · Final approval is conditioned upon commencement of work before October 16, 2019 and submission of comprehensive photographic](https://reader034.vdocuments.mx/reader034/viewer/2022052003/6016c26f2c6ad44d8b3fc8ab/html5/thumbnails/22.jpg)
Laurie Hawkinson, Manual Miranda, Richard Moore, Signe Nielsen, Ethel Sheffer,
Merryl H. Tisch, Hank Willis Thomas, Shin-pei Tsay, Mary Valverde, Commissioners
October 16, 2017
CERTIFICATE 26355
RESOLVED That the Design Commission, having considered designs for the rehabilitation of a
comfort station, St. Mary's Park, 450 St. Ann’s Avenue, St. Ann’s Avenue at East 145th Street,
Bronx, submitted by the Department of Parks & Recreation, represented by exhibits 2169-DG,
DH & DI of record in this matter, hereby gives to the same unanimous preliminary approval with
the understanding that (1) the security screens will be revised to be 18 gauge and 63% open,
and (2) the bulletin board will be revised to be silver.
Preliminary approval is conditioned upon submission of this project for final review and
approval before October 16, 2019.
A true copy of resolution adopted by
the Design Commission at its meeting
on October 16, 2017.
Justin Garrett Moore
Executive Director
![Page 23: October 16, 2017 CERTIFICATE 26334 - New York...Oct 16, 2017 · Final approval is conditioned upon commencement of work before October 16, 2019 and submission of comprehensive photographic](https://reader034.vdocuments.mx/reader034/viewer/2022052003/6016c26f2c6ad44d8b3fc8ab/html5/thumbnails/23.jpg)
Laurie Hawkinson, Manuel Miranda, Richard Moore, Signe Nielsen, Ethel Sheffer,
Merryl H. Tisch, Hank Willis Thomas, Shin-pei Tsay, Mary Valverde, Commissioners
October 16, 2017
CERTIFICATE 26356
RESOLVED That the Design Commission, having considered designs for the installation of gas
line, meter and piping, Operations Office, Sara D. Roosevelt Park, 263 Grand Street between
Chrystie Street, Forsyth Street, and Delancey Street, Manhattan, submitted by the Department
of Parks & Recreation, represented by exhibits 3557-AX, AY & AZ of record in this matter,
hereby gives to the same unanimous preliminary and final approval.
Final approval is conditioned upon commencement of work before October 16, 2019 and
submission of comprehensive photographic documentation of the completed project
consisting of 8” x 10” archival-quality color photographs.
A true copy of resolution adopted by
the Design Commission at its meeting
on October 16, 2017.
Justin Garrett Moore
Executive Director
![Page 24: October 16, 2017 CERTIFICATE 26334 - New York...Oct 16, 2017 · Final approval is conditioned upon commencement of work before October 16, 2019 and submission of comprehensive photographic](https://reader034.vdocuments.mx/reader034/viewer/2022052003/6016c26f2c6ad44d8b3fc8ab/html5/thumbnails/24.jpg)
Laurie Hawkinson, Manuel Miranda, Richard Moore, Signe Nielsen, Ethel Sheffer,
Merryl H. Tisch, Hank Willis Thomas, Shin-pei Tsay, Mary Valverde, Commissioners
October 16, 2017
CERTIFICATE 26357
RESOLVED That the Design Commission, having considered designs for the reconstruction of
docks, Mill Basin Marina, East 69th Street and Avenue Y, Brooklyn, submitted by the
Department of Parks & Recreation, represented by exhibits 7331-A, B & C of record in this
matter, hereby gives to the same unanimous preliminary and final approval.
Final approval is conditioned upon commencement of work before October 16, 2019 and
submission of comprehensive photographic documentation of the completed project
consisting of 8” x 10” archival-quality color photographs.
A true copy of resolution adopted by
the Design Commission at its meeting
on October 16, 2017.
Justin Garrett Moore
Executive Director
![Page 25: October 16, 2017 CERTIFICATE 26334 - New York...Oct 16, 2017 · Final approval is conditioned upon commencement of work before October 16, 2019 and submission of comprehensive photographic](https://reader034.vdocuments.mx/reader034/viewer/2022052003/6016c26f2c6ad44d8b3fc8ab/html5/thumbnails/25.jpg)
Laurie Hawkinson, Manuel Miranda, Richard Moore, Signe Nielsen, Ethel Sheffer,
Merryl H. Tisch, Hank Willis Thomas, Shin-pei Tsay, Mary Valverde, Commissioners
October 16, 2017
CERTIFICATE 26358
RESOLVED That the Design Commission, having considered designs for the construction of an
adult fitness area and adjacent site work, Bronx Park, Bronx Park East and Allerton Avenue,
Bronx, submitted by the Department of Parks & Recreation, represented by exhibits 1736-FG,
FH & FI of record in this matter, hereby gives to the same unanimous final approval.
Final approval is conditioned upon commencement of work before October 16, 2019 and
submission of comprehensive photographic documentation of the completed project
consisting of 8” x 10” archival-quality color photographs.
A true copy of resolution adopted by
the Design Commission at its meeting
on October 16, 2017.
Justin Garrett Moore
Executive Director
![Page 26: October 16, 2017 CERTIFICATE 26334 - New York...Oct 16, 2017 · Final approval is conditioned upon commencement of work before October 16, 2019 and submission of comprehensive photographic](https://reader034.vdocuments.mx/reader034/viewer/2022052003/6016c26f2c6ad44d8b3fc8ab/html5/thumbnails/26.jpg)
Laurie Hawkinson, Manuel Miranda, Richard Moore, Signe Nielsen, Ethel Sheffer,
Merryl H. Tisch, Hank Willis Thomas, Shin-pei Tsay, Mary Valverde, Commissioners
October 16, 2017
CERTIFICATE 26359
RESOLVED That the Design Commission, having considered designs for the installation of an
ADA ramp at the comfort station, Sara D. Roosevelt Park, Stanton Street between Chrystie
Street and Forsyth Street, Manhattan, submitted by the Department of Parks & Recreation,
represented by exhibits 3557-BA, BB & VC of record in this matter, hereby gives to the same
unanimous final approval.
Final approval is conditioned upon commencement of work before October 16, 2019 and
submission of comprehensive photographic documentation of the completed project
consisting of 8” x 10” archival-quality color photographs.
A true copy of resolution adopted by
the Design Commission at its meeting
on October 16, 2017.
Justin Garrett Moore
Executive Director
![Page 27: October 16, 2017 CERTIFICATE 26334 - New York...Oct 16, 2017 · Final approval is conditioned upon commencement of work before October 16, 2019 and submission of comprehensive photographic](https://reader034.vdocuments.mx/reader034/viewer/2022052003/6016c26f2c6ad44d8b3fc8ab/html5/thumbnails/27.jpg)
Laurie Hawkinson, Manuel Miranda, Richard Moore, Signe Nielsen, Ethel Sheffer,
Merryl H. Tisch, Hank Willis Thomas, Shin-pei Tsay, Mary Valverde, Commissioners
October 16, 2017
CERTIFICATE 26360
RESOLVED That the Design Commission, having considered designs for the reconstruction of
Almeda Playground, adjacent to P.S. 42, Beach Channel Drive between Beach 65th Street and
Beach 66th Street, Arverne, Queens, submitted by the Department of Parks & Recreation,
represented by exhibits 3707-N, O & P of record in this matter, hereby gives to the same
unanimous final approval.
Final approval is conditioned upon commencement of work before October 16, 2019 and
submission of comprehensive photographic documentation of the completed project
consisting of 8” x 10” archival-quality color photographs.
A true copy of resolution adopted by
the Design Commission at its meeting
on October 16, 2017.
Justin Garrett Moore
Executive Director
![Page 28: October 16, 2017 CERTIFICATE 26334 - New York...Oct 16, 2017 · Final approval is conditioned upon commencement of work before October 16, 2019 and submission of comprehensive photographic](https://reader034.vdocuments.mx/reader034/viewer/2022052003/6016c26f2c6ad44d8b3fc8ab/html5/thumbnails/28.jpg)
Laurie Hawkinson, Manuel Miranda, Richard Moore, Signe Nielsen, Ethel Sheffer,
Merryl H. Tisch, Hank Willis Thomas, Shin-pei Tsay, Mary Valverde, Commissioners
October 16, 2017
CERTIFICATE 26361
RESOLVED That the Design Commission, having considered designs for the reconstruction of
athletic courts and installation of an artificial turf field, General Douglas MacArthur Park,
Dongan Hills Avenue and Jefferson Street, Staten Island, submitted by the Department of
Parks & Recreation, represented by exhibits 7303-D, E, F, G, & H of record in this matter,
hereby gives to the same unanimous final approval.
Final approval is conditioned upon commencement of work before October 16, 2019 and
submission of comprehensive photographic documentation of the completed project
consisting of 8” x 10” archival-quality color photographs.
A true copy of resolution adopted by
the Design Commission at its meeting
on October 16, 2017.
Justin Garrett Moore
Executive Director
![Page 29: October 16, 2017 CERTIFICATE 26334 - New York...Oct 16, 2017 · Final approval is conditioned upon commencement of work before October 16, 2019 and submission of comprehensive photographic](https://reader034.vdocuments.mx/reader034/viewer/2022052003/6016c26f2c6ad44d8b3fc8ab/html5/thumbnails/29.jpg)
Laurie Hawkinson, Manuel Miranda, Richard Moore, Signe Nielsen, Ethel Sheffer,
Merryl H. Tisch, Hank Willis Thomas, Shin-pei Tsay, Mary Valverde, Commissioners
October 16, 2017
CERTIFICATE 26362
RESOLVED That the Design Commission, having considered designs for the reconstruction of
athletic fields and adjacent site work as Phase I of the reconstruction of Astoria Park, Astoria
Park South, 21st Street, and Shore Boulevard, Astoria, Queens, submitted by the Department
of Parks & Recreation, represented by exhibits 1007-CM, CN, CO & CP of record in this matter,
hereby gives to the same unanimous final approval.
Final approval is conditioned upon commencement of work before October 16, 2019 and
submission of comprehensive photographic documentation of the completed project
consisting of 8” x 10” archival-quality color photographs.
A true copy of resolution adopted by
the Design Commission at its meeting
on October 16, 2017.
Justin Garrett Moore
Executive Director
![Page 30: October 16, 2017 CERTIFICATE 26334 - New York...Oct 16, 2017 · Final approval is conditioned upon commencement of work before October 16, 2019 and submission of comprehensive photographic](https://reader034.vdocuments.mx/reader034/viewer/2022052003/6016c26f2c6ad44d8b3fc8ab/html5/thumbnails/30.jpg)
Laurie Hawkinson, Manuel Miranda, Richard Moore, Signe Nielsen, Ethel Sheffer,
Merryl H. Tisch, Hank Willis Thomas, Shin-pei Tsay, Mary Valverde, Commissioners
October 16, 2017
CERTIFICATE 26363
RESOLVED That the Design Commission, having considered designs for the reconstruction of
basketball courts, Nostrand Playground, adjacent to P.S. 269, Nostrand Avenue and Foster
Avenue, Brooklyn, submitted by the Department of Parks & Recreation, represented by exhibits
2817-AG, AH & AI of record in this matter, hereby gives to the same unanimous final approval.
Final approval is conditioned upon commencement of work before October 16, 2019 and
submission of comprehensive photographic documentation of the completed project
consisting of 8” x 10” archival-quality color photographs.
A true copy of resolution adopted by
the Design Commission at its meeting
on October 16, 2017.
Justin Garrett Moore
Executive Director
![Page 31: October 16, 2017 CERTIFICATE 26334 - New York...Oct 16, 2017 · Final approval is conditioned upon commencement of work before October 16, 2019 and submission of comprehensive photographic](https://reader034.vdocuments.mx/reader034/viewer/2022052003/6016c26f2c6ad44d8b3fc8ab/html5/thumbnails/31.jpg)
Laurie Hawkinson, Manuel Miranda, Richard Moore, Signe Nielsen, Ethel Sheffer,
Merryl H. Tisch, Hank Willis Thomas, Shin-pei Tsay, Mary Valverde, Commissioners
October 16, 2017
CERTIFICATE 26364
RESOLVED That the Design Commission, having considered designs for the reconstruction of
Fairview Park, Phase II, including the construction of a prototypical comfort station, Fairview
Park, Englewood Avenue, Arthur Kill Road, Veterans Road West, and Bricktown Way, Staten
Island, submitted by the Department of Parks & Recreation, represented by exhibits 6496-X, Y
& Z of record in this matter, hereby gives to the same unanimous final approval.
Final approval is conditioned upon commencement of work before October 16, 2019 and
submission of comprehensive photographic documentation of the completed project
consisting of 8” x 10” archival-quality color photographs.
A true copy of resolution adopted by
the Design Commission at its meeting
on October 16, 2017.
Justin Garrett Moore
Executive Director
![Page 32: October 16, 2017 CERTIFICATE 26334 - New York...Oct 16, 2017 · Final approval is conditioned upon commencement of work before October 16, 2019 and submission of comprehensive photographic](https://reader034.vdocuments.mx/reader034/viewer/2022052003/6016c26f2c6ad44d8b3fc8ab/html5/thumbnails/32.jpg)
Laurie Hawkinson, Manuel Miranda, Richard Moore, Signe Nielsen, Ethel Sheffer,
Merryl H. Tisch, Hank Willis Thomas, Shin-pei Tsay, Mary Valverde, Commissioners
October 16, 2017
CERTIFICATE 26365
RESOLVED That the Design Commission, having considered designs for the reconstruction of
Garrison Playground, East 146th Street, Walton Avenue, and the Grand Concourse, Bronx,
submitted by the Department of Parks & Recreation, represented by exhibits 7293-C, D, E & F
of record in this matter, hereby gives to the same unanimous final approval.
Final approval is conditioned upon commencement of work before October 16, 2019 and
submission of comprehensive photographic documentation of the completed project
consisting of 8” x 10” archival-quality color photographs.
A true copy of resolution adopted by
the Design Commission at its meeting
on October 16, 2017.
Justin Garrett Moore
Executive Director
![Page 33: October 16, 2017 CERTIFICATE 26334 - New York...Oct 16, 2017 · Final approval is conditioned upon commencement of work before October 16, 2019 and submission of comprehensive photographic](https://reader034.vdocuments.mx/reader034/viewer/2022052003/6016c26f2c6ad44d8b3fc8ab/html5/thumbnails/33.jpg)
Laurie Hawkinson, Manuel Miranda, Richard Moore, Signe Nielsen, Ethel Sheffer,
Merryl H. Tisch, Hank Willis Thomas, Shin-pei Tsay, Mary Valverde, Commissioners
October 16, 2017
CERTIFICATE 26366
RESOLVED That the Design Commission, having considered designs for the reconstruction of
Hallets Cove Playground, Vernon Boulevard between Welling Court and 30th Road, Astoria,
Queens, submitted by the Department of Parks & Recreation, represented by exhibits 5635-G,
H & I of record in this matter, hereby gives to the same unanimous final approval.
Final approval is conditioned upon commencement of work before October 16, 2019 and
submission of comprehensive photographic documentation of the completed project
consisting of 8” x 10” archival-quality color photographs.
A true copy of resolution adopted by
the Design Commission at its meeting
on October 16, 2017.
Justin Garrett Moore
Executive Director
![Page 34: October 16, 2017 CERTIFICATE 26334 - New York...Oct 16, 2017 · Final approval is conditioned upon commencement of work before October 16, 2019 and submission of comprehensive photographic](https://reader034.vdocuments.mx/reader034/viewer/2022052003/6016c26f2c6ad44d8b3fc8ab/html5/thumbnails/34.jpg)
Laurie Hawkinson, Manuel Miranda, Richard Moore, Signe Nielsen, Ethel Sheffer,
Merryl H. Tisch, Hank Willis Thomas, Shin-pei Tsay, Mary Valverde, Commissioners
October 16, 2017
CERTIFICATE 26367
RESOLVED That the Design Commission, having considered designs for the reconstruction of
Weeksville Playground, Howard Avenue between Atlantic Avenue and Herkimer Street,
Brooklyn, submitted by the Department of Parks & Recreation, represented by exhibits 7295-D
& E of record in this matter, hereby gives to the same unanimous final approval.
Final approval is conditioned upon commencement of work before October 16, 2019 and
submission of comprehensive photographic documentation of the completed project
consisting of 8” x 10” archival-quality color photographs.
A true copy of resolution adopted by
the Design Commission at its meeting
on October 16, 2017.
Justin Garrett Moore
Executive Director
![Page 35: October 16, 2017 CERTIFICATE 26334 - New York...Oct 16, 2017 · Final approval is conditioned upon commencement of work before October 16, 2019 and submission of comprehensive photographic](https://reader034.vdocuments.mx/reader034/viewer/2022052003/6016c26f2c6ad44d8b3fc8ab/html5/thumbnails/35.jpg)
Laurie Hawkinson, Manuel Miranda, Richard Moore, Signe Nielsen, Ethel Sheffer,
Merryl H. Tisch, Hank Willis Thomas, Shin-pei Tsay, Mary Valverde, Commissioners
October 16, 2017
CERTIFICATE 26368
RESOLVED That the Design Commission, having considered designs for the rehabilitation of a
comfort station, Abraham Lincoln Playground, East 135th Street between 5th Avenue and
Madison Avenue, Manhattan, submitted by the Department of Parks & Recreation, represented
by exhibits 7304-E & F of record in this matter, hereby gives to the same unanimous final
approval.
Final approval is conditioned upon commencement of work before October 16, 2019 and
submission of comprehensive photographic documentation of the completed project
consisting of 8” x 10” archival-quality color photographs.
A true copy of resolution adopted by
the Design Commission at its meeting
on October 16, 2017.
Justin Garrett Moore
Executive Director
![Page 36: October 16, 2017 CERTIFICATE 26334 - New York...Oct 16, 2017 · Final approval is conditioned upon commencement of work before October 16, 2019 and submission of comprehensive photographic](https://reader034.vdocuments.mx/reader034/viewer/2022052003/6016c26f2c6ad44d8b3fc8ab/html5/thumbnails/36.jpg)
Laurie Hawkinson, Manuel Miranda, Richard Moore, Signe Nielsen, Ethel Sheffer,
Merryl H. Tisch, Hank Willis Thomas, Shin-pei Tsay, Mary Valverde, Commissioners
October 16, 2017
CERTIFICATE 26369
RESOLVED That the Design Commission, having considered designs for the rehabilitation of a
comfort station, Playground 174 (formerly Bronx River Houses Playground), East 174th Street
between Ward Avenue and Manor Avenue, Bronx, submitted by the Department of Parks &
Recreation, represented by exhibits 4896-I, J, K & L of record in this matter, hereby gives to
the same unanimous final approval.
Final approval is conditioned upon commencement of work before October 16, 2019 and
submission of comprehensive photographic documentation of the completed project
consisting of 8” x 10” archival-quality color photographs.
A true copy of resolution adopted by
the Design Commission at its meeting
on October 16, 2017.
Justin Garrett Moore
Executive Director
![Page 37: October 16, 2017 CERTIFICATE 26334 - New York...Oct 16, 2017 · Final approval is conditioned upon commencement of work before October 16, 2019 and submission of comprehensive photographic](https://reader034.vdocuments.mx/reader034/viewer/2022052003/6016c26f2c6ad44d8b3fc8ab/html5/thumbnails/37.jpg)
Laurie Hawkinson, Manuel Miranda, Richard Moore, Signe Nielsen, Ethel Sheffer,
Merryl H. Tisch, Hank Willis Thomas, Shin-pei Tsay, Mary Valverde, Commissioners
October 16, 2017
CERTIFICATE 26370
RESOLVED That the Design Commission, having considered designs for the installation of
structural support beams, High Line Maintenance and Operations facility, Gansevoort Street
and Washington Street, Manhattan, submitted by the Department of Parks & Recreation and
the Friends of the High Line, represented by exhibits 6640-ES, ET & EU of record in this matter,
hereby gives to the same unanimous preliminary and final approval. Commissioner Aarons
recused himself.
Final approval is conditioned upon commencement of work before October 16, 2019 and
submission of comprehensive photographic documentation of the completed project
consisting of 8” x 10” archival-quality color photographs.
A true copy of resolution adopted by
the Design Commission at its meeting
on October 16, 2017.
Justin Garrett Moore
Executive Director
![Page 38: October 16, 2017 CERTIFICATE 26334 - New York...Oct 16, 2017 · Final approval is conditioned upon commencement of work before October 16, 2019 and submission of comprehensive photographic](https://reader034.vdocuments.mx/reader034/viewer/2022052003/6016c26f2c6ad44d8b3fc8ab/html5/thumbnails/38.jpg)
Laurie Hawkinson, Manuel Miranda, Richard Moore, Signe Nielsen, Ethel Sheffer,
Merryl H. Tisch, Hank Willis Thomas, Shin-pei Tsay, Mary Valverde, Commissioners
October 16, 2017
CERTIFICATE 26371
RESOLVED That the Design Commission, having considered designs for the installation of two
distance markers, Astoria Park, Astoria, Queens, submitted by the Department of Parks &
Recreation and the New York Road Runners, represented by exhibits 1007-CQ & CR of record
in this matter, hereby gives to the same unanimous preliminary and final approval.
Final approval is conditioned upon commencement of work before October 16, 2019 and
submission of comprehensive photographic documentation of the completed project
consisting of 8” x 10” archival-quality color photographs.
A true copy of resolution adopted by
the Design Commission at its meeting
on October 16, 2017.
Justin Garrett Moore
Executive Director
![Page 39: October 16, 2017 CERTIFICATE 26334 - New York...Oct 16, 2017 · Final approval is conditioned upon commencement of work before October 16, 2019 and submission of comprehensive photographic](https://reader034.vdocuments.mx/reader034/viewer/2022052003/6016c26f2c6ad44d8b3fc8ab/html5/thumbnails/39.jpg)
Laurie Hawkinson, Manuel Miranda, Richard Moore, Signe Nielsen, Ethel Sheffer,
Merryl H. Tisch, Hank Willis Thomas, Shin-pei Tsay, Mary Valverde, Commissioners
October 16, 2017
CERTIFICATE 26372
RESOLVED That the Design Commission, having considered designs for the installation of a
pre-fabricated storage building, Prospect Park, Prospect Park West between Sixth Street and
Eighth Street, Brooklyn, submitted by the Department of Parks & Recreation and the Prospect
Park Alliance, represented by exhibits 7327-D & E of record in this matter, hereby gives to the
same unanimous final approval.
Final approval is conditioned upon commencement of work before October 16, 2019 and
submission of comprehensive photographic documentation of the completed project
consisting of 8” x 10” archival-quality color photographs.
A true copy of resolution adopted by
the Design Commission at its meeting
on October 16, 2017.
Justin Garrett Moore
Executive Director
![Page 40: October 16, 2017 CERTIFICATE 26334 - New York...Oct 16, 2017 · Final approval is conditioned upon commencement of work before October 16, 2019 and submission of comprehensive photographic](https://reader034.vdocuments.mx/reader034/viewer/2022052003/6016c26f2c6ad44d8b3fc8ab/html5/thumbnails/40.jpg)
Laurie Hawkinson, Manuel Miranda, Richard Moore, Signe Nielsen, Ethel Sheffer,
Merryl H. Tisch, Hank Willis Thomas, Shin-pei Tsay, Mary Valverde, Commissioners
October 16, 2017
CERTIFICATE 26373
RESOLVED That the Design Commission, having considered designs for the reconstruction of
a picnic area, Prospect Park Picnic House, Prospect Park West and Fifth Street, Brooklyn,
submitted by the Department of Parks & Recreation and the Prospect Park Alliance,
represented by exhibits 1485-V & W of record in this matter, hereby gives to the same
unanimous final approval.
Final approval is conditioned upon commencement of work before October 16, 2019 and
submission of comprehensive photographic documentation of the completed project
consisting of 8” x 10” archival-quality color photographs.
A true copy of resolution adopted by
the Design Commission at its meeting
on October 16, 2017.
Justin Garrett Moore
Executive Director
![Page 41: October 16, 2017 CERTIFICATE 26334 - New York...Oct 16, 2017 · Final approval is conditioned upon commencement of work before October 16, 2019 and submission of comprehensive photographic](https://reader034.vdocuments.mx/reader034/viewer/2022052003/6016c26f2c6ad44d8b3fc8ab/html5/thumbnails/41.jpg)
Laurie Hawkinson, Manuel Miranda, Richard Moore, Signe Nielsen, Ethel Sheffer,
Merryl H. Tisch, Hank Willis Thomas, Shin-pei Tsay, Mary Valverde, Commissioners
October 16, 2017
CERTIFICATE 26374
RESOLVED That the Design Commission, having considered designs for the reconstruction of
the picnic areas and adjacent site work, Prospect Park Bandshell, Prospect Park West
between 9th Street and 11th Street, Brooklyn, submitted by the Department of Parks &
Recreation and the Prospect Park Alliance, represented by exhibits 5954-K & L of record in this
matter, hereby gives to the same unanimous final approval.
Final approval is conditioned upon commencement of work before October 16, 2019 and
submission of comprehensive photographic documentation of the completed project
consisting of 8” x 10” archival-quality color photographs.
A true copy of resolution adopted by
the Design Commission at its meeting
on October 16, 2017.
Justin Garrett Moore
Executive Director
![Page 42: October 16, 2017 CERTIFICATE 26334 - New York...Oct 16, 2017 · Final approval is conditioned upon commencement of work before October 16, 2019 and submission of comprehensive photographic](https://reader034.vdocuments.mx/reader034/viewer/2022052003/6016c26f2c6ad44d8b3fc8ab/html5/thumbnails/42.jpg)
Laurie Hawkinson, Manuel Miranda, Richard Moore, Signe Nielsen, Ethel Sheffer,
Merryl H. Tisch, Hank Willis Thomas, Shin-pei Tsay, Mary Valverde, Commissioners
October 16, 2017
CERTIFICATE 26375
RESOLVED That the Design Commission, having considered designs for the installation of a
roof, Manhattan Borough Repair Shop, 636 West 26th Street, Manhattan, submitted by the
Department of Sanitation, represented by exhibits 5428-U, V, W & X of record in this matter,
hereby gives to the same unanimous preliminary and final approval.
Final approval is conditioned upon commencement of work before October 16, 2019 and
submission of comprehensive photographic documentation of the completed project
consisting of 8” x 10” archival-quality color photographs.
A true copy of resolution adopted by
the Design Commission at its meeting
on October 16, 2017.
Justin Garrett Moore
Executive Director
![Page 43: October 16, 2017 CERTIFICATE 26334 - New York...Oct 16, 2017 · Final approval is conditioned upon commencement of work before October 16, 2019 and submission of comprehensive photographic](https://reader034.vdocuments.mx/reader034/viewer/2022052003/6016c26f2c6ad44d8b3fc8ab/html5/thumbnails/43.jpg)
Laurie Hawkinson, Manuel Miranda, Richard Moore, Signe Nielsen, Ethel Sheffer,
Merryl H. Tisch, Hank Willis Thomas, Shin-pei Tsay, Mary Valverde, Commissioners
October 16, 2017
CERTIFICATE 26376
RESOLVED That the Design Commission, having considered designs for the construction of a
plaza and adjacent site work, Newtown Playground, 56th Avenue and 92nd Street, Elmhurst,
Queens, submitted by the Department of Parks & Recreation, represented by exhibits 1934-L,
M, N & O of record in this matter, hereby gives to the same unanimous preliminary and final
approval.
Final approval is conditioned upon commencement of work before October 16, 2019 and
submission of comprehensive photographic documentation of the completed project
consisting of 8” x 10” archival-quality color photographs.
A true copy of resolution adopted by
the Design Commission at its meeting
on October 16, 2017.
Justin Garrett Moore