    CONFIDENTIAL AP/OCT 2004/QSB566

    UNIVERSITI TEKNOLOGI MARAFINAL EXAMINATION

    COURSECOURSE CODEDATETIME

    FACULTYSEMESTERPROGRA MME/ C ODE

    CONSTRUCTION ECONOMICS IIQSB56612 OCTOBER 20043 HOURS (9.00 a.m -12.00 p.m)

    Architecture, Planning and SurveyingJune 2004 - October 2004Bachelor of Quantity S urveying (Hons.) / AP224

    INSTRUCTIONS TO CANDIDATES1. This question paper consists of FIVE (5) questions.

    Answer FOUR (4) questions only. Answ er QUESTION 1 and THREE (3) other questions.Answer to each question must be written in the answer booklet.Do not bring an y material into the examination room unless permission is given by theinvigilator.

    5. Please check to make sure that this examination pack consists of:i) the Question Paperii) anAnswer Booklet - provided by theFaculty

    DO NOT TURN THIS PAGE UNTIL YOU ARE TOLDTO DO SOTh is examination paper consists of 5 printed pages H a k C i p ta U n i v e r s i t i T e k n o l o g i M A R A CONFIDENTIAL

  • 8/2/2019 OCT 2004.pdf

    2/5

    CONFIDENTIAL AP/OCT 2004/QSB566

    COMPULSORY QUESTION

    QUESTION 1

    You have identified a cost analysis of a four-storey office building tendered in June lastyear and part of the analysis is reproduced in Table 1 below.

    WBLFF 32,000.00 32.00 250 128.00FRAME 163,000.00 163.00 1000 163.00ROOF 54,600.00 54.60 280 195.00EXTERNALWALL

    10,920.00 10.92 420 26.00

    INTERNALWALL

    22,360.00 22.36 860 26.00

    INTERNALFLOORFINISHES

    24,500.00 24.50 980 25.00

    SERVICES 54,000.00 54.00

    TABLE 1Prepare the cost targets for the above elements in a p roposed six-storey office building ofsimilar design and plan layout that will be tendered out in early 2005, based on thespecification and information given in Table 2.

    Ha k Cipta Universiti Teknologi MARA CONFIDENTIAL

  • 8/2/2019 OCT 2004.pdf

    3/5

    CONFIDENTIAL AP/OCT 2004/QSB566

    m

    Tender Price Index - 258.54Location Index - 1.165Storey-height - 3.2mTender Price Index - 264.37Location Index - 1.093Storey-height - 3.4m

    WBLFF RC PilingRC pile cap and ground beam Weaker soil condition for proposedbuilding. Allowance of 12% is given ifno. of storeys and storey-height issimilar to analysed building.FRAME RC Column and beam Similar construction for structuralcolumn and beam.ROOF Flat roof N ew design fo r flat roof. Current costallowed;Structure @ RM135.00/m 2Covering @ RM45.007m2Perimeter details, say 5% of bothcosts.EXTERNALWALL

    Half Brickwall Half Brickwall

    INTERNALWALL &INTERNALPARTITION

    Half Brickwall Half BrickwallOpen plan layoutAssume 45% omission of area ofinternal partition.INTERNALFLOORFINISHES

    Cement render for al l officeareaCeramic tiles for wet area.Improve specification to two floors, asthis area will be owner occupied. Allow15% increase in cost for these tw of loors

    SERVICES Normal services for officebuilding Total cost estimate from M&E engineer- RM145,000.00 to cater for the liftinstallation etc.

    TABLE 2

    (25 m arks)

    Ha k Cipta Universiti Teknologi MARA CONFIDENTIAL

  • 8/2/2019 OCT 2004.pdf

    4/5

    CONFIDENTIAL 4 AP/OCT 2004/QSBS66

    ANSWER ANY THREE (3) FROM THE FOLLOWING QUESTIONS.QUESTION 2Elemental cost analysis (EGA) has been identified as an effective cost control tool in projectdevelopment and as such they may be used in preparation of preliminary estimate todetermine the cost limit of a project.a) Explain the criteria in selecting the most suitable EGA to be used as the basis of anestimate. (5 marks)b) Briefly describe the possible adjustments that may be done to the EGA to ensurethat the estimate is reliable by giving a sample project. Use the following format (ofEGA) as your guidelines in identifying the possible adjustments,

    i. Form 1 - Information on project and analysis of single buildingii. Form 2- Simplified brief cost analysisiii. Form 3- Brief specification (20 marks)QUESTION 3a) Discuss the approach that the Quantity Surveyor should take to control cost duringpost contract stage. (15 marks)

    b) Explain how cost of variation works could be controlled in a government project.(10 marks)QUESTION 4a) "Tender-based index is generally accepted by the estimator to be more suitable inachieving reliable cost estimates than other types of indices".

    Discuss this statement and give your reasons why this statement might not alwaysbe true. (15 marks)b) List down the reasons why some estimators are reluctant to use indices in doingadjustment fo r their estimates.

    (10 marks)

    Hak Cipta Universiti Teknologi MARA CONFIDENTIAL

  • 8/2/2019 OCT 2004.pdf

    5/5

    CONFIDENTIAL 5 AP/OCT 2004/QSB566

    QUESTION 5a) One of the methods used by Jabatan Kerja Raya (JKR) to prepare preliminary

    estimate is Floor Area Method. E stima te the cos t for One-unit Government QuartersClass F (standard design), which will be built in Mac 2006 at Johor (area D) basedon the information given below.Information obtained from JKR's data bankGFA (standard design) - 340m 2Govt. Quarters Class F (Main Building works) - RM840.00/m2 (average)Locality factor for area D -1.076 (Base location-area C)Tender Price index - 3.54%(annual increment f rom year 2004)M&E Works

    Electrical - 14%Fire Fighting - 4%Air-Conditioning - 4%Others - 9%External WorksSoil Drainage - 10.87%Site - 5.29%Surface water Drainage - 18.29%Roadwork - 7.67%Landscaping - 2.09%Fencing - 10.42%Others - 15.25%Preliminaries - 6%Provisional Sum - 5%Contingencies, supervision & advert isem ent - 5% (17 marks)

    b) Suggest ways how the accuracy of preliminary estimates could be improved.(8 marks)

    END OF QUESTION PAPER