Shire OF Wiluna TENDER REGISTER Tender No. RET abG + Brief description of goods or o services required: Particulars of the decision to invite tenders: CEO . Advertisement Details: Advertising Date(s): Newspaper(s): Closing Date and Time: Opening Date and Time: Opened in the presence of: NAME: SIGNATURE Tenderers Contact Name and Company Name: Address:

Upload: others

Post on 26-Feb-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: OCR Zone Data Test - Shire of Wiluna · (Mob/Demob C) Hour WATER SUPPLY EQUIPMENT AT EACH WATER SOURCE SITE-including standalone standpipe with 150mm transfer pump, 3-phase submersible

Shire OFWiluna

TENDER REGISTER Tender No.

RET abG +Brief description of goods or o

services required:

Particulars of the decision to

invite tenders: CEO .

Advertisement Details: Advertising Date(s): Newspaper(s):

Closing Date and Time:

Opening Date and Time:

Opened in the presence of: NAME: SIGNATURE

Tenderers Contact Name and Company Name: Address:

DCEO
Typewritten text
8th February 2018 2:09pm
Page 2: OCR Zone Data Test - Shire of Wiluna · (Mob/Demob C) Hour WATER SUPPLY EQUIPMENT AT EACH WATER SOURCE SITE-including standalone standpipe with 150mm transfer pump, 3-phase submersible

Shire of Wiluna - Submissions Made https://www.tenderlink.com/webapps/jadehttp.dll?WebTender&tend...

f5ܧ Pfe 9L ed users have made submissions to the tenders box for this tender. Their details, and details of the filesthey uploaded are shown below.

WILUNA-795047 - RFT 2017-06 - Supply of Plant with Operators for Flood Damage Repairs

Company Details Had Files Submitted [date - time uploaded]Copy

SE THEM Earthmoving Pty Ltd rft_2017-06_wiluna_--them__submission.pdf [08/02/2018 - 11:10 a.m.]130 Horwood RoadGERALDTON WA 6530AUSTRALIAContact : Katrina-Lee O'BrienPh : 0408856780ABN Number : 40137486116

The Joshua Johnson Family Trust [08/02/2018 -T/As Red Dust Holdings Pty Ltd rft_2017-06_road-flood_damage_-_final.pdf 1:59 p.m.]PO Box 2136

[08/02/2018 -Geraldton rft_2017-06-supply-of-plant_and-operators_for_.pdf 1:58 p.m.]GERALDTON WA 6531AUSTRALIAContact : Josh JohnsonPh : 08 99654891ABN Number : 82428834120

? Robbro WA Pty Ltd [08/02/2018 -P O Box 245 rft_2017-06-supply_of__plant_and__operators_for_.pdf 12:38 p.m.]GINGIN WA 6503AUSTRALIAContact : Michael RobertsPh : 08 9575.1129ABN Number : 51126381292

Quadrio Earthmoving Pty Ltd. . [08/02/2018 -

P.O. Box 2811 5.2.1_compliance-criteria.pdf10:41 a.m.]

GERALDTON WA 6531[08/02/2018 -AUSTRALIA a._organisational_experience_and_capacity.pdf 10:46 a.m.]Contact : Dianne Heinz

B Numbe 13152547950b._road-construction-experience_in_rural.pdf

0251

[08/02/2018 -c.._key_personnel_and-overall-capacity.pdf 10:52 a.m.]

[08/02/2018 -d._extentand_condition-of__road.pdf10:54 a.m.]

[08/02/2018 -e_wiluna__flood_damage-schedule_--timeline.mpp 10:48 a.m.]

non- [08/02/2018 -

conforming__rft_2017-06_supply-of__plant-o_.pdf 11:02 a.m.]

[08/02/2018 -qem_-_insurances_-fleet.pdf 10:41 a.m.]

qem_-_insurances-- [08/02/2018 -

_workers_compensation_2018.pdf10:41 a.m.]

[08/02/2018 -qem_-_letter_of_reference_-_attie_swart_wml.pdf 10:49 a.m.]

[08/02/2018 -qem_-_letter_of_reference_--shire-of_murchison.pdf 10:49 a.m.]

[08/02/2018 -qem_-_letter_of_reference_--tony-chisholm.pdf 10:50 a.m.]

[08/02/2018 -qem_.-_public. and_products_liability.pdf 10:41 a.m.]

[08/02/2018 -qem_--safety-health___environment-policy.pdf 10:51 a.m.]

[08/02/2018 -qem_administration-resume---brenda_hipper.pdf 10:52 a.m.]

[08/02/2018 -qem__dozer-operator_-_aaron-merritt.pdf 10:52 a.m.]

[08/02/2018 -qem_dozer__operator_-_phil-mcintosh.pdf 10:52 a.m.]

. [08/02/2018 -qem_field-mechanic - lan-logan.pdf10:53 a.m.]

. [08/02/2018 -qem_field-mechanic_-_shane_winch-buist.pdf 10:53 a.m.]

1 of 9 o zn n, a - .

Page 3: OCR Zone Data Test - Shire of Wiluna · (Mob/Demob C) Hour WATER SUPPLY EQUIPMENT AT EACH WATER SOURCE SITE-including standalone standpipe with 150mm transfer pump, 3-phase submersible

Shire of Wiluna - Submissions Made https://www.tenderlink.com/webapps/jadehttp.dll?WebTender&tend...

[08/02/2018 -qem_grader_operator_-_keith-purcell.pdf 10:53 a.m.]

[08/02/2018 -qem_grader-resume_-_nicholas_jolliffe.pdf 10:53 a.m.]

[08/02/2018 -qem_leading-hand__resume--_ken__quadrio.pdf 10:54 a.m.]

[08/02/2018 -qem_ohs_2016_certificate.iso9001_2015.pdf 10:51 a.m.]

[08/02/2018 -qem_ohs_2016_certificate.pdf 10:51 a.m.]

[08/02/2018 -qem-plant-list.pdf 11:00 a.m.]

[08/02/2018 -qem_supervisor_resume -_craig_jupp.pdf 10:54 a.m.]

[08/02/2018 -qem_supervisor_resume_-_graeme_wenn.pdf 10:54 a.m.]

[08/02/2018 -quadrio-earthmoving_-_camp_.layout.pdf 10:51 a.m.]

[08/02/2018 -reference to dates value time_taken.pdf10:47 a.m.]

[08/02/2018 -rft_2017-06_supply-of-plant_and-operators_.for_.pdf 10:27 a.m.]

risk_assessment_i__qem__- [08/02/2018 -

organisational_chart__.pdf 10:42 a.m.]

[08/02/2018 -risk_assessment_i_qem_number-of-personnel.pdf 10:42 a.m.]

[08/02/2018 -risk__assessment_ii-asic__company__statement.pdf 10:43 a.m.]

risk_assessment_xii_qem_- [08/02/2018 -

_accountant_endorsement.pdf10:44 a.m.]

[08/02/2018 -risk_assessment_xii__qem-profit__loss_statement.pdf 10:46 a.m.]

[08/02/2018 -schedule_3.pdf 10:48 a.m.]

schedule 4.pdf [08/02/2018 -10:48 a.m.]

[08/02/2018 -schedule_5.pdf 10:48 a.m.]

[08/02/2018 -schedule_6.pdf 10:52 a.m.]

[08/02/2018 -schedule_7.pdf 10:58 a.m.]

Northern Goldfields Earthmoving 12pa4_companyprofile_v2.pdf [08/02/2018 - 10:35 a.m.]PO Box 117HERNE HILL WA 6056 nge-wilunatender-rtf_2017-06_parcel_1.pdf [08/02/2018 - 10:26 a.m.]AUSTRALIA nge-wilunatender-rtf_2017-06_parcel_3.pdf [08/02/2018 - 10:31 a.m.]Contact : Martha LinkePh : 04 2981 2988ABN Number : 46314139426

GOODWORK HOLDINGS PTY LTD zzz_v8-1._rft_2017-06_- [07/02/2018 - 8:19 a.m.]25 Wongawol Road_flood__gw_final.pdfWiluna

WILUNA WA 6646AUSTRALIAContact : Simon ThomasPh : 0899817157ABN Number : 29066339722

Broome Contracting t100_- [07/02/2018 - 6:38

tender-submission-broome_contracting-final.pdf p.m.]BROOME WA

AUSTRALIAContact : Chris WhelanPh : 0418804508ABN Number: 86073 062 503

Page 4: OCR Zone Data Test - Shire of Wiluna · (Mob/Demob C) Hour WATER SUPPLY EQUIPMENT AT EACH WATER SOURCE SITE-including standalone standpipe with 150mm transfer pump, 3-phase submersible

Tender awarded by: DATE OF COUNCIL MEETING COUNCIL MINUTE NO.

Name of Successful Tenderer(s):

Amount of Successful Tender(s):

Copy of Advertisement: Statutory advertisement below.

The West Australian, Saturday, January 13, 2018

DCEO
Typewritten text
28th March 2018 Resolution no. 028/18
DCEO
Typewritten text
Parcel 1 - Goodwork Holdings Pty Ltd Parcel 2 - Goodwork Holdings Pty Ltd Parcel 3 - Goodwork Holdings Pty Ltd
DCEO
Typewritten text
Not a lump sum - see attached price schedule
Page 5: OCR Zone Data Test - Shire of Wiluna · (Mob/Demob C) Hour WATER SUPPLY EQUIPMENT AT EACH WATER SOURCE SITE-including standalone standpipe with 150mm transfer pump, 3-phase submersible

Part 5 COMPLETE AND RETURN THIS PART

5.3.2 Price Schedule

PRICE SCHEDULE – PARCEL BIDS

Which Works Parcel Do You Intend to Bid for?ParcelNo 1

ParcelNo 2

ParcelNo 3

Only One Works parcel (indicate which Parcel option via

a single tick)

More than One Works parcel as Lead Contractor

simultaneously (indicate which multiple Parcels via ticks)

PRICE SCHEDULE – GENERAL ITEMSContractors Name ………………………………………………………………….

Works Parcel No. 1 Units Qty Amount ($)Allow for all general items as follows:Mobilisation and demobilisation of all plant and

equipment to and from Wiluna

(Mob/Demob A)

Item 1

Mobilisation and Demobilisation of all plant and

equipment between roads within Works Parcel

(Mob/Demob B)

Item 1

Allow for all camp, accommodation and messing Item 1 Included in productive

plant ratesAllow for all insurances required under the contract Item 1 Included in productive

plant ratesAllow for compliance with all legislation, statutes, and

regulationsItem 1 Included in productive

plant ratesPrepare Traffic Management Plan Item 1

SUB-TOTAL GENERAL ITEMSWorks Parcel No.1

PRICE SCHEDULE – GENERAL ITEMSContractors Name …………………………………………………………………….

Works Parcel No. 2 Units Qty Amount ($)Allow for all general items as follows:

Mobilisation and demobilisation of all plant

and equipment to and from Wiluna

(Mob/Demob A)

Item 1

Mobilisation and Demobilisation of all plant

and equipment between roads within Works

Parcel

(Mob/Demob B)

Item 1

Allow for all camp, accommodation and

messing

Item 1 Included in productive

plant rates

Allow for all insurances required under the

contract

Item 1 Included in productive

plant rates

Allow for compliance with all legislation,

statutes, and regulations

Item 1 Included in productive

plant rates

Prepare Traffic Management Plan Item 1

SUB-TOTAL GENERAL ITEMSWorks Parcel No.2

Page 51 of 146

GOODWORK HOLDINGS PTY LTD

NIL

NIL

GOODWORK HOLDINGS PTY LTD

$ 1,200

$ 1,200

$ 11,000

$ 12,200

$ 14,000

$ 15,200

RFT2017-06 | GOODWORK HLDS Page 18 of 64

Page 6: OCR Zone Data Test - Shire of Wiluna · (Mob/Demob C) Hour WATER SUPPLY EQUIPMENT AT EACH WATER SOURCE SITE-including standalone standpipe with 150mm transfer pump, 3-phase submersible

Part 5 COMPLETE AND RETURN THIS PART

PRICE SCHEDULE – GENERAL ITEMSContractors Name …………………………………………………………………….

Works Parcel No. 3 Units Qty Amount ($)Allow for all general items as follows:

Mobilisation and demobilisation of all plant

and equipment to and from Wiluna

(Mob/Demob A)

Item 1

Mobilisation and Demobilisation of all plant

and equipment between roads within Works

Parcel

(Mob/Demob B)

Item 1

Allow for all camp, accommodation and

messing

Item 1 Included in productive

plant rates

Allow for all insurances required under the

contract

Item 1 Included in productive

plant rates

Allow for compliance with all legislation,

statutes, and regulations

Item 1 Included in productive

plant rates

Prepare Traffic Management Plan Item 1

SUB-TOTAL GENERAL ITEMSWorks Parcel No.3

Page 52 of 146

NIL

$ 18,500

$ 1,200

GOODWORK HOLDINGS PTY LTD

$ 19,700

RFT2017-06 | GOODWORK HLDS Page 19 of 64

Page 7: OCR Zone Data Test - Shire of Wiluna · (Mob/Demob C) Hour WATER SUPPLY EQUIPMENT AT EACH WATER SOURCE SITE-including standalone standpipe with 150mm transfer pump, 3-phase submersible

Part 5 COMPLETE AND RETURN THIS PART

PRICE SCHEDULE – PLANT HIRE ITEMSContractors Name …………………………………………………………………….Note: Items indicated in italics areprovisional only

No. of Plant itemsrequired per WorksParcel

Units Rate PerPlant item($/unit)

DOZERD8 or similar 1Productive operating hours HourStandby hours (inclement weather only) Hour

GRADER,140H or similar

Between 2 & 3

Productive operating hours HourStandby hours (inclement weather only) Hour

FRONT END LOADER2.0-3.0m3 Bucket (with IT Appendix)

1

Productive operating hours HourStandby hours (inclement weather only) Hour

FRONT END LOADER4.0-5.0m3 Bucket

1

Productive operating hours HourStandby hours (inclement weather only) Hour

45 TONNE EXCAVATOR

With rock breaker Appendix

1

Productive operating hours Hour

Standby hours (inclement weather only) Hour

35 TONNE EXCAVATOR

With rock breaker Appendix

1

Productive operating hours Hour

Standby hours (inclement weather only) Hour

VIBRATORY PADFOOT ROLLERMin 16t deadweight

Between 1 & 2

Productive operating hours HourStandby hours (inclement weather only) Hour

VIBRATORY ROLLER SMOOTHDRUM ROLLERMin 16t deadweight

1

Productive operating hours Hour

Standby hours (inclement weather only) Hour

GRID ROLLER 12t-16t static rollerweight (excluding tractor)

1

Productive operating hours Hour

Standby hours (inclement weather only) Hour

MULTI-TYRED ROLLERMin 16t deadweight 1Productive operating hours Hour

Standby hours (inclement weather only) Hour

Page 53 of 146

210.00

60.00

172.00

160.00 55.00

3

1

55.00

2

0

1

1

1

180.00

35.00

185.00

130.00

45.00

55.00

128.00

45.00

125.00

45.00

1

1

GOODWORK HOLDINGS PTY LTD

RFT2017-06 | GOODWORK HLDS Page 20 of 64

Page 8: OCR Zone Data Test - Shire of Wiluna · (Mob/Demob C) Hour WATER SUPPLY EQUIPMENT AT EACH WATER SOURCE SITE-including standalone standpipe with 150mm transfer pump, 3-phase submersible

Part 5 COMPLETE AND RETURN THIS PART

PRICE SCHEDULE – PLANT HIRE ITEMSContractors Name……………………………………………………………………….Note: Items indicated in italics areprovisional only

No. of Plant itemsrequired per WorksParcel

Units Rate PerPlant item($/unit)

WATER CARTMin 25 kL

Between 3 & 4

Productive operating hours HourStandby hours Hour

ROAD TRAIN WATER CART

Min 50 kL

Between 1 & 2

Productive operating hours Hour

Standby hours Hour

SIDE – TIPPER Single (18m3) Between 2 & 4Productive operating hours HourStandby hours Hour

ROADTRAIN SIDE - TIPPERDouble (36m3)

Between 3 & 4

Productive operating hours HourStandby hours Hour

ROADTRAIN SIDE - TIPPERTriple (54m3)

Between 2 & 4

Productive operating hours HourStandby hours Hour

MACHINERY FLOAT 1Rate per hour whilst used mobilising

between work sections (Mob/Demob C)Hour

WATER SUPPLY EQUIPMENT ATEACH WATER SOURCE SITE-including standalone standpipe with

150mm transfer pump, 3-phase

submersible bore pump including power

generators as required

Between 1 & 3 atany time per worksection

Rate per site for all equipment including

maintenance and re-fuellingDay

Standby rate per site (when not

pumping)Day

Dam liner (if required) Per

liner

TRAFFIC MANAGEMENTSupply of all traffic control personnel,

signs, materials & equipment etc.

Under roadworks HourLABOUR ONLY RATE- applicable

only when prior approval of Supers Site

Supervisor is gained

Hour

Page 54 of 146

155.0050.00

1

195.00

50.00

4

155.00

50.00

4

195.00

55.00

2

215.00

55.00

170.00

500.00

100.00

2000.00

68.00

60.00

3-4

GOODWORK HOLDINGS PTY LTD

RFT2017-06 | GOODWORK HLDS Page 21 of 64

Page 9: OCR Zone Data Test - Shire of Wiluna · (Mob/Demob C) Hour WATER SUPPLY EQUIPMENT AT EACH WATER SOURCE SITE-including standalone standpipe with 150mm transfer pump, 3-phase submersible

Part 5 COMPLETE AND RETURN THIS PART

PRICE SCHEDULE – PLANT HIRE ITEMS

Contractors Name……………………………………………………………………….

ADDITIONAL NON-SPECIFIEDITEMS BEING OFFERED

No. of Plant itemsrequired per WorksParcel

Units Rate PerPlant item($/unit)

ITEM………………………………………………Productive operating hours HourStandby hours HourMobilisation and demob for single item Item

ITEM………………………………………………Productive operating hours HourStandby hours HourMobilisation and demob for single item Item

ITEM………………………………………………Productive operating hours HourStandby hours HourMobilisation and demob for single item Item

ITEM………………………………………………Productive operating hours HourStandby hours HourMobilisation and demob for single item Item

ITEM………………………………………………Productive operating hours HourStandby hours HourMobilisation and demob for single item Item

ITEM………………………………………………Productive operating hours HourStandby hours HourMobilisation and demob for single item Item

Page 55 of 146

130.00

20.00

100.00

MINI EXCAVATOR 1.8T 1

125.00

20.00100.00

D6R DOZER 1

170.00

40.00500.00

EX 65 DOZER 1

170.0040.00

500.00

2

120.00

10.00

100.00

FLAT TOP TRAILERS

HIAB TRUCK

2

150.00

10.00

100.00

SKID STEER LOADER 2

GOODWORK HOLDINGS PTY LTD

RFT2017-06 | GOODWORK HLDS Page 22 of 64