ocean park boulevard streetscape improvement …...demo curb cut proposed curb cut 0.0. n e i l s o...

12
OCEAN PARK BOULEVARD STREETSCAPE IMPROVEMENT PROJECT URBAN STUDIO www.urbanstudio-la.com Draft Concept Plan February 2, 2010

Upload: others

Post on 16-Jul-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: OCEAN PARK BOULEVARD STREETSCAPE IMPROVEMENT …...Demo Curb Cut Proposed Curb Cut 0.0. N e i l s o n W a y M a i n S t r e e t Extend existing sidewalk to provide new parkway and

OCEAN PARK BOULEVARD STREETSCAPE IMPROVEMENT PROJECT

URBAN STUDIOwww.urbanstudio-la.com

Draft Concept PlanFebruary 2, 2010

Page 2: OCEAN PARK BOULEVARD STREETSCAPE IMPROVEMENT …...Demo Curb Cut Proposed Curb Cut 0.0. N e i l s o n W a y M a i n S t r e e t Extend existing sidewalk to provide new parkway and

OCEAN PARK BOULEVARD COMPLETE GREEN STREET PROJECT URBAN STUDIOwww.urbanstudio-la.com

0 50 100 ftN

KEY PLAN & LEGEND

bi g bl ue bus

bi g bl ue bus

big b

l ue

bus

M

bi g bl ue bus

bi g bl ue busbi g bl ue bus

bi g bl ue bus

bi g bl ue bus

bi g bl ue bus

big bl ue busbi g bl ue bus

bi g bl ue bus

ON

E W

AY

ON

E W

AY

big b

l ue

bus

big b

l ue

bus

bi g bl ue bus

bi g bl ue bus

big b

l ue

bus

M

bi g bl ue bus

bi g bl ue busbi g bl ue bus

bi g bl ue bus

bi g bl ue bus

bi g bl ue bus

big bl ue busbi g bl ue bus

bi g bl ue bus

ON

E W

AY

ON

E W

AY

big b

l ue

bus

big b

l ue

bus

Nei

lson

Way

Mai

n St

reet

2nd

Stre

et

3rd

Stre

et

5th

Stre

et

6th

Stre

et6t

h St

reet

Beve

rly A

venu

e

7th

Stre

et

Hig

hlan

d Av

enue

7th

Stre

et

Linc

oln

Boul

evar

d

4th

Stre

et

1 2 3 4 5 6 7 8 9Ocean Park Boulevard

KEY MAP

LEGEND

big blue bus

Proposed Pedestrian Light Pole

Existing Light Pole

Proposed Bench

Existing Bench

Proposed Waste Receptacle

Existing Waste Receptacle

Proposed Bike Rack

Existing Bike Rack

Proposed Street Tree

Proposed Street Tree + New Tree Well

Existing Tree

Existing Palm Tree

Demo Existing Tree

Proposed Median Canopy Tree

Proposed Median Ornamental Tree

Proposed Palm Tree + New Tree Well

Proposed Ornamental Palm Tree

Existing Stop Sign

Existing Traff ic Signal

Proposed In-Pavement Flashers

Existing In-Pavement Flashers

Proposed Overhead Flashing Beacon

Proposed Pedestrian Crossing Sign

Proposed Road Merging Sign

big blue bus

Existing Catchment Basin

Existing Crosswalk

Existing Crosswalk within 1/4 mile of Elementary School

Proposed Crosswalk

Existing Bus Stop

Relocated Bus Stop

Line of Existing Curb

Area of New Sidewalk Extension

Permeable Paving

Parkway/Bioswale

Demo Curb Cut

Proposed Curb Cut

0.0

Page 3: OCEAN PARK BOULEVARD STREETSCAPE IMPROVEMENT …...Demo Curb Cut Proposed Curb Cut 0.0. N e i l s o n W a y M a i n S t r e e t Extend existing sidewalk to provide new parkway and

Neils

on W

ay

Mai

n St

reet

Extend existing sidewalk to provide new parkway and curb/bioswale

CALIFORNIAHERITAGEMUSEUM

MAT

CH

LIN

E

Ocean Park Boulevard

Line of existing curb

New trees, typ.

OCEAN PARK BOULEVARD COMPLETE GREEN STREET PROJECT URBAN STUDIOwww.urbanstudio-la.com

0 50 100 ftN

SHEET - 11.0

Page 4: OCEAN PARK BOULEVARD STREETSCAPE IMPROVEMENT …...Demo Curb Cut Proposed Curb Cut 0.0. N e i l s o n W a y M a i n S t r e e t Extend existing sidewalk to provide new parkway and

big blue bus

big blue bus

big

blue

bus

M

ON

E W

AY

ON

E W

AY

big blue bus

big blue bus

big

blue

bus

M

ON

E W

AY

ON

E W

AY

Mai

n St

reet

2nd

Stre

et

Permeable paving

Program and planting to bedetermined during schematic

design phase. Potentialprograms include but are not

limited to a Native PlantingBotanical Garden, Passive

Recreation Area, Bike ParkingStation, Children's Play Area,Dog Run, Community Garden

New pedestrian light pole, typ.

New landscapedmedian with

pedestrianrefuge

2

MAT

CH

LIN

E

OCEAN PARKPUBLIC LIBRARY

MAT

CH

LIN

E

Ocean Park Boulevard

Permeable paving

Extend new median to obstructillegal through traff ic from

right-turn only lane

OCEAN PARK BOULEVARD COMPLETE GREEN STREET PROJECT URBAN STUDIOwww.urbanstudio-la.com

0 50 100 ftN

SHEET - 22.0

Page 5: OCEAN PARK BOULEVARD STREETSCAPE IMPROVEMENT …...Demo Curb Cut Proposed Curb Cut 0.0. N e i l s o n W a y M a i n S t r e e t Extend existing sidewalk to provide new parkway and

3rd

Stre

et

New landscapedmedian with

pedestrian refuge

Extend curb toobstruct illegal

left-turns

Program and planting to be determinedduring schematic design phase.

Potential programs include but are notlimited to a Native Planting Botanical

Garden, Passive Recreation Area, BikeParking Station, Children's Play Area,

Dog Run, Community Garden

Extend existingsidewalk and curb

to provide newparkway/bioswale

Extend existingsidewalk and curb

to provide newparkway/bioswale

Permeable paving

Extendexisting

sidewalk

MAT

CH

LIN

E

MAT

CH

LIN

E

Ocean Park Boulevard

OCEAN PARK BOULEVARD COMPLETE GREEN STREET PROJECT URBAN STUDIOwww.urbanstudio-la.com

0 50 100 ftN

SHEET - 33.0

Page 6: OCEAN PARK BOULEVARD STREETSCAPE IMPROVEMENT …...Demo Curb Cut Proposed Curb Cut 0.0. N e i l s o n W a y M a i n S t r e e t Extend existing sidewalk to provide new parkway and

big blue bus

big blue bus

big

blue

bus

big

blue

bus

big blue bus

big blue bus

big

blue

bus

big

blue

bus

4th

Stre

et

Permeable paving

Optionalviewingplatform

supportedfrom below Remove existing median

and restripe to accommodate relocation of existing bus stops

Extendexisting

sidewalk

Program and planting to bedetermined during schematic

design phase. Potentialprograms include but are not

limited to a Native PlantingBotanical Garden, Passive

Recreation Area, BikeParking Station, Children's

Play Area, Dog Run,Community Garden

Repair/pathcracks/gaps at

bridge andsidewalk

interface toprevent weeds

New median

MAT

CH

LIN

EMAT

CH

LIN

E

Optional viewing platform supported from below

Ocean Park Boulevard

OCEAN PARK BOULEVARD COMPLETE GREEN STREET PROJECT URBAN STUDIOwww.urbanstudio-la.com

0 50 100 ftN

SHEET - 44.0

Page 7: OCEAN PARK BOULEVARD STREETSCAPE IMPROVEMENT …...Demo Curb Cut Proposed Curb Cut 0.0. N e i l s o n W a y M a i n S t r e e t Extend existing sidewalk to provide new parkway and

big blue busbig blue bus

big blue bus

big blue busbig blue bus

big blue bus

5th

Stre

et

Extend existing sidewalk

New landscaped median

Program and planting to be determined during schematic design phase. Potential programs include but are not limited to a Native Planting Botanical Garden, Passive Recreation Area, Bike Parking Station, Children's Play Area, Dog Run, Community Garden

JOHN MUIRELEMENTARY/

SANTA MONICAALTERNATIVE

SCHOOL HOUSE

MAT

CH

LIN

E

MAT

CH

LIN

E

Ocean Park Boulevard

Permeable paving

OCEAN PARK BOULEVARD COMPLETE GREEN STREET PROJECT URBAN STUDIOwww.urbanstudio-la.com

0 50 100 ftN

SHEET - 55.0

Page 8: OCEAN PARK BOULEVARD STREETSCAPE IMPROVEMENT …...Demo Curb Cut Proposed Curb Cut 0.0. N e i l s o n W a y M a i n S t r e e t Extend existing sidewalk to provide new parkway and

big blue bus

big blue bus

big blue bus

big blue bus

6th

Stre

et

6th

Stre

et

Extend existing sidewalk and curb to provide new parkway/bioswale

New landscaped median

Extend existing sidewalk and curb to provide new parkway/bioswale

Extend existing "pork chop"

Extend existing sidewalk and curb to provide new parkway/bioswale

Program and planting to bedetermined during schematic design

phase. Potential programs includebut are not limited to a Native

Planting Botanical Garden, PassiveRecreation Area, Bike Parking

Station, Children's Play Area, DogRun, Community Garden

MAT

CH

LIN

E

MAT

CH

LIN

E

JOHN MUIRELEMENTARY/SANTA MONICAALTERNATIVE

SCHOOL HOUSE

Ocean Park Boulevard

Maximize sidewalk at school crosswalk

OCEAN PARK BOULEVARD COMPLETE GREEN STREET PROJECT URBAN STUDIOwww.urbanstudio-la.com

0 50 100 ftN

SHEET - 66.0

Page 9: OCEAN PARK BOULEVARD STREETSCAPE IMPROVEMENT …...Demo Curb Cut Proposed Curb Cut 0.0. N e i l s o n W a y M a i n S t r e e t Extend existing sidewalk to provide new parkway and

big blue bus

big blue bus

big blue bus

big blue bus

Beve

rly A

venu

e

High

land

Ave

nue

New "pork chop" to obstruct illegal left-turns

New marked crosswalk with an enhanced Overhead Flashing Beacon

New landscaped median with pedestrian refuge

Extend existing sidewalk and curb to provide new parkway/bioswale

New "pork chop" to obstruct illegal left-turns

Extend existing sidewalk and curb to provide new parkway/bioswale

Program and planting to be determined during schematic design phase. Potential programs include but are not limited to a Native Planting Botanical Garden, Passive Recreation Area, Bike Parking Station, Children's Play Area, Dog Run, Community Garden

MAT

CH

LIN

EMAT

CH

LIN

E

Extend existing sidewalk and curb to provide new parkway/bioswale

Ocean Park Boulevard

OCEAN PARK BOULEVARD COMPLETE GREEN STREET PROJECT URBAN STUDIOwww.urbanstudio-la.com

0 50 100 ftN

SHEET - 77.0

Page 10: OCEAN PARK BOULEVARD STREETSCAPE IMPROVEMENT …...Demo Curb Cut Proposed Curb Cut 0.0. N e i l s o n W a y M a i n S t r e e t Extend existing sidewalk to provide new parkway and

7th

Stre

et

7th

Stre

et

New "pork chop" to obstruct illegal left-turns

New marked crosswalk with a pedestrian refuge and an enhanced Overhead Flashing Beacon

Extend existing sidewalk and curb to provide new parkway/bioswale

Extend existing sidewalk and curb to provide new parkway/bioswale

New landscapedmedian with

pedestrian refuge

MAT

CH

LIN

E

MAT

CH

LIN

E

Ocean Park Boulevard

OCEAN PARK BOULEVARD COMPLETE GREEN STREET PROJECT URBAN STUDIOwww.urbanstudio-la.com

0 50 100 ftN

SHEET - 88.0

Page 11: OCEAN PARK BOULEVARD STREETSCAPE IMPROVEMENT …...Demo Curb Cut Proposed Curb Cut 0.0. N e i l s o n W a y M a i n S t r e e t Extend existing sidewalk to provide new parkway and

DIDI

big blue bus

big blue busbig blue bus

big blue bus

big blue busbig blue bus

Linc

oln

Bou

leva

rd

Allocate a portion of Olympic High School's open space towards streetscaping

New bike racks, typ.

New landscaped median

Bike lane ends and merges with traff ic east of Lincoln Boulevard as sharrows with markings indicating shared road with bikes and cars.

New bike box with bike detector

OLYMPIC HIGH SCHOOL

MAT

CH

LIN

E

Ocean Park Boulevard

OCEAN PARK BOULEVARD COMPLETE GREEN STREET PROJECT URBAN STUDIOwww.urbanstudio-la.com

0 50 100 ftN

SHEET - 99.0

Page 12: OCEAN PARK BOULEVARD STREETSCAPE IMPROVEMENT …...Demo Curb Cut Proposed Curb Cut 0.0. N e i l s o n W a y M a i n S t r e e t Extend existing sidewalk to provide new parkway and

Ocean Park

Boulevard

OCEAN PARK BOULEVARD COMPLETE GREEN STREET PROJECT URBAN STUDIOwww.urbanstudio-la.com

0 50 100 ftN

PLAN AND SECTION AT PEDESTRIAN REFUGE10.0

0 20 40 ft

A

B

C

D

Sidewalk (Maintain 48" minimum clearance)

Sidewalk and Curb Extension with Parkway/Storm Water Inf iltration Area

Bike Lane

Vehicular Through Lane

Shy Distance

Landscaped Center MedianE

F

Proposed Median Ornamental Tree

Proposed Sidewalk Extension with Parkway/Bioswale

Existing Tree Removed

Proposed Street Trees at Bioswale

Proposed Painted Bike Lanes

Proposed Overhead Beacon

Existing Line of Sidewalk

Proposed Crosswalk

Proposed Curb Cuts

Proposed Landscaped Median with Pedestrian Refuge

Proposed Sidewalk Extension

Property Line/ Back of Sidewalk

PLAN AT OCEAN PARK BOULEVARD AND 7TH STREET

SECTION AT OCEAN PARK BOULEVARD AND 7TH STREET, FACING EAST

ABCDFDCA B E E