ocean beach master plan public workshop 3 presentation october 29, 2011
TRANSCRIPT
-
8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011
1/90
october29, 2011 |
click to edit master title style1
october 29, 2011
p u b l i c w o r k s h o p 3
-
8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011
2/90
october29, 2011 | 2
workshop agendawelcome
workshop goals
public workshop 2
results summary
trending
master plan draft recommendations
vision, goals, objectives
key moves
outcomes, key questions
brief Q+A
discussion + input
next steps
intro
project update
presentation
open house
wrap-up
-
8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011
3/90
october29, 2011 | 3
project updatepublic workshop #2 resultsand trending
present master plandraft recommendationskey moves, outcomes,
outstanding questions
discuss + evaluaterecommendations
workshop goals
-
8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011
4/90
october29, 2011 | 4
f o c u s
a r e a sPAC 1
+
Scm1
+
public
workshop 1
d r i v e r s
+responders
i d e a s t o
e x p l o r ePAC 2
public
workshop 3public
workshop 2
+PAC 4
working
session
image+characteruses+activities+programecologyaccess+connectivitycoastal dynamics infrastructuremgt+stewardship
ecologycoastal dynamics infrastructure
ideas spectrums
A: maximum habitat
B: maximum recreationC: max. green infrastructure
D: maximum infrastructure
t e s t
scenarios
d r a f tproposed
master plan
master plan
input input input
input inputevaluation
c r i t e r i a PAC 3
SCm 2
input
SCm 3
+PAC 5
-
8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011
5/90
october29, 2011 | 5
09 /11 10 /11 11 /11 12 /11 01 /12 02 /12
PAC5
publc
workshop
3
recomm
endations
draftmasterplan(MP)
PAC6
MPdocu
mentdraft
PACbriefings
ession
finalmasterplan
publc
presen
tation
PAC7
-
8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011
6/90
october29, 2011 |
project update
-
8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011
7/90october29, 2011 | 7
to knit the unique assets and experiences of ocean beach
into a seamless and welcoming public landscape, planning for
recreation, environmental conservation, sustainable
infrastructure, and long-term stewardship
overall vision statement
september 16, 2011 | 7
-
8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011
8/90october29, 2011 | 8
7 focus areas
ecology
utility infrastructure
coastal dynamics
access + connectivity
image / character / culture
uses / activities / program
management + stewardship
-
8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011
9/90october29, 2011 | 9
-
8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011
10/90october29, 2011 | 10
-
8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011
11/90october29, 2011 | 11
-
8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011
12/90october29, 2011 | 12
OB coastal dynamics : the littoral cell
-
8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011
13/90october29, 2011 | 13
-
8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011
14/90october29, 2011 | 14
SF westside combined sewer system
-
8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011
15/90october29, 2011 | 15
-
8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011
16/90october29, 2011 |outreach process
-
8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011
17/90october29, 2011 | 17
project overview | community outreach
3 public workshops:
workshop 3 TODAY
steering committee
planning advisory, technical committees
website, social media
SPUR programming
-
8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011
18/90october29, 2011 | 18
workshop 2 breakout session :
hybrid scenariosresults
-
8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011
19/90october29, 2011 | 19
testscenarios
-
8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011
20/90october29, 2011 | 20
-
8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011
21/90october29, 2011 | 21
-
8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011
22/90october29, 2011 | 22
-
8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011
23/90october29, 2011 | 23
-
8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011
24/90
october29, 2011 | 24
-
8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011
25/90
october29, 2011 | 25
-
8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011
26/90
october29, 2011 | 26
-
8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011
27/90
october29, 2011 | 27
testscenarios
-
8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011
28/90
october29, 2011 | 28
base scenarioused per reach
-
8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011
29/90
october29, 2011 | 29
testscenarios
preferences
-
8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011
30/90
october29, 2011 | 30
workshop 1 station 3 : user preferencesresults
30
-
8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011
31/90
october29, 2011 | 31
user preferences
0
2
46
8
10
12
14
16
art
bankswallows
bea
chcombing
biking/cycling
birdwatching
Christmastreeburning
diversityofpeople
d
og-offleash
dunes
dynamic,change
severyday
eco
logy/wildlife
exercising
familygatheringonbea
ch/kidsplay
fewpeople
firepits
fishing
food
freshair
gathering
GGp
ark
hiking
javabeach
marinelife
nativeplan
tswatching
nature
ob
community
ocean
ParkChalet
peoplewhoenjoytheob
promenade
proximitytocity
proxim
itytoparks
quietness
recreating
relaxing/
hangingout
relieffromc
ity
rockthrow
inginwater
running
sand
seawallatriv
era-noriega
sh
ipwatching
shore
shorebirds
-
8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011
32/90
october29, 2011 | 32
user preferences
SloatSt(beachaccess,surf,
bathrooms)
sm
ellofocean
sn
owyplovers
soundofwaves
spaciousne
ss/expanse
stargazing
sunning
sunsets
surfers
surfing
swimming
trails
tra
nsitoptions
views
v
isitorcenter
volleyball
wading
walking
waves
weather
widebeach
wildbluffw/n
ativeplants
wilderness
working
-
8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011
33/90
october29, 2011 | 33
0
5
10
15
20
25
30
35
seating(allki
nds)
trashreceptacles
bikera
cks
specialligh
ting
naturetrails
sidewalks
bikelanes/trails
boardw
alk
promen
ade
shadestructures
restrooms
show
ers
lockers
lifeguardoverlo
oks
overlo
oks
playgrou
nds
sportsco
urts
p
iers
temporaryevent
publicart
interpretivedisplays
trees
restorednativedu
nes
programs + amenities
-
8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011
34/90
october29, 2011 | 34
user preferences
what is yourfavorite place at ocean beach?
where is the best gathering place?
what is the best viewing spot?
-
8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011
35/90
october29, 2011 | 35
user preferences
what is yourfavorite place at ocean beach?
where is the best gathering place?
what is the best viewing spot?
-
8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011
36/90
october29, 2011 | 36
ocean beach master plan draft recommendations
-
8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011
37/90
october29, 2011 | 37
ocean beach master plan draft recommendations
-
8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011
38/90
october29, 2011 | 38
ocean beach master plan draft recommendations
-
8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011
39/90
october29, 2011 | 39
ocean beach master plan draft recommendations
-
8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011
40/90
october29, 2011 |
presentation
-
8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011
41/90
october29, 2011 |
draft recommendations
-
8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011
42/90
october29, 2011 | 42
ocean beach master plan draft recommendations
analysis to 2100 horizon
recommendations to 2050 non-regulatory guidance document ongoing monitoring + adaptive management re-evaluation in 2030
-
8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011
43/90
october29, 2011 | 43
ocean beach master plan draft recommendations
SOUTH REACH
KEY MOVE 1 : Reroute Great Highway behind the Zoo via Sloat and Skyline
KEY MOVE 2 : Introduce a multi-purpose coastal protection/restoration/access system
MIDDLE REACH
KEY MOVE 3 : Reduce width of Great Highway to provide Amenities / Managed Retreat
KEY MOVE 4 : Middle Reach Native Dune Restoration
NORTH REACH
KEY MOVE 5 : Better Connection between Golden Gate Park and Beach
KEY MOVE 6 : Bicycle + pedestrian improvements north of Balboa
six (6) key moves
1
2
34
4
5
6
south reach north reachmiddle reach
-
8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011
44/90
october29, 2011 | 44
SOUTH REACH
ocean beach master plandraft recommendations
-
8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011
45/90
october29, 2011 | 45
KEY MOVE 1
reroute great highway behind the
zoo via sloat and skyline
ocean beach master plandraft recommendations
ocean beach master plan
-
8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011
46/90
october29, 2011 | 46
draft recommendations
KEY MOVE 1 :reroute great highway behind
the zoo via sloat and skyline
1.1 reconfigure sloat/great highway andsloat/skyline intersections
1.2 maintain 1-lane out southbound fromoceanside treatment plant (OTP) fortrucks
1.3 reconfigure sloat blvd, with parkingalong zoo boundary, permeable
pavement, bikeway, and coastalaccess amenities
1.4 pull L-taraval south across sloat,terminus at zoo gate
1.5 introduce coastal trail to ft funston
1.6 connect N-S to california coastal trail,linking lake merced all the way to
marin
1.7 replace beach/zoo parking alongarmory road and using OTP roof
1.8 reopen armory road: skyline to zoo lot
ocean beach master plan
-
8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011
47/90
october29, 2011 | 47
draft recommendationsKEY MOVE 1 :
reroute great highway behind
the zoo via sloat and skyline
1.3 reconfigure sloat blvd, with parkingalong zoo boundary, permeablepavement, bikeway, and coastal
access amenities
ocean beach master plandraft recommendationsKEY MOVE 1 :
-
8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011
48/90
october29, 2011 | 48
BEFORE
KEY MOVE 1 :reroute great highway behind
the zoo via sloat and skyline
ocean beach master plandraft recommendationsKEY MOVE 1 :
-
8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011
49/90
october29, 2011 | 49
AFTER
1.3 reconfigure sloat blvd, with parkingalong zoo boundary, permeable
pavement, bikeway, and coastalaccess amenities
KEY MOVE 1 :reroute great highway behind
the zoo via sloat and skyline
bike lane
swale
permeablepaving
ocean beach master plandraft recommendationsKEY MOVE 1 :
-
8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011
50/90
october29, 2011 | 50
benefits spectacular new coastal trail, continuous pedestrian connection enables significant retreat from coastal erosion more flexible infrastructure protection major improvements to sloat blvd design, with green infrastructure elements
constraints some traffic impacts, likely minor requires reconfiguring zoo access cost of roadway and intersection improvementsoutstanding questions nature of traffic impacts? configuration of sloat blvd? funding sources?
KEY MOVE 1 :reroute great highway behind
the zoo via sloat and skyline
-
8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011
51/90
october29, 2011 | 51
KEY MOVE 2
introduce a multi-purpose coastal
protection / restoration / access
system
ocean beach master plandraft recommendations
ocean beach master plandraft recommendations
-
8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011
52/90
october29, 2011 | 52
KEY MOVE 2 :introduce a multi-purpose
coastal protection /
restoration / access system
2.1 withdraw from bluff edge,
incrementally demolish roadway,parking, restroom at sloat
2.2 reinforce the lake merced tunnel inplace with a low profile structure or
internal ballast, remove revetmentsand fill
2.3 sand nourishment via armycorps,develop and pursue best
practices for beach nourishment
2.4 cobble berm over lm tunnel covered
by sand (via army corps sand
nourishment) serves as wavedissipation zone; overwash occursduring severe storm events
2.5 second cobble berm protects forcemains, high ground at pump station,
fleishhacker bldg
cobble berm + sand
ocean beach master plandraft recommendations
-
8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011
53/90
october29, 2011 | 53
KEY MOVE 2 (cont) :introduce a multi-purpose
coastal protection /
restoration / access system
2.6 terraced, vegetated seawall withcobble toe along oceansidetreatment plant, incorporating tunnel
structure, coastal trail, erodible bluff(banks swallow habitat), and plant
driveway
2.7 create detention swale (through
zoo) and constructed wetland topassively clean and infiltratestormwater from sloat blvd and
adjacent parking
2.8 fleishhacker bldg renovated aswarming hut and interpretive center
2.9 pump station, force mains remain;interpretive elements explain the
system to visitors. beautify pumpstation and reconfigure to maximizeadjacent coastal access
2.10 conduct near-term pilot studies of
dynamic coastal protection
vegetated seawall
constructed wetland
KEY MOVE 2 :
-
8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011
54/90
october29, 2011 | 54
KEY MOVE 2 :introduce a multi-purpose coastal
protection / restoration / access system
2.4 cobble berm over lm tunnel covered bysand (via army corps sand
nourishment) serves as wavedissipation zone; overwash occursduring severe storm events
2.5 second cobble berm protects forcemains, high ground at pump station,
fleishhacker bldg
KEY MOVE 2 :
-
8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011
55/90
october29, 2011 | 55
KEY MOVE 2 :introduce a multi-purpose coastal
protection / restoration / access system
lake merced tunnel
force mains
fleishhacker pool bldg
zoo parking lot
cobble berm + sand
back beach
second cobble berm
detention pond
bluff
-
8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011
56/90
october29, 2011 | 56
-
8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011
57/90
october29, 2011 | 57
BEFORE
revetments
exposed fill
ocean level 2011
-
8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011
58/90
october29, 2011 | 58
cobble berm + sand
cobble berm
AFTER
ocean level 2050
ocean beach master plandraft recommendationsKEY MOVE 2 :
-
8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011
59/90
october29, 2011 | 59
benefits incorporates significant coastal retreat protects costly infrastructure in place for decades a softer approach to coastal protection, that can work with coastal processes restores ecological and recreational function
constraints significant up-front investment from multiple agencies challenging to maintain sand cover and surface restoration depends on careful integration with army corps beach nourishment new approach requiring careful study and monitoringoutstanding questions can the tunnel be protected at a low enough profile for a reasonable cost? how will wave action interact with cobble and sand to shape the beach and
berm?
how will protection measures be phased to prevent spills, protect habitat, andmanage cost?
introduce a multi-purpose coastal
protection / restoration / access system
ocean beach master plan
-
8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011
60/90
october29, 2011 | 60
MIDDLE REACH
draft recommendations
ocean beach master plan
-
8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011
61/90
october29, 2011 | 61
KEY MOVE 3
reduce the width of great highway
to provide amenities / managed
retreat
draft recommendations
ocean beach master plandraft recommendations
-
8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011
62/90
october29, 2011 | 62
KEY MOVE 3 :reduce the width of great highway to provide amenities / managed retreat
3.1 reduce great highway from 4 lanes to 2 at balboa-sloat, including wide shoulder for cycling/emergency access; use
current south-bound lanes and median for dune restoration, amenities
3.2 reconfigure great highway/sloat intersection slightly inland, following transport box to avoid erosion
3.3 introduce small pockets of parking distributed at key access nodes
3.4 powered by wind and solarrestore existing restrooms; introduce 3 new off-the-grid restrooms
3.5 improve access at judah, taraval, rivera and noriega with trailheads/info, bike parking, vertical elements, etc
3.6 traffic calming and mitigation measures to lessen neighborhood traffic impacts
3.7 LID (Low-Impact Design) throughout adjacent neighborhoods to address stormwater management
DETAIL
ocean beach master plandraft recommendations
-
8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011
63/90
october29, 2011 | 63
KEY MOVE 3 :reduce the width of great highway to provide amenities / managed retreat
3.1 reduce great highway from 4 lanes to 2 at balboa-sloat, including wide shoulder for cycling/emergency access; use
current south-bound lanes and median for dune restoration, amenities
3.2 reconfigure great highway/sloat intersection slightly inland, following transport box to avoid erosion
3.3 introduce small pockets of parking distributed at key access nodes
3.4 restore existing restrooms; introduce 2-3 new off-the-grid (wind/solar) restrooms
3.5 improve access at judah, taraval, rivera and noriega with trailheads/info, bike parking, vertical elements, etc
3.6 traffic calming and mitigation measures to lessen neighborhood traffic impacts
3.7 LID (Low-Impact Design) throughout adjacent neighborhoods to address stormwater management
DETAIL
-
8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011
64/90
october29, 2011 | 64
-
8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011
65/90
october29, 2011 | 65
KEY MOVE 3 :reduce the width of great
highway to provide
amenities / managed retreat
permeable parkingpublic restroom
seating / play
bike share station
signage
ocean beach master plandraft recommendationsKEY MOVE 3 :d h id h f hi h
-
8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011
66/90
october29, 2011 | 66
benefits a restored dune system is given space to migrate landward, allowing a
wider beach as sea-level rise sets in. allows space for additional amenities, improved beach access favors pedestrians, bicycles, beach access, and wildlife over traffic flow
constraints traffic impacts, which may be significant, in adjacent neighborhoods limited space gained at substantial cost potential to bring more users to plover habitat areas some redundancy between recreational trailsoutstanding questions what will traffic impacts be and to what degree can they be mitigated? how much additional beach width will result in the long run?
reduce the width of great highway to
provide amenities / managed retreat
ocean beach master plan
-
8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011
67/90
october29, 2011 | 67
KEY MOVE 4
middle reach native dune
restoration
draft recommendations
KEY MOVE 4 :
ocean beach master plandraft recommendations
-
8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011
68/90
october29, 2011 | 68
KEY MOVE 4 :middle reach native dune restoration
4.1 sand nourishment via army corps of engineers along southern end of middle reach
4.2 dune restoration in key locations: especially at lincoln, vicente
4.3 sand ladders and modular boardwalks provide access while limiting impact
dune restoration
sand ladder
-
8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011
69/90
october29, 2011 | 69
EXISTING non-native dune at OB
CA native dune profile
non-native dune profile
PROPOSED native dune restoration
ocean beach master plandraft recommendationsKEY MOVE 4 :middle reach nati e d ne restoration
-
8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011
70/90
october29, 2011 | 70
benefits ecological restoration and improved aesthetics removal of non-native species lower profile will allow more visual access to the ocean potential for improved sand management with lower profile
constraints significant cost challenge of fully removing non-native grasses access to dunes limited to protect restorationoutstanding questions would a native dune form offer comparable coastal protection? to what degree would management of windblown sand be improved how can sand placed through beach nourishment best feed the dune
system?
middle reach native dune restoration
ocean beach master plan
-
8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011
71/90
october29, 2011 | 71
NORTH REACH
draft recommendations
ocean beach master plan
-
8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011
72/90
october29, 2011 | 72
KEY MOVE 5
better connection between golden
gate park and beach
draft recommendations
KEY MOVE 5 :
ocean beach master plandraft recommendations
-
8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011
73/90
october29, 2011 | 73
KEY MOVE 5 :better connection between golden gate park and beach
5.1 tighten parking lot potentially replacing asphalt for permeable paving, preserve event/flex-space capacity
5.2 maintain row of watching the water parking
5.3 modify parking entrances, and improve pedestrian crossings at JFK/beach chalet
5.4 provide vertical arrival element / overlook at ends of golden gate park
5.5 add east side bike lanes (in both directions) north of fulton to balboa, connect bike trail with existing GGP trail right-of-way
5.6 add abundant bike parking
5.7 joint city/federal parking management plan, consider some fee parking on peak days
5.8 introduce landscape site elements and seating appropriate to rugged conditions and introduce and restore climate
appropriate/native landscape
golden gate park
KEY MOVE 5 :better connection between golden gate
-
8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011
74/90
october29, 2011 | 74
permeable parking+ ocean overlook
seating / overlook
permeable parkingpublic restroom
better connection between golden gate
park and beach
5.1 tighten parking lot potentiallyreplacing asphalt for permeablepaving, preserve event/flex-space
capacity
ocean beach master plandraft recommendationsKEY MOVE 5 :better connection between golden gate
-
8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011
75/90
october29, 2011 | 75
benefits a sense of arrival in a context-appropriate landscape improved basic amenities at the busiest access point maintains parking and event capacity while improving pedestrian and
bicycle safety
improved environmental performance with permeable paving, alternativeenergy
constraints cost interagency management challenges
better connection between golden gate
park and beach
ocean beach master plan
-
8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011
76/90
october29, 2011 | 76
KEY MOVE 6
bicycle + pedestrian
improvements north of balboa
draft recommendations
ocean beach master plandraft recommendations
-
8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011
77/90
october29, 2011 | 77
KEY MOVE 6 :bicycle + pedestrian
improvements north of
balboa
6.1 narrow great highway north ofbalboa (from 4 to 2 lanes)
6.2 keep diagonal cliff house parking
6.3 narrow point lobos avenue from 4lanes to 2, add 2-way separated
bikeway on inland side; separatedbikeway along cliff to preventbicycle/vehicular conflict on steep
slope
6.4 connect bike lane to bike trail tolands end and add bicycle box at
pt lobos and 49th
ocean beach master plandraft recommendationsKEY MOVE 6 :bicycle + pedestrian
-
8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011
78/90
october29, 2011 | 78
BEFORE
bicycle + pedestrian
improvements north of
balboa
ocean beach master plandraft recommendationsKEY MOVE 6 :bicycle + pedestrian
-
8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011
79/90
october29, 2011 | 79
AFTER
bicycle pedestrian
improvements north of
balboa
6.3 narrow point lobos avenue from 4 lanes to 2, add 2-wayseparated bikeway on inland side; separated bikewayalong cliff to prevent bicycle/vehicular conflict on steep
slope
6.4 connect bike lane to bike trail to lands end and addbicycle box at pt lobos and 49th
ocean beach master plandraft recommendationsKEY MOVE 6 :bicycle + pedestrian improvements
-
8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011
80/90
october29, 2011 | 80
benefits improved pedestrian, bicycle safety, shortened crossings improved aesthetics and street design maintains cliff house parking while reducing car-bike conflicts enhances key recreational connection to lands end, coastal trail
constraints modest traffic impactsoutstanding questions what is the optimal arrangement of bicycle lanes along point lobos avenue? what will the traffic impacts be?
bicycle pedestrian improvements
north of balboa
key moves
-
8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011
81/90
october29, 2011 | 81
after 2050
with the same assumptions: additional armoring will likely be required availability of sand may change beach may become difficult to maintain
revisit assumptions and adapt in 2030 infrastructure configuration private property acquisition
key moves
-
8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011
82/90
october29, 2011 | 82
key move 7ocean beach master plan adaptive revision : 2030
better data on climate change advances in techniques and policies more public awareness 2 decades of proactive management 2 decades left in phase I
-
8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011
83/90
october29, 2011 | 83
implementation updates
Army Corps beachnourishment process update
Environmental ReviewDocuments Pending
Beneficial Reuse Plan inDraft Form
Dredge retrofit awaitingfunding
-
8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011
84/90
october29, 2011 | 84
implementation updates
OBMP implementation roadmapin progress
projects lead and partner agencies regulatory process funding opportunities
-
8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011
85/90
october29, 2011 | 85
implementation updates
Several efforts already pending Recreation and Open Space
Element (SF General Plan)
GGNRA GeneralManagement Plan Update(in Draft)
Urban WatershedsFramework (SFPUC)
"Tier 5" WestsideTransportation Study(meeting 11/2, SFSU)
brief q+a
-
8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011
86/90
october29, 2011 |
briefq+a
-
8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011
87/90
october29, 2011 | 87
open house
-
8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011
88/90
october29, 2011 |
wrap-up
ns
(MP)
aft
n
-
8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011
89/90
october29, 2011 | 89
09 /11 10 /11 11 /11 12 /11 01 /12 02 /12
PAC
5
publc
work
shop
3
recom
mendation
draftma
sterplan(
PAC
6
MPdocumentdra
PACbriefing
session
finalmasterpla
publc
presentation
PAC
7
-
8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011
90/90
questions / comments / suggestions?email: [email protected]
master plan document draft : december 2011next public meeting : february 2012