  • 8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011

    1/90

    october29, 2011 |

    click to edit master title style1

    october 29, 2011

    p u b l i c w o r k s h o p 3

  • 8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011

    2/90

    october29, 2011 | 2

    workshop agendawelcome

    workshop goals

    public workshop 2

    results summary

    trending

    master plan draft recommendations

    vision, goals, objectives

    key moves

    outcomes, key questions

    brief Q+A

    discussion + input

    next steps

    intro

    project update

    presentation

    open house

    wrap-up

  • 8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011

    3/90

    october29, 2011 | 3

    project updatepublic workshop #2 resultsand trending

    present master plandraft recommendationskey moves, outcomes,

    outstanding questions

    discuss + evaluaterecommendations

    workshop goals

  • 8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011

    4/90

    october29, 2011 | 4

    f o c u s

    a r e a sPAC 1

    +

    Scm1

    +

    public

    workshop 1

    d r i v e r s

    +responders

    i d e a s t o

    e x p l o r ePAC 2

    public

    workshop 3public

    workshop 2

    +PAC 4

    working

    session

    image+characteruses+activities+programecologyaccess+connectivitycoastal dynamics infrastructuremgt+stewardship

    ecologycoastal dynamics infrastructure

    ideas spectrums

    A: maximum habitat

    B: maximum recreationC: max. green infrastructure

    D: maximum infrastructure

    t e s t

    scenarios

    d r a f tproposed

    master plan

    master plan

    input input input

    input inputevaluation

    c r i t e r i a PAC 3

    SCm 2

    input

    SCm 3

    +PAC 5

  • 8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011

    5/90

    october29, 2011 | 5

    09 /11 10 /11 11 /11 12 /11 01 /12 02 /12

    PAC5

    publc

    workshop

    3

    recomm

    endations

    draftmasterplan(MP)

    PAC6

    MPdocu

    mentdraft

    PACbriefings

    ession

    finalmasterplan

    publc

    presen

    tation

    PAC7

  • 8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011

    6/90

    october29, 2011 |

    project update

  • 8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011

    7/90october29, 2011 | 7

    to knit the unique assets and experiences of ocean beach

    into a seamless and welcoming public landscape, planning for

    recreation, environmental conservation, sustainable

    infrastructure, and long-term stewardship

    overall vision statement

    september 16, 2011 | 7

  • 8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011

    8/90october29, 2011 | 8

    7 focus areas

    ecology

    utility infrastructure

    coastal dynamics

    access + connectivity

    image / character / culture

    uses / activities / program

    management + stewardship

  • 8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011

    9/90october29, 2011 | 9

  • 8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011

    10/90october29, 2011 | 10

  • 8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011

    11/90october29, 2011 | 11

  • 8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011

    12/90october29, 2011 | 12

    OB coastal dynamics : the littoral cell

  • 8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011

    13/90october29, 2011 | 13

  • 8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011

    14/90october29, 2011 | 14

    SF westside combined sewer system

  • 8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011

    15/90october29, 2011 | 15

  • 8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011

    16/90october29, 2011 |outreach process

  • 8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011

    17/90october29, 2011 | 17

    project overview | community outreach

    3 public workshops:

    workshop 3 TODAY

    steering committee

    planning advisory, technical committees

    website, social media

    SPUR programming

  • 8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011

    18/90october29, 2011 | 18

    workshop 2 breakout session :

    hybrid scenariosresults

  • 8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011

    19/90october29, 2011 | 19

    testscenarios

  • 8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011

    20/90october29, 2011 | 20

  • 8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011

    21/90october29, 2011 | 21

  • 8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011

    22/90october29, 2011 | 22

  • 8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011

    23/90october29, 2011 | 23

  • 8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011

    24/90

    october29, 2011 | 24

  • 8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011

    25/90

    october29, 2011 | 25

  • 8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011

    26/90

    october29, 2011 | 26

  • 8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011

    27/90

    october29, 2011 | 27

    testscenarios

  • 8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011

    28/90

    october29, 2011 | 28

    base scenarioused per reach

  • 8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011

    29/90

    october29, 2011 | 29

    testscenarios

    preferences

  • 8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011

    30/90

    october29, 2011 | 30

    workshop 1 station 3 : user preferencesresults

    30

  • 8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011

    31/90

    october29, 2011 | 31

    user preferences

    0

    2

    46

    8

    10

    12

    14

    16

    art

    bankswallows

    bea

    chcombing

    biking/cycling

    birdwatching

    Christmastreeburning

    diversityofpeople

    d

    og-offleash

    dunes

    dynamic,change

    severyday

    eco

    logy/wildlife

    exercising

    familygatheringonbea

    ch/kidsplay

    fewpeople

    firepits

    fishing

    food

    freshair

    gathering

    GGp

    ark

    hiking

    javabeach

    marinelife

    nativeplan

    tswatching

    nature

    ob

    community

    ocean

    ParkChalet

    peoplewhoenjoytheob

    promenade

    proximitytocity

    proxim

    itytoparks

    quietness

    recreating

    relaxing/

    hangingout

    relieffromc

    ity

    rockthrow

    inginwater

    running

    sand

    seawallatriv

    era-noriega

    sh

    ipwatching

    shore

    shorebirds

  • 8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011

    32/90

    october29, 2011 | 32

    user preferences

    SloatSt(beachaccess,surf,

    bathrooms)

    sm

    ellofocean

    sn

    owyplovers

    soundofwaves

    spaciousne

    ss/expanse

    stargazing

    sunning

    sunsets

    surfers

    surfing

    swimming

    trails

    tra

    nsitoptions

    views

    v

    isitorcenter

    volleyball

    wading

    walking

    waves

    weather

    widebeach

    wildbluffw/n

    ativeplants

    wilderness

    working

  • 8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011

    33/90

    october29, 2011 | 33

    0

    5

    10

    15

    20

    25

    30

    35

    seating(allki

    nds)

    trashreceptacles

    bikera

    cks

    specialligh

    ting

    naturetrails

    sidewalks

    bikelanes/trails

    boardw

    alk

    promen

    ade

    shadestructures

    restrooms

    show

    ers

    lockers

    lifeguardoverlo

    oks

    overlo

    oks

    playgrou

    nds

    sportsco

    urts

    p

    iers

    temporaryevent

    publicart

    interpretivedisplays

    trees

    restorednativedu

    nes

    programs + amenities

  • 8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011

    34/90

    october29, 2011 | 34

    user preferences

    what is yourfavorite place at ocean beach?

    where is the best gathering place?

    what is the best viewing spot?

  • 8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011

    35/90

    october29, 2011 | 35

    user preferences

    what is yourfavorite place at ocean beach?

    where is the best gathering place?

    what is the best viewing spot?

  • 8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011

    36/90

    october29, 2011 | 36

    ocean beach master plan draft recommendations

  • 8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011

    37/90

    october29, 2011 | 37

    ocean beach master plan draft recommendations

  • 8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011

    38/90

    october29, 2011 | 38

    ocean beach master plan draft recommendations

  • 8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011

    39/90

    october29, 2011 | 39

    ocean beach master plan draft recommendations

  • 8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011

    40/90

    october29, 2011 |

    presentation

  • 8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011

    41/90

    october29, 2011 |

    draft recommendations

  • 8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011

    42/90

    october29, 2011 | 42

    ocean beach master plan draft recommendations

    analysis to 2100 horizon

    recommendations to 2050 non-regulatory guidance document ongoing monitoring + adaptive management re-evaluation in 2030

  • 8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011

    43/90

    october29, 2011 | 43

    ocean beach master plan draft recommendations

    SOUTH REACH

    KEY MOVE 1 : Reroute Great Highway behind the Zoo via Sloat and Skyline

    KEY MOVE 2 : Introduce a multi-purpose coastal protection/restoration/access system

    MIDDLE REACH

    KEY MOVE 3 : Reduce width of Great Highway to provide Amenities / Managed Retreat

    KEY MOVE 4 : Middle Reach Native Dune Restoration

    NORTH REACH

    KEY MOVE 5 : Better Connection between Golden Gate Park and Beach

    KEY MOVE 6 : Bicycle + pedestrian improvements north of Balboa

    six (6) key moves

    1

    2

    34

    4

    5

    6

    south reach north reachmiddle reach

  • 8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011

    44/90

    october29, 2011 | 44

    SOUTH REACH

    ocean beach master plandraft recommendations

  • 8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011

    45/90

    october29, 2011 | 45

    KEY MOVE 1

    reroute great highway behind the

    zoo via sloat and skyline

    ocean beach master plandraft recommendations

    ocean beach master plan

  • 8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011

    46/90

    october29, 2011 | 46

    draft recommendations

    KEY MOVE 1 :reroute great highway behind

    the zoo via sloat and skyline

    1.1 reconfigure sloat/great highway andsloat/skyline intersections

    1.2 maintain 1-lane out southbound fromoceanside treatment plant (OTP) fortrucks

    1.3 reconfigure sloat blvd, with parkingalong zoo boundary, permeable

    pavement, bikeway, and coastalaccess amenities

    1.4 pull L-taraval south across sloat,terminus at zoo gate

    1.5 introduce coastal trail to ft funston

    1.6 connect N-S to california coastal trail,linking lake merced all the way to

    marin

    1.7 replace beach/zoo parking alongarmory road and using OTP roof

    1.8 reopen armory road: skyline to zoo lot

    ocean beach master plan

  • 8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011

    47/90

    october29, 2011 | 47

    draft recommendationsKEY MOVE 1 :

    reroute great highway behind

    the zoo via sloat and skyline

    1.3 reconfigure sloat blvd, with parkingalong zoo boundary, permeablepavement, bikeway, and coastal

    access amenities

    ocean beach master plandraft recommendationsKEY MOVE 1 :

  • 8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011

    48/90

    october29, 2011 | 48

    BEFORE

    KEY MOVE 1 :reroute great highway behind

    the zoo via sloat and skyline

    ocean beach master plandraft recommendationsKEY MOVE 1 :

  • 8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011

    49/90

    october29, 2011 | 49

    AFTER

    1.3 reconfigure sloat blvd, with parkingalong zoo boundary, permeable

    pavement, bikeway, and coastalaccess amenities

    KEY MOVE 1 :reroute great highway behind

    the zoo via sloat and skyline

    bike lane

    swale

    permeablepaving

    ocean beach master plandraft recommendationsKEY MOVE 1 :

  • 8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011

    50/90

    october29, 2011 | 50

    benefits spectacular new coastal trail, continuous pedestrian connection enables significant retreat from coastal erosion more flexible infrastructure protection major improvements to sloat blvd design, with green infrastructure elements

    constraints some traffic impacts, likely minor requires reconfiguring zoo access cost of roadway and intersection improvementsoutstanding questions nature of traffic impacts? configuration of sloat blvd? funding sources?

    KEY MOVE 1 :reroute great highway behind

    the zoo via sloat and skyline

  • 8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011

    51/90

    october29, 2011 | 51

    KEY MOVE 2

    introduce a multi-purpose coastal

    protection / restoration / access

    system

    ocean beach master plandraft recommendations

    ocean beach master plandraft recommendations

  • 8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011

    52/90

    october29, 2011 | 52

    KEY MOVE 2 :introduce a multi-purpose

    coastal protection /

    restoration / access system

    2.1 withdraw from bluff edge,

    incrementally demolish roadway,parking, restroom at sloat

    2.2 reinforce the lake merced tunnel inplace with a low profile structure or

    internal ballast, remove revetmentsand fill

    2.3 sand nourishment via armycorps,develop and pursue best

    practices for beach nourishment

    2.4 cobble berm over lm tunnel covered

    by sand (via army corps sand

    nourishment) serves as wavedissipation zone; overwash occursduring severe storm events

    2.5 second cobble berm protects forcemains, high ground at pump station,

    fleishhacker bldg

    cobble berm + sand

    ocean beach master plandraft recommendations

  • 8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011

    53/90

    october29, 2011 | 53

    KEY MOVE 2 (cont) :introduce a multi-purpose

    coastal protection /

    restoration / access system

    2.6 terraced, vegetated seawall withcobble toe along oceansidetreatment plant, incorporating tunnel

    structure, coastal trail, erodible bluff(banks swallow habitat), and plant

    driveway

    2.7 create detention swale (through

    zoo) and constructed wetland topassively clean and infiltratestormwater from sloat blvd and

    adjacent parking

    2.8 fleishhacker bldg renovated aswarming hut and interpretive center

    2.9 pump station, force mains remain;interpretive elements explain the

    system to visitors. beautify pumpstation and reconfigure to maximizeadjacent coastal access

    2.10 conduct near-term pilot studies of

    dynamic coastal protection

    vegetated seawall

    constructed wetland

    KEY MOVE 2 :

  • 8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011

    54/90

    october29, 2011 | 54

    KEY MOVE 2 :introduce a multi-purpose coastal

    protection / restoration / access system

    2.4 cobble berm over lm tunnel covered bysand (via army corps sand

    nourishment) serves as wavedissipation zone; overwash occursduring severe storm events

    2.5 second cobble berm protects forcemains, high ground at pump station,

    fleishhacker bldg

    KEY MOVE 2 :

  • 8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011

    55/90

    october29, 2011 | 55

    KEY MOVE 2 :introduce a multi-purpose coastal

    protection / restoration / access system

    lake merced tunnel

    force mains

    fleishhacker pool bldg

    zoo parking lot

    cobble berm + sand

    back beach

    second cobble berm

    detention pond

    bluff

  • 8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011

    56/90

    october29, 2011 | 56

  • 8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011

    57/90

    october29, 2011 | 57

    BEFORE

    revetments

    exposed fill

    ocean level 2011

  • 8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011

    58/90

    october29, 2011 | 58

    cobble berm + sand

    cobble berm

    AFTER

    ocean level 2050

    ocean beach master plandraft recommendationsKEY MOVE 2 :

  • 8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011

    59/90

    october29, 2011 | 59

    benefits incorporates significant coastal retreat protects costly infrastructure in place for decades a softer approach to coastal protection, that can work with coastal processes restores ecological and recreational function

    constraints significant up-front investment from multiple agencies challenging to maintain sand cover and surface restoration depends on careful integration with army corps beach nourishment new approach requiring careful study and monitoringoutstanding questions can the tunnel be protected at a low enough profile for a reasonable cost? how will wave action interact with cobble and sand to shape the beach and

    berm?

    how will protection measures be phased to prevent spills, protect habitat, andmanage cost?

    introduce a multi-purpose coastal

    protection / restoration / access system

    ocean beach master plan

  • 8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011

    60/90

    october29, 2011 | 60

    MIDDLE REACH

    draft recommendations

    ocean beach master plan

  • 8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011

    61/90

    october29, 2011 | 61

    KEY MOVE 3

    reduce the width of great highway

    to provide amenities / managed

    retreat

    draft recommendations

    ocean beach master plandraft recommendations

  • 8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011

    62/90

    october29, 2011 | 62

    KEY MOVE 3 :reduce the width of great highway to provide amenities / managed retreat

    3.1 reduce great highway from 4 lanes to 2 at balboa-sloat, including wide shoulder for cycling/emergency access; use

    current south-bound lanes and median for dune restoration, amenities

    3.2 reconfigure great highway/sloat intersection slightly inland, following transport box to avoid erosion

    3.3 introduce small pockets of parking distributed at key access nodes

    3.4 powered by wind and solarrestore existing restrooms; introduce 3 new off-the-grid restrooms

    3.5 improve access at judah, taraval, rivera and noriega with trailheads/info, bike parking, vertical elements, etc

    3.6 traffic calming and mitigation measures to lessen neighborhood traffic impacts

    3.7 LID (Low-Impact Design) throughout adjacent neighborhoods to address stormwater management

    DETAIL

    ocean beach master plandraft recommendations

  • 8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011

    63/90

    october29, 2011 | 63

    KEY MOVE 3 :reduce the width of great highway to provide amenities / managed retreat

    3.1 reduce great highway from 4 lanes to 2 at balboa-sloat, including wide shoulder for cycling/emergency access; use

    current south-bound lanes and median for dune restoration, amenities

    3.2 reconfigure great highway/sloat intersection slightly inland, following transport box to avoid erosion

    3.3 introduce small pockets of parking distributed at key access nodes

    3.4 restore existing restrooms; introduce 2-3 new off-the-grid (wind/solar) restrooms

    3.5 improve access at judah, taraval, rivera and noriega with trailheads/info, bike parking, vertical elements, etc

    3.6 traffic calming and mitigation measures to lessen neighborhood traffic impacts

    3.7 LID (Low-Impact Design) throughout adjacent neighborhoods to address stormwater management

    DETAIL

  • 8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011

    64/90

    october29, 2011 | 64

  • 8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011

    65/90

    october29, 2011 | 65

    KEY MOVE 3 :reduce the width of great

    highway to provide

    amenities / managed retreat

    permeable parkingpublic restroom

    seating / play

    bike share station

    signage

    ocean beach master plandraft recommendationsKEY MOVE 3 :d h id h f hi h

  • 8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011

    66/90

    october29, 2011 | 66

    benefits a restored dune system is given space to migrate landward, allowing a

    wider beach as sea-level rise sets in. allows space for additional amenities, improved beach access favors pedestrians, bicycles, beach access, and wildlife over traffic flow

    constraints traffic impacts, which may be significant, in adjacent neighborhoods limited space gained at substantial cost potential to bring more users to plover habitat areas some redundancy between recreational trailsoutstanding questions what will traffic impacts be and to what degree can they be mitigated? how much additional beach width will result in the long run?

    reduce the width of great highway to

    provide amenities / managed retreat

    ocean beach master plan

  • 8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011

    67/90

    october29, 2011 | 67

    KEY MOVE 4

    middle reach native dune

    restoration

    draft recommendations

    KEY MOVE 4 :

    ocean beach master plandraft recommendations

  • 8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011

    68/90

    october29, 2011 | 68

    KEY MOVE 4 :middle reach native dune restoration

    4.1 sand nourishment via army corps of engineers along southern end of middle reach

    4.2 dune restoration in key locations: especially at lincoln, vicente

    4.3 sand ladders and modular boardwalks provide access while limiting impact

    dune restoration

    sand ladder

  • 8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011

    69/90

    october29, 2011 | 69

    EXISTING non-native dune at OB

    CA native dune profile

    non-native dune profile

    PROPOSED native dune restoration

    ocean beach master plandraft recommendationsKEY MOVE 4 :middle reach nati e d ne restoration

  • 8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011

    70/90

    october29, 2011 | 70

    benefits ecological restoration and improved aesthetics removal of non-native species lower profile will allow more visual access to the ocean potential for improved sand management with lower profile

    constraints significant cost challenge of fully removing non-native grasses access to dunes limited to protect restorationoutstanding questions would a native dune form offer comparable coastal protection? to what degree would management of windblown sand be improved how can sand placed through beach nourishment best feed the dune

    system?

    middle reach native dune restoration

    ocean beach master plan

  • 8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011

    71/90

    october29, 2011 | 71

    NORTH REACH

    draft recommendations

    ocean beach master plan

  • 8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011

    72/90

    october29, 2011 | 72

    KEY MOVE 5

    better connection between golden

    gate park and beach

    draft recommendations

    KEY MOVE 5 :

    ocean beach master plandraft recommendations

  • 8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011

    73/90

    october29, 2011 | 73

    KEY MOVE 5 :better connection between golden gate park and beach

    5.1 tighten parking lot potentially replacing asphalt for permeable paving, preserve event/flex-space capacity

    5.2 maintain row of watching the water parking

    5.3 modify parking entrances, and improve pedestrian crossings at JFK/beach chalet

    5.4 provide vertical arrival element / overlook at ends of golden gate park

    5.5 add east side bike lanes (in both directions) north of fulton to balboa, connect bike trail with existing GGP trail right-of-way

    5.6 add abundant bike parking

    5.7 joint city/federal parking management plan, consider some fee parking on peak days

    5.8 introduce landscape site elements and seating appropriate to rugged conditions and introduce and restore climate

    appropriate/native landscape

    golden gate park

    KEY MOVE 5 :better connection between golden gate

  • 8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011

    74/90

    october29, 2011 | 74

    permeable parking+ ocean overlook

    seating / overlook

    permeable parkingpublic restroom

    better connection between golden gate

    park and beach

    5.1 tighten parking lot potentiallyreplacing asphalt for permeablepaving, preserve event/flex-space

    capacity

    ocean beach master plandraft recommendationsKEY MOVE 5 :better connection between golden gate

  • 8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011

    75/90

    october29, 2011 | 75

    benefits a sense of arrival in a context-appropriate landscape improved basic amenities at the busiest access point maintains parking and event capacity while improving pedestrian and

    bicycle safety

    improved environmental performance with permeable paving, alternativeenergy

    constraints cost interagency management challenges

    better connection between golden gate

    park and beach

    ocean beach master plan

  • 8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011

    76/90

    october29, 2011 | 76

    KEY MOVE 6

    bicycle + pedestrian

    improvements north of balboa

    draft recommendations

    ocean beach master plandraft recommendations

  • 8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011

    77/90

    october29, 2011 | 77

    KEY MOVE 6 :bicycle + pedestrian

    improvements north of

    balboa

    6.1 narrow great highway north ofbalboa (from 4 to 2 lanes)

    6.2 keep diagonal cliff house parking

    6.3 narrow point lobos avenue from 4lanes to 2, add 2-way separated

    bikeway on inland side; separatedbikeway along cliff to preventbicycle/vehicular conflict on steep

    slope

    6.4 connect bike lane to bike trail tolands end and add bicycle box at

    pt lobos and 49th

    ocean beach master plandraft recommendationsKEY MOVE 6 :bicycle + pedestrian

  • 8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011

    78/90

    october29, 2011 | 78

    BEFORE

    bicycle + pedestrian

    improvements north of

    balboa

    ocean beach master plandraft recommendationsKEY MOVE 6 :bicycle + pedestrian

  • 8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011

    79/90

    october29, 2011 | 79

    AFTER

    bicycle pedestrian

    improvements north of

    balboa

    6.3 narrow point lobos avenue from 4 lanes to 2, add 2-wayseparated bikeway on inland side; separated bikewayalong cliff to prevent bicycle/vehicular conflict on steep

    slope

    6.4 connect bike lane to bike trail to lands end and addbicycle box at pt lobos and 49th

    ocean beach master plandraft recommendationsKEY MOVE 6 :bicycle + pedestrian improvements

  • 8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011

    80/90

    october29, 2011 | 80

    benefits improved pedestrian, bicycle safety, shortened crossings improved aesthetics and street design maintains cliff house parking while reducing car-bike conflicts enhances key recreational connection to lands end, coastal trail

    constraints modest traffic impactsoutstanding questions what is the optimal arrangement of bicycle lanes along point lobos avenue? what will the traffic impacts be?

    bicycle pedestrian improvements

    north of balboa

    key moves

  • 8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011

    81/90

    october29, 2011 | 81

    after 2050

    with the same assumptions: additional armoring will likely be required availability of sand may change beach may become difficult to maintain

    revisit assumptions and adapt in 2030 infrastructure configuration private property acquisition

    key moves

  • 8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011

    82/90

    october29, 2011 | 82

    key move 7ocean beach master plan adaptive revision : 2030

    better data on climate change advances in techniques and policies more public awareness 2 decades of proactive management 2 decades left in phase I

  • 8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011

    83/90

    october29, 2011 | 83

    implementation updates

    Army Corps beachnourishment process update

    Environmental ReviewDocuments Pending

    Beneficial Reuse Plan inDraft Form

    Dredge retrofit awaitingfunding

  • 8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011

    84/90

    october29, 2011 | 84

    implementation updates

    OBMP implementation roadmapin progress

    projects lead and partner agencies regulatory process funding opportunities

  • 8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011

    85/90

    october29, 2011 | 85

    implementation updates

    Several efforts already pending Recreation and Open Space

    Element (SF General Plan)

    GGNRA GeneralManagement Plan Update(in Draft)

    Urban WatershedsFramework (SFPUC)

    "Tier 5" WestsideTransportation Study(meeting 11/2, SFSU)

    brief q+a

  • 8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011

    86/90

    october29, 2011 |

    briefq+a

  • 8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011

    87/90

    october29, 2011 | 87

    open house

  • 8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011

    88/90

    october29, 2011 |

    wrap-up

    ns

    (MP)

    aft

    n

  • 8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011

    89/90

    october29, 2011 | 89

    09 /11 10 /11 11 /11 12 /11 01 /12 02 /12

    PAC

    5

    publc

    work

    shop

    3

    recom

    mendation

    draftma

    sterplan(

    PAC

    6

    MPdocumentdra

    PACbriefing

    session

    finalmasterpla

    publc

    presentation

    PAC

    7

  • 8/3/2019 Ocean Beach Master Plan Public Workshop 3 Presentation October 29, 2011

    90/90

    questions / comments / suggestions?email: [email protected]

    master plan document draft : december 2011next public meeting : february 2012