  • 8/18/2019 Observation Sheet for Ekramul Haque

    1/6

    SL

    .

    N

    O.

    Observations and consequences Control Measures

     Immediate and longer term

    actions

    Timesc

    01 Hazard

    Belt cover was absent for air compressorrunning at work site and the workers

    were passing nearby.

    Consequence

    oose clothing worn by the workers may

    get entangled in the air compressor!s

    rotating wheels and thereby severe

    in"uries can happen to them.

    #ivert the workers pathway from

    near the air compressor runningarea.

     $emporary barricading to be

    provided around the air

    compressor.

    %rovide belt cover for the air

    compressor.

    &mmedi

    01 #ay

    01 'ee

    0( Hazard

    Cement bricks were scattered on the

    pathway for workers and the workers

    were using this way.

    Consequence

    )cattered cement bricks on pathway

    can cause tripping and falling of workers

    and thereby serious in"uries can happen

    to them.

    *emove the scattered cement

    bricks from the pathway for

    workers.

    +aintain proper housekeeping.

    &mmedi

    01 #ay

    0, Hazard

    -cavation was going on at site and the

    reposed soil was kept near the edges ofecavation. )afe distance from the

    edges of ecavation for keeping reposed

    soil was not maintained.

    Consequence

    *eposed soil may fall down to

    ecavation and thereby serious in"uries

    or even death of workers can happen.

    *emove the reposed soil from

    near the edges of ecavation.

    #epute a competent person to

    monitor the activity.

    &mmedi

    01 #ay

    0/ Hazard

    nderground water pipe line found

    inside the ecavation. %ipe line was

    slightly broken and water was coming

    out of the hole on pipe line. 'ater line

    was not isolated.

    Consequence

    Hole on pipe line can get bigger and

    thus ecavation may get ooded and

    thus drowning and thereby death of

    )top the ecavation activity and

    isolate the water supply to the

    pipe line running beneath

    ecavation.

    'ater pipe line to be re routed

    away from ecavation area.

    &mmedi

    01 'ee

  • 8/18/2019 Observation Sheet for Ekramul Haque

    2/6

    workers working inside ecavation can

    happen.

    02 Hazard

    &n the canteen for workers3 uncovered

    waste bins were found. 'aste bins werefull with food waste and food waste were

    scattered around it. 4lies were present

    over food waste.

    Consequence

    4lies over food waste can spread

    diseases like cholera3 dysentery etc to

    the workers.

     Clear the waste in waste bin

    and the waste scattered around

    the waste bin.

    %rovide su5cient waste bins in

    canteen to avoid overow.

    6nti ies spray to be used for

    destroying ies in the canteen

    area.

     &mmed

    01 #ay

    0( #ays

    07 )taircase giving access to 8rst oor wasfound wet and slippery and the workers

    were using this way.

    Consequence

    #uring the course of work3 workers may

    get slip on staircase and thereby serious

    in"uries can happen to them.

    *estrict the workers from usingwet and slippery stair case.

    Clean and dry the stair case and

    non slippery mats to be spread

    on stair case.

     &mmed

    01 #ay

    09 'orkers found shifting cement bags

    from ground oor to second oor and

    they were followed wrong lifting

    techniques.Consequence

    6doption of wrong lifting techniques can

    cause back in"ury3 bone in"ury etc to the

    workers

    -nforce the workers to adopt

    right lifting techniques and

    depute a competent supervisor

    for monitoring.

    Conduct a training programme

    to workers on right lifting

    methods.

    &mmedi

    01 'ee

    0: 'orkers found doing the steel frame

    work of second oor top and they had

    not worn safety harness.

    Consequence;on usage of safety harness by the

    workers while working at height can lead

    to falling of them from height and thus

    severe in"uries like head in"ury or even

    death can happen to them.

    -nforce the workers to wear

    safety harness while working at

    height and if insu5cient3 provide

    them with the same.

     $raining programme to be

    conducted for workers working

    at height regarding the safe

    practices to be followed while

    working at height.

    &mmedi

    01 'ee

  • 8/18/2019 Observation Sheet for Ekramul Haque

    3/6

    0< +ason as well as labours involved in the

    cement plastering work of 8rst oor

    were not worn %%-!s against chemicalslike cement.

    Consequence

    Contact with chemicals like cement can

    cause corrosive e=ect3 allergic e=ect3

    carcinogenic e=ect etc. on worker!s

    body

    %rovide appropriate %%-!s like

    rubberized hand gloves3 gum

    boots etc. to cement plasteringworkers.

    Conduct a health surveillance

    programme to the cement

    plastering workers on the ill

    health e=ects of chemicals like

    cement on human body.

    &mmedi

    0( 'ee

    10 6cetylene gas cylinder was foundleaking and welding was going on

    nearby.

    Consequence

    eaked acetylene gas may catch 8re

    from ying ob"ects coming out of

    welding process and the 8re inturn can

    cause the eplosion of acetylene gas

    cylinder. -plosion of cylinder can cause

    severe in"uries to the workers in the

    vicinity.

    )top the welding work and stopthe leakage of acetylene

    cylinder.

    *eplace the cylinder with a new

    one.

    6wareness programme on safe

    practices to be followed during

    hot work to be imparted to

    welders.

    &mmedi

    01 #ay

    01 'ee

    11 6t one part of work site3 piling was going

    on and heavy noise was coming out of

    piling equipments.

    Consequence

    -posure to heavy noise from piling

    equipments can cause ;&H3 tinnitus etc.

    to the workers working nearby.

    )ubstitute the equipments with

    those of lesser noise or provide

    appropriate %%-!s such as ear

    defender3 ear mu>er etc. to the

    workers.

    %rovide proper training and

    awareness to all workers.

    &mmedi

    1 week

    1( 'orkers were found using welding

    machine whose cable insulation wasbroken at several places.

    Consequence

    sage of cables for welding machine

    with broken insulation can lead to severe

    electric shock to the welders as well as

    workers passing nearby and thereby

    serious burns and death can happen to

    )top the work and the welding

    equipment?s cable to beinsulated temporarily with

    insulating tape.

     *enew the cable of welding

    equipment.

    &mmedi

    1 week

  • 8/18/2019 Observation Sheet for Ekramul Haque

    4/6

    workers.

    1, +obile crane was operating at work site.)afe load was not maintained on it. )'

    certi8cate was absent for the mobile

    crane. 'orkers were found working

    beneath the suspended load.

    Consequence

    6s safe working load was not maintained

    on mobile crane and as )' certi8cate

    was absent on it3 the load may fell on

    top of workers working beneath and thus

    serious in"uries or death can happen to

    the workers.

    )top mobile crane operation andrestrict the workers to work

    beneath suspended load.

    *emove the old sling and static

    crane to be 8tted with a new

    sling.

    +aintenance of the sling to be

    done on a weekly basis.

     

    &mmedi

    ( #ays

    01 'ee

    1/ @ack hammer was used by the workers

    for concrete breaking near entrance of

    work site without wearing %%-!s against

    vibration from the equipment. $he

    process was continuous and eposure to

    vibration was maimum.

    Consequence

    -posure to heavy vibration for a longer

    duration can cause H6A)3 '*# etc. tothe workers.

    %%-!s like rubberized hand

    gloves to be provided to the

    workers and to minimize the

    vibration e=ect3 "ack hammer to

    be provided with rubber

    handles.

    'ork rotation system and shift

    system to be provided for theworkers

    &mmedi

     

    0( 'ee

    12 'elders were found using welding glass

    instead of face shield during welding.

    Consequence

    4lying ob"ects from the welding process

    can cause eye in"ury or facial burns to

    welders.

    &nstruct the welders to use face

    shield instead of welding glass

    and provide them with the

    same.

    #epute a competent supervisor

    to monitor welding activity.

    &mmedi

    01 'ee

    17 'orkers were found using grinding

    machine which was without guard.

    Consequence

    6bsence of guard on grinding machine

    %rovide appropriate %%-!s like

    rubberized hand gloves to the

    operator of grinding machine.

    %rovide temporary guard for

    &mmedi

    01 #ay

  • 8/18/2019 Observation Sheet for Ekramul Haque

    5/6

    can cause cuts from its sharp blades to

    the operator.

    grinding machine.

     $he grinding machine to be

    replaced with a new one with

    appropriate guard.

    0, 'ee

    19 4ork lift truck was found reversingwithout banks man and the workers

    were working near fork lift truck.

    Consequence

    6bsence of banks man for 4ork lift truck

    while reversing can cause collisions of it

    with the workers and thus serious

    in"uries or even death of workers can

    happen.

    eep the workers away from forklift operating area and depute a

    competent banks man for fork

    lift truck.

    'arning signs to be placed in

    fork lift operating area and

    reverse alarm to be 8tted on

    fork lift truck.

    &mmedi

    0( #ays

    1: 'orkers involved in steel frame work

    erection were eposed to direct heat

    from sun for a long duration.

    Consequence

    Health problems like dehydration3 heat

    cramp3 heat stroke etc. can happen to

    the workers due to direct heat eposure

    for a longer duration.

    Heat resistant clothing and

    drinking water to be provided to

    the workers.

    *est place to be provided.

    'ork rotation system to be

    implemented.

    &mmedi

    01 #ay

    0, 'ee

    1< 'orkers involved in concrete miing

    were not worn nose mask and were

    eposed to cement dust.Consequence

     Cement dust can be inhaled by the

    workers and thus breathing problems3

    lung cancer etc. can happen to them.

     %rovide su5cient nose masks to

    the concrete workers and

    enforce the workers to wearnose mask while doing concrete

    miing .

    #epute competent supervisor

    for monitoring.

    Conduct health surveillance

    programme for the workers.

    &mmedi

    01 #ay

    01 'ee

    (0 Hazard

    n the 8rst oor of the building3 welding

    work was going on. 'astes like papers3

    empty cement bags etc. were scattered

    around the welding area.

    Consequence

    4lying hot particles coming out of

    welding process can give ignition to

    papers3 empty cement bags etc. and

    )top welding and remove the

    wastes around the welding area

    and place a 8re watch.

    #epute a competent supervisor

    for monitoring.

    &mmedi

    01 #ay

  • 8/18/2019 Observation Sheet for Ekramul Haque

    6/6

    thus 8re can happen and due to the

    spread of 8re3 severe burns to the

    workers in the proimity and damages to

    the material can happen.

    (1 6bsence of drugs and alcohol at entirework site was a good observation.

    (( Aisitors sign in and sign out register

    maintained at the work site was a good

    observation

    (, 6dequate illumination at work site was a

    good observation.

    (/ )afety helmets with appropriate color

    coding were worn by one and all at work

    site. $hat was a good observation.

    (2 4irst aider and ambulance service were

    available at work site for (/ hours. $hat

    was a good observation.