objective atc 02.7 essip plan 2014 ingrid feijt dss/pepr 19.09.2014

9
Objective ATC 02.7 ESSIP Plan 2014 Ingrid FEIJT DSS/PEPR 19.09.2014

Upload: naomi-dickerson

Post on 16-Jan-2016

214 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Objective ATC 02.7 ESSIP Plan 2014 Ingrid FEIJT DSS/PEPR 19.09.2014

Objective ATC 02.7

ESSIP Plan 2014

Ingrid FEIJTDSS/PEPR

19.09.2014

Page 2: Objective ATC 02.7 ESSIP Plan 2014 Ingrid FEIJT DSS/PEPR 19.09.2014

ESSIP Plan 2014 / Objective ATC 02.7 2

Comprehensive Explanation (1/2)

Implementation of Approach Path Monitoring (APM) functions. Can be considered as an extension of MSAW (alert to a/c proximity

to terrain or obstacle) in the final approach. ECAC applicability (except Georgia, Greece and Slovak Republic). Depending on airspace organisation, it might include a lower portion

of TMAs and CTR. This objective is not applicable to the en-route airspace.

Military authorities: Military ATC are invited to consider implementation of APM level 2 when providing ATS surveillance services to GAT.

Page 3: Objective ATC 02.7 ESSIP Plan 2014 Ingrid FEIJT DSS/PEPR 19.09.2014

Comprehensive Explanation (2/2)

APM checks the extrapolated track positions (based on Surveillance data-current track position performing a linear extrapolation using detected ground speed and rate of climb/descent), applying QHN correction and identifies the predicted or actual conflicts against the terrain during the final approach.

Terrain can be build up using digital terrain data or set of polygons that sufficiently accurate shape the vertical environment.

FP data is not used. APM requires an appropriate presentation of predicted / actual

conflicts to the tactical controllers and ATC supervisor. APM requires careful optimalisation / tuning to minimise false

alarms.

ESSIP Plan 2014 / Objective ATC 02.7 3

Page 4: Objective ATC 02.7 ESSIP Plan 2014 Ingrid FEIJT DSS/PEPR 19.09.2014

Link to European ATM Master Plan

[CM-0801] – Ground Based Safety Nets (TMA, En Route)

ESSIP Plan 2014 / Objective ATC 02.7 4

Page 5: Objective ATC 02.7 ESSIP Plan 2014 Ingrid FEIJT DSS/PEPR 19.09.2014

Most important SLoA(s)

ASP01 “Implement the APM function. Put into service ground-based safety tool systems and associated procedures supporting the APM function.” ASP to check the compliance of the implemented APM with the

requirements stated in the specification, the related guidance material and the relevant training and safety requirements.

ESSIP Plan 2014 / Objective ATC 02.7 5

Page 6: Objective ATC 02.7 ESSIP Plan 2014 Ingrid FEIJT DSS/PEPR 19.09.2014

Finalisation Criteria

Ensure that Ground systems have been upgraded to support the APM function.

Ensure that the technical file (TF) with evidences of compliance and the EC declaration of verification of systems (DoV) has been delivered to the competent National Supervisory Authority (NSA).

Ensure that the APM function is in operational use.

Ensure that the training plans have been updated and a training package has been developed by the ANSP for the use of APM functions.

ESSIP Plan 2014 / Objective ATC 02.7 6

Page 7: Objective ATC 02.7 ESSIP Plan 2014 Ingrid FEIJT DSS/PEPR 19.09.2014

Supporting Material

The EUROCONTROL specification for APM issued in May 2009 (edition 0.9) which is still a draft.

The EUROCONTROL Guidance Material for APM issued in May 2009, Edition 1.0

EUROCONTROL Guide “ Safety Nets Ensuring Effectiveness, dated 21 May 2011

This if for guidance only, and is not compulsory.

Council Decision of 30 March 2009 endorsing the European ATM Master Plan of the Single European Sky ATM Research (SESAR) project (2009/320/EC)

ESSIP Plan 2014 / Objective ATC 02.7 7

Page 8: Objective ATC 02.7 ESSIP Plan 2014 Ingrid FEIJT DSS/PEPR 19.09.2014

ESSIP Report 2013

A slight improved progress has been made in the deployment of this Objective, compared to 2012.

Majority of the States declared to have plans for implementation between 09/2016 and 12/2016 end of the full operational capability date

Achieving ATM MP (IP1) in time could be jeopardised.

ESSIP Plan 2014 / Objective ATC 02.7 8

Page 9: Objective ATC 02.7 ESSIP Plan 2014 Ingrid FEIJT DSS/PEPR 19.09.2014

Contacts

Objective Coordinator:

FEIJT, Ingrid +32 2 729 5044

[email protected]

DNM Objective Expert(s):

BAKKER, Ben +32 2 729 3149

[email protected]

DROZDOWSKI, Stanislaw +32 2 729 3760

[email protected]

ESSIP Plan 2014 / Objective ATC 02.7 9