ob clearspan gable gazebo end - stratco · 2018. 6. 19. · clearspan gable with gazebo end...

19
CLEARSPAN GABLE WITH GAZEBO END ATTACHED PATIO STRATCO OUTBACK ASSEMBLY INSTRUCTIONS. ® Your supplementary guide to building an ATTACHED CLEARSPAN GABLE VERANDAH or PATIO WITH GAZEBO END This set of instructions should be used in conjunction with the Stratco instruction brochure Your complete guide to building an Attached Outback Verandah, Patio or Carport'. Flat Verandahs Attached - ® BEFORE YOU START Carefully read these instructions, along with the Stratco Flat Verandahs Attached Instructions. If you do not have all the necessary tools or information, contact Stratco for advice. Before starting lay out all components and check them against the delivery docket. The parts description identifies additional gable parts, and the component layout diagram indicates their fastening position.

Upload: others

Post on 29-Mar-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: OB Clearspan Gable Gazebo End - Stratco · 2018. 6. 19. · CLEARSPAN GABLE WITH GAZEBO END ATTACHED PATIO STRATCO OUTBACK ASSEMBLY INSTRUCTIONS.® Your supplementary guide to building

CLEARSPAN GABLEWITH GAZEBO END ATTACHED PATIO

STRATCO OUTBACK ASSEMBLY INSTRUCTIONS.®

Your supplementary guide to building an

ATTACHED CLEARSPAN GABLE VERANDAH or PATIO

WITH GAZEBO ENDThis set of instructions should be used in conjunction with the Stratco instruction brochure‘ Your complete guide to building an Attached Outback Verandah,Patio or Carport'.Flat Verandahs Attached -

®

BEFORE YOU START

Carefully read these instructions, along with the Stratco Flat Verandahs AttachedInstructions. If you do not have all the necessary tools or information, contact Stratcofor advice. Before starting lay out all components and check them against the deliverydocket. The parts description identifies additional gable parts, and the componentlayout diagram indicates their fastening position.

Issued: MARCH 2011All brands and logos/images accompanied by ® or are trade marks of Stratco (Australia) Pty LimitedTM

Page 2: OB Clearspan Gable Gazebo End - Stratco · 2018. 6. 19. · CLEARSPAN GABLE WITH GAZEBO END ATTACHED PATIO STRATCO OUTBACK ASSEMBLY INSTRUCTIONS.® Your supplementary guide to building

18

HEADER BEAM

INFILL PANEL

49

8x35mm SELFEMBEDDING TEK

12x20 HEX HEAD SELFDRILLING SCREWS

HEADER FLASHING

15.2 HEADER BEAM WITHOUT GUTTER

Infill panels are fixed through the top groove of rafters andthe lower groove of the header beam with 8x35mm selfembedding teks. Fix at 500mm centres in non-cyclonicareas and 250mm centres in cyclonic areas. Panels arefixed to the end strut at the same spacings. Attach theheader flashing to the underside of the header beam with10x16 hex head screws to neatly finish the base of the infillpanels (Figure 49).

16.0 ATTACHING BARGE CAPPING

If barge capping is required at the opposite end to thegazebo, attach the barge cap by screwing the lower lip tothe rafter and rivet the top section to the deck, as shown inFigure 50. Mitre the barge at the apex of the gable for a neatfinish. Run the barge cap along the gable section to where itmeets the flat verandah deck and finish neatly.

17.0 HELPFUL TIPS

Leave plastic coating on members until they are about to befastened to the structure. This will help prevent scratchingof the colorbond finish.

Sweep the roof and clean gutters after the completion ofwork. Ensure any swarf and rivet stubs are removed as theycan cause unsightly rust stains.

Do not allow soil to remain in permanent contact with thecolumns, as corrosion will result in the base of the column.Refer to the “Selection, Use and Maintenance of StratcoSteel Products” brochure for complete details of themaintenance requirements.

Double check all measurements and drilling locationsbefore proceeding.

Regularly check framework for squareness and verticalalignment to make sure it hasn't moved during construction.

50

OUTBACKDECKING

®

BARGE CAP

GABLERAFTER

BARGE CAPIS SCREWED

TO GABLERAFTER

RIVET

BEAM CAPPINGFixed to top of the valleybeam to provide supportfor outback deck.

TWO PIECECLEARSPAN BACKCHANNELSecures deckover hip rafters.

GAZEBO BEAMCAPPING MITRECovers the gap at theBeam Cappingintersection.

GABLE BEAMBRACKETConnects rafters toheader beam on aninfill gable.

PARTS DESCRIPTION 1

BEAM TO BEAM BRACKET

BEAM FILLER

Connects horizontalbeams.

Fills gapbetweenintersectingBeams.

BARGE CAPThe barge cap coversthe area where thedeck finishes at portalframe.

SCREWS AND RIVETSFastener types vary dependingupon the connection, ensurecorrect fixings are used.

14 x 95

12 x 20RIVET

RIDGE KNUCKLESlots inside the gable rafters toform connection at the ridge.

RIDGE CAPThis flashing covers theroof sheets at the gableridge and the Gazebo Endhips.

END STRUTThe gable infill issupported by theend strut, whichconsists of a sectionof post.

22 or 30 ENDSTRUT PLATESecures the endstrut at the ridge.

º º

RAFTERSGable Raftersconsist of pre-cut120 Outbackbeam.

®

SOAKER FLASHINGThe soaker flashingwater proofs the rearof the gable andconceals the existinghouse gutter.

PERIMETERBRACKETThis bracketfastens therafters to thegazebo fasciabeam.

APEX BRACKETThis bracket fastens the hiprafters to the apex of the gableframe.

BOLTSFastener types vary dependingupon the connection, ensurecorrect fixings are used.

M10 HEX

HEAD BOLT

M12 HEX

HEAD BOLT

CUPHEAD

BOLT

RAFTER TOVALLEYBRACKETThis bracketfastens therafter to thevalley beam.

SPACERSAre used to prevent the150 attachment beamfrom crushing.

HEADER BEAM BRACKETConnects end strut to headerbeam on an infill gable.

HEADER FLASHINGSRuns along header beamto neatly finish the base ofinfill panels.

PANEL STRIPSDecorative strips fixed toinfill panels.

INFILL PANELCut to suit gable endframes.

FINIALProvides decorationat the apex of thegable end frame.

POST BRACKET

POST CAP

Connects postto beam.

Fills gap betweenpost and beam.

Page 3: OB Clearspan Gable Gazebo End - Stratco · 2018. 6. 19. · CLEARSPAN GABLE WITH GAZEBO END ATTACHED PATIO STRATCO OUTBACK ASSEMBLY INSTRUCTIONS.® Your supplementary guide to building

COMPONENT LAYOUT

7

8

9

10

6

5

4

3

2

1 Ridge Cap

Flat Section

Outback Deck

Ridge Beam

Ridge nuckle

Gable Rafter

Valley Beam

Angled Back Channel

Beam Capping

®

K

15

14

13

12

11

Rafter to Valley Bracket

Front Fascia Beam

Post Bracket

Post

End Fascia Beam

Gutter

Notched Beam Filler

1

2

34

5

6

7

8

9

10

11

12

13

15

CLEARSPAN GABLE(GAZEBO END)

1

14

16

16

2

14.0 RIDGE CAPPING

14.1 MAIN RIDGE

Position the ridge cap over the ridge beam and two angledback channels and rivet into the channel (Figure 44).

44

RIDGE CAP

FIX RIDGE CAP TO BACKCHANNEL WITH RIVETS

OUTBACKDECK

®

17

14.2 GAZEBO END CAPPING

Ridge cap is also used over all gazebo end rafters toconceal the two piece back channel. The ridge cap ispositioned over the channels and screwed in place throughthe channels (Figure 45). Ridge capping will need to be cutto meet a point at the apex as detailed in figure 46. Allow anapproximate 20mm overlap at the ridge. The capping is tobe fully silicon sealed at the apex for waterproofing.

TWO PIECE BACKCHANNEL

OUTBACK DECK®

45HIP RAFTER

PURLIN COVER

BIP FOAM

SHEET RIVETED TOBASE FLASHING

RIDGE CAP

46

20mm OVERLAP

FRONT GABLE FRAME

RIDGE CAPPING

47

FIX TO FRONT OF RIDGEWITH 2 12x20 HEX HEADSELF DRILLING SCREWS

FIX TO STRUT WITH2 12x20 HEX HEAD SELFDRILLING SCREWS

FIX STRUT TO BRACKETWITH 2 12x20 HEX HEADSELF DRILLING SCREWSEITHER SIDE

FIX BRACKET TO HEADERWITH 2 12x20 HEX HEADSELF DRILLING SCREWS

15.0 INFILL PANELS

Two styles of header flashings are available to neatly finishthe base of infill panels, one is used on header beams withgutter and the other for headers without gutter. Gable infillpanels are to be cut in triangular shapes to fit the end frame.Panels can be painted to the desired colour beforeinstalling.

End struts are fixed mid-span of the header to a headerbeam bracket at the base and an end strut plate at the ridge(Figure 47).

15.1 HEADER BEAM WITH GUTTER

Attach the header flashing to the rear gutter lip with rivets.Infill panels are fixed through the top groove of rafters andthe end strut with 8x35mm self embedding teks at 500mmcentres in non-cyclonic areas and 250mm centres incyclonic areas. Panels are fixed at the base through theheader flashing with split tail soft pull rivets at 500mmcentres (Figure 48).

INFILL PANEL

48

GUTTER

HEADER FLASHING

SPLIT TAIL SOFTPULL RIVETS

HEADER BEAM

Page 4: OB Clearspan Gable Gazebo End - Stratco · 2018. 6. 19. · CLEARSPAN GABLE WITH GAZEBO END ATTACHED PATIO STRATCO OUTBACK ASSEMBLY INSTRUCTIONS.® Your supplementary guide to building

COMPONENT LAYOUT 3

2

7

8

6

5

4

3

2

1 Ridge Cap

Two Piece Clearspan

Backchannel

Ridge Knuckle

Hip Rafter

Gazebo Fascia Beam

Beam Capping

Beam Channel

Outback Deck®

9

10

Gazebo Apex Bracket

Rafter to Valley Bracket

Post Bracket

Post

67.5 Angled Inline Beam Connector

Post Cap

Perimeter Bracket

Beam End Cap

Gazebo Beam Capping Mitre

°13

12

11

14

1

15

2

4

5

6

9

10

1114

16

3

12

13

717

15

16

GAZEBO END

17

8

16

42

3

2 DECKING

GAZEBO END

4

5 1

13.2 CLEARSPAN GABLE

13.3 GAZEBO END

When attaching the decking to the gable, start from therear (non gazebo end) on one side of the gable. Fix thedeck to the angled backchannel at the ridge, and to thecapping at the valley beam.

If the deck of the flat roof section runs perpendicular tothe valley beams, align the ribs of the gable decking upwith the flat roof section.

At the point when less than one full sheet is required to passthe centreline of the end gable frame on one side, theOutback decking will need to be cut to suit.

Continue laying deck past the end gable frame (Section 1,Figure 42) and cut the sheeting to fit inside the Clearspantwo piece back channel. Cut sheeting to fit sections 2, 3, 4,and 5 and continue back down the side of the ClearspanGable.

Outback

Sheets are to be taken down from the framework tobe cut. It is recommended sheeting is supported in ahorizontal plane off the ground at a comfortable height forcutting.

‘Outback Flat AttachedVerandahs, Patios & Carports’).

deck is riveted to the base flashing at 250mmcentres (Figure 43).

®

®

Note:

Note: If Installing Outback Rooflite, refer to “OUTBACKROOFLITE INSTALLATION” (

43

HIP RAFTER

TWO PIECE BACKCHANNEL

OUTBACK DECK®

aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa

aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa

BIP FOAM

SHEET RIVETED TOBASE FLASHING

All sheeting which ends at the apex is to be cut to a point soit meets directly above the centre of the end gable frame.

The Outback decking will need to overhang the beamcapping allowing water to flow directly into the gutter(Figure 39).

®

Page 5: OB Clearspan Gable Gazebo End - Stratco · 2018. 6. 19. · CLEARSPAN GABLE WITH GAZEBO END ATTACHED PATIO STRATCO OUTBACK ASSEMBLY INSTRUCTIONS.® Your supplementary guide to building

15

38

GABLERAFTER

BACK CHANNELAT MIDPOINT FRONT

GABLE RAFTER

MODIFIED SUSPENSIONBRACKET FIXED AT

RIDGE USING FOUR 12 x 20 HEXHEAD SELF DRILLING SCREWS

ANGLEDBACK CHANNEL

RIDGE BEAM FIXED TOMODIFIED SUSPENSION

BRACKET USING TWO 12 x 20HEX HEAD SELF DRILLING

SCREWS EACH SIDE

RIDGE BEAM

ATTACHINGRIDGE BEAM

11.0 REMAINING FRAME ASSEMBLY

12.0 GUTTERING

Assemble the remaining framework of the verandah as perthe

.

Fix the posts, as described in the installation guide under"COLUMNS AND FOOTINGS” or "ALTERNATIVEFOOTING".

Note: All adjustable construction props are to be left inposition until decking is attached and concrete is set.

installation guide ‘Outback Flat Attached Verandahs,Patios & Carports’

‘Outback FlatAttached Verandahs, Patios & Carports’

Gutter around the gazebo end needs to be mitred. Cut30mm tabs in the gutter back lip at 1000mm intervals andfold back. Fix the gutter to the beam capping, through thetabs with rivets as shown in figure 39. Once decking isattached (Section 13.0). Fit gutter straps at maximum1000mm intervals, attaching to the top of the decking withrivets. Waterproof rivets with silicone. The same method isused where there is no flat roof adjacent the gable.

The gazebo end gutter will be at a higher level than the flatroof gutter. The lower gutter is notched if required at thepoint the gazebo gutter intersects allowing the gazebo endgutter to overlap and flow directly into the lower gutter(Figure 40).

Alternatively, the flat roof gutter and the gazebo end guttermay be kept mutually exclusive having gutter stop endssealing the gutters to keep them separate. Separatedownpipes will then be necessary.

All gutter joins are to be waterproofed with silicon.

Connect the gutter to the flat roof Outbacks as described in”. Flat

roof gutters need to end flush with the gable valley beamsand stop ends are fixed.

®

40

LOWERGUTTER

GAZEBO ENDGUTTER

NOTCHEDSECTION

39

GAZEBO FASCIABEAMGUTTER

HIP RAFTEROUTBACK DECK

RIVET TABS TO TOPOF BEAM CAPPING AT1000mm INTERVALS

BEAM CAPPING

BEAM CAPPINGMITRE

PLAN VIEW FRONT VIEW

13.0 ATTACH DECKING

13.1 FLAT ROOF

Attach the decking to the flat roof verandah first as laid outunder "THE DECKING" (‘Outback Flat AttachedVerandahs, Patios & Carports’), starting from the valleybeam and working away, on both sides.

The back channel should have been attached upside down(the shorter leg on top) along beam capping to assist thefixing of decking. (Figure 41).

41

OUTBACK DECK®

OUTBACKDECK

®

BACK CHANNEL FIXEDUPSIDE DOWN TOBEAM CAPPING

FRONT FASCIA BEAM GAZEBO FASCIA BEAM

BEAMCAPPING

HIP RAFTER

COLUMN

BEAM CAPPING

BEAM CAPPINGMITRE

ADDITIONAL MATERIALS

These materials are needed to complete the job, but are notincluded in the basic kit price. (they must be purchased asextra items, and their quantities specified):

Rafter strengthening brackets and channels to suit 150beam attachment for attaching gable to house.M12 bolts and nuts for fixing strengthening brackets to therafter.M12 bolts and nuts for fixing 150 attachment beam tostrengthening brackets.Fascia Brackets for attaching gable on end to house.M10 coach bolts and nuts for fixing fascia brackets to thehouse rafter.M8 masonary anchors for fixing Wall Brackets to masonary.

12x25 type 17 teks for fixing Suspension Brackets totimber.12x20 hex head screws for fixing Suspension Brackets tosteel fascia.Cover flashings (measurements required).Box gutter (measurements required).

These items are available at request:Infill PanelsPanel StripsFinialSoaker Flashing in lieu of Header FlashingPurlin Intersection Cap

OPTIONAL EXTRAS

1.0 INTRODUCTION

2.0 ATTACHING TO AN EXISTINGSTRUCTURE

2.1ATTACHING ON SIDE TO HOUSE

Please read these assembly instructions thoroughly beforecommencing the construction. Double check alldimensions, levels and bolting locations before cutting,screwing or bolting structural members. It is recommendedthat the persons erecting the structure have had someprevious building experience, because some modificationsto the existing house structure are required.

The builder or council is to ensure the existinghouse/structure is of a suitable structural integrity andcomplies with all the relevant Australian Building codes andstandards. For more information regarding the suitability ofthe house structure to accommodate the Stratco AttachedClearspan Gable, consult a structural engineer or a buildingauthority. It is the builders responsibility to ensure that theexisting house roof structure is strengthened correctly.

Refer to section 2.1 if attaching Clearspan Gable on it’s sideto a house, section 2.2 if attaching on it’s end to a house orrefer to both sections if attaching the gable on it’s side andend.

A Stratco Clearspan attached on it’s side to a house isattached to the existing eaves overhang at the fascia.

The first objective in the construction is to fix a structuralside beam along the fascia or wall, to which the Gable Unitis attached.

Most existing houses have not been designed for theattachment of portal framed gables to their side, thereforeadditional strengthening of the house rafters must beperformed.

In order to strengthen the existing house rafters, the rooftiles or roof sheets need to be lifted, to expose the roofframe. Steel rafter brackets and channels are then boltedalong the house rafters. Refer to section 2.1.1.

A 150 mm Outba beam is bolted to the strengtheningbrackets at the fascia. Once the 150 attachment beam issecured to the house the Gable Unit can be erected andfastened to the beam.

The first step is to determine the number of rafters whichneed to be strengthened, and their location relative to theunit. You will have to lift some roof tiles or roof sheets todiscover the rafter positions and spacings. The number ofrafters which need to be strengthened is determined by thebuilder.

: It is the builders responsibility to ensure the existingrafters and fascia are adequately reinforced andstrengthened to accommodate any additional attachedstructure. The reinforcing method must be approved by theappropriate council and engineer.

Use an adjustable rafter strengthening bracket and onechannel for eaves overhangs up to 450 mm. Use anadjustable rafter strengthening bracket and two channelsfor eaves overhangs over 450 mm and up to and including600 mm, as shown in figure 4.

The adjustable rafter strengthening bracket is shown infigure 3. Please note that this bracket may not be suitablefor applications where the front face of the house gutter ishigher than 120 mm. In these cases please contact Stratcofor alternative solutions.

ck®

Note

2.1.1 RAFTER STRENGTHENING

4

ADJUSTABLE RAFTER STRENGTHENINGBRACKET 3

Page 6: OB Clearspan Gable Gazebo End - Stratco · 2018. 6. 19. · CLEARSPAN GABLE WITH GAZEBO END ATTACHED PATIO STRATCO OUTBACK ASSEMBLY INSTRUCTIONS.® Your supplementary guide to building

HIPRAFTER

PERIMETER BEAMBRACKET

GAZEBO FASCIABEAM

12x20 HEX HEADSCREWS

>20

>30

>20

34

35

12x20 HEX HEADSCREWS

RAFTER BEAM

TWO PIECE CLEARSPANBACK CHANNEL

9.0 CLEARSPAN TWO PIECE BACKCHANNEL ASSEMBLY.

A special two piece back channel will be required and isto be located along the hip rafters before the decking isfastened in place. The flashings are screwed to thecentre of the hip rafter using 12x20 hex head screws at500mm centres (Figure 35). The back channel shall runthe full length of the hip rafters and should be mitred atthe apex for a neat finish. BIP foam is inserted either sideof the back channel before decking is fixed in place.

500

BEAM CAPPING

10.0 ASSEMBLING RIDGE BEAM

Assemble ridge beam before attaching to gable frames. Fixangled back channel to both sides of the ridge beam using12x20 hex head self drilling screws at 500mm centres,ensuring that the top of the back channel is in line with thebottom of the beam chamfer as shown in figure 36. Theback channel should run 68mm past the end of the beam atboth ends of the ridge beam. If there is no rear portal frame,finish the back channel flush at one end.

36

OVERHANGBACK CHANNEL

68mm

150 RIDGE BEAM

ATTACH ANGLED BACKCHANNEL TO RIDGE BEAM

USING 12X20 HEX HEAD SELFDRILLING SCREWS AT 500mm

CENTRES

ATTACHINGBACK CHANNELTO RIDGE BEAM

In the case of decking overhanging the gable frame(non-gazebo end), run the angled back channel to the end ofthe overhanging ridge beam as shown in figure 37. Amodified suspension bracket will be required on bothsides of the ridge to support overhang.

10.1 ATTACHING RIDGE BEAM

Fix modified suspension bracket at the ridge using four 12 x20 hex head self drilling screws through the gable frameand into the ridge knuckle.

Position the ridge beam so that the angled back channelrests on the gable frame (Figure 38). Fix to modifiedsuspension bracket using two 12x20 hex head self drillingscrews each side.

37

BACK CHANNELFLUSH WITH

END OF BEAM

OVERHANGING 150RIDGE BEAM

ATTACHING BACK CHANNELTO OVERHANGING RIDGE BEAM

(DECK OVERHANG)

ATTACH ANGLED BACKCHANNEL TO RIDGE BEAM

USING 12X20 HEX HEAD SELFDRILLING SCREWS AT 500mm

CENTRES

14

4

450mm EAVES OVERHANG

RAFTERSTRENGTHENING

BRACKET

M12 BOLT

TIMBER RAFTER

60x44x2.0 G450 GALVANISEDCHANNEL

600mm EAVES OVERHANG

RAFTERSTRENGTHENING

BRACKET

M12 BOLT

TIMBER RAFTER

60x44x2.0 G450 GALVANISEDCHANNEL

Fixing the 150Attachment Beam in Place

After fixing all the brackets and channels, the 150 beam isfixed in place.

Prop up the 150 beam in position with the double flange ontop, the beam will need to be located at a height on thebracket which allows clearance between the gable roofsheets and the gutter. Fix to the end plates of the rafterbracket using two M12 bolts, with the bolt head on the 150beam side. Insert spacers to prevent the beam fromcrushing, and bolt in position, using nuts and washers.

Do not over tighten bolts as this can lead to a visibleindentation due to the high gloss nature of the material.Refer to Figure 8 for fixing spacers.

Note:

5

Fixing Rafter Strengthening Brackets andChannels

The adjustable rafter strengthening bracket allows for anadjustment of pitch in the range of 15 to 30 degrees. Thedistance the bracket extends past the fascia is alsoadjustable to allow for standard gutters or box gutters with awidth of up to 200mm.

In conjunction with rafter strengthening brackets, channelsare fixed to the side of the house rafter (Figure 4). Thebottom end of the channel will be located at the base of thehouse rafter. Holes should be marked and pre-drilled in thechannels to suit the location of existing holes in the bracket.The channel will extend beyond the bracket so additionalholes are to be drilled in the channel at approximately500mm centres.

Initially the bracket T piece shall be fixed to the bracket armwith two M12 cup head bolts (hand tighten only), a springwasher is to be located between the standard M12 washerand nut (Figure 5). Mark the position of the bracket on thefascia and notch a rectangular hole in the fascia allowingthe bracket to be fed through the front of the fascia. The holemay need to be enlarged slightly if the M12 cup head boltsinterfere with the fascia.

5

BRACKET ARMT PIECE

TIGHTEN TO 35NmTORQUE

M12 WASHER

M12 SPRING WASHER

M12 NUTM12x40 CUP HEADBOLT

Insert the bracket through the fascia and fix with thechannel(s) to the house rafter using M12 hex head boltsthrough the existing holes in the bracket and further up thechannel(s) (Figure 7). Adjust the T piece so it is horizontaland has the appropriate extension past the fascia to allowfor fixing of the attachment beam. T piece connection boltsare to be tightened to a minimum 35Nm torque.

Fix the bracket as close to the base of the gutter as possible(recommended distance 10mm from lowest end of gutter),as shown in figure 6.

The 150 attachment beam is to be fixed to the end plate toensure the carport roof sheets drain into the existing housegutter (Figure 6).

RAFTER

6

ENOUGH CLEARANCE FORROOF SHEETS TO RUN INTO

THE HOUSE GUTTER

FIX BRACKET AS CLOSEAS POSSIBLE TO THE BASE

OF THE GUTTER

RAFTERSTRENGTHENING

BRACKET

OUTBACK ROOF SHEET®

150 ATTACHMENTBEAM

Page 7: OB Clearspan Gable Gazebo End - Stratco · 2018. 6. 19. · CLEARSPAN GABLE WITH GAZEBO END ATTACHED PATIO STRATCO OUTBACK ASSEMBLY INSTRUCTIONS.® Your supplementary guide to building

7.0 PERIMETER BRACKETS

Perimeter brackets are to be located at the internal join ofthe beam capping so the bottom face of the bracket is inlinewith the bottom edge of the upper groove in the beam(Figure 32). Brackets are to be fastened to the beamcapping using four 12x20 hex head screws through the pre-drilled holes. Note: Ensure the bottom screws fix throughinternal beam capping channel.

8.0 GAZEBO HIP RAFTERS

Having all the Perimeter Brackets in place will allowrafters to be located. The two shorter rafters are to bepositioned closest to the end gable frame on either side.It is important that rafters are firstly fixed at the apex,position rafters over the apex bracket tabs so the cut faceof the rafter is flush with the face of the bracket.

Two 12x20 hex head screws are used to fix the rafter tothe tab with the first screw being located 20mm from thefront face of the bracket and the second 20mm from thefirst screw (Figure 33). This process is repeated for thetwo internal gazebo hip rafters.

32

PERIMETER BRACKET

12x20 HEX HEADSCREWS

GAZEBO FASCIA BEAMS

BEAM CAPPING

HIP RAFTERS

12x20 HEX HEADSCREWS

GAZEBO APEXBRACKET

INTERNAL HIPRAFTER

GAZEBO APEXBRACKET

20

20

33

With all gazebo rafters fixed at the apex they can befastened to the perimeter brackets. Fix rafters through thebase of the perimeter brackets using two 12x20 hex headscrews at a minimum spacing of 30mm. As a smalltolerance is allowed for at this bracket it is important thatthe screws are located at least 20mm from the bracketedge and the bottom edge of the rafter (Figure 34).

13

The 150 attachment beam becomes the base for the attachment of the Clearspan gable unit. Figure 7 shows a unit attached atthe side.

7

CHANNEL EXTENSION

CLEARSPAN GABLE ATTACHED AT THE SIDE

WEB OVERHANG

STUD WALL

TIMBER RAFTER

A

A

GUTTER

EAVES OVERHANG

BRICK WORK

RAFTER STRENGTHENING BRACKETATTACHED TO RAFTER WITH

6 (M12 HEX HEAD BOLTS)

RAFTER

6

150 ATTACHMENT BEAM

REFER FIGURE 4

450

600

1800

1900

300

400

EavesOverhang

(mm)

Channel ExtensionBeyond Birds Mouth

(mm)Web Overhang

(mm)

Recommended Channel Extension

To insert spacers drill 11 mm holes through the 150attachment beam. Then drill 16 mm holes on the outsideface only, ie this time do not drill all the way through. This willallow the spacer to slide in, from the outside and stop at theother side as shown in figure 8.

You would have ordered and received your custom madeflashings to cover the exposed brackets and holes throughfascia. Rivet flashings in place, figure 9 suggests asimplified flashing. You may however use your imaginationand design a flashing that suits your individual taste.

8

BEAM CAPPING

BEAM CHANNEL150 ATTACHMENTBEAM

SPACER

NUT

RAFTERSTRENGTHENING

BRACKET

M12 BOLT

DOUBLE FLANGE

ENLARGED HOLE(16 MM THIS SIDE ONLY)11 MM HOLE

WASHER

WASHER

2.2ATTACHING ON END TO HOUSE

If fixing a Clearspan Gable on its end to a wall, twoalternatives are available. Ridge and valley beams arefixed directly to the wall using 150 beam to wall brackets.This option will not require a rear gable frame and backchannel is fixed to the wall to accommodate sheets runningalong the wall. The other alternative requires valley beamsbe fixed to the wall and a rear gable frame installed. Therear gable frame will need to be slightly offset from the wallto allow the appropriate bracket fixing.

If fixing a Clearspan Gable on its end with suspensionbrackets to a fascia (Figure 10) typically a soaker flashing isused. In this case the gable rafter at the rear of the unit is tobe 153mm from the house fascia in order to accommodatea standard soaker flashing (refer Figures 29 and 30).

150 ATTACHMENT BEAM FIXED TORAFTER BRACKET WITH TWO

M12 BOLTS

CHANNEL

9COVER FLASHING(OPTIONAL)RIVET

RIVET

STRENGTHENINGBRACKET

FASCIA

150 ATTACHMENTBEAM

HOUSEGUTTER

Page 8: OB Clearspan Gable Gazebo End - Stratco · 2018. 6. 19. · CLEARSPAN GABLE WITH GAZEBO END ATTACHED PATIO STRATCO OUTBACK ASSEMBLY INSTRUCTIONS.® Your supplementary guide to building

ATTACH GABLE BEAMBRACKET USING A MINIMUMOF EIGHT 12x20 HEX HEADSELF DRILLING SCREWS

ATTACH RAFTER TOBRACKET USING A MINIMUMOF THREE 12x20 HEX HEAD

SELF DRILLING SCREWSEACH SIDE

GABLE BEAMBRACKET

BEAMCAPPING

RAFTER

HEADERBEAM

NOTCH BEAMCAPPING TO FIT

OVER BEAM

VALLEYBEAM

ATTACHING TO FRONT BEAM

6.2.1 SOAKER FLASHING

In the case of a rear infill panel, a soaker flashing is used toconceal the existing house gutter, waterproof the rear endof the gable and neatly finish the base of the infill panel(Figure 29).

The rear gable frame and header beam are positioned 153mm from the house fascia in order to accommodate thestandard soaker flashing which is optional with theOutback unit (Figure 30). The frame is fixed on the rearheader beam into gable beam brackets as detailed above.

Fix the standard soaker flashing into position on top of theback channel and underneath the gutter. Infill panels mustbe fixed with split tail soft pull rivets at 500mm centres aminimum of 20 mm above the pan of the soaker flashing.This will reduce the possibility of moisture being absorbedinto the sheet.

Refer section 15 for details of fixing infill panels to gableframes.

®

153mm

30

VALLEY BEAM

BACK CHANNEL

120 GABLE RAFTER

SOAKERFLASHING

BEAMCAPPING

INFILL PANEL

GUTTER

SOFFIT LINING

SUSPENSIONBRACKET

STEEL FASCIA BRACKET(ATTACHED TO RAFTER

& BACKCHANNEL)

Note:

1. If your house gutter is wider than 150 mm a custom madesoaker flashing will need to be ordered to the requireddimensions. The rafter setback will need to be adjusted tosuit.

2. Do not form stop ends at either end of the soaker flashing.

3. Soaker flashing is not to come in contact with the base ofthe house gutter.

6.2.2 HEADER FLASHING

When a gable is fixed at the rear to an attachment beam,elevated to the existing house gutter height, typically aheader flashing is used in conjunction with the rear infill. Inthis case, the rear attachment beam is considered aheader, and along with the rear gable frame is fixed as closeas possible (within 5mm) to the existing gutter in order toaccommodate the header flashing. The gable frame is fixedon the rear header to gable beam brackets as previouslydescribed.

Fix the header flashing into position over the existing gutterlip with rivets. Infill panels are located behind the headerflashing and fixed with split tail soft pull rivets at 500mmcentres (Figure 31).

Refer section 15 for details of fixing infill panels to gableframes.

SPLIT TAIL SOFTPULL RIVETS

SOAKERFLASHING

29

28

20mm GAP

31

STRENGTHENINGBRACKET

FASCIA

HOUSEGUTTER

INFILL PANEL

VALLEY BEAM

BEAM CAPPING

150 ATTACHMENTBEAM

HEADERFLASHING

SPLIT TAILSOFT PULL RIVET

12

VALLEY BEAM

BACK CHANNEL

120 GABLE RAFTER

SOAKERFLASHING

BEAMCAPPING

INFILL PANEL

GUTTER

SOFFIT LINING

SUSPENSIONBRACKET

STEEL FASCIA BRACKET(ATTACHED TO RAFTER

& BACKCHANNEL)

10

Note:

Note

If your house gutter is wider than 150mm a custommade soaker flashing will need to be ordered and the rafterset back adjusted to suit.

If fixing a Clearspan Gable on its end to an attachmentbeam, elevated to the existing house gutter height, theattachment beam is to be as close as possible (within 5mm)to the outside face of the gutter (Figure 31). The 150mmattachment beam is fixed to rafter strengthening bracketsas detailed in section 2.1.1.

: It is the builders responsibility to ensure the existingrafters and fascia are adequately reinforced andstrengthened to accommodate any additional attachedstructure. The reinforcing method must be approved by theappropriate council or engineer.

2.2.1 FASCIASTRENGTHENING

Steel fascia brackets are generally fastened at 1200mmcentres to fascia and rafters (Figure 10). It is the buildersresponsibility to determine the adequacy of the fascia andrafters and the frequency of brackets for each individualsituation.

3.0 GABLE FRAME ASSEMBLY

IMPORTANT:

Note:

Ensure that the double thickness portion isat the top when installing all beams and rafters.

The rafters are supplied pre-cut and drilled at theridge as shown in Figure 11.

Measure the distance between rafter ends, O, to checkvalley beam spacing (Figure 13).

13

GABLE OPENING (O)

12

2 (12 X 20 HEX HEAD SELFDRILLING SCREWS) EACH

2 (12 X 20 HEX HEAD SELFDRILLING SCREWS)

THROUGH TOP OF BOTH

Insert ridge knuckle into the pre-cut rafters and screwtogether using two 12x20 hex head self drilling screws bothsides of each rafter and two 12x20 hex head self drillingscrews through the top (double flange side) of each rafter.

Pilot holes indicate screw locations as shown in figure 12Make sure that the two ends are flush at the connection,leaving no gaps.

7

3.1 APEX BRACKET

The Gazebo Apex bracket is to be fixed to the front face ofthe front gable frame at the apex. The bracket is to belocated so the bottom edge of the apex bracket is in-linewith the top edge of the bottom chamfer of the gable framerafters. The apex bracket is to be located centrally at theapex and fixed through the pre-drilled holes using 12x20hex head screws (Figure 14).

11

OPEN GABLE RAFTER

INFILL GABLE RAFTER

Page 9: OB Clearspan Gable Gazebo End - Stratco · 2018. 6. 19. · CLEARSPAN GABLE WITH GAZEBO END ATTACHED PATIO STRATCO OUTBACK ASSEMBLY INSTRUCTIONS.® Your supplementary guide to building

6.0 GABLE FRAME CONNECTION

Note: Be aware that gable frames are always 120 beamsand valley beams are always 150 beams for Clearspanunits with a gazebo end.

The front gable frame will need to be set back from the frontof the valley beams to accommodate the gazebo end. Referto Figure 25 and Table 1 for set back distance.

The rafter to valley brackets will have been attached to thebeam capping using six 12x20 hex head screws (Figure 18,Section 4.1) at the location determined from Table 1(Figure 25).

6.1 GABLE FRAMES(Figure 1)

Table 1Interpolation may be used to determine valuesbetween those shown.All lengths in millimetres (mm).

VALLEY BEAM

25

RAFTER

A(S

ET

BA

CK

)

RAFTER TO VALLEYBRACKET

OPENING, O A (Set Back)

1200150018002100240027003000330036003900420045004800510054005700600063006600

1022108411471209

13331395

277339401463525587649712774836898960

1271

Fix the gable rafters to the rafter to valley brackets with two12x20 hex head screws either side (Figure 26).

If attached on the end, attach the second valley beam intothe wall or suspension bracket.

If the unit includes rear infill a rear header beam isrequired and must be installed before fixing the secondvalley beam in position, refer section 6.2.

Note:

VALLEY BEAMCAPPING

120 RAFTER

VALLEY BEAM 26

RAFTER TO VALLEYBRACKET

TWO 12x20 HEX HEADSCREWS EITHER SIDE

Intermediate frames should be spaced evenly and fixedinto rafter to valley brackets as previously described.

A rear gable frame without a header beam is fixed as peran intermediate frame.

6.2 REAR INFILL

A rear header beam will be required if the unit includes infillto the rear gable frame. For units attached at the rear withsuspension brackets, the rear header is fixed betweenvalley beams using beam to beam brackets. If fixed at therear to an attachment beam (Figure 31), the attachmentbeam becomes the header (valley beams are fixed to theheader beam) and if attached on the side the rear header isfixed to the attachment beam with beam to beam brackets.

Attach gable beam brackets to the rear header beamagainst the beam capping at spacing, O, as determined insection 3. A minimum of four 12x20 hex head screws arerequired to fix the bracket to the beam capping and aminimum of four screws to fix to the header beam (Figures27 or 28).

The rear gable frame rafters are supplied notched at thebase to fit the gable beam brackets. Rafters are fastenedinside the gable beam brackets with a minimum of three12x20 hex head self drilling screws either side as shown infigures 27 or 28.

Refer section 15 for details of fixing infill panels to gableframes.

27

GABLE BEAMBRACKET

BEAMCAPPING

HEADER BEAM

RAFTER

ATTACH RAFTER TO BRACKETUSING A MINIMUM OF THREE

12x20 HEX HEAD SELF DRILLINGSCREWS EACH SIDE

ATTACH GABLE BEAMBRACKET USING A MINIMUMOF EIGHT 12x20 HEX HEADSELF DRILLING SCREWS

VALLEYBEAM

11

3.2 COLLAR TIES

If collar ties are required on intermediate frames they are tobe mitred to suit the pitch of the gable rafters. For gableopenings up to 6000mm collar ties are to be located mid-height of the gable frame. For gable openings greater than6000mm collar ties are to be located at a height to give acollar tie length of 3000mm.

Collar tie brackets are to be fixed back to gable rafters withfour 12x20 hex head self drilling screws at the appropriateheight. Collar ties are then fixed inside the brackets usingthree 12x20 hex head self drilling screws either side (Figure15).

14

APEX BRACKET

RAFTER

12x20 HEX HEADSCREWS

12x20 HEX HEADSCREWS

SIDE FIXINGTAB

A

A

SECTION A-A

17

16

INSIDE EDGE

INSIDE EDGE

BEAM CAPPING

BEAM CAPPINGMITRE

MITRE

MITRE

VALLEY BEAM(ONE END MITRED)

GAZEBO FASCIA BEAM(BOTH ENDS MITRED)

15

Collar tie length (L < 3000)

Collar Tie

FIX COLLAR TIE USINGTHREE 12x20 HEX HEAD

SCREWS EACH SIDE

FIX BRACKET TORAFTER USING FOUR

12x20 HEX HEADSCREWS

4.0 VALLEY BEAMASSEMBLY

Before erecting any valley beams fix channel and capping tothe top of the beams. Fix beam channel to the top of thevalley beam using 12x20 hex head self drilling screws atmaximum 500mm centres. Use four screws at the locationof all rafters as shown in figure 14. Fix the beam capping tothe channel using 3mm rivets or 12x20 hex head screwseach side at maximum 500mm centres, ensuring two rivetsor screws are used either side at the location of all rafters.The capping break must be located in the top groove (Figure16).

Note that the beam capping does not need to be mitred andwill end at the inside of the mitre on the valley beam asshown in figure 17.

If attaching the valley beam to a header beam, notch thecapping so that it sits on top of the beam as shown in figure28.

BEAMCHANNEL

VALLEY BEAM

BEAMCAPPING

FIX BEAM CAPPING TOCHANNEL USING 3mmRIVETS OR 12X20 HEXHEAD SCREWS EACHSIDE AT 500MM CENTRES

FIX WITH TWO RIVETS ORTWO SCREWS EITHER SIDEAT THE LOCATION OF ARAFTER

FIX BEAM CHANNEL TOTOP OF THE VALLEY BEAMUSING 12 X 20 HEX HEADSELF DRILLING SCREWS AT500mm CENTRES

FIX CHANNEL WITH FOURSCREWS AT THE LOCATIONOF A RAFTER

LOCATE THEBREAK ON THE

CAPPING IN TOPGROOVE OF

VALLEY BEAM

ATTACHING TO HEADER BEAM

8

Page 10: OB Clearspan Gable Gazebo End - Stratco · 2018. 6. 19. · CLEARSPAN GABLE WITH GAZEBO END ATTACHED PATIO STRATCO OUTBACK ASSEMBLY INSTRUCTIONS.® Your supplementary guide to building

9

4.1 SIDE ATTACHED

For side attached units fix the rafter to valley brackets to thebeam capping (150 attachment beam will be considered avalley beam) at the correct rafter positions (refer Section 6)using six 12x20mm hex head screws per bracket throughthe pre-drilled holes (Figure 18). Please note that thebottom face of the bracket is inline with the bottom edge ofthe upper groove in the beam. Check positions beforedrilling.

40

150 VALLEYBEAM

150 VALLEY BEAM WITH22° RAFTER VALLEY BRACKET

20

25

BRACKET POSITION INLINE WITHTHE BOTTOM EDGE OF THEUPPER GROOVE

BEAM CAPPING

25

30

25

150 VALLEY BEAM WITH30° RAFTER VALLEY BRACKET

BRACKET POSITION INLINE WITHTHE BOTTOM EDGE OF THEUPPER GROOVE

18

25

positioned at either side of the gable opening at the spacingdetermined in part 3.0. The first bracket is fastened to thewall with two M8x65mm masonry anchors. The curved legsof the bracket are located at the top (Figure 19).

Locate the first valley beam (beam cap on top) up into thewall bracket so the curved legs locate against the top flute ofthe beam. The valley beam is fastened to the wall bracketwith 12x20 hex head screws in the pre-drilled holes whilethe opposite end is supported on adjustable constructionprops.

If any intermediate columns are required measure thevalley beam marking where they meet. Fasten postbrackets as explained in ‘Outback Flat AttachedVerandahs, Patios & Carports’ under “FRONT FASCIABEAM”. Support the second valley beam at the spacingdetermined in part 3.0 on adjustable construction props.

For units attached on the end to a wall, wall brackets are

4.2 ENDATTACHED

19

WALLBRACKET

TWO 12x20HEX HEAD SELF

DRILLING SCREWSEITHER SIDE

TWO M8x65 MASONARY ANCHORSor

TWO 6mm DIAMETER SCREWBOLTSWITH A MINIMUM EMBEDMENT OF 45mm

MINIMUM EDGE DISTANCE OF BOLTS &SCREWS IS (10 x dia)

For units attached on the end to a fascia, suspensionbrackets are positioned at either side of the gable openingat the spacing determined in part 3.0. The top tab of thesuspension bracket must be located between the fasciaand back channel. A minimum of two 12x20 hex headscrews are fixed through back channel, suspension bracketand steel fascia while two 12x25 type 17 screws are used tofix through back channel, suspension bracket and timber(Figure 20).

If back channel is not present, (ie, no adjacent flatroof) locate washer plate behind steel fascia at suspensionbracket. Fix through bracket, fascia and plate.

The first valley beam is fastened into the suspensionbracket with 12x20 hex head screws through the dimpleswhile the opposite end is supported on adjustableconstruction props.

Note:

20

VALLEY BEAM

BACK CHANNEL

120 GABLERAFTER

SOAKERFLASHING

BEAMCAPPING

INFILL PANELGUTTER

SUSPENSIONBRACKET

1.0mm STEPPEDBACK CHANNEL

FASCIA

12x20 HEX HEADSCREWS TO STEEL

12x25 TYPE 17SCREWS TO

TIMBER

If any intermediate columns are required measure thevalley beam marking where they meet. Fasten postbrackets as explained in the installation guide ‘Outback FlatAttached Verandahs, Patios & Carports’ under “FRONTFASCIA BEAM”. This can be done before valley beams arefixed in place.

Support the second valley beam on adjustable constructionprops but do not fix to the wall, fascia or attachment beamuntil the front gable frame has been attached.

Fix the rafter to valley brackets to the beam capping at thecorrect rafter positions (refer Section 6). Fixing details asshown in section 4.1.

Attach the in-line connector brackets back to back usingM10 bolts and nuts in the holes provided (Figure 22).Ensure the constructed bracket makes the required internalangle of 135 degrees.

Slide the in-line connector into the valley beam and fix usingtwo 12x20 hex head screws either side of the beam. Fix oneof the three gazebo fascia beams to the protruding half ofthe in-line connector using two 12x20 hex head screwseither side of the beam ensuring both beams are flush withone another. Support the first gazebo fascia beam on anadjustable construction prop.

Repeat the above process on the centre gazebo fasciabeam. Fix the remaining in-line connectors to the free endsof the gazebo fascia and valley beams. The final gazebofascia beam is now be fixed in place.

5.0 GAZEBO FASCIABEAMS

For units attached on the end to an attachment beam(Figure 31), beam to beam brackets are positioned at eitherside of the gable opening at the spacing determined in part3.0.

Fix beam to beam brackets to the attachment beam (headerbeam) with two 12x20 hex head screws so they clamp thebeam filler to the beam (Figure 21).

The first valley beam is fastened over the beam to beambracket with two 12x20 hex head screws either side whilethe opposite end is supported on adjustable constructionprops.

21

NOTCHEDBEAM CAPPING

TWO 12x20 HEXHEAD SELF DRILLINGSCREWS EITHER SIDE

BEAM TOBEAM BRACKET

BEAM FILLER

ATTACHMENT(HEADER) BEAM

TWO 12x20 HEX HEADSELF DRILLING SCREWS

Gazebo beam capping mitres are used to cover the gapmade by the beam capping. Rivet the mitre through bothoverlaps to the beam channel and to the top of the beamcapping (Figure 23).

24

POST BRACKET

GAZEBO FASCIABEAMS

BEAM CAPPING

With all the gazebo fascia beams secured post brackets areto be fastened as close as practical to the gazebo fasciabeam joins (Figure 24). Refer to installation guide‘Outback Flat Attached Verandahs, Patios & Carports’ forpost bracket fixing details.

22

INLINE CONNECTOR

12x20 HEX HEAD SCREW

M10 BOLT

BEAM CAPPING

23GAZEBO

FASCIA BEAM

GAZEBO BEAMCAPPING MITRE

BEAM CAPPING

FOUR 3mmRIVETS

10

60mm

Page 11: OB Clearspan Gable Gazebo End - Stratco · 2018. 6. 19. · CLEARSPAN GABLE WITH GAZEBO END ATTACHED PATIO STRATCO OUTBACK ASSEMBLY INSTRUCTIONS.® Your supplementary guide to building

9

4.1 SIDE ATTACHED

For side attached units fix the rafter to valley brackets to thebeam capping (150 attachment beam will be considered avalley beam) at the correct rafter positions (refer Section 6)using six 12x20mm hex head screws per bracket throughthe pre-drilled holes (Figure 18). Please note that thebottom face of the bracket is inline with the bottom edge ofthe upper groove in the beam. Check positions beforedrilling.

40

150 VALLEYBEAM

150 VALLEY BEAM WITH22° RAFTER VALLEY BRACKET

20

25

BRACKET POSITION INLINE WITHTHE BOTTOM EDGE OF THEUPPER GROOVE

BEAM CAPPING

25

30

25

150 VALLEY BEAM WITH30° RAFTER VALLEY BRACKET

BRACKET POSITION INLINE WITHTHE BOTTOM EDGE OF THEUPPER GROOVE

18

25

positioned at either side of the gable opening at the spacingdetermined in part 3.0. The first bracket is fastened to thewall with two M8x65mm masonry anchors. The curved legsof the bracket are located at the top (Figure 19).

Locate the first valley beam (beam cap on top) up into thewall bracket so the curved legs locate against the top flute ofthe beam. The valley beam is fastened to the wall bracketwith 12x20 hex head screws in the pre-drilled holes whilethe opposite end is supported on adjustable constructionprops.

If any intermediate columns are required measure thevalley beam marking where they meet. Fasten postbrackets as explained in ‘Outback Flat AttachedVerandahs, Patios & Carports’ under “FRONT FASCIABEAM”. Support the second valley beam at the spacingdetermined in part 3.0 on adjustable construction props.

For units attached on the end to a wall, wall brackets are

4.2 ENDATTACHED

19

WALLBRACKET

TWO 12x20HEX HEAD SELF

DRILLING SCREWSEITHER SIDE

TWO M8x65 MASONARY ANCHORSor

TWO 6mm DIAMETER SCREWBOLTSWITH A MINIMUM EMBEDMENT OF 45mm

MINIMUM EDGE DISTANCE OF BOLTS &SCREWS IS (10 x dia)

For units attached on the end to a fascia, suspensionbrackets are positioned at either side of the gable openingat the spacing determined in part 3.0. The top tab of thesuspension bracket must be located between the fasciaand back channel. A minimum of two 12x20 hex headscrews are fixed through back channel, suspension bracketand steel fascia while two 12x25 type 17 screws are used tofix through back channel, suspension bracket and timber(Figure 20).

If back channel is not present, (ie, no adjacent flatroof) locate washer plate behind steel fascia at suspensionbracket. Fix through bracket, fascia and plate.

The first valley beam is fastened into the suspensionbracket with 12x20 hex head screws through the dimpleswhile the opposite end is supported on adjustableconstruction props.

Note:

20

VALLEY BEAM

BACK CHANNEL

120 GABLERAFTER

SOAKERFLASHING

BEAMCAPPING

INFILL PANELGUTTER

SUSPENSIONBRACKET

1.0mm STEPPEDBACK CHANNEL

FASCIA

12x20 HEX HEADSCREWS TO STEEL

12x25 TYPE 17SCREWS TO

TIMBER

If any intermediate columns are required measure thevalley beam marking where they meet. Fasten postbrackets as explained in the installation guide ‘Outback FlatAttached Verandahs, Patios & Carports’ under “FRONTFASCIA BEAM”. This can be done before valley beams arefixed in place.

Support the second valley beam on adjustable constructionprops but do not fix to the wall, fascia or attachment beamuntil the front gable frame has been attached.

Fix the rafter to valley brackets to the beam capping at thecorrect rafter positions (refer Section 6). Fixing details asshown in section 4.1.

Attach the in-line connector brackets back to back usingM10 bolts and nuts in the holes provided (Figure 22).Ensure the constructed bracket makes the required internalangle of 135 degrees.

Slide the in-line connector into the valley beam and fix usingtwo 12x20 hex head screws either side of the beam. Fix oneof the three gazebo fascia beams to the protruding half ofthe in-line connector using two 12x20 hex head screwseither side of the beam ensuring both beams are flush withone another. Support the first gazebo fascia beam on anadjustable construction prop.

Repeat the above process on the centre gazebo fasciabeam. Fix the remaining in-line connectors to the free endsof the gazebo fascia and valley beams. The final gazebofascia beam is now be fixed in place.

5.0 GAZEBO FASCIABEAMS

For units attached on the end to an attachment beam(Figure 31), beam to beam brackets are positioned at eitherside of the gable opening at the spacing determined in part3.0.

Fix beam to beam brackets to the attachment beam (headerbeam) with two 12x20 hex head screws so they clamp thebeam filler to the beam (Figure 21).

The first valley beam is fastened over the beam to beambracket with two 12x20 hex head screws either side whilethe opposite end is supported on adjustable constructionprops.

21

NOTCHEDBEAM CAPPING

TWO 12x20 HEXHEAD SELF DRILLINGSCREWS EITHER SIDE

BEAM TOBEAM BRACKET

BEAM FILLER

ATTACHMENT(HEADER) BEAM

TWO 12x20 HEX HEADSELF DRILLING SCREWS

Gazebo beam capping mitres are used to cover the gapmade by the beam capping. Rivet the mitre through bothoverlaps to the beam channel and to the top of the beamcapping (Figure 23).

24

POST BRACKET

GAZEBO FASCIABEAMS

BEAM CAPPING

With all the gazebo fascia beams secured post brackets areto be fastened as close as practical to the gazebo fasciabeam joins (Figure 24). Refer to installation guide‘Outback Flat Attached Verandahs, Patios & Carports’ forpost bracket fixing details.

22

INLINE CONNECTOR

12x20 HEX HEAD SCREW

M10 BOLT

BEAM CAPPING

23GAZEBO

FASCIA BEAM

GAZEBO BEAMCAPPING MITRE

BEAM CAPPING

FOUR 3mmRIVETS

10

60mm

Page 12: OB Clearspan Gable Gazebo End - Stratco · 2018. 6. 19. · CLEARSPAN GABLE WITH GAZEBO END ATTACHED PATIO STRATCO OUTBACK ASSEMBLY INSTRUCTIONS.® Your supplementary guide to building

6.0 GABLE FRAME CONNECTION

Note: Be aware that gable frames are always 120 beamsand valley beams are always 150 beams for Clearspanunits with a gazebo end.

The front gable frame will need to be set back from the frontof the valley beams to accommodate the gazebo end. Referto Figure 25 and Table 1 for set back distance.

The rafter to valley brackets will have been attached to thebeam capping using six 12x20 hex head screws (Figure 18,Section 4.1) at the location determined from Table 1(Figure 25).

6.1 GABLE FRAMES(Figure 1)

Table 1Interpolation may be used to determine valuesbetween those shown.All lengths in millimetres (mm).

VALLEY BEAM

25

RAFTER

A(S

ET

BA

CK

)

RAFTER TO VALLEYBRACKET

OPENING, O A (Set Back)

1200150018002100240027003000330036003900420045004800510054005700600063006600

1022108411471209

13331395

277339401463525587649712774836898960

1271

Fix the gable rafters to the rafter to valley brackets with two12x20 hex head screws either side (Figure 26).

If attached on the end, attach the second valley beam intothe wall or suspension bracket.

If the unit includes rear infill a rear header beam isrequired and must be installed before fixing the secondvalley beam in position, refer section 6.2.

Note:

VALLEY BEAMCAPPING

120 RAFTER

VALLEY BEAM 26

RAFTER TO VALLEYBRACKET

TWO 12x20 HEX HEADSCREWS EITHER SIDE

Intermediate frames should be spaced evenly and fixedinto rafter to valley brackets as previously described.

A rear gable frame without a header beam is fixed as peran intermediate frame.

6.2 REAR INFILL

A rear header beam will be required if the unit includes infillto the rear gable frame. For units attached at the rear withsuspension brackets, the rear header is fixed betweenvalley beams using beam to beam brackets. If fixed at therear to an attachment beam (Figure 31), the attachmentbeam becomes the header (valley beams are fixed to theheader beam) and if attached on the side the rear header isfixed to the attachment beam with beam to beam brackets.

Attach gable beam brackets to the rear header beamagainst the beam capping at spacing, O, as determined insection 3. A minimum of four 12x20 hex head screws arerequired to fix the bracket to the beam capping and aminimum of four screws to fix to the header beam (Figures27 or 28).

The rear gable frame rafters are supplied notched at thebase to fit the gable beam brackets. Rafters are fastenedinside the gable beam brackets with a minimum of three12x20 hex head self drilling screws either side as shown infigures 27 or 28.

Refer section 15 for details of fixing infill panels to gableframes.

27

GABLE BEAMBRACKET

BEAMCAPPING

HEADER BEAM

RAFTER

ATTACH RAFTER TO BRACKETUSING A MINIMUM OF THREE

12x20 HEX HEAD SELF DRILLINGSCREWS EACH SIDE

ATTACH GABLE BEAMBRACKET USING A MINIMUMOF EIGHT 12x20 HEX HEADSELF DRILLING SCREWS

VALLEYBEAM

11

3.2 COLLAR TIES

If collar ties are required on intermediate frames they are tobe mitred to suit the pitch of the gable rafters. For gableopenings up to 6000mm collar ties are to be located mid-height of the gable frame. For gable openings greater than6000mm collar ties are to be located at a height to give acollar tie length of 3000mm.

Collar tie brackets are to be fixed back to gable rafters withfour 12x20 hex head self drilling screws at the appropriateheight. Collar ties are then fixed inside the brackets usingthree 12x20 hex head self drilling screws either side (Figure15).

14

APEX BRACKET

RAFTER

12x20 HEX HEADSCREWS

12x20 HEX HEADSCREWS

SIDE FIXINGTAB

A

A

SECTION A-A

17

16

INSIDE EDGE

INSIDE EDGE

BEAM CAPPING

BEAM CAPPINGMITRE

MITRE

MITRE

VALLEY BEAM(ONE END MITRED)

GAZEBO FASCIA BEAM(BOTH ENDS MITRED)

15

Collar tie length (L < 3000)

Collar Tie

FIX COLLAR TIE USINGTHREE 12x20 HEX HEAD

SCREWS EACH SIDE

FIX BRACKET TORAFTER USING FOUR

12x20 HEX HEADSCREWS

4.0 VALLEY BEAMASSEMBLY

Before erecting any valley beams fix channel and capping tothe top of the beams. Fix beam channel to the top of thevalley beam using 12x20 hex head self drilling screws atmaximum 500mm centres. Use four screws at the locationof all rafters as shown in figure 14. Fix the beam capping tothe channel using 3mm rivets or 12x20 hex head screwseach side at maximum 500mm centres, ensuring two rivetsor screws are used either side at the location of all rafters.The capping break must be located in the top groove (Figure16).

Note that the beam capping does not need to be mitred andwill end at the inside of the mitre on the valley beam asshown in figure 17.

If attaching the valley beam to a header beam, notch thecapping so that it sits on top of the beam as shown in figure28.

BEAMCHANNEL

VALLEY BEAM

BEAMCAPPING

FIX BEAM CAPPING TOCHANNEL USING 3mmRIVETS OR 12X20 HEXHEAD SCREWS EACHSIDE AT 500MM CENTRES

FIX WITH TWO RIVETS ORTWO SCREWS EITHER SIDEAT THE LOCATION OF ARAFTER

FIX BEAM CHANNEL TOTOP OF THE VALLEY BEAMUSING 12 X 20 HEX HEADSELF DRILLING SCREWS AT500mm CENTRES

FIX CHANNEL WITH FOURSCREWS AT THE LOCATIONOF A RAFTER

LOCATE THEBREAK ON THE

CAPPING IN TOPGROOVE OF

VALLEY BEAM

ATTACHING TO HEADER BEAM

8

Page 13: OB Clearspan Gable Gazebo End - Stratco · 2018. 6. 19. · CLEARSPAN GABLE WITH GAZEBO END ATTACHED PATIO STRATCO OUTBACK ASSEMBLY INSTRUCTIONS.® Your supplementary guide to building

ATTACH GABLE BEAMBRACKET USING A MINIMUMOF EIGHT 12x20 HEX HEADSELF DRILLING SCREWS

ATTACH RAFTER TOBRACKET USING A MINIMUMOF THREE 12x20 HEX HEAD

SELF DRILLING SCREWSEACH SIDE

GABLE BEAMBRACKET

BEAMCAPPING

RAFTER

HEADERBEAM

NOTCH BEAMCAPPING TO FIT

OVER BEAM

VALLEYBEAM

ATTACHING TO FRONT BEAM

6.2.1 SOAKER FLASHING

In the case of a rear infill panel, a soaker flashing is used toconceal the existing house gutter, waterproof the rear endof the gable and neatly finish the base of the infill panel(Figure 29).

The rear gable frame and header beam are positioned 153mm from the house fascia in order to accommodate thestandard soaker flashing which is optional with theOutback unit (Figure 30). The frame is fixed on the rearheader beam into gable beam brackets as detailed above.

Fix the standard soaker flashing into position on top of theback channel and underneath the gutter. Infill panels mustbe fixed with split tail soft pull rivets at 500mm centres aminimum of 20 mm above the pan of the soaker flashing.This will reduce the possibility of moisture being absorbedinto the sheet.

Refer section 15 for details of fixing infill panels to gableframes.

®

153mm

30

VALLEY BEAM

BACK CHANNEL

120 GABLE RAFTER

SOAKERFLASHING

BEAMCAPPING

INFILL PANEL

GUTTER

SOFFIT LINING

SUSPENSIONBRACKET

STEEL FASCIA BRACKET(ATTACHED TO RAFTER

& BACKCHANNEL)

Note:

1. If your house gutter is wider than 150 mm a custom madesoaker flashing will need to be ordered to the requireddimensions. The rafter setback will need to be adjusted tosuit.

2. Do not form stop ends at either end of the soaker flashing.

3. Soaker flashing is not to come in contact with the base ofthe house gutter.

6.2.2 HEADER FLASHING

When a gable is fixed at the rear to an attachment beam,elevated to the existing house gutter height, typically aheader flashing is used in conjunction with the rear infill. Inthis case, the rear attachment beam is considered aheader, and along with the rear gable frame is fixed as closeas possible (within 5mm) to the existing gutter in order toaccommodate the header flashing. The gable frame is fixedon the rear header to gable beam brackets as previouslydescribed.

Fix the header flashing into position over the existing gutterlip with rivets. Infill panels are located behind the headerflashing and fixed with split tail soft pull rivets at 500mmcentres (Figure 31).

Refer section 15 for details of fixing infill panels to gableframes.

SPLIT TAIL SOFTPULL RIVETS

SOAKERFLASHING

29

28

20mm GAP

31

STRENGTHENINGBRACKET

FASCIA

HOUSEGUTTER

INFILL PANEL

VALLEY BEAM

BEAM CAPPING

150 ATTACHMENTBEAM

HEADERFLASHING

SPLIT TAILSOFT PULL RIVET

12

VALLEY BEAM

BACK CHANNEL

120 GABLE RAFTER

SOAKERFLASHING

BEAMCAPPING

INFILL PANEL

GUTTER

SOFFIT LINING

SUSPENSIONBRACKET

STEEL FASCIA BRACKET(ATTACHED TO RAFTER

& BACKCHANNEL)

10

Note:

Note

If your house gutter is wider than 150mm a custommade soaker flashing will need to be ordered and the rafterset back adjusted to suit.

If fixing a Clearspan Gable on its end to an attachmentbeam, elevated to the existing house gutter height, theattachment beam is to be as close as possible (within 5mm)to the outside face of the gutter (Figure 31). The 150mmattachment beam is fixed to rafter strengthening bracketsas detailed in section 2.1.1.

: It is the builders responsibility to ensure the existingrafters and fascia are adequately reinforced andstrengthened to accommodate any additional attachedstructure. The reinforcing method must be approved by theappropriate council or engineer.

2.2.1 FASCIASTRENGTHENING

Steel fascia brackets are generally fastened at 1200mmcentres to fascia and rafters (Figure 10). It is the buildersresponsibility to determine the adequacy of the fascia andrafters and the frequency of brackets for each individualsituation.

3.0 GABLE FRAME ASSEMBLY

IMPORTANT:

Note:

Ensure that the double thickness portion isat the top when installing all beams and rafters.

The rafters are supplied pre-cut and drilled at theridge as shown in Figure 11.

Measure the distance between rafter ends, O, to checkvalley beam spacing (Figure 13).

13

GABLE OPENING (O)

12

2 (12 X 20 HEX HEAD SELFDRILLING SCREWS) EACH

2 (12 X 20 HEX HEAD SELFDRILLING SCREWS)

THROUGH TOP OF BOTH

Insert ridge knuckle into the pre-cut rafters and screwtogether using two 12x20 hex head self drilling screws bothsides of each rafter and two 12x20 hex head self drillingscrews through the top (double flange side) of each rafter.

Pilot holes indicate screw locations as shown in figure 12Make sure that the two ends are flush at the connection,leaving no gaps.

7

3.1 APEX BRACKET

The Gazebo Apex bracket is to be fixed to the front face ofthe front gable frame at the apex. The bracket is to belocated so the bottom edge of the apex bracket is in-linewith the top edge of the bottom chamfer of the gable framerafters. The apex bracket is to be located centrally at theapex and fixed through the pre-drilled holes using 12x20hex head screws (Figure 14).

11

OPEN GABLE RAFTER

INFILL GABLE RAFTER

Page 14: OB Clearspan Gable Gazebo End - Stratco · 2018. 6. 19. · CLEARSPAN GABLE WITH GAZEBO END ATTACHED PATIO STRATCO OUTBACK ASSEMBLY INSTRUCTIONS.® Your supplementary guide to building

7.0 PERIMETER BRACKETS

Perimeter brackets are to be located at the internal join ofthe beam capping so the bottom face of the bracket is inlinewith the bottom edge of the upper groove in the beam(Figure 32). Brackets are to be fastened to the beamcapping using four 12x20 hex head screws through the pre-drilled holes. Note: Ensure the bottom screws fix throughinternal beam capping channel.

8.0 GAZEBO HIP RAFTERS

Having all the Perimeter Brackets in place will allowrafters to be located. The two shorter rafters are to bepositioned closest to the end gable frame on either side.It is important that rafters are firstly fixed at the apex,position rafters over the apex bracket tabs so the cut faceof the rafter is flush with the face of the bracket.

Two 12x20 hex head screws are used to fix the rafter tothe tab with the first screw being located 20mm from thefront face of the bracket and the second 20mm from thefirst screw (Figure 33). This process is repeated for thetwo internal gazebo hip rafters.

32

PERIMETER BRACKET

12x20 HEX HEADSCREWS

GAZEBO FASCIA BEAMS

BEAM CAPPING

HIP RAFTERS

12x20 HEX HEADSCREWS

GAZEBO APEXBRACKET

INTERNAL HIPRAFTER

GAZEBO APEXBRACKET

20

20

33

With all gazebo rafters fixed at the apex they can befastened to the perimeter brackets. Fix rafters through thebase of the perimeter brackets using two 12x20 hex headscrews at a minimum spacing of 30mm. As a smalltolerance is allowed for at this bracket it is important thatthe screws are located at least 20mm from the bracketedge and the bottom edge of the rafter (Figure 34).

13

The 150 attachment beam becomes the base for the attachment of the Clearspan gable unit. Figure 7 shows a unit attached atthe side.

7

CHANNEL EXTENSION

CLEARSPAN GABLE ATTACHED AT THE SIDE

WEB OVERHANG

STUD WALL

TIMBER RAFTER

A

A

GUTTER

EAVES OVERHANG

BRICK WORK

RAFTER STRENGTHENING BRACKETATTACHED TO RAFTER WITH

6 (M12 HEX HEAD BOLTS)

RAFTER

6

150 ATTACHMENT BEAM

REFER FIGURE 4

450

600

1800

1900

300

400

EavesOverhang

(mm)

Channel ExtensionBeyond Birds Mouth

(mm)Web Overhang

(mm)

Recommended Channel Extension

To insert spacers drill 11 mm holes through the 150attachment beam. Then drill 16 mm holes on the outsideface only, ie this time do not drill all the way through. This willallow the spacer to slide in, from the outside and stop at theother side as shown in figure 8.

You would have ordered and received your custom madeflashings to cover the exposed brackets and holes throughfascia. Rivet flashings in place, figure 9 suggests asimplified flashing. You may however use your imaginationand design a flashing that suits your individual taste.

8

BEAM CAPPING

BEAM CHANNEL150 ATTACHMENTBEAM

SPACER

NUT

RAFTERSTRENGTHENING

BRACKET

M12 BOLT

DOUBLE FLANGE

ENLARGED HOLE(16 MM THIS SIDE ONLY)11 MM HOLE

WASHER

WASHER

2.2ATTACHING ON END TO HOUSE

If fixing a Clearspan Gable on its end to a wall, twoalternatives are available. Ridge and valley beams arefixed directly to the wall using 150 beam to wall brackets.This option will not require a rear gable frame and backchannel is fixed to the wall to accommodate sheets runningalong the wall. The other alternative requires valley beamsbe fixed to the wall and a rear gable frame installed. Therear gable frame will need to be slightly offset from the wallto allow the appropriate bracket fixing.

If fixing a Clearspan Gable on its end with suspensionbrackets to a fascia (Figure 10) typically a soaker flashing isused. In this case the gable rafter at the rear of the unit is tobe 153mm from the house fascia in order to accommodatea standard soaker flashing (refer Figures 29 and 30).

150 ATTACHMENT BEAM FIXED TORAFTER BRACKET WITH TWO

M12 BOLTS

CHANNEL

9COVER FLASHING(OPTIONAL)RIVET

RIVET

STRENGTHENINGBRACKET

FASCIA

150 ATTACHMENTBEAM

HOUSEGUTTER

Page 15: OB Clearspan Gable Gazebo End - Stratco · 2018. 6. 19. · CLEARSPAN GABLE WITH GAZEBO END ATTACHED PATIO STRATCO OUTBACK ASSEMBLY INSTRUCTIONS.® Your supplementary guide to building

HIPRAFTER

PERIMETER BEAMBRACKET

GAZEBO FASCIABEAM

12x20 HEX HEADSCREWS

>20

>30

>20

34

35

12x20 HEX HEADSCREWS

RAFTER BEAM

TWO PIECE CLEARSPANBACK CHANNEL

9.0 CLEARSPAN TWO PIECE BACKCHANNEL ASSEMBLY.

A special two piece back channel will be required and isto be located along the hip rafters before the decking isfastened in place. The flashings are screwed to thecentre of the hip rafter using 12x20 hex head screws at500mm centres (Figure 35). The back channel shall runthe full length of the hip rafters and should be mitred atthe apex for a neat finish. BIP foam is inserted either sideof the back channel before decking is fixed in place.

500

BEAM CAPPING

10.0 ASSEMBLING RIDGE BEAM

Assemble ridge beam before attaching to gable frames. Fixangled back channel to both sides of the ridge beam using12x20 hex head self drilling screws at 500mm centres,ensuring that the top of the back channel is in line with thebottom of the beam chamfer as shown in figure 36. Theback channel should run 68mm past the end of the beam atboth ends of the ridge beam. If there is no rear portal frame,finish the back channel flush at one end.

36

OVERHANGBACK CHANNEL

68mm

150 RIDGE BEAM

ATTACH ANGLED BACKCHANNEL TO RIDGE BEAM

USING 12X20 HEX HEAD SELFDRILLING SCREWS AT 500mm

CENTRES

ATTACHINGBACK CHANNELTO RIDGE BEAM

In the case of decking overhanging the gable frame(non-gazebo end), run the angled back channel to the end ofthe overhanging ridge beam as shown in figure 37. Amodified suspension bracket will be required on bothsides of the ridge to support overhang.

10.1 ATTACHING RIDGE BEAM

Fix modified suspension bracket at the ridge using four 12 x20 hex head self drilling screws through the gable frameand into the ridge knuckle.

Position the ridge beam so that the angled back channelrests on the gable frame (Figure 38). Fix to modifiedsuspension bracket using two 12x20 hex head self drillingscrews each side.

37

BACK CHANNELFLUSH WITH

END OF BEAM

OVERHANGING 150RIDGE BEAM

ATTACHING BACK CHANNELTO OVERHANGING RIDGE BEAM

(DECK OVERHANG)

ATTACH ANGLED BACKCHANNEL TO RIDGE BEAM

USING 12X20 HEX HEAD SELFDRILLING SCREWS AT 500mm

CENTRES

14

4

450mm EAVES OVERHANG

RAFTERSTRENGTHENING

BRACKET

M12 BOLT

TIMBER RAFTER

60x44x2.0 G450 GALVANISEDCHANNEL

600mm EAVES OVERHANG

RAFTERSTRENGTHENING

BRACKET

M12 BOLT

TIMBER RAFTER

60x44x2.0 G450 GALVANISEDCHANNEL

Fixing the 150Attachment Beam in Place

After fixing all the brackets and channels, the 150 beam isfixed in place.

Prop up the 150 beam in position with the double flange ontop, the beam will need to be located at a height on thebracket which allows clearance between the gable roofsheets and the gutter. Fix to the end plates of the rafterbracket using two M12 bolts, with the bolt head on the 150beam side. Insert spacers to prevent the beam fromcrushing, and bolt in position, using nuts and washers.

Do not over tighten bolts as this can lead to a visibleindentation due to the high gloss nature of the material.Refer to Figure 8 for fixing spacers.

Note:

5

Fixing Rafter Strengthening Brackets andChannels

The adjustable rafter strengthening bracket allows for anadjustment of pitch in the range of 15 to 30 degrees. Thedistance the bracket extends past the fascia is alsoadjustable to allow for standard gutters or box gutters with awidth of up to 200mm.

In conjunction with rafter strengthening brackets, channelsare fixed to the side of the house rafter (Figure 4). Thebottom end of the channel will be located at the base of thehouse rafter. Holes should be marked and pre-drilled in thechannels to suit the location of existing holes in the bracket.The channel will extend beyond the bracket so additionalholes are to be drilled in the channel at approximately500mm centres.

Initially the bracket T piece shall be fixed to the bracket armwith two M12 cup head bolts (hand tighten only), a springwasher is to be located between the standard M12 washerand nut (Figure 5). Mark the position of the bracket on thefascia and notch a rectangular hole in the fascia allowingthe bracket to be fed through the front of the fascia. The holemay need to be enlarged slightly if the M12 cup head boltsinterfere with the fascia.

5

BRACKET ARMT PIECE

TIGHTEN TO 35NmTORQUE

M12 WASHER

M12 SPRING WASHER

M12 NUTM12x40 CUP HEADBOLT

Insert the bracket through the fascia and fix with thechannel(s) to the house rafter using M12 hex head boltsthrough the existing holes in the bracket and further up thechannel(s) (Figure 7). Adjust the T piece so it is horizontaland has the appropriate extension past the fascia to allowfor fixing of the attachment beam. T piece connection boltsare to be tightened to a minimum 35Nm torque.

Fix the bracket as close to the base of the gutter as possible(recommended distance 10mm from lowest end of gutter),as shown in figure 6.

The 150 attachment beam is to be fixed to the end plate toensure the carport roof sheets drain into the existing housegutter (Figure 6).

RAFTER

6

ENOUGH CLEARANCE FORROOF SHEETS TO RUN INTO

THE HOUSE GUTTER

FIX BRACKET AS CLOSEAS POSSIBLE TO THE BASE

OF THE GUTTER

RAFTERSTRENGTHENING

BRACKET

OUTBACK ROOF SHEET®

150 ATTACHMENTBEAM

Page 16: OB Clearspan Gable Gazebo End - Stratco · 2018. 6. 19. · CLEARSPAN GABLE WITH GAZEBO END ATTACHED PATIO STRATCO OUTBACK ASSEMBLY INSTRUCTIONS.® Your supplementary guide to building

15

38

GABLERAFTER

BACK CHANNELAT MIDPOINT FRONT

GABLE RAFTER

MODIFIED SUSPENSIONBRACKET FIXED AT

RIDGE USING FOUR 12 x 20 HEXHEAD SELF DRILLING SCREWS

ANGLEDBACK CHANNEL

RIDGE BEAM FIXED TOMODIFIED SUSPENSION

BRACKET USING TWO 12 x 20HEX HEAD SELF DRILLING

SCREWS EACH SIDE

RIDGE BEAM

ATTACHINGRIDGE BEAM

11.0 REMAINING FRAME ASSEMBLY

12.0 GUTTERING

Assemble the remaining framework of the verandah as perthe

.

Fix the posts, as described in the installation guide under"COLUMNS AND FOOTINGS” or "ALTERNATIVEFOOTING".

Note: All adjustable construction props are to be left inposition until decking is attached and concrete is set.

installation guide ‘Outback Flat Attached Verandahs,Patios & Carports’

‘Outback FlatAttached Verandahs, Patios & Carports’

Gutter around the gazebo end needs to be mitred. Cut30mm tabs in the gutter back lip at 1000mm intervals andfold back. Fix the gutter to the beam capping, through thetabs with rivets as shown in figure 39. Once decking isattached (Section 13.0). Fit gutter straps at maximum1000mm intervals, attaching to the top of the decking withrivets. Waterproof rivets with silicone. The same method isused where there is no flat roof adjacent the gable.

The gazebo end gutter will be at a higher level than the flatroof gutter. The lower gutter is notched if required at thepoint the gazebo gutter intersects allowing the gazebo endgutter to overlap and flow directly into the lower gutter(Figure 40).

Alternatively, the flat roof gutter and the gazebo end guttermay be kept mutually exclusive having gutter stop endssealing the gutters to keep them separate. Separatedownpipes will then be necessary.

All gutter joins are to be waterproofed with silicon.

Connect the gutter to the flat roof Outbacks as described in”. Flat

roof gutters need to end flush with the gable valley beamsand stop ends are fixed.

®

40

LOWERGUTTER

GAZEBO ENDGUTTER

NOTCHEDSECTION

39

GAZEBO FASCIABEAMGUTTER

HIP RAFTEROUTBACK DECK

RIVET TABS TO TOPOF BEAM CAPPING AT1000mm INTERVALS

BEAM CAPPING

BEAM CAPPINGMITRE

PLAN VIEW FRONT VIEW

13.0 ATTACH DECKING

13.1 FLAT ROOF

Attach the decking to the flat roof verandah first as laid outunder "THE DECKING" (‘Outback Flat AttachedVerandahs, Patios & Carports’), starting from the valleybeam and working away, on both sides.

The back channel should have been attached upside down(the shorter leg on top) along beam capping to assist thefixing of decking. (Figure 41).

41

OUTBACK DECK®

OUTBACKDECK

®

BACK CHANNEL FIXEDUPSIDE DOWN TOBEAM CAPPING

FRONT FASCIA BEAM GAZEBO FASCIA BEAM

BEAMCAPPING

HIP RAFTER

COLUMN

BEAM CAPPING

BEAM CAPPINGMITRE

ADDITIONAL MATERIALS

These materials are needed to complete the job, but are notincluded in the basic kit price. (they must be purchased asextra items, and their quantities specified):

Rafter strengthening brackets and channels to suit 150beam attachment for attaching gable to house.M12 bolts and nuts for fixing strengthening brackets to therafter.M12 bolts and nuts for fixing 150 attachment beam tostrengthening brackets.Fascia Brackets for attaching gable on end to house.M10 coach bolts and nuts for fixing fascia brackets to thehouse rafter.M8 masonary anchors for fixing Wall Brackets to masonary.

12x25 type 17 teks for fixing Suspension Brackets totimber.12x20 hex head screws for fixing Suspension Brackets tosteel fascia.Cover flashings (measurements required).Box gutter (measurements required).

These items are available at request:Infill PanelsPanel StripsFinialSoaker Flashing in lieu of Header FlashingPurlin Intersection Cap

OPTIONAL EXTRAS

1.0 INTRODUCTION

2.0 ATTACHING TO AN EXISTINGSTRUCTURE

2.1ATTACHING ON SIDE TO HOUSE

Please read these assembly instructions thoroughly beforecommencing the construction. Double check alldimensions, levels and bolting locations before cutting,screwing or bolting structural members. It is recommendedthat the persons erecting the structure have had someprevious building experience, because some modificationsto the existing house structure are required.

The builder or council is to ensure the existinghouse/structure is of a suitable structural integrity andcomplies with all the relevant Australian Building codes andstandards. For more information regarding the suitability ofthe house structure to accommodate the Stratco AttachedClearspan Gable, consult a structural engineer or a buildingauthority. It is the builders responsibility to ensure that theexisting house roof structure is strengthened correctly.

Refer to section 2.1 if attaching Clearspan Gable on it’s sideto a house, section 2.2 if attaching on it’s end to a house orrefer to both sections if attaching the gable on it’s side andend.

A Stratco Clearspan attached on it’s side to a house isattached to the existing eaves overhang at the fascia.

The first objective in the construction is to fix a structuralside beam along the fascia or wall, to which the Gable Unitis attached.

Most existing houses have not been designed for theattachment of portal framed gables to their side, thereforeadditional strengthening of the house rafters must beperformed.

In order to strengthen the existing house rafters, the rooftiles or roof sheets need to be lifted, to expose the roofframe. Steel rafter brackets and channels are then boltedalong the house rafters. Refer to section 2.1.1.

A 150 mm Outba beam is bolted to the strengtheningbrackets at the fascia. Once the 150 attachment beam issecured to the house the Gable Unit can be erected andfastened to the beam.

The first step is to determine the number of rafters whichneed to be strengthened, and their location relative to theunit. You will have to lift some roof tiles or roof sheets todiscover the rafter positions and spacings. The number ofrafters which need to be strengthened is determined by thebuilder.

: It is the builders responsibility to ensure the existingrafters and fascia are adequately reinforced andstrengthened to accommodate any additional attachedstructure. The reinforcing method must be approved by theappropriate council and engineer.

Use an adjustable rafter strengthening bracket and onechannel for eaves overhangs up to 450 mm. Use anadjustable rafter strengthening bracket and two channelsfor eaves overhangs over 450 mm and up to and including600 mm, as shown in figure 4.

The adjustable rafter strengthening bracket is shown infigure 3. Please note that this bracket may not be suitablefor applications where the front face of the house gutter ishigher than 120 mm. In these cases please contact Stratcofor alternative solutions.

ck®

Note

2.1.1 RAFTER STRENGTHENING

4

ADJUSTABLE RAFTER STRENGTHENINGBRACKET 3

Page 17: OB Clearspan Gable Gazebo End - Stratco · 2018. 6. 19. · CLEARSPAN GABLE WITH GAZEBO END ATTACHED PATIO STRATCO OUTBACK ASSEMBLY INSTRUCTIONS.® Your supplementary guide to building

COMPONENT LAYOUT 3

2

7

8

6

5

4

3

2

1 Ridge Cap

Two Piece Clearspan

Backchannel

Ridge Knuckle

Hip Rafter

Gazebo Fascia Beam

Beam Capping

Beam Channel

Outback Deck®

9

10

Gazebo Apex Bracket

Rafter to Valley Bracket

Post Bracket

Post

67.5 Angled Inline Beam Connector

Post Cap

Perimeter Bracket

Beam End Cap

Gazebo Beam Capping Mitre

°13

12

11

14

1

15

2

4

5

6

9

10

1114

16

3

12

13

717

15

16

GAZEBO END

17

8

16

42

3

2 DECKING

GAZEBO END

4

5 1

13.2 CLEARSPAN GABLE

13.3 GAZEBO END

When attaching the decking to the gable, start from therear (non gazebo end) on one side of the gable. Fix thedeck to the angled backchannel at the ridge, and to thecapping at the valley beam.

If the deck of the flat roof section runs perpendicular tothe valley beams, align the ribs of the gable decking upwith the flat roof section.

At the point when less than one full sheet is required to passthe centreline of the end gable frame on one side, theOutback decking will need to be cut to suit.

Continue laying deck past the end gable frame (Section 1,Figure 42) and cut the sheeting to fit inside the Clearspantwo piece back channel. Cut sheeting to fit sections 2, 3, 4,and 5 and continue back down the side of the ClearspanGable.

Outback

Sheets are to be taken down from the framework tobe cut. It is recommended sheeting is supported in ahorizontal plane off the ground at a comfortable height forcutting.

‘Outback Flat AttachedVerandahs, Patios & Carports’).

deck is riveted to the base flashing at 250mmcentres (Figure 43).

®

®

Note:

Note: If Installing Outback Rooflite, refer to “OUTBACKROOFLITE INSTALLATION” (

43

HIP RAFTER

TWO PIECE BACKCHANNEL

OUTBACK DECK®

aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa

aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa

BIP FOAM

SHEET RIVETED TOBASE FLASHING

All sheeting which ends at the apex is to be cut to a point soit meets directly above the centre of the end gable frame.

The Outback decking will need to overhang the beamcapping allowing water to flow directly into the gutter(Figure 39).

®

Page 18: OB Clearspan Gable Gazebo End - Stratco · 2018. 6. 19. · CLEARSPAN GABLE WITH GAZEBO END ATTACHED PATIO STRATCO OUTBACK ASSEMBLY INSTRUCTIONS.® Your supplementary guide to building

COMPONENT LAYOUT

7

8

9

10

6

5

4

3

2

1 Ridge Cap

Flat Section

Outback Deck

Ridge Beam

Ridge nuckle

Gable Rafter

Valley Beam

Angled Back Channel

Beam Capping

®

K

15

14

13

12

11

Rafter to Valley Bracket

Front Fascia Beam

Post Bracket

Post

End Fascia Beam

Gutter

Notched Beam Filler

1

2

34

5

6

7

8

9

10

11

12

13

15

CLEARSPAN GABLE(GAZEBO END)

1

14

16

16

2

14.0 RIDGE CAPPING

14.1 MAIN RIDGE

Position the ridge cap over the ridge beam and two angledback channels and rivet into the channel (Figure 44).

44

RIDGE CAP

FIX RIDGE CAP TO BACKCHANNEL WITH RIVETS

OUTBACKDECK

®

17

14.2 GAZEBO END CAPPING

Ridge cap is also used over all gazebo end rafters toconceal the two piece back channel. The ridge cap ispositioned over the channels and screwed in place throughthe channels (Figure 45). Ridge capping will need to be cutto meet a point at the apex as detailed in figure 46. Allow anapproximate 20mm overlap at the ridge. The capping is tobe fully silicon sealed at the apex for waterproofing.

TWO PIECE BACKCHANNEL

OUTBACK DECK®

45HIP RAFTER

PURLIN COVER

BIP FOAM

SHEET RIVETED TOBASE FLASHING

RIDGE CAP

46

20mm OVERLAP

FRONT GABLE FRAME

RIDGE CAPPING

47

FIX TO FRONT OF RIDGEWITH 2 12x20 HEX HEADSELF DRILLING SCREWS

FIX TO STRUT WITH2 12x20 HEX HEAD SELFDRILLING SCREWS

FIX STRUT TO BRACKETWITH 2 12x20 HEX HEADSELF DRILLING SCREWSEITHER SIDE

FIX BRACKET TO HEADERWITH 2 12x20 HEX HEADSELF DRILLING SCREWS

15.0 INFILL PANELS

Two styles of header flashings are available to neatly finishthe base of infill panels, one is used on header beams withgutter and the other for headers without gutter. Gable infillpanels are to be cut in triangular shapes to fit the end frame.Panels can be painted to the desired colour beforeinstalling.

End struts are fixed mid-span of the header to a headerbeam bracket at the base and an end strut plate at the ridge(Figure 47).

15.1 HEADER BEAM WITH GUTTER

Attach the header flashing to the rear gutter lip with rivets.Infill panels are fixed through the top groove of rafters andthe end strut with 8x35mm self embedding teks at 500mmcentres in non-cyclonic areas and 250mm centres incyclonic areas. Panels are fixed at the base through theheader flashing with split tail soft pull rivets at 500mmcentres (Figure 48).

INFILL PANEL

48

GUTTER

HEADER FLASHING

SPLIT TAIL SOFTPULL RIVETS

HEADER BEAM

Page 19: OB Clearspan Gable Gazebo End - Stratco · 2018. 6. 19. · CLEARSPAN GABLE WITH GAZEBO END ATTACHED PATIO STRATCO OUTBACK ASSEMBLY INSTRUCTIONS.® Your supplementary guide to building

18

HEADER BEAM

INFILL PANEL

49

8x35mm SELFEMBEDDING TEK

12x20 HEX HEAD SELFDRILLING SCREWS

HEADER FLASHING

15.2 HEADER BEAM WITHOUT GUTTER

Infill panels are fixed through the top groove of rafters andthe lower groove of the header beam with 8x35mm selfembedding teks. Fix at 500mm centres in non-cyclonicareas and 250mm centres in cyclonic areas. Panels arefixed to the end strut at the same spacings. Attach theheader flashing to the underside of the header beam with10x16 hex head screws to neatly finish the base of the infillpanels (Figure 49).

16.0 ATTACHING BARGE CAPPING

If barge capping is required at the opposite end to thegazebo, attach the barge cap by screwing the lower lip tothe rafter and rivet the top section to the deck, as shown inFigure 50. Mitre the barge at the apex of the gable for a neatfinish. Run the barge cap along the gable section to where itmeets the flat verandah deck and finish neatly.

17.0 HELPFUL TIPS

Leave plastic coating on members until they are about to befastened to the structure. This will help prevent scratchingof the colorbond finish.

Sweep the roof and clean gutters after the completion ofwork. Ensure any swarf and rivet stubs are removed as theycan cause unsightly rust stains.

Do not allow soil to remain in permanent contact with thecolumns, as corrosion will result in the base of the column.Refer to the “Selection, Use and Maintenance of StratcoSteel Products” brochure for complete details of themaintenance requirements.

Double check all measurements and drilling locationsbefore proceeding.

Regularly check framework for squareness and verticalalignment to make sure it hasn't moved during construction.

50

OUTBACKDECKING

®

BARGE CAP

GABLERAFTER

BARGE CAPIS SCREWED

TO GABLERAFTER

RIVET

BEAM CAPPINGFixed to top of the valleybeam to provide supportfor outback deck.

TWO PIECECLEARSPAN BACKCHANNELSecures deckover hip rafters.

GAZEBO BEAMCAPPING MITRECovers the gap at theBeam Cappingintersection.

GABLE BEAMBRACKETConnects rafters toheader beam on aninfill gable.

PARTS DESCRIPTION 1

BEAM TO BEAM BRACKET

BEAM FILLER

Connects horizontalbeams.

Fills gapbetweenintersectingBeams.

BARGE CAPThe barge cap coversthe area where thedeck finishes at portalframe.

SCREWS AND RIVETSFastener types vary dependingupon the connection, ensurecorrect fixings are used.

14 x 95

12 x 20RIVET

RIDGE KNUCKLESlots inside the gable rafters toform connection at the ridge.

RIDGE CAPThis flashing covers theroof sheets at the gableridge and the Gazebo Endhips.

END STRUTThe gable infill issupported by theend strut, whichconsists of a sectionof post.

22 or 30 ENDSTRUT PLATESecures the endstrut at the ridge.

º º

RAFTERSGable Raftersconsist of pre-cut120 Outbackbeam.

®

SOAKER FLASHINGThe soaker flashingwater proofs the rearof the gable andconceals the existinghouse gutter.

PERIMETERBRACKETThis bracketfastens therafters to thegazebo fasciabeam.

APEX BRACKETThis bracket fastens the hiprafters to the apex of the gableframe.

BOLTSFastener types vary dependingupon the connection, ensurecorrect fixings are used.

M10 HEX

HEAD BOLT

M12 HEX

HEAD BOLT

CUPHEAD

BOLT

RAFTER TOVALLEYBRACKETThis bracketfastens therafter to thevalley beam.

SPACERSAre used to prevent the150 attachment beamfrom crushing.

HEADER BEAM BRACKETConnects end strut to headerbeam on an infill gable.

HEADER FLASHINGSRuns along header beamto neatly finish the base ofinfill panels.

PANEL STRIPSDecorative strips fixed toinfill panels.

INFILL PANELCut to suit gable endframes.

FINIALProvides decorationat the apex of thegable end frame.

POST BRACKET

POST CAP

Connects postto beam.

Fills gap betweenpost and beam.