nya Ångström building information · verkstad 1k152 verkstad 1k154 wc 1k153 godsmottagning yttre...

3
Nya Ångström Building Information 21 April 2020 Weeks 17–20 Work area Building 10 o Installation of facade o Roof work o Ground work o Interior additions to the framework o Disassembly of crane week 19 Work area Building 9 o Inspections, tests and various additional work ongoing inside. o Ground work, preparations for asphalting. o Exterior laying of paving stones. Work area Building 5 Recycling o Installations, outer surface on new recycling building, see marking on interior construction site layout plan. o Sawing for and assembly of new door section in facade on Monday 27 April. o Flooring installed Wednesday–Thursday 29–30 April. This can result in odours but no extra measures are required. Work area Building 1(Existing Ångström) o New joist work in the old entrance between Building 10 and Building 1, floor 1. o Expansion of work area by Building 2’s gable impacts access to Ångström’s temporary entrance. See the construction site layout plan. o Surfacing by Building 4’s gable for new location of temporary bicycle parking. Disturbances o Ground packing prior to asphalting and laying paving stones can cause disturbances. Noise. o Noise from demolition work at Building 5 K1, for shorter periods and primarily locally in Building 5 on the floor above K1. o Sawing door hole K1 Building 5 on Monday 27 April. o Corridor Building 5k1 closed. o Noise from work in Building 1’s old entrance. o Pick up ear plugs in the library if the noise disturbs you. o Very heave traffic during disassembly of the crane. Closures, provisional arrangements o According to the attached general plan. Noticeable upcoming work (preliminary start times) o Work with commissioning buildings. o Change of windows in rooms closest to the link to Building 10, tentatively planned to start on 18 May 2020. o Start for rebuilding of the goods reception week 21. Construction management for NCC and Akademiska Hus

Upload: others

Post on 29-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Nya Ångström Building Information 21 April 2020

Weeks 17–20

Work area Building 10 o Installation of facade o Roof work o Ground work o Interior additions to the framework o Disassembly of crane week 19

Work area Building 9

o Inspections, tests and various additional work ongoing inside. o Ground work, preparations for asphalting. o Exterior laying of paving stones.

Work area Building 5 Recycling

o Installations, outer surface on new recycling building, see marking on interior construction site layout plan.

o Sawing for and assembly of new door section in facade on Monday 27 April. o Flooring installed Wednesday–Thursday 29–30 April. This can result in

odours but no extra measures are required.

Work area Building 1(Existing Ångström) o New joist work in the old entrance between Building 10 and Building 1, floor 1. o Expansion of work area by Building 2’s gable impacts access to

Ångström’s temporary entrance. See the construction site layout plan. o Surfacing by Building 4’s gable for new location of temporary bicycle parking.

Disturbances

o Ground packing prior to asphalting and laying paving stones can cause disturbances. Noise.

o Noise from demolition work at Building 5 K1, for shorter periods and primarily locally in Building 5 on the floor above K1.

o Sawing door hole K1 Building 5 on Monday 27 April. o Corridor Building 5k1 closed. o Noise from work in Building 1’s old entrance. o Pick up ear plugs in the library if the noise disturbs you. o Very heave traffic during disassembly of the crane.

Closures, provisional arrangements

o According to the attached general plan.

Noticeable upcoming work (preliminary start times) o Work with commissioning buildings. o Change of windows in rooms closest to the link to Building 10, tentatively

planned to start on 18 May 2020. o Start for rebuilding of the goods reception week 21.

Construction management for NCC and Akademiska Hus

1K1123SKRIVRUM 1K1122SKRIVRUM

1K1627KORRIDOR

1K149PASSAGE

1K151VERKSTAD 1K152VERKSTAD

1K154WC

1K153GODSMOTTAGNINGYTTRE

1K155GODSMOTTAGNINGINRE

1K156GODSMOTTAGNINGUTLÄMNING1K148FÖRRUM

1K144KORRIDOR

5K142KÄLLSORTERINGENTRÉ

5K160KORRIDOR

5K104KÄLLSORTERINGFÖRPACKNINGAR,RETURPAPPER5K103KÄLLSORTERINGELEKTRONIK

5K101KÄLLSORTERINGMETALL,GLAS

5K102KÄLLSORTERINGKOMPOST

1K150GODSMOTTAGNING,KORRIDOR

1K149PASSAGE

K1

00

K2

01

02

03

04

05

N

UPPDRAG.NR RITAD/KONSTR. AV HANDLÄGGARE

DATUM

ANSVARIG

FORMAT NUMMER BET

KONSULT

SKALA

REV. / REL.DATUM

REGISTERFASTIGHET

BYGGNADSVERKSNUMMER

HUSDEL

REGISTRERINGSNUMMER

PLANID ANSV. PART

LOKALISERINGSFIGUR

-

A1

1

4

6

8

30

7

5

9

23

C0109001

C109:1

Ångström etapp 4 - 40 51 620

31

AKADEMISKA

HUS

Akademiska Hus ABakademiskahus.se