Nya Ångström Building Information 21 April 2020
Weeks 17–20
Work area Building 10 o Installation of facade o Roof work o Ground work o Interior additions to the framework o Disassembly of crane week 19
Work area Building 9
o Inspections, tests and various additional work ongoing inside. o Ground work, preparations for asphalting. o Exterior laying of paving stones.
Work area Building 5 Recycling
o Installations, outer surface on new recycling building, see marking on interior construction site layout plan.
o Sawing for and assembly of new door section in facade on Monday 27 April. o Flooring installed Wednesday–Thursday 29–30 April. This can result in
odours but no extra measures are required.
Work area Building 1(Existing Ångström) o New joist work in the old entrance between Building 10 and Building 1, floor 1. o Expansion of work area by Building 2’s gable impacts access to
Ångström’s temporary entrance. See the construction site layout plan. o Surfacing by Building 4’s gable for new location of temporary bicycle parking.
Disturbances
o Ground packing prior to asphalting and laying paving stones can cause disturbances. Noise.
o Noise from demolition work at Building 5 K1, for shorter periods and primarily locally in Building 5 on the floor above K1.
o Sawing door hole K1 Building 5 on Monday 27 April. o Corridor Building 5k1 closed. o Noise from work in Building 1’s old entrance. o Pick up ear plugs in the library if the noise disturbs you. o Very heave traffic during disassembly of the crane.
Closures, provisional arrangements
o According to the attached general plan.
Noticeable upcoming work (preliminary start times) o Work with commissioning buildings. o Change of windows in rooms closest to the link to Building 10, tentatively
planned to start on 18 May 2020. o Start for rebuilding of the goods reception week 21.
Construction management for NCC and Akademiska Hus
1K1123SKRIVRUM 1K1122SKRIVRUM
1K1627KORRIDOR
1K149PASSAGE
1K151VERKSTAD 1K152VERKSTAD
1K154WC
1K153GODSMOTTAGNINGYTTRE
1K155GODSMOTTAGNINGINRE
1K156GODSMOTTAGNINGUTLÄMNING1K148FÖRRUM
1K144KORRIDOR
5K142KÄLLSORTERINGENTRÉ
5K160KORRIDOR
5K104KÄLLSORTERINGFÖRPACKNINGAR,RETURPAPPER5K103KÄLLSORTERINGELEKTRONIK
5K101KÄLLSORTERINGMETALL,GLAS
5K102KÄLLSORTERINGKOMPOST
1K150GODSMOTTAGNING,KORRIDOR
1K149PASSAGE
K1
00
K2
01
02
03
04
05
N
UPPDRAG.NR RITAD/KONSTR. AV HANDLÄGGARE
DATUM
ANSVARIG
FORMAT NUMMER BET
KONSULT
SKALA
REV. / REL.DATUM
REGISTERFASTIGHET
BYGGNADSVERKSNUMMER
HUSDEL
REGISTRERINGSNUMMER
PLANID ANSV. PART
LOKALISERINGSFIGUR
-
A1
1
4
6
8
30
7
5
9
23
C0109001
C109:1
Ångström etapp 4 - 40 51 620
31
AKADEMISKA
HUS
Akademiska Hus ABakademiskahus.se