Page 1: nwr.indianrailways.gov.innwr.indianrailways.gov.in/uploads/files/1350027498494-R…  · Web viewd. During the Journey, the passenger, whose identity card number has been indicated

mRrj if’pe jsyosNorth Western Railway

nj lwpuk dzekad 01 & „012RATE ADVICE No 01 OF 2012

t;iqj 31 ekPkZ, 2012 th ,Yk ehuk

eq[; okf.kT; ÁcUèkd Jaipur, 31 MARCH, 2012 G.L.MEENA

CHIEF COMMERCIAL MANAGER

1

Page 2: nwr.indianrailways.gov.innwr.indianrailways.gov.in/uploads/files/1350027498494-R…  · Web viewd. During the Journey, the passenger, whose identity card number has been indicated

RATE ADVICE ASSURANCE SHEET

Rate advice received on date______________________________________

We, the following staff have gone through the Rate Advice No. ...................... and Noted the content of the same.

Sr. No. Name Designation Signature 1234567891011121314151617181920

(Note: This sheet is to be signed by all the concerned Supervisors and Staff for having understood the contents.)

2

Page 3: nwr.indianrailways.gov.innwr.indianrailways.gov.in/uploads/files/1350027498494-R…  · Web viewd. During the Journey, the passenger, whose identity card number has been indicated

INDEXC.L No.

Subject Page No.

THROUGH RATE CIRCULAR (COACHING)01 Closure of Hanumangarh-Sri Ganganagar (MG) section for Gauge Conversion work w.e.f.01.02.2012.

THROUGH RATE CIRCULAR (GOODS)01 Opening of Kribhco Infrastructure Limited ICD-Jaipur Division.02 Opening of Bhilwara(BHL) & Sarotra Road (SZA) for goods traffic.03 Errata to North Western Railway Local Distance Table No.1 in force from 01.04.2003.04 Notification of distance for Mavli Jn- Nathdwara new BG parallel line(Corrigendum to TRC 37

(Goods) of 2011)05 Permission for handling container traffic06 Notification of inter station distance due to shifting of Ratangarh Kanakwal (RKK) station building over

Bikaner Division.07 Updated/Fresh revised list of Stations/Sidings Capable for handling full block rake and half rake of

(BG) goods traffic of North Western Railway.08 Opening of Bhagega (BAGA) Station for Inward coal traffic on permanent basis.

LOCAL RATE CIRCULAR (COACHING)01 Amendment in Tatkal Scheme. (CC.No.59 of 2011)02 Amendment in Tatkal Scheme. (CC.No.61 of 2011)03 Amendment in Tatkal Scheme. (CC.No.62 of 2011)04 Streamlining the procedure of release of Out-station Quota.( CC.No.64of 2011) 05 Verification of Travel detail-charging of fee by Railways. ( CC No.65 of 2011 ) 06 Distribution of Reservation quota in Yuva trains. (CC No.66 of 2011)07 Introduction of Tatkal scheme in Duronto Express Train.(CC No.67 of 2011)08 Accepting Unique Identification Card “Aadhaar” as one of the prescribed proofs of identity. (CC

No.69 of 201109 Introduction of Tatkal Scheme in Duronto Express Train. (CC No.71 of 2011)10 Amendment in Tatkal Scheme-Identity Proof.\ (CC No.72 of 2011) 11 Provision for carrying of ID proof during Journey on reserved tickets.

(Comml. Circular No.04 of 2012)12 Accepting SMS sent by IRCTC/Railways on par with Electronic Reservation Slip (ERS)

for undertaking journey on e-tickets. (Commercial Circular No.07 of 2012)13 Publicity regarding facility of booking of vacant accommodation at current counters.

(Commercial Circular No.10 of 2012)14 Time limit for Advance Reservations.(Commercial Circular No.12 of 2012)15 Validity of Passes for travel in Garib Rath Express Trains. (Commercial Circular No.11

of 2012) 16 Waiting List limit.17 Provision for carrying of ID proof during journey on reserved tickets.

(Commercial Circular No.14 of 2012)18 Clearance of wait –listed passengers –Amendment to Para 618 of Indian Railways

Commercial Manual Vol-I. (Commercial Circular No.15 of 2012)19 Amendment in Jan Sadharan Ticket Booking Sewak(JTBS) Scheme.( Commercial Circular

No.17 of 2012) LOCAL RATE CIRCULAR (GOODS)

01 Two point combinations for steel traffic and composition of CONCORD rake. (Corrigendum No.27 to Rates Circular No.62 of 2009)

02 Levy of Service Tax on Transportation of Goods by Rail.

3

Page 4: nwr.indianrailways.gov.innwr.indianrailways.gov.in/uploads/files/1350027498494-R…  · Web viewd. During the Journey, the passenger, whose identity card number has been indicated

03 Guidelines for Electronic Payment System.(Corrigendum No.08 to Rates Circular No.39/2008)04 Hire Charge for utilization of Railway Brake Van by Container Train Operators. (Rates Circular

No.2 of 2012)05 Haulage Charge recoverable for movement of nine notified commodity groups in container(Corrigendum 2

to Rates Circular No.05 of 2011)06 Free time for loading/unloading of covered wagons(Rates Circular No.01 of 2012)07 LIBERALIZED WAGON INVESTMENT SCHEME (LWIS) (Freight Marketing Circular No.11 of

2011)08 Wrong charging of 40 feet container by the system09 Charging of 40 feet container.10 Policy Guidelines-Freight Incentive Scheme and Transportation Products(Corrigendum No.29 to Rates

Circular No.62 of 2009)11 Charges for haulage of empty wagons on private account((Rates Circular No.3 of 2012)12 Signing of Private Siding Agreement13 Policy Guidelines-Freight Incentive Scheme and Transportation Products.( (Corrigendum No.28 to

Rates Circular No.62 of 2009)14 Revision in Rule 1807 of Indian Railway Code for Traffic (Commercial ) Department15 The charging of mixed commodity in a rake16 Charges for providing Brakevans in Wagon Investment Scheme (WIS) rakes.17 Classification of “Neem Coated Urea and “Boronated Suphala”18 Policy Circular- Freight Marketing Circular No.01 of 2012 on Siding Matters-Liberalization of Siding

Rules. (Freight Marketing Policy Circular No.01 of 2012)19 Implementation of e-payment System of freight.20 Rationalization of Freight rate effective from 06.03.2012(R.C.No.07 of 2012)21 Classification of Iron Ore( Addendum No.15 to Rates Circular No.36 of 2009)22 Notified Stations.(R.C.No.4 of 2012)23 Hire Charge for utilization of Railway Brake Van by Container Train Operators. ( Corrigendum to

Rates Circular No.02 of 2012)24 Inflation in distance for charging of freight on Chavaj-Bharuch-Dahej Section

.(R.C.No.5 of 2012)25 Inflation in distance for charging of freight on Chavaj-Bharuch-Dahej Section. (Corrigendum No.1 to

Rates Circular No.05 of 2012)26 Inflation in distance for charging freight on Banspani-Tomka BG section on South Eastern

Railway. .(R.C.No.6 of 2012)27 Permissible Carrying Capacity (PCC) of 8 Wheeler BG Wagons. ( Corrigendum No.2 to Rates Circular

No.28 of 2011)28 Haulage Charges recoverable for movement of notified commodity groups in container.

(Corrigendum 3 to Rates Circular No.5 of 2011)29 In private /assisted siding where placement/release of a rake from /to interchange point is done

through siding owner’s loco,the guidelines for reckoning of excess detention when a loaded rake, after unloading, is back-loaded. ( Rates Circular No.08 of 2012)

30 Dynamic Pricing Policy-Congestion Charge( Rates Circular No.09 of 2012) SUMMARY OF OTHER RAILWAY THROUGH RATE CIRCULAR (GOODS)

1 1.- Opening of Changsari (CGS) station for Chassis stuffing /destuffing operation only.2.- Opening of New Jalpaiguri (NJP) station as a Container Rail Terminal.3- Opening of Manu, Jirania Churaibari, Karimganj MG Stations & Lamsakhang BG station for Out ward and Inward booking of RMC traffic.4. - Opening of Lakwa (LXA) station for Inward traffic.5- Opening of Furkating (FKG) for handling of Inward crane consignment of Iron Pipes. 6:- Opening of Bihara (BHZ) MG for Out ward booking of Coal traffic 7- Opening of New Guwahati (NGC) for Container Rail Terminal (CRT)

4

Page 5: nwr.indianrailways.gov.innwr.indianrailways.gov.in/uploads/files/1350027498494-R…  · Web viewd. During the Journey, the passenger, whose identity card number has been indicated

8- Railway Wagons allowed for loading of Sawn Timber pertaining to Arunachal Pradesh.2 1- Chargeable Distance Kilometers between Katihar –Teznarayanpur after Gauge

conversion from MG to BG. 2.- Closure of Stations.3.- Chargeable distance from and to Kamalpur (KMPH) halt station between AZR –KWE Railway stations in BOE-MLDT section (Main Line)4.- Opening of Teznarayanpur (TNPR) station for Inward Booking of RMC Traffic only.5- Re-Opening of Amoni (AONI) Station under LMG Division for both Inward and Outward booking of Goods traffic. 6- Opening of Bathnaha (BTF) station for Inward booking of stone chips.

3 1- Errata to Central Railway local distance Table No.5 inforce from 01.01.20052- Permission to co-use Private siding of M/s Lloyd Steel Industries Ltd served by Wardha by M/s. Gopani Iron and Power (India ) Pvt. Ltd.3- Opening of Daund and Goods shed for loading of Malasses in tank wagons.

4 Notification of Railway Electronic –in-motion weighbridge installed at Nandurbar yard.5 1.- Permission to co-use private siding of M/s. Vimla Infrastructure India Pvt. Ltd. served

by Tadali by M/s. Nair Coal Services Ltd. as Liaisoning Agent on behalf of Gujarat State Electricity Corp.Ltd. 2.- Permission to co-use siding of M/s. PNP Maritime Services Ltd. (PPDP) Dharamtar Creek served by Pen on Mumbai Division.3.- Extension of permission for handling BCN Rakes by M/s. Navkar Corporation Ltd. at PNCS Siding.

6 1.Inter distance in two decimals of Anandapuram-Talguppa BG (converted from MG ) section on Mysore Division over South Western Railway.2. Extension of Bellary Cantonment (BYC) station for handling Inward Goods Traffic.

7 Opening of Tarn Taran Station for handling of inward Coal traffic.8 Permission to co-use private siding of M/s. Vimla infrastructure India Pvt. Ltd. served by

Tadali by M/s. Anshul Impex Pvt. Ltd., and M/s. Ultra Tech Cement Ltd.9 1- W.Rly’s Station Code list section I/II (2003 Edition)

2- Permission for Co-Use of Kribhco Infrastructure Ltd. Siding at Hazira served by Kosad /Gothangam by M/s. Essar Steel Ltd.

10 1- Co-use permission of siding M/s. Khalari Cements Ltd. served by KLRE Railway station for Lanco Anpara (Anpara C) TPS siding over Dhanbad division.2- Co-user permission for siding KDH line no. II (Code KASN for Monnet Daniels Coal Washeries Pvt. Ltd.) over DHN division.

11 1- Amendment to Note No.2 below Clause (15) (e) of Rule 201 regarding ‘forfeiture of registration fee’ contained in chapter –II on Indian Railway conference Association, Goods Tariff No. 41, part-I (Volume-I).2.- Temporary opening lead line of M/s. Adhunik Alloys and Power Ltd. for Traffic served by Kandra Station

12 1.Re-opening of Wangapalli station for handling goods traffic. 2.Corrigendum -Change of name of M/s. SJK Steel Plant Limited, siding served by Challavaripalli to M/s. Kalyani Gerdau Steel Limited.3- Change of name M/s. S.J.K Steel Plant Limited, siding served by Challavaripalli to M/s. Kalyani Gerdau Steel Limited.4.- Notification of Permission for allowing M/s. Zuari Industries Limited Goa as a co-user of M/s. Coramandal International Limited at Kakinada Port.5-Opening of Domestic Container Terminal Siding of M/s.CONCOR served by nagalapalle Station on Secunderabad Division of S.C.Rly.

13 1- Opening of Angul Station for inward & Outward goods traffic.2- Opening of new private siding of Balaram Siding of M/s. MCL /Talcher.

5

Page 6: nwr.indianrailways.gov.innwr.indianrailways.gov.in/uploads/files/1350027498494-R…  · Web viewd. During the Journey, the passenger, whose identity card number has been indicated

3- Permission of handling Inward Alumina at Private siding of M/s Vedanta Aluminium Ltd (Alpha Code: MVAA, Numeric Code: 12221470 ) served by Ambodala Station of SBP Division.4- Inward & Outward traffic at Private siding of M/s. Vedanta Aluminium Ltd (Alpha Code: MVAA, Numeric Code: 12221470) served by Ambodala Station for SBP Division.

14 Addition /Correction /Deletion in the Numerical Code list of Various Zonal Railways.15 1- Closure of M/s. India Cements Limited Siding Served by Yerraguntla.

2- Closure of M/s. Penna Cements Industries Siding Served by Tadipathri.16 1- Chgargeable distance for M/s Mahanadi Coalfields Limited’s siding served by Talcher

over Khurda road Division.2- Issue of RR in the case of M/s. DPCL siding in ECOR.3- Notification of Bobbilli (VBL) station as CRT for chasis stuffing /destuffing & loading /unloading operation.4- Notification of Vizianagram (VZM) Goods Shed for outward booking of Timber Waste.

17 Permission to co-use of private siding of M/s. Vimla Infrastructure India Pvt. Ltd. served by Tadali by M/s. Jaibharat Enterprises and M/s. Murli Industries Ltd.

18 1- Extension of Amritapura (AMC) Station for handling outward goods traffic.2- Opening of Kolar Station for handling inward goods traffic.

19 1- Temporary permission of 6 months for using CCIL Siding /GZB by M/s Innovative B2B Logistics Solutions Ltd.2- Corrigendum – Temporary permission of 6 months for using CCIL Siding /GZB by M/s Innovative B2B Logistics Solutions Ltd.

20 Opening of Malanpur (MLAR) station for Goods Traffic. Time Limit Extension21 1-Extension of permission for outward booking of non-programmed Coal from goods

sheds/sidings.2- Temporary Suspension of Goods Shed at Akaltara for a period of 04(four) months w.e.f 21.11.2011.

22 Opening of Tarakeswar Station as Container Rail Terminal (CRT) under HWH Division.23 Opening of Janakpur Road Station for inward Goods traffic.24 Opening of Kaima station for goods traffic over Jabalpur Division on West Central

Railway.25 Updated list of full rake /half rake goods shed/sidings two point combinations

(Originating ) for outward loading in Jumbo /Coal in BOX ‘N’ wagons and two point combination (Destination ) for Inward Jumbo over Central Railway.

26 Permission to co-use private siding of M/s. Vimla Insfrastructure India Pvt. Ltd., served by Tadali by M/s. Gupta Energy (p) Ltd.,

27 Opening of Dodballapur (DBU) station for handling of inward coal traffic.28 Updated /Fresh list of stations /sidings capable for handling full block rake and half rake

of (BG) goods traffic on Northern Railway.29 Opening of Bina Refinery Plant Siding, served by Mahadeokhedi station of BPL Division.30 1.- Opening of New Alipurduar (NOQ) Station for outward booking of all Goods traffic.

2- Opening of Bamunigaon (BMGN) BG Station for outward booking of All Goods traffic.3- Opening of New Tinsukia (NTSK) BG Station for outward booking of CPC consignment.4- Opening of Bamunigaon (BMGN) Station for outward booking of coal traffic in block rake.

31 Change in Alpha Code for M/s. SJK Steel Plant Limited siding Served by Challavaripalli.32 Change of name of siding of M/s. Vikram Sponge Iorn Ltd., to Welspun Maxsteel Ltd.,33 Permission for co-use of Kribhco Infrastructure Siding (served by Kosad & Gothangaon)

by M/s. Trans Rail Logistics Limited.

6

Page 7: nwr.indianrailways.gov.innwr.indianrailways.gov.in/uploads/files/1350027498494-R…  · Web viewd. During the Journey, the passenger, whose identity card number has been indicated

34 Opening of Bardoli (BIY) goods shed of Mumbai Division for Inward Coal traffic.35 Notification of Distance of Howrah/ Sealdah /Kolkata as “0” Distance36 Permission to co-use private siding of M/s. Vimla Infrastructure India Pvt

Ltd., served by Tadali by M/s. Shaping Dream Project Ltd., 37 1- De-notification of goods sheds and sidings from the list of Rake handling points of East Coast Railway.

2. Revision in the rate of siding charges.38 1- Allotment of Numerical Codes.

2-- Name and Code Initials of Stations,Sidings, PRS etc. Sanctioned to be adopted.39 1-Extension of Thondebhavi (TDV) station for handling Outward Cement traffic.

2-Opening of Nidvanda Station (NDV) for outward goods traffic (NMG). 40 1- Commercial Notification of private siding of M/s Navkar Corporation Ltd. as Brownfield

PFT.2.- Commercial notification of private siding of M/s. Vimla Infrastructure (India) Pvt. Ltd. as Brownfield PFT.3-Opening of MEL Siding Chandrapur for outward traffic of Coke/Coal.

41 1- Permission to access container terminal /siding of M/s. Innovative B2B Logistics Solutions Ltd., at Kalamboli (MILK) by other approved CTOs.2. Permission to co-use siding of M/s. PNP Maritime Services Ltd. (PPDP) Dharamtar Creek served by Pen on Mumbai Division.

42 1- Opening of a new Private Siding, namely M/s. Kanpur Logistics Park Private Limited at Panki.2- Opening of Saktesgarh (SKGH) station for outward half rake loading of stone traffic.

43 1- Extension of Vyasa Colony (VC) station for handling Inward Goods Traffic. 2- Opening of Yelahanka (YNK) station for handling inward goods traffic.

44 Addition/Correction /Deletion in the Numerical Code list of Various Zonal Railways.SUMMARY OF OTHER RAILWAY THROUGH RATE CIRCULAR (COACHING)

1 Closing of Mansi (MNE) station over Sonepur division for parcel traffic both inward/outward.2 Opening of Anandapuram (ANF)-Talguppa (TLGP) BG Section for booking of passenger,

luggage and parcel traffic.3 Correction of distance of Semerkhedi Station.4 Allotment of 8 digit numerical code.

5 1. Parcel package booked Dibrugarh Town (BDRT). 2:- Opening of Pandu Parcel Siding (Alpha code PNOP)3.- Closure of new Guwahati station for parcel traffic.

6 Preventive check conducted by Norhern Railway Vigilance in Parcel office New Delhi on 27.8.2011.

7 1-Rationalisation of rates for parcel traffic – methodology for reckoning the percentage utilization of SLR to determine categorization of each train for the purpose of charging freight for parcel and luggage traffic.2- Rationalisation of rates for parcel traffic-methodology for reckoning the percentage utilization of SLR to determine categorization of each train for the purpose of charging freight for parcel and luggage traffic.

8 Withhold of indent /Demand Non-lease Millennium Parcel Cargo Exp In view of development of Shalimar as Coaching terminal.

TRC COACHING_________________________________________________

THROUGH RATE CIRCULAR-COACHING (TRC)NO.:01 of 2012 ________________________________________________________

Sub:- Closure of Hanumangarh-Sri Ganganagar (MG) section for Gauge Conversion work w.e.f.01.02.2012.

7

Page 8: nwr.indianrailways.gov.innwr.indianrailways.gov.in/uploads/files/1350027498494-R…  · Web viewd. During the Journey, the passenger, whose identity card number has been indicated

It is for the information of all concerned that the Hanumangarh-Sri Ganganagar (MG) section will be closed from 00.00 hrs of 01.02.2012 for Gauge Conversion work and will be opened in BG after gauge conversion. Thus, it has been decided that following changes viz Cancellation of following trains shall take place as under:-

Partially train cancellation Sr.No Train No Station Date of last

service Cancelled w.e.fFrom To Cancelled

Between Station

1 02413 SDLP SGNR HMO-SGNR

31.01.2012 01.02.2012

2 02414 SGNR SDLP SGNR-HMO

31.01.2012 01.02.2012

3 52405 SDLP SGNR HMO-SGNR

31.01.2012 01.02.2012

4 52406 SGNR SDLP SGNR-HMO

31.01.2012 01.02.2012

5 52407 SDLP SGNR HMO-SGNR

31.01.2012 01.02.2012

6 52408 SGNR SDLP SGNR-HMO

31.01.2012 01.02.2012

7 52411 SDLP SGNR HMO-SGNR

31.01.2012 01.02.2012

8 52412 SGNR SDLP SGNR-HMO

31.01.2012 01.02.2012

9 52413 SDLP SGNR HMO-SGNR

31.01.2012 01.02.2012

10 52414 SGNR SDLP SGNR-HMO

31.01.2012 01.02.2012

Reorganization of these MG services between Hanumangarh Town (HMO) and Sadulpur (SDLP) w.e.f.01.02.2012 will be as under:-

Detailed timings of MG trains between SDLP-HMO will be as under-Station 52407 52405 A/T 52413 A/T 02413 52411 A/TSDLP 04.00 07.05 11.50 15.30 17.45SURP -

04.0707.1207.13

11.5711.58

15.3715.38

-17.52

PRSR - 07.2307.24

12.0712.08

15.4715.48

17.5918.00

NRWI 04.2604.27

07.3107.32

12.1512.16

15.5715.58

18.0918.10

HSWS 04.3904.40

07.4407.45

12.2812.29

16.0516.06

18.2218.23

SDMK 04.5104.52

07.5607.57

12.4012.41

16.1716.18

18.3418.35

AUS 05.0605.07

08.1108.13

12.5512.56

16.3216.33

18.4518.46

KALN 05.1705.18

08.2308.24

13.0613.07

16.4316.44

18.5618.57

TSD 05.3205.34

08.38T08.40

13.2113.23

16.5817.00

19.1119.13

8

Page 9: nwr.indianrailways.gov.innwr.indianrailways.gov.in/uploads/files/1350027498494-R…  · Web viewd. During the Journey, the passenger, whose identity card number has been indicated

GAMI 05.5005.52

09.0409.18Xing 52407

09.0409.06

13.3913.41

17.1617.18

19.2919.31

SRHG 06.0106.02

09.2709.28

09.1509.16

13.5013.51

17.2717.28

19.4019.41

DPLN 06.1706.18

09.4209.44

09.3009.32

14.0514.06

17.3817.40

19.5119.53

NHR 06.3006.32

09.5609.58

09.4409.46

14.1814.20

17.5217.54

20.0520.07

BKKA 06.4006.41

10.0610.07

09.5409.55

14.2814.29

18.0218.03

20.1520.16

KNNA 06.5506.56

10.2810.42Xing 52414

10.0910.11

14.4314.44

18.1718.19

20.3020.31

SURR 07.0507.06

10.5110.52

10.2110.22

14.5314.54

18.2818.29

20.4020.41

ENB 07.1407.16

11.0011.02

10.2910.31

15.0115.03

18.3718.39

20.4920.51

TLI 07.2907.30

11.1411.15

10.4310.45

15.1515.29

15.1515.16

18.5418.56

21.0321.04

TIE 07.4107.42

11.2611.27

10.5610.57

15.3815.39

15.2615.27

19.0719.08

21.1521.16

SJSM 07.4807.49

11.3311.34

11.0311.04

15.4515.46

15.3215.33

19.1419.15

21.2221.23

SRKN 07.5407.55

11.3911.40

11.0911.11

15.5115.52

15.3915.40

19.2019.21

21.3621.50Xing 02414

21.4021.41

HMO 08.25 --

12.15 --

16.35 --

20.00 --

22.25 --

Detailed timing of MG trains between HMO-SDLP will be as under-Station 52412 A/T 52414 A/T 52406 A/T 52408 02414HMO 06.45 09.25 14.40 18.10 21.30SRKN 06.57

06.5809.3709.38

14.5314.55

18.2218.23

--21.43

SJSM 07.0307.04

09.4309.44

15.0015.01

18.2818.29

----

TIE 07.1007.12

09.5009.51

15.0715.09

18.3518.36

21.5121.53

TLI 07.2207.36

07.2207.23

10.0210.03

15.2215.23

18.4719.01

22.0422.06

ENB 07.4807.50

07.3507.37

10.1510.17

15.3715.39

19.1319.15

22.1922.21

SURR 07.5807.59

07.4507.46

10.2510.26

15.4715.48

19.2319.24

----

KNNA 08.0808.09

07.5407.55

10.3510.36

15.5715.59

19.3319.34

---22.36

9

Page 10: nwr.indianrailways.gov.innwr.indianrailways.gov.in/uploads/files/1350027498494-R…  · Web viewd. During the Journey, the passenger, whose identity card number has been indicated

BKKA 08.2308.24

08.1008.11

10.5010.51

16.1416.15

19.4719.48

---

NHR 08.3208.34

08.1908.21

10.5911.01

16.2316.25

19.5820.12

22.5622.58

DPLN 08.4608.47

08.3308.34

11.1311.14

16.3716.39

20.2420.25

---23.09

SRHG 08.5808.59

08.4508.46

11.2511.26

16.5016.51

20.3620.37

----

GAMI 09.1109.13

11.3511.36

17.0917.23

20.4920.51

23.2423.26

TSD 09.2909.31

11.5211.54

17.4117.43

21.0721.09

23.4023.42

KALN 09.4509.46

12.0812.09

17.5717.58

21.2321.24

-----

AUS 09.5609.57

12.1912.20

18.0818.10

21.3421.35

---00.02

SDMK 10.1110.12

12.3412.46

12.3412.35

18.2718.41

18.2718.29

21.4921.50

00.1300.15

HSWS 10.2310.24

13.0013.01

12.4912.50

18.5018.51

18.3818.39

22.0122.02

-----

NRWI 10.3310.35

13.1513.16

13.0413.05

19.0719.09

18.5618.57

22.1422.15

---00.35

PRSR 10.4010.41

13.2313.24

13.1213.13

19.1619.17

19.0419.05

---- --

SURP 10.5010.51

13.3013.32

13.2213.23

19.2619.27

19.1419.15

---22.32

----00.49

SDLP 11.10----

14.00 ---

20.00 22.55 ---

01.15 ---

Division should ensure removal of surplus MG stock from the section before closure. Please issue necessary instructions to all concerned and acknowledge the receipt of this

letter (Authority:-CPTM/NWR No.T-425/24/4/GC of dt 18.01.2012) (Authority: CCM/NWR No. C-436/New Train/12 of dt 19.01.2012)

TRC GOODS

__________________________________________________________________ THROUGH RATE CIRCULAR –GOODS (TRC) NO. : 1 of 2012___________________________________________________________________ Sub:- Opening of Kribhco Infrastructure Limited ICD-Jaipur Division.

1. The competent authority has given the approval for opening of Kribhco Infrastructure Limited ICD

10

Page 11: nwr.indianrailways.gov.innwr.indianrailways.gov.in/uploads/files/1350027498494-R…  · Web viewd. During the Journey, the passenger, whose identity card number has been indicated

served by Pali station on Jaipur Division of North Western Railway as a private siding for both inward & outward container traffic in train load when consigned to & by Kribhco Infrastructure Limited siding at Pali.

2. In case of train load traffic which are entering directly into the siding without terminating at the serving station duly fulfilling the requisite condition, freight for traffic moved to and from the siding will be charged on through distance basis. The chargeable distance from serving station Pali (PALI) to Kribhco Infrastructure Limited- ICD(KIIP) is 3.101 Kms.

3. For any shunting done on party’s account, separate shunting charges are leviable as per extant rules.

4. This ICD will function round the clock.

5. The alpha code and numerical code of the siding would be as under:-Name of Station/Siding /CBA Numerical

CodeAlpha Code Gauge Division

Kribhco Infrastructure Limited -ICD served by Pali

11306420 KIIP BG JP

6. All instructions on this subject should be followed rigidly.

7. TMS nodal point of this ICD will be Khori (KORI) station of Jaipur Division.

(Authority: CCM/NWR No. C-498/ICD/Pali/Kribhco of dt 05.01.2012)

__________________________________________________________________ THROUGH RATE CIRCULAR –GOODS (TRC) NO. : 2 of 2012___________________________________________________________________

Sub:- Opening of Bhilwara(BHL) & Sarotra Road (SZA) for goods traffic.

1. The competent authority has given the approval for opening of Bhilwara (BHL) Station of Ajmer Division for inward fertilizer and outward of soap stone powder in bags except POL, Coal & Crane consignment & live stock in half rake load for a period of one year w.e.f 21.12.2011

2. The competent authority has given the approval for opening of Sarotra Road(SZA) of Ajmer Division for outward loading except POL, Coal, Crane Consignment & Live stock in full rake load for a period of one year w.e.f 07.12.2011.

3. Nodal point of Sarotra Road station for issuing TMS generate RRs will be Daurai station of Ajmer Division.

(Authority: CCM/NWR No. C-498/3/AII Vol.I of dt 11.01.2012)

______________________________________________________________ THROUGH RATE CIRCULAR –GOODS (TRC) NO. : 3 of 2012 _____________________________________________________________

Sub:- Errata to North Western Railway Local Distance Table No.1 in force from 01.04.2003. Ref:- North Western Railway’s Local Distance Table No.1

Errata to Local distance table no.1of North Western Railway is shown below for carrying out

11

Page 12: nwr.indianrailways.gov.innwr.indianrailways.gov.in/uploads/files/1350027498494-R…  · Web viewd. During the Journey, the passenger, whose identity card number has been indicated

correction.

Station between

Ref to LDT Page No Distance in KMsAs printed in LDT Should be corrected as

Marwar Mundwad\ to Palana

06 119.09 111.09

Necessary instructions may please be issued to all concerned and acknowledge receipt of this letter.

(Authority:-CCM/NWR No.C-541/9/1 Vol-II of dt 17.01.2012)

_______________________________________________________________ THROUGH RATE CIRCULAR –GOODS (TRC) NO. : 4 of 2012

_____________________________________________________________

Corrigendum to TRC 37 (Goods) of 2011 Sub:- Notification of distance for Mavli Jn- Nathdwara new BG parallel line.

Ref:- TRC No. 37 (Goods) of 2011 dtd 05.10.2011.

The alpha code of Mavli Jn appearing in the said TRC as MVI may be read as MVJ instead of MVI in Column no 2 & 4 of the table

(Authority: CCM/NWR No. C-541/9/1 (MVJ-NDT) of dt 18-01.2012)

_______________________________________________________________

THROUGH RATE CIRCULAR –GOODS (TRC) NO. : 5 of 2012_____________________________________________________________

Sub:- Permission for handling container traffic Ref :- TRC No.30 & 31 (Goods) of 2011 dated 05.08.2011 &09.08.2011

The competent authority has accorded approval for handling container traffic in M/s. J. K. Cement Works Ltd. Siding (MJCG) served by Gotan for period of one year w.e.f. 5.02.2012 subject to review during and thereafter . However, the container train operators will carry traffic belonging to the siding owner only. All terms & conditions stipulated in railway Board’s letter No.2009/TT-III/73/9 dated 10.12.2010 and relevant rules should be followed rigidly..

(Authority: CCM/NWR No. C-491/Sdg/GOTN/J .K. Cement/ of dt 27/01 /2012) _____________________________________________________________ THROUGH RATE CIRCULAR –GOODS (TRC) NO. : 6 of 2012 _____________________________________________________________

Sub:- Notification of inter station distance due to shifting of Ratangarh Kanakwal (RKK) station building over Bikaner Division.

Due to shifting of Ratangarh Kanakwal (RKK) station building over Bikaner Division from previous location, the distance between Rewari( RE) to Bathinda Jn(BTI) section has changed as shown in the table below:-

S.No Stations Present Distance Changed Distance1 REWARI Jn. 266.35 264.992 KISHANGARH BALAWAS H 257.04 255.683 JATUSANA 249.15 247.79

12

Page 13: nwr.indianrailways.gov.innwr.indianrailways.gov.in/uploads/files/1350027498494-R…  · Web viewd. During the Journey, the passenger, whose identity card number has been indicated

4 NANGALPATHANI H 244.53 243.175 KOSLI 238.51 237.156 SUDHRANA HALT 233.11 231.757 JHARLI 224.66 223.308 PATUWAS MEHRANA H 218.02 216.669 CHARKHIDADRI 210.86 209.5010 FATEHGARH HARYANA H 203.93 202.5711 MANHERU 197.33 195.9712 DHANA LADANPURA H 190.83 189.4713 BHIWANI Jn. 183.79 182.4314 SUI HALT 175.05 173.6915 BHIWANIKHERA 165.83 164.4716 JITAKHERI 156.62 155.2617 AURANGNAGAR H 154.09 152.7318 HANSI 146.90 145.5419 MAYAR HALT 138.99 137.6320 SATROD 134.43 133.0721 HISAR Jn. 123.79 122.4322 NYOLIKALAN HALT 113.92 112.5623 JAKHOD KHERA 107.79 106.4324 MANDI ADAMPUR 94.71 93.3524 KHABARA KALANH 83.95 82.5926 BHATTU 77.67 76.3127 MEHUWALA HALT 74.21 72.8528 DING 66.63 65.2729 JODA KA HALT 61.60 60.2430 SUCHAN KOTLI 56.85 55.4931 BAJE KA HALT 48.25 46.8932 SIRSA 42.05 40.6933 BARAGUDHAD 24.02 22.6634 SUKHCHAIN HALT 17.00 15.6435 KALAN WALI 8.88 7.5236 RATANGARH KANAKWA L 0.00 0.0037 RAMAN 5.28 6.6438 BAGGINIHAL SINGH .H 10.72 12.0839 MANWALA KOT BAKHTU .H 14.08 15.4440 SHERGARH 16.95 18.3141 GAHRIBAGHI HALT 23.15 24.5142 BATHINDA Jn 33.49 34.85

This has the approval of competent authority Distance Tables/ Softwares etc. be updated accordingly

(Authority: CCM/NWR No. C-541/9/1.Vol-III (Loose) of dt 02.02.2012)_____________________________________________________________

THROUGH RATE CIRCULAR –GOODS (TRC) NO. : 7 of 2012 _____________________________________________________________

Sub.:Updated/Fresh revised list of Stations/Sidings Capable for handling full block rake and half rake of (BG) goods traffic of North Western Railway.

A revised updated list of stations/sidings capable of handling full rake/half rake of goods

traffic (including coal rake handling list) on North Western Railway is enclosed herewith for information and necessary action.

13

Page 14: nwr.indianrailways.gov.innwr.indianrailways.gov.in/uploads/files/1350027498494-R…  · Web viewd. During the Journey, the passenger, whose identity card number has been indicated

Advise to all concerned accordingly. DA: As above.

(Authority: CCM/NWR No. 498/5/Vol II dt. 03.02.12) (Authority: COM /NWR No. T-2/216/4/Vol.IV/2011 of date 15.11.2011)

AJMER DIVISION ( FULL RAKE)

SN Name of station/ siding Code Inward Outward

1 Shree cement siding S/B Bangurgram BNGS Coal, Gypsum Cement, clinker

2 Lakshmi Cement siding S/B Banas LCTS Coal, Gypsum Cement, clinker

3Binani Cement siding Binani gram S/B by Keshavganj

BGKG Coal and Gypsum Cement, clinker

4 IOC siding, Daurai ICSD POL only -

5 Daurai DOZ All commodities except POL & coal

All commodities including crane consignment except POL & coal.

6 Mangliyawas MLI -All commodities except POL , coal live stock and Crane consignment

7 Kharwa KRW Coal only Nil

8 Beawar BERAll commodities except POL, Coal and Crane consignment.

All commodities except POL, Coal and Crane consignment.

9 Marwar Jn. MJAll commodities except POL, Coal and Crane consignment.

All commodities except POL, Coal and Crane consignment.

10 Keshavganj KVJAll commodities except POL, coal and Crane consignment

All commodities except POL, coal and Crane consignment

11 Nasirabad NSD - Public water12 Bhilwara BHL Public Water -

13 Rupaheli RPI - All commodities except POL and Crane consignment

14 Hamirgarh HMGAll commodities except POL , coal and Crane consignment

All commodities except POL and Crane consignment

15 Mandapiya MDPAAll commodities except POL , Live stock and Motor vehicle

All commodities except POL , Live stock and Motor vehicle

16 Fatah Nagar FANAll commodities except POL coal and Crane consignment

All commodities except POL, coal and Crane consignment.

17 Khemli KLHAll commodities except POL,coal and Crane consignments

All commodities except POL, coal and Crane consignment.

18 Debari DRBAll commodities except POL and CraneConsignment

All commodities except POL , coal and Crane consignment

19 Ranapratap Nagar RPZ All commodities except POL, coal and Crane

All commodities except POL , coal and Crane consignment

14

Page 15: nwr.indianrailways.gov.innwr.indianrailways.gov.in/uploads/files/1350027498494-R…  · Web viewd. During the Journey, the passenger, whose identity card number has been indicated

consignment

20 Det DET -All commodities except POL , coal Live stock and Crane consignment

HALF RAKES. No. Name of station/ siding Code Inward Outward

1 Jawai Bandh JWBAll commodities except POL, Coal and Crane consignment.

All commodities except POL, Coal and Crane consignment.

2 Sirohi Road SOHAll commodities except POL, Coal and Crane consignment.

All commodities except POL, Coal and Crane consignment.

3 Ajmer AII RMC only RMC only4 Madar MD RMC only RMC only

BIKANER DIVISION ( FULL RAKE)

S N

Name of station/ siding Code Inward Outward

1 Lalgarh LGH All commodities except POL All commodities except POL , coal and Crane consignment

2 Kolayat KLYTAll commodities including coal except POL and Crane consignment

All commodities except POL , coal and Crane consignment

3 Kanasar KNSR Nil Gypsum 4 Jamsar JMS Nil Gypsum

5 Suratgarh Thermal Power Siding STPB Coal/POL only Nil

6 Suratgarh SOG All commodities except POL and Crane consignment

All commodities except POL , coal and Crane consignment

7 Sri Vijai Nagar SBNR All commodities except POL and Crane consignment

All commodities except POL, coal and Crane consignment.

8 Anupgarh APH All commodities except POL and Crane consignment

All commodities except POL , coal and Crane consignment

9 Pilibanga PGK All commodities except POL All commodities except POL

10 Hanumargarh HMH All commodities except Crane consignment

All commodities except POL , coal and Crane consignment

11 Sangariya SGRA All commodities except POL and Crane consignment

All commodities except POL, coal and Crane consignment.

12 Mandi Dabwali MBY All commodities except POL and Crane consignment

All commodities except POL , coal and Crane consignment

13 Sri Ganganagar SGNR All commodities except POL and Crane consignment

All commodities except POL , coal and Crane consignment

14 Raman RMN All commodities except POL and Crane consignment

All commodities except POL , coal and Crane consignment

15 Kalanwali KNL All commodities except POL and Crane consignment

All commodities except POL , coal and Crane consignment

16 Sirsa SSA All commodities except POL and Crane consignment

All commodities except POL , coal and Crane consignment

17 FCI siding Sirsa FCSD Food grain Food grain

18 Bhattu BHT All commodities except POL and Crane consignment

All commodities except POL , coal and Crane consignment

15

Page 16: nwr.indianrailways.gov.innwr.indianrailways.gov.in/uploads/files/1350027498494-R…  · Web viewd. During the Journey, the passenger, whose identity card number has been indicated

19 Mandi Adampur ADR All commodities except POL and Crane consignment

All commodities except POL , coal and Crane consignment

20 Hissar Jn. HSR POL bagged consignment Bagged consignment

21 Hansi HNS All commodities except POL and Crane consignment

All commodities except POL , coal and Crane consignment

22 Bhiwani BNW All commodities except POL and Crane consignment

All commodities except POL, coal and Crane consignment.

23 Bhiwani City BNWC Coal only Nil

24 Satrod STD All commodities except POL, Coal and Live stock

All commodities except POL, Coal and Live stock.

25Indira Gandhi Thermal Power Project

MIGK For POL and Coal Nil

26 Sadulpur SDLPAll commodities except POL, coal and Crane consignment, Motor vehicle and Live stock

All commodities except POL, coal and Crane consignment, Motor vehicle and Live stock

27 Dhirera DHRR - General Goods traffic28 BAP BAF RMC RMC29 Ram singhpur RMSR - Gypsum Powder (in bags)

30 IOC/HPC Sidings (IOSH) IOSH POL -

HALF RAKE

S. No.

Name of station/ siding Code Inward Outward

1. Hanumangarh HMH POL only -

JAIPUR DIVISION (FULL RAKE)

S N Name of station/ siding Code Inward Outward

1 Reliance industries Ltd siding (S/B KNGT) MRIK Only POL -

2 ICD Anaj Mandi Rewari S/B AMRI IAMR Container only Container only.

3 Alwar Goods shed AGS All commodities except POL and Crane consignment

All commodities except POL , coal and Crane consignment

4 Kanakpura KKU All commodities including Crane consignment except POL, Coal.

All commodities except POL , Crane consignment and Coal

5 ICD Kankpura siding ( S/B KKU) ICDK Container only Container only.

6 Sanganer SNGN Edible Oil and coal only Edible Oil only

7 Sheodaspura Padampura SAS All commodities except POL and

livestockAll commodities except POL and livestock

8 Banasthali Niwai BNLW All commodities except POL, coal and Crane consignment

All commodities except POL , coal and Crane consignment

9 Dabla DBLA All commodities except Live All commodities except POL,

16

Page 17: nwr.indianrailways.gov.innwr.indianrailways.gov.in/uploads/files/1350027498494-R…  · Web viewd. During the Journey, the passenger, whose identity card number has been indicated

stock crane consignment,POL and Motor Vehicle

coal, live stock and Crane consignment and Motor Vehicle

10 Narnaul NNLAll commodities except POL, coal, live stock and Crane consignment

All commodities except POL, coal, live stock and Crane consignment

11 M/s Binani Cement Ltd. Siding, Bhagaga MBSB Clinker, Fly ash, Gypsum and

Coal Cement

12 Bhagega BAGAAll commodities except POL, Coal, Live stock and Motor vehicle

All commodities except POL, Coal, Live stock and Motor vehicle

13 Pali PALIAll commodities except POL, Coal, Live stock and Motor vehicle

All commodities except POL, Coal, Live stock and Motor vehicle

14 Khori KORI All commodities except POL and Coal

All commodities except POL and Coal

15 Adani Logistics ICD ALIK S/B MNDV ALIK Container only Container only

16 Bassi BAI

All commodities including Crane consignment except POL, Coal, Live stock and Motor vehicle, period of one year(w.e.f.05.07.2011)

All commodities including Crane consignment except POL, Coal, Live stock and Motor vehicle, period of one year(w.e.f.05.07.2011)

17 Amarpur Jorasi APJ

All commodities including Coal except POL, Live stock and Motor vehicle,and Crane consignment(upto 31.03.2012)

-

HALF RAKE:S.

No.Name of station/

siding Code Inward Outward

NIL

JODHPUR DIVISION (FULL RAKE)

S N Name of station/ siding Code Inward Outward

1 Pali Marwar PMY All commodities except POL, Coal & Crane consignment

All commodities except POL, Coal & Crane consignment

2 Bhagat ki Kothi BGKT All commodities except POL, Coal & Crane consignment

All commodities except POL, Coal & Crane consignment

3 Container siding S/B Bhagat ki Kothi CBKB Container only Container only

4 Banar BNO All commodities except POL, Coal & Crane consignment

All commodities except POL, Coal & Crane consignment

5 Nagour NGO All commodities except POL, Coal & Crane consignment

All commodities except POL, Coal & Crane consignment

6 Nokha NOK All commodities except POL, Coal & Crane consignment

All commodities except POL, Coal & Crane consignment

7 Deshnok DSO All commodities except POL, Coal & Crane consignment

All commodities except POL, Coal & Crane consignment

8 Phalodi PLCJ All commodities except POL, Coal & Crane consignment

All commodities except POL, Coal & Crane consignment

17

Page 18: nwr.indianrailways.gov.innwr.indianrailways.gov.in/uploads/files/1350027498494-R…  · Web viewd. During the Journey, the passenger, whose identity card number has been indicated

9 Ashapur Gomat AQG All commodities except POL, Coal & Crane consignment

All commodities except POL, Coal & Crane consignment

10 Pokran POK All commodities except POL, Coal & Crane consignment

All commodities except POL, Coal & Crane consignment

11 Odaniya Chacha OCH All commodities except POL, Coal & Crane consignment

All commodities except POL, Coal & Crane consignment

12 Shri Bhadariya Lathi SBLT All commodities except POL, Coal & Crane consignment

All commodities except POL, Coal & Crane consignment

13 Thaiyat Hamira THM All commodities except POL, Coal & Crane consignment

All commodities except POL, Coal & Crane consignment

14 Jaisalmer JSM All commodities except POL & Coal

All commodities except POL, Coal & Crane consignment

15 Gotan GOTN NIL All commodities except POL, Coal & Crane consignment

16 Kharia Khangar KXG Container only Container only

17 Merta Road MTD All commodities except POL& Crane consignment

All commodities except POL, Coal & Crane consignment

18 Merta City MEC All commodities except POL, Coal & Crane consignment

All commodities except POL, Coal & Crane consignment

19 Kuchaman City KMNC All commodities except POL, Coal & Crane consignment

All commodities except POL, Coal & Crane consignment.

20 Nawacity NAC All commodities except POL, Coal & Crane consignment

All commodities except POL, Coal & Crane consignment

21 Govindi Marwar GVMR All commodities except POL, Coal & Crane consignment

All commodities except POL, Coal & Crane consignment

22 Sambhar Lake SBR All commodities except POL, Coal & Crane consignment

All commodities except POL, Coal & Crane consignment

23 Bhimarlai BMQ All commodities except POL, Coal & Crane consignment

All commodities except POL, Coal & Crane consignment

24 Utarlai UTL All commodities except coal, POL and Crane consignment

All commodities except POL, Coal & Crane consignment

25 Balotra BLT All commodities except POL, Coal & Crane consignment

All commodities except POL, Coal & Crane consignment.

26 Barmer BME All commodities except POL, Coal & Crane consignment

All commodities except POL, Coal & Crane consignment.

27 Kavas KVA All commodities except POL, Coal & Crane consignment

All commodities except POL, Coal & Crane consignment.

28 Baitu BUT All commodities except POL, Coal & Crane consignment

All commodities except POL, Coal & Crane consignment

29 Marwar Mundwa MDW All commodities except POL, Coal & Crane consignment

All commodities except POL, Coal & Crane consignment

30 Rajkiyawas RKZ Petroleum coke only -

31 Samdari SMR RMC Only RMC only.32 Bomadara BOM Public Water only -33 Rohat RT Public Water only -34 Bania Sanda Dhora BSDA Coal Only NIL

35 Sujangarh SUJH All commodities except POL, Coal & Crane conignment

All commodities except POL, Coal & Crane conignment

36 Jalore JOR All commodities except POL, Coal & Crane conignment

All commodities except POL, Coal & Crane conignment

18

Page 19: nwr.indianrailways.gov.innwr.indianrailways.gov.in/uploads/files/1350027498494-R…  · Web viewd. During the Journey, the passenger, whose identity card number has been indicated

37 Pipar Road PPR All commodities except POL, Coal & Crane conignment

All commodities except POL, Coal & Crane conignment

38 Gudha GAAll commodities except POL, Coal , Live stock & Motor vehicle

All commodities except POL, Coal ,Live stock & Motor vehicle

39 M/s J.K.Cement Works Ltd.S/B Gotan MJCG Gypsum, Coal,Container Cement,Clinker, Container

40 Sambhar Lake salt siding No.1 SSSL - Salt

41 Sambhar Lake salt siding No.2 SSSL - Salt

42 Ultratech Cement Siding S/B Kharia Khangar IRLS - Cement

HALF RAKE:

S. No.

Name of station/ siding Code Inward Outward

1 Degana DNAAll commodities except POL, Coal and Crane consignment.

All commodities except POL, Coal and Crane consignment.

2 Marwar Chapri MCPE RMC ONLY PRC only.

_____________________________________________________________THROUGH RATE CIRCULAR –GOODS (TRC) NO. : 8 of 2012

_____________________________________________________________

Sub.:Opening of Bhagega (BAGA) Station for Inward coal traffic on permanent basis.

The competent authority has given approval for opening of Bhagega (BAGA) Station of Jaipur Division over North Western Railway for inward Coal traffic in full rake loads on permanent basis.

Nodal TMS point of this station will be Binani Cement Limited Siding, Bhagega (MBSB) of Jaipur Division.

Enviromental issues, if any, should be kept in mind and complied with by the party.

(Authority: CCM/NWR No.C.498/1 Vol.I dt. 23.2.2012)

19

Page 20: nwr.indianrailways.gov.innwr.indianrailways.gov.in/uploads/files/1350027498494-R…  · Web viewd. During the Journey, the passenger, whose identity card number has been indicated

LRA COACHING____________________________________________________________________ LOCAL RATE ADVICE-COACHING (LRA) No.01 of 2012_____________________________________________________________________ Sub:- Amendment in Tatkal Scheme. ( CC.No.59 of 2011)

The Tatkal scheme for reservation has been reviewed and it has been decided to make following changes in the scheme:-

(i) The Advance Reservation Period (ARP) of Tatkal scheme should be reduced from two days at present to one day excluding the day of Journey from the train originating station.For example, if train is to depart from the originating station on the second of the month, the Tatkal quota for that particular train shall open at 0800 hours on the first of the month.

(ii) No refund will be granted on cancellation of confirmed Tatkal tickets except in case of circumstances mentioned in para 2 of instructions contained in Commercial Circular no.53 of 2006 issued vide letter no.2006/TGI-I/20/P/Tatkal, dated 30.06.2006.

(iii) No duplicate Tatkal tickets shall be issued. Duplicate Tatkal tickets shall be issued only in exceptional cases on payment of full fare including Tatkal charges.

(iv) Tatkal tickets shall be issued only on production of one of the eight prescribed proof of identity (as mentioned in Commercial Circular No.05 of 2011 issued vide letter No.2010/TG.I/20/P/Tatkal dated 28.01.2011) as per procedure explained below:-

a. For this purpose, a self attested photo copy of the proof of identity of any one passenger shall be attached to the requisition slip.

20

Page 21: nwr.indianrailways.gov.innwr.indianrailways.gov.in/uploads/files/1350027498494-R…  · Web viewd. During the Journey, the passenger, whose identity card number has been indicated

b. The details of the identity proof shall be captured by the system and indicated on the reserved tickets as well on the reservation chart.

c. It will not be mandatory for the passenger(s) to go to the counter to book the Tatkal ticket, however, the proof will have to be sent in the aforementioned manner.

d. During the Journey, the passenger, whose identity card number has been indicated on the ticket, will have to produce original proof of identity indicated on the ticket, failing which all the passengers booked on the ticket shall be treated as travelling without ticket and charged accordingly. Indication will come on the ticket regarding carrying the same original proof of identity during the journey, as indicated on the ticket

e. If the passenger whose identity card number is indicated on the ticket is not travelling , all other passengers booked on that ticket, if found travelling in train, will be treated as travelling without ticket and charged accordingly.

f. CRIS may explore the feasibility of storing the number of proof of identity in case of more than one passenger, whose indication can be made on the ticket as well on the reservation chart. If such provision is made any one of the passengers whose proof of identity have been indicated can produce the original proof as indicated on the ticket as well as reservation chart. In such cases, in case of non-travelling of the one of the passengers whose proof of identity has been indicated , other passenger(s) will be able to undertake the journey on production of original proof of identity by the other passenger(s) whose proof of identity has been indicated on the ticket as well on the reservation chart.

(v) Agents / RTSAs shall be restricted from the booking Tatkal tickets at the counters between 0800 hours and 1000 hours .This restriction shall be enforced through frequent inspection at the counters .The agents both web service agents and web agents shall also be restricted from booking Tatkal tickets on the internet between 0800 hours and 1000 hours.

(vi) Even for internet booking for Tatkal tickets, the passenger shall enter the identity proof type and number , which is to be used for travel. These details shall be printed on the ERS/indicated on the MRM/VRM as well as in the reservation chart.

(vii) It will be possible to book a maximum of only four passengers per PNR for Tatkal tickets.

(viii) The web services agents of IRCTC will be permitted to book only one Tatkal ticket per train per day on the internet.

(ix) CRIS & IRCTC will make necessary changes in the software latest by 21.11.2011 and will advise the date of effect to all Zonal Railways.

(Authority:- Railway Board’s letter No.2011/TG-I/20/P/Tatkal of dt 11.11.2011 (Authority CCM,NWR No.C-436/ Tatkal Policy/9 of dt 17.11.2011)

_____________________________________________________________________ LOCAL RATE ADVICE-COACHING (LRA) No.02 of 2012

_____________________________________________________________________

Sub:- Amendment in Tatkal Scheme. (CC.No.61 of 2011)

21

Page 22: nwr.indianrailways.gov.innwr.indianrailways.gov.in/uploads/files/1350027498494-R…  · Web viewd. During the Journey, the passenger, whose identity card number has been indicated

Please refer to this office letter of even number dated 11.11.2011 on the subject quoted above wherein certain modifications to be made in Tatkal scheme have been advised to all Zonal Railways. In continuation of the Commercial Circular No.59 of 2011, The matter has been further examined in consultation with CRIS and it is informed as under:-

(i) The modifications advised vide letter dated 11.11.2011 referred to above shall be implemented with effect from 21.11.2011.

(ii) No refund will be given for duplicate Tatkal tickets even if original ticket is found. Issue of duplicate Tatkal ticket in exceptional circumstances would be on collection of full fare and Tatkal charges by the user to whom the privileges (preferably Chief Reservation Supervisor) would be assigned by Railways.

(iii) In case of cancellation of partially confirmed Tatkal ticket, refund for only waiting list Tatkal ticket will be given.

(iv) In PRS, the number of proof of identity will have maximum length of 16 alpha-numeric characters. Minimum 4 characters are mandatory and capturing of ID proof of anyone passenger per ticket is mandatory.

(v) In reservation charts, the last ten digits of the number of proof of identity would be printed. This identity card number would be printed in place of stock number.

(vi) In PRS, feature of capturing the number of proof of identity for all the four passengers has been provided. Those passengers who want to indicate the number of proof of identity for more than one passenger will have this option but will be required to produce copy(ies) of prescribed proof(s) of identity for additional passenger(s) also.The numbers of such identity card(s) will also be captured by the system and will be reflected in the reservation charts.

(vii) In case of partial cancellation, if the passenger, whose identity card number has been indicated, is getting cancelled in a PNR, the number of proof of identity of at least one of the remaining passengers needs to be provided mandatorily. However, in case of tickets booked through internet, initially, details of proof of identity of one of the passengers has been provided and subsequently provision for capturing data of all the four passengers will be made.

(viii) In case the number of proof of identity of more than one passenger has been indicated, during the journey, even if anyone passenger produces the original identity card indicated on the ticket as well as reservation chart, all the passengers can undertake the journey,

(ix) For ticket booked across the counter, if ‘RTSA Transaction’ is confirmed by the booking operator, Tatkal ticket will not be issued between 0800hrs.and 10.00hrs.

2. Necessary instructions may be issued to all concerned.

2.1 Ticket checking staff should be made conversant with the revised features of the Tatkal scheme to avoid inconvenience to general public.

3. Wide publicity may be given to the revised feature of Tatkal scheme trough all means for the information of general public.

(Authority:- Railway Board’s letter No.2010/TG-I/20/P/Tatkal of dt 18.11.2011

22

Page 23: nwr.indianrailways.gov.innwr.indianrailways.gov.in/uploads/files/1350027498494-R…  · Web viewd. During the Journey, the passenger, whose identity card number has been indicated

(Authority CCM,NWR No.C-436/ Tatkal Policy/9 of dt 30.11.2011)

_____________________________________________________________________ LOCAL RATE ADVICE-COACHING (LRA) No.03 of 2012 _____________________________________________________________________ Sub:- Amendment in Tatkal Scheme. (CC.No.62 of 2011) Please refer para (vii) of instructions contained in Commercial Circular No.61 of 2011 circulated vide this

office letter of even number dated 18.11.2011 on the subject quoted above.

2. It is clarified that the details of proof of Identity for one or more passengers can be furnished/captured for booking Tatkal tickets only at the time of booking of the ticket(s) both through PRS as well as through Internet.Once the Tatkal ticket has been booked, details of additional Identity Cards shall not be captured subsequently.

3. Necessary instructions may be issued to all concerned.

(Authority:- Railway Board’s letter No.2010/TG-I/20/P/Tatkal of dt 28.11.2011 (Authority CCM,NWR No.C-436/ Tatkal Policy/9 of dt 19.12.2011)

_____________________________________________________________________ LOCAL RATE ADVICE-COACHING (LRA) No.04 of 2012 _____________________________________________________________________

Sub:- Streamlining the procedure of release of Out-station Quota. (CC.No.64 of 2011) Please refer to this office letter of even number dated 16.08.2011 (Commercial Circular No.41 of 2011) on this

subject quoted above wherein detailed instructions regarding feeding of Outstation Quota in the PRS have been advised to all Zonal Railways.

2. With a view to maintain the uniformity as well as correct interpretation in MIS reports and Data Warehouse reports, the following strategy is being adopted in defining various Out-station Quotas:

S No Quota To be defined in PRS as In MIS Reports/PPM, Quota would appear as

1. Value added scheme for IRCTC OS ITDC VA2. Cancer Patients Quota OS OTCP CQ3. Emergency Quota OS< Controlling

Station>,Flag ‘EQ’ to be set for Controlling

EQ

4. Duty Pass Quota OS< Controlling Station>,Flag ‘DT’ to be set for Controlling station in outstation file.

DT

5. Defence Quota OS DF DE6. State Govt.Quota SG SG7. CRPF Quota CP CP

Note: All the above mentioned unutilized quotas will be released at the time of charting.

3. CRIS may implement the above said changes at the earliest. 4. Necessary instructions may be issued to all concerned accordingly.(Authority:- Railway Board’s letter No.2011/TG-I/20/P/Quota of dt 8.12.2011

(Authority CCM,NWR No.C-436/Resrn.Quota Policy/2011 of dt 22.12.2011)

23

Page 24: nwr.indianrailways.gov.innwr.indianrailways.gov.in/uploads/files/1350027498494-R…  · Web viewd. During the Journey, the passenger, whose identity card number has been indicated

_____________________________________________________________________ LOCAL RATE ADVICE-COACHING (LRA) No.05 of 2012 _____________________________________________________________________

Sub:- Verification of Travel detail-charging of fee by Railways. ( CC No.65 of 2011 )

Please refer to this office letter of even number dated 10.01.2007 (Comml Circular No.06 of 2007) and 31.08.2010 (Comml Circular No.40 of 2010) regarding charging of fee of Rs.750/- per PNR for verification.

2. Clarification has been sought by Zonal Railways regarding charging of fee for furnishing of copy of reservation charts or working charts.

3. The issue has been examined in consultation with Finance Directorate of Board’s office and it has been decided that the following fee should be realized for furnishing a copy of reservation chart to any person:-

(i) For furnishing a copy of reservation chart to any person, a fee of Rs.1,000/- per page should be charged. In this case, party will be provided a printout of the reservation chart taken out from the system without indicating the status of passenger viz. turning up/non turning up.

(ii) In case of furnishing of copy of working chart (having indication by TTEs/TCs relating up or non-turning up and other relevant details), a fee of Rs.750/- per PNR should be charged for all the PNRs indicated on that page.

4. This issues with the concurrence of Finance Directorate of Ministry of Railways. (Authority:- Railway Board’s letter No.2006/TG-1/20/P/LTC Pt. of dt 13.12.2011)

(Authority CCM,NWR No.C-436/Resrn.Quota Policy/2011 of dt 22.12.2011)

_____________________________________________________________________ LOCAL RATE ADVICE-COACHING (LRA) No.06 of 2012 _____________________________________________________________________

(CC No.66 of 2011) Sub:- Distribution of Reservation quota in Yuva trains.

Please refer to this office letter no.TC-II/2910/09/Yuva dated 22.12.2009 (Comml. Circular No.70 of 2009) wherein it has been inter-alia advised that initially 60% of the total number of coaches (rounded off to next higher whole number in case of a fraction) may be earmarked for Yuva category and the remaining may be earmarked for general passengers (non-Yuva). It was also indicated that these arrangements will be reviewed after six months of introduction of trains.

2. The distribution of reservation quota in Yuva trains has been accordingly examined keeping in view the utilization pattern and it has been decided that the quota distribution between Yuva and general category in Yuva trains should be revised to 20% of the total accommodation (rounded off to next higher whole number in case of fraction) for Yuva and remaining approximately 80% for General category.

3. Necessary action may kindly be taken by CCMs, Western, Northern and Eastern Railways to revise the quota distribution of Yuva trains at the earliest but not later than 26.12.2011.

4. Compliance in this regard may be sent to this office after doing the needful.

24

Page 25: nwr.indianrailways.gov.innwr.indianrailways.gov.in/uploads/files/1350027498494-R…  · Web viewd. During the Journey, the passenger, whose identity card number has been indicated

(Authority:- Railway Board’s letter No.2010/TG-1/20/PQuota. of dt 09.12.2011) (Authority CCM,NWR No.C-436/Resrn.Quota Policy/2011 of dt 22.12.2011)

_____________________________________________________________________ LOCAL RATE ADVICE-COACHING (LRA) No.07 of 2012 _____________________________________________________________________

Sub:- Introduction of Tatkal scheme in Duronto Express Train. (CC No.67 of 2011)

Please refer to para 8 of this office letter no. TCII/2910/Duronto Train dated 14.09.2009 (Comml. Circular No.46 of 2009) wherein it has been advised that there will be no “Tatkal” facility applicable in Duronto Trains for the time being.

2. On receipt of demands from various quarters on this aspect, the issue regarding introduction of Tatkal scheme in Duronto Express Trains has been examined and it has been decided that the existing Tatkal scheme may be introduced in Duronto Express Train also with the conditions that the extent of accommodation and the charges to be realized for Tatkal accommodation in different classes will be the same as applicable to the Mail/Express trains.

(Authority:- Railway Board’s letter No.2011/TG-1/20/P/TATKAL DURONTO. of dt 12.12.2011) (Authority CCM,NWR No.C-436/Resrn.Quota Policy/2011 of dt 22.12.2011)

S _____________________________________________________________________ LOCAL RATE ADVICE-COACHING (LRA) No.08 of 2012 _____________________________________________________________________

Sub:- Accepting Unique Identification Card “Aadhaar” as one of the prescribed proofs of

identity. (CC No.69 of 2011)

Ref:- a) Board’s letter No.2008/TG-I/10/P/e-ticket ID dated 06.08.2010 (Comml.Circular No.36 of 2010)

b) Board’s letter No.2010/TG-I/20/P/Tatkal dated 28.01.2011 (Comml.Circular No.05 of 2011)

Vide letters referred to above, the proofs of identity to be accepted for undertaking journey on e-tickets and under Tatkal Scheme were advised to Zonal Railways.A reference has now been received from Unique Identification Authority of India to consider “Aadhaar” as one of the prescribed proofs of identity documents for booking Railway tickets.

2. Although “Aadhaar” is covered under the heading ‘Photo Identity Card issued by Central /State Government’, it has been decided to specifically incorporate and indicate “Aadhaar” as one of the proofs of identity acceptable for undertaking journey on e-tickets as well as under Tatkal Scheme. Hence, the number of proofs of identity to be accepted for undertaking journey on e-tickets as well as under Tatkal Scheme will now become 9 (nine) as mentioned below:

(i) Voter Photo Identity Card issued by Election Commission of India. (ii) Passport (iii) PAN Card issued by Income Tax Department (iv) Driving Licence issued by RTO (v) Photo Identity Card issued by Central/State Government

25

Page 26: nwr.indianrailways.gov.innwr.indianrailways.gov.in/uploads/files/1350027498494-R…  · Web viewd. During the Journey, the passenger, whose identity card number has been indicated

(vi) Student Identity Card with photograph issued by recognized School/College for their students.

(vii) Nationalised Bank Passbook with photograph and (viii) Credit Cards issued by Banks with laminated photograph (ix) Unique Identification Card “Aadhaar”

3. Wide Publicity may be given through all possible means for information of general public.

4. Necessary instructions may be issued to all concerned.

(Authority:- Railway Board’s letter No.2011/TG-1/10/e-ticket ID/Part I. of dt 13.12.2011) (Authority CCM,NWR No.C-436/Resrn.Quota Policy/2011 of dt 22.12.2011)

_____________________________________________________________________ LOCAL RATE ADVICE-COACHING (LRA) No.09 of 2012 _____________________________________________________________________ Sub :- Introduction of Tatkal Scheme in Duronto Express Train. (CC No.71 of 2011)

Please refer to this office letter of even no. dated 12.12.2011 on the subject quoted above (Comml. Circular No.67 of 2011) wherein Zonal Railways have been advised to introduce Tatkal scheme in Duronto Express Trains.

2. The matter has been further examined and it is desired as under:-

(i) Tatkal facility should become available in all Duronto Express Trains for journeys starting on 01.04.2012(from train originating station).

(ii) Wide publicity should be given by all Zonal Railways through all possible means in the month of March,2012 regarding provision of this facility in Duronto Express Trains.

3. Necessary action may be taken accordingly under intimation to this office. (Authority:- Railway Board’s letter No.2011/TG-1/20/P/ TATKAL DURONTO of dt 14.12.2011)

(Authority CCM,NWR No.C-436/Tatkal Policy/2011 of dt 22.12.2011) ____________________________________________________________________ LOCAL RATE ADVICE-COACHING (LRA) No.10 of 2012 _____________________________________________________________________

Sub:- Amendment in Tatkal Scheme-Identity Proof. (CC No.72 of 2011)

Please refer to Board’s letter No.2011/TG-1/20/P/Tatkal dated 28.01.2011( Commercial Circular No.05 of 2011) and No.2011/TG-1/10/e-ticket ID/Part 1 dated 13.12.2011 (Commercial Circular No.69 of 2011) on the subject quoted above.

2. Instances have been brought to the notice of this office by a zonal Railway regarding inconvenience faced by them in this regard on following account:

(i) Some photo identity cards issued by State Government for their employees do not contain any number for capturing the same in the system. When these are rejected

26

Page 27: nwr.indianrailways.gov.innwr.indianrailways.gov.in/uploads/files/1350027498494-R…  · Web viewd. During the Journey, the passenger, whose identity card number has been indicated

by the ECRC at the booking counter, the same results in complaints.

(ii) In some of the ration cards issued by the State Governments, the photograph of the head of the family is only available and not of all the family members. Therefore, in the absence of the photograph of the passenger performing the journey, this being accepted as a proof of identity at the time of booking Tatkal ticket .This also resulted in complaints.

3. The matter was examined and it has been decided as under:

(i) Only those photo identity cards issued by Central/ State Government should be accepted which are having serial number.

(ii) Ration card should be accepted as proof of identity for undertaking journey under Tatkal scheme only if the passenger whose photograph is available on the ration card is travelling.

3.1 The above said clarifications are also applicable in case of proofs of identity acceptable for undertaking journey on e-tickets.

(Authority:- Railway Board’s letter No.2011/TG-1/20/P/ TATKAL of dt 29.12.2011) (Authority CCM,NWR No.C-436/Tatkal Policy/12 of dt 06.01.2012)

____________________________________________________________________ LOCAL RATE ADVICE-COACHING (LRA) No.11 of 2012 _____________________________________________________________________

Sub:- Provision for carrying of ID proof during Journey on reserved tickets. (Comml. Circular No.04 of 2012)

At present the passengers with Tatkal ticket and e-ticket are to carry original proof of identity during the course of railway journey. With a view to preventing the cases of travelling on transferred tickets, now it has been decided that any one of the passengers/ the passenger booked on the tickets issued from computerised Passenger Reservation System (PRS) and internet (i-ticket), undertaking journey in AC-3 tier, AC-2 tier, 1st AC, AC Chair Car and Executive classes, will also have to carry any one of the nine prescribed proofs of identity (in original) during the journey, and produce the same as and when required failing which all the passengers booked on that ticket will be treated as without ticket and charged accordingly.

2. The list of valid proofs of identity are as under:-

* Voter Photo Identity card issued by Election Commission of India.

* Passport

* PAN Card issued by Income Tax Department

* Driving Licence issued by RTO

* Photo identity card having serial number issued by Central/StateGovernment

* Student Identity Card with photograph issued by recognized School/College for their students.

27

Page 28: nwr.indianrailways.gov.innwr.indianrailways.gov.in/uploads/files/1350027498494-R…  · Web viewd. During the Journey, the passenger, whose identity card number has been indicated

* Nationalised Bank Passbook with photograph .

* Credit Cards issued by Banks with laminated photograph.

* Unique Identification Card “Aadhaar”

3. CRIS will make necessary provision in the software for indicating the message on this account on the ticket issued in the above said classes through computerised PRS/i-ticket.

4. These instructions will come into effect from 15.02.2012.

5 Wide publicity may be given by zonal railways through all possible means on this account for the information of general public.

6 Necessary instructions may be issued to all concerned particularly Ticket Checking Staff so as to educate them about the revised provisions.

(Authority:- Railway Board’s letter No.2011/TG-1/20/P/ TATKAL of dt 16.01.2011) (Authority CCM,NWR No.C-436/Tatkal Policy/12 of dt 17.01.2012)

____________________________________________________________________ LOCAL RATE ADVICE-COACHING (LRA) No.12 of 2012 _____________________________________________________________________

Sub:- Accepting SMS sent by IRCTC/Railways on par with Electronic Reservation Slip (ERS) for undertaking journey on e-tickets. (Commercial Circular No.07 of 2012)

Ref:- (i) Board’s letter No.2008/TG-I/10/P/SMS dated 20.07.2011. (ii) Board’s letter No.2011/TG-I/10/P/Web Portal dated 7.07.2011(Commercial

Circular No.36 of 2011)

Vide reference cited above, it had been decided to treat the screen shot of the e-ticket displayed through laptops/palmtops/mobile phones referred to as Virtual reservation Message-VRM and the MRM-Mobile reservation message for tickets booked on mobile phones combined with valid photo-id in original, as an instrument on per with the Electronic Reservation Slip (ERS), even for tickets booked through the IRCTC website.

2. It has now been decided to permit Short Messaging Service (SMS) sent by IRCTC/Railways, containing vital details as an instrument on per with the Electronic reservation slip-ERS.

3. The mandatory features of the authorized SMS are as under:

a) SMS sent by IRCTC/Railways will be considered for this purpose.

b) The SMS should contain all the vital ticket details as illustrated:

PNR: 4231009529, Train: 16723 , DOJ: 15/07/2011, 3AC, NDLS to BCT, Hari Krishna +3, SI 10-13, Fare: Rs.10000, SC-Rs.10(+PG charges as applicable)

c) Also if feasible , the SMS will accommodate the names of all passengers booked on the e-ticket, otherwise maximum number of passengers.

28

Page 29: nwr.indianrailways.gov.innwr.indianrailways.gov.in/uploads/files/1350027498494-R…  · Web viewd. During the Journey, the passenger, whose identity card number has been indicated

4. The authorized SMS containing all the aforementioned vital details when displayed through laptops/palmtops/mobile phones combined with valid photo-id in original shall be treated as an instrument on per with the ERS.

5. The ERS/SMS/VRM/MRM along with the following will be the components of a valid authority to travel:-

(i) Confirmed/RAC reservation, (ii) Valid ID-proof, and (iii) Appearance of name of the passengers on the chart.

6 The list of valid proofs of identity to be produced in original during the course of on board and off-board checking are as under:-

* Voter Photo identity card issued by Election Commission of India.

* Passport

* PAN Card issued by Income Tax Department

* Driving Licence issued by RTO

* Photo identity card having serial number issued by Central/StateGovernment

* Student Identity Card with photograph issued by recognized School/College for their students.

* Nationalised Bank Passbook with photograph .

* Credit Cards issued by Banks with laminated photograph.

* Unique Identification Card “Aadhaar”

7. The SMS will also have to be displayed during the course of On-board/Off-Board checking. If the passenger fails to produce/display this SMS due to any eventuality (loss, discharged mobile/laptop ,etc) but has the prescribed proof of identity, a penalty of Rs.50/- per ticket as applicable to such cases will be levied.The ticket checking staff On board/off board will give EFT for the same.

8. The On-Board ticket checking staff shall carefully verify the passenger details from the reservation charts.

9. Wide publicity may be given by Zonal Railways through all possible means on this account for the information of general public.

10. Necessary instructions may be issued to all concerned particularly Ticket Checking Staff so as to educate them about the revised provisions.

11. This issues with the concurrence of Finance Directorate of Ministry of Railways.

(Authority:- Railway Board’s letter No.2008/TG-1/10/P/ SMS of dt 01.02.2012)

29

Page 30: nwr.indianrailways.gov.innwr.indianrailways.gov.in/uploads/files/1350027498494-R…  · Web viewd. During the Journey, the passenger, whose identity card number has been indicated

(Authority CCM,NWR No.C-436/Resvn.Quotal Policy/12 of dt 08.02.2012)

____________________________________________________________________ LOCAL RATE ADVICE-COACHING (LRA) No.13 of 2012 _____________________________________________________________________

Sub:- Publicity regarding facility of booking of vacant accommodation at current

counters. (Commercial Circular No.10 of 2012)

As per extant procedure, vacant reserved accommodation available on trains after preparation of reservation charts can be booked at current counters of the train originating station upto a specified time before departure of trains. It appears that owing to lack of awareness among passengers, this is misused by unscrupulous elements /intermediaries for providing confirmed accommodation to passengers at a premium by using the current counter facility.There have been a few misleading media reports in this regard.

2. It is therefore desired as under:-

(i) Adequate publicity regarding the facility of booking of vacant accommodation available on trains at current counters of train originating station, after preparation of reservation charts, may be given through all possible means.

(ii) Zonal Railways should notify through newspapers and other means, the names of stations where the facility of reservation at current counters is available.

(iii) Delhi Division of Northern Railway is showing the train-wise details of available accommodation at current counters at Delhi/New Delhi /Hazrat Nizamuddin/Delhi Sarai Rohilla through internet. Such innovative measures can also be experimented by other Zonal Railways

(Authority:- Railway Board’s letter No.2112/TG-1/20/P/ Publicity of dt 02.02.2012) (Authority CCM,NWR No.C-436/Resvn.Quota Policy/12 of dt 07.02.2012)

____________________________________________________________________ LOCAL RATE ADVICE-COACHING (LRA) No.14 of 2012 _____________________________________________________________________

Sub:- Time limit for Advance Reservations. (Commercial Circular No.12 of 2012)

It has been decided to increase the advance reservation period from 90 days to 120 days on experimental basis (excluding the date of journey) w.e.f 10.03.2012.CRIS will make necessary changes in the software for this purpose under intimation to all Zonal Railways as well as Board’s office.

2. There will be no change in case of certain day time Express Trains like Taj Express, Gomti Express, etc.where lower time limits for advance reservation are at present in force.There will also be no change in case of the limit of 360 days for foreign tourists.

3. Board desire that the above change may be given wide publicity well in advance of its implementation.Suitable instructions to ali concerned may be issued to ensure smooth

30

Page 31: nwr.indianrailways.gov.innwr.indianrailways.gov.in/uploads/files/1350027498494-R…  · Web viewd. During the Journey, the passenger, whose identity card number has been indicated

change-over to the new time limit. (Authority:- Railway Board’s letter No.2112/TG-1/20/P of dt 06.02.2012)

(Authority CCM,NWR No.C-436/Resvn.Quota Policy/12 of dt 07.02.2012) ____________________________________________________________________ LOCAL RATE ADVICE-COACHING (LRA) No.15 of 2012 _____________________________________________________________________ Sub:- Validity of Passes for travel in Garib Rath Express Trains. (Commercial Circular No.11 of 2012)

Please refer to this office letter of even number dated 03.10.2011 (Commercial Circular No.51 of 2011) on the subject quoted above.

2. CRIS vide their letter No.CRIS/PRS/Rly.Bd.Corresp./189/Pt.-XI dated 28.10.2011 (copy enclosed) has advised that provision for booking on 2nd /Sleeper Class Pass has been enabled in PRS for Garib Rath Express Trains (3A,CC) Ny paying the difference of fare between the class of actual travel of Garib Rath Express trains and the Sleeper Class of Express trains for the distance travelled w.e.f.25.10.2011 on Concession Code PRVSEC.3. Necessary instructions may be issued to all concerned.Ticket Checking staff may also be informed of the revised provision to avoid inconvenience.

DA: As above

(Authority:- Railway Board’s letter No.2007/TG-1/20/P of dt 03.02.2012) (Authority CCM,NWR No.C-436/Resvn.Quota /09 of dt 17.02.2012)

Sub:- Validation of 2nd /Sleeper Class Pass in Garib Rath Express Trains.

Ref:- Railway Board’s letter No.2007/TG-1/20/P dated 03.10.2011 (Commercial Circular No.51 of 2011)

With Reference to above mentioned letter, it is advised that provision for booking on 2 nd /Sleeper Class Pass has been enabled in PRS for Garib Rath Express Trains (3A,CC) by paying the difference w.e.f.25.10.2011 on Concession Code PRVSEC.

(Authority: General Manager/PRS CRIS No.CRIS/PRS/Rly.Bd Coesp./189/Pt.XI of dt 28.10.2011)

____________________________________________________________________ LOCAL RATE ADVICE-COACHING (LRA) No.16 of 2012 _____________________________________________________________________

Sub: Waiting List limit.

Instructions were issued vide Board’s letter of even no. dated 06.10.2003 fixing the following upper waiting list limit for current waiting list in various classes:-

Class Waiting List limit1st AC/EC 302AC 1001st Class 303AC/Chair Car 300* *75 in case one AC-3-Tier/CC

31

Page 32: nwr.indianrailways.gov.innwr.indianrailways.gov.in/uploads/files/1350027498494-R…  · Web viewd. During the Journey, the passenger, whose identity card number has been indicated

running in trainSleeper Class 400

1.1 In case of certain trains having no stoppage enroute , the upper limit for current waiting list in Sleeper Class was prescribed as 150 whereas no upper waiting list limit was prescribed in 1AC,2AC and 3AC Classes of these trains.

2. The matter has been reviewed and it has been decided that the maximum waiting list limit for current waiting list in different classes may be modified as under:

Class Maximum Current Waiting List limit Existing Proposed

First Class/First AC/EC 30 1002AC 100 4003AC/AC Chair Car 300 600Sleeper 400 1300

3. It is proposed to implement these changes temporarily for the trains whose bookings gets opened

till 31st March,2012.

4. CRIS will make necessary modification in the software and advise the date of effect to all Zonal Railways as well as this office.

5. Necessary instructions may be issued to all concerned

(Authority:- Railway Board’s letter No.2003/TG-1/20/P of dt 09.02.2012) (Authority CCM,NWR No.C-436/Resvn.Quota policy /12 of dt 21.02.2012)

____________________________________________________________________ LOCAL RATE ADVICE-COACHING (LRA) No.17 of 2012 _____________________________________________________________________

Sub:- Provision for carrying of ID proof during journey on reserved tickets. (Commercial Circular No.14 of 2012)

Please refer to this office letter No.2011/TG-1/20/P/Tatkal dated 16.01.2012 (Commercial Circular No.04 of 2012) on the subject quoted above, wherein Zonal Railways have been informed about the provision of carrying proof of identity while travelling in AC classes.

2. After issuing of instructions, certain clarifications have been sought regarding application of this provision to the passengers who are upgraded from sleeper class. Apprehensions have also been raised regarding adequacy of number of identity card allowed for this purpose.

3. The matter has been examined and it is clarified as under:-

(i) In case of passengers who are automatically upgraded by the system from Sleeper Class to Air-conditioned class and in case of passengers who are upgraded by on-board ticket checking staff on realisation of difference of fare, the condition of carrying proof of identity during the journey as mentioned in Commercial Circular No.4 of 2012 shall not be applicable.

(ii) It is also clarified that the scope of the term “photo identity card having serial number

32

Page 33: nwr.indianrailways.gov.innwr.indianrailways.gov.in/uploads/files/1350027498494-R…  · Web viewd. During the Journey, the passenger, whose identity card number has been indicated

issued by Central /State Government” permissible under the scheme is very wide and it covers a large number of photo identity cards , some of which are as under:

Pension Pay Orders (PPO) Ration Card with photographs. Senior citizen cards. Below Poverty Line (BPL) cards.

ESI cards (with photographs) issued for taking treatment in ESI dispensaries.

CGHS Cards (with photograph) issued to individual family members of Central Govt. employees.

There may be many other cards issued by State Governments, Central Government which may get covered under the above category. However, based on the feedback, if necessary, the matter can be reviewed after implementation of this Scheme with effect from 15.02.2012.

4. It is also desired that wide publicity through all possible means may be given to this revised provision for information of general public, some of which are given below:

(i) Advertisement/Notification in Press through all leading newspapers.(ii) Through public address system in computerised PRS centers as well as on the

Railway Stations.

(iii) By displaying this information on the boards at the PRS centers and other prominent places.

(iv) By distributing pamphlets which can be published through advertisement at no cost to Railways.

(v) Through electronic media.

5.Necessary action may be taken to send intimation to all concerned particularly Ticket Checking Staff to avoid inconvenience to passengers.

(Authority:- Railway Board’s letter No.2011/TG-1/20/P/ID of dt 07.02.2012) (Authority CCM,NWR No.C-436/Resvn.Quota policy /12 of dt 08.02.2012)

____________________________________________________________________ LOCAL RATE ADVICE-COACHING (LRA) No.18 of 2012 _____________________________________________________________________

Sub:-Clearance of wait –listed passengers –Amendment to Para 618 of Indian Railways Commercial Manual Vol-I. (Commercial Circular No.15 of 2012)

Ministry of Railways have decided that para 618 of 1992’s Third Edition of Indian Railways Commercial Manual Vol.I may be revised as per correction slip No.24 enclosed.

(Authority:- Railway Board’s letter No.2011/TG-1/20/P of dt 29.02.2012) (Authority CCM,NWR No.C-436/Resvn.Quota policy /12 of dt 12.03.2012)

Correction slip No.24 to Indian Railways Commercial Manual Vol.I Para 618 may be revised as under:

33

Page 34: nwr.indianrailways.gov.innwr.indianrailways.gov.in/uploads/files/1350027498494-R…  · Web viewd. During the Journey, the passenger, whose identity card number has been indicated

Para 618 may be revised as under:-

The following procedure should be adopted for placing of indent for attachment of additional coach in train to clear waiting list:-

618: Clearance of wait –listed passengers- When the demand for reserved accommodation by any train is in excess of the actual availability as per normal train composition, the Assistant Commercial Manager (Reservation) or any other officer nominated by the administration at the Headquarters office should contact his counterpart in the operating branch for augmenting the train composition, if possible. A similar procedure should be followed at the Divisional Level where the Divisional Commercial Manager or the Assistant Commercial Manager should watch the waiting list and initiate action for making additional accommodation available in consultation with the officer concerned in the operating branch. It is important that the planning and implementation of attaching extra coaches to trains should be done sufficiently in advance so that the public may have as long a notice as possible of the additional accommodation being made available.

When it is possible to augment the load of a particular train, alternative arrangements to provide additional accommodation on other suitable trains should be made. For example , if accommodation by Golden Temple Mail train is not available and strengthening of it is also not feasible, accommodation by other trains, such as Paschim Express, should be increased as possible.

____________________________________________________________________ LOCAL RATE ADVICE-COACHING (LRA) No.19 of 2012 _____________________________________________________________________

Sub:- Amendment in Jan Sadharan Ticket Booking Sewak(JTBS) Scheme. ( Commercial Circular No.17 of 2012)

Please refer to para 3(d) of this office letter No.2007/TG-I/20/P dated 24.01.2008 (Commercial Circular No.08 of 2008) on the subject quoted above which is as under:-

“ Applicant should be a local resident of the area served by the station”.

2. A reference has been received from Central Railway wherein it has been advised that the above said clause has become constraint in selecting JTBS in Mumbai area as Mumbai is a big metro city with dense population where all stations are contiguous and it is difficult to decide whether the resident of the area is a local resident of the area served by the station.

3. The matter has been examined and it has been observed that the issue raised by Central Railway is not exclusively applicable to Mumbai area but universally applicable to all Metropolitan and other big cities.It has, therefore, been decided to revise para.3(d) of Commercial Circular No.8 of 2008 as under:-

“ Applicant should be residing in the municipal limits of the city/district in which JTBS is being appointed.”

4. Necessary action may be taken to send intimation to all concerned. (Authority:- Railway Board’s letter No.2012/TG-1/20/JTBS of dt 02.03.2012)

(Authority CCM,NWR No.C-436/JTBS/10 of dt 20.03.2012)

LRA(GOODS) _________________________________________________________ LOCAL RATE ADVICE-GOODS (LRA) No.01 of 2012

34

Page 35: nwr.indianrailways.gov.innwr.indianrailways.gov.in/uploads/files/1350027498494-R…  · Web viewd. During the Journey, the passenger, whose identity card number has been indicated

____________________________________________________________________ Corrigendum No.27 to Rates Circular No.62 of 2009

Sub:- Two point combinations for steel traffic and composition of CONCORD rake.

Ref:- Board’s letter of even number dated 10.11.2009 (RC No.62/2009) and corrigendum thereto.

1.0 In terms of Corrigendum No.18 to Rates Circular No.62 of 2009, loading of two point CONCORD rakes (for steel traffic only) in any combination of BRN/BOST/BFNS was permitted for any two point combinations within the same Zonal Railways for the period commencing from 30.04.2011 to 31.12.2011.

2.0 The matter has been reviewed. It has now been decided that the loading of two point CONCORD rakes (for steel traffic only) in any combination of BRN/BOST/BFNS may be permitted for any two point combinations within the same Zonal Railways for the period beyond 31.12.2011 and upto 30.06.2012.

3.0 All other details of the Rates Circular under reference will continue to apply unchanged.

4.0 This issues in consultation with Traffic Transportation Directorate and with the concurrence of Finance Directorate of the Ministry of Railways.

(Authority: Railway Baord’s letter No. TCR/1078/2009/13 date 27.12.2011) (Authority: CCM/NWR No. C-429/0/Vol-1of date 28-12-2011)

_____________________________________________________ LOCAL RATE ADVICE-GOODS (LRA) No.02 of 2012 _______________________________________________________________

Sub:- Levy of Service Tax on Transportation of Goods by Rail. Ref: i) Board’s letters of even number dated 29.12.2011 (RC No.43 of 2011).

ii) Ministry of Finance Department of Revenue Notification No.49,50 & 51/2011-Service Tax dated 30th December 2011

The Department of Revenue, Ministry of Finance vide its notifications referred above has advised that its earlier instructions for levy of Service Tax Education Cess and Higher Education Cess on Transportation of Goods by Rail is now held in abeyance till 31st March 2012. Copies of its Notification Nos.49,50& 51 of 2011 dated 30th December 2011 are enclosed.

In the light of the above, instructions issued vide RC No.43 of 2011 are not to be given effect and may be held in abeyance till 31st March 2012.

DA:- As above (Authority: Railway Baord’s letter No. TCR/1078/2011/2 date 30.12.2011) (Authority: CCM/NWR No. C-351/1/Service Tax on Goods of date 04-01-2011)

[TO BE PUBLISHED IN THE GAZETTE OF INDIA, EXTRAORDINARY, PART II SECTION 3, SUB-SECTION (i)]

Government of India Ministry of Finance (Department of revenue)

New Delhi , 30th December ,2011

35

Page 36: nwr.indianrailways.gov.innwr.indianrailways.gov.in/uploads/files/1350027498494-R…  · Web viewd. During the Journey, the passenger, whose identity card number has been indicated

Notification No.49/2011-Service Tax

G.S.R. (E).- In exercise of the powers conferred by sub-section (1) of section 93 of the Finance Act, 1994 (32 of 1994) (hereinafter referred to as the Finance Act), the Central Government, on being satisfied that it is necessary in the public interest so to do, hereby makes the following amendment in the notification of the Government of India in the Ministry of Finance (Department of Revenue) No.07/2010-Service Tax, dated the 27 th February, 2010, published in the Gazette of India, Extraordinary ,Part II, section 3, sub-section(i), vide number G.S.R.151 (E), dated the 27 th February, 2010 namely:-

2. In the said notification, in para 2, for the word ‘January’; the word ‘April’, shall be substituted.

[F.No.B-1/2/2010-TRU]

Note.- The principal notification No.07/2010-Service Tax, dated the 27th February,2010, was published in the Gazette of India, Extraordinary, Part II, Section 3, Sub-section (i) vide number G.S.R. 151 (E), dated the 27 th February, 2010 and last amended vide Notification No.38/2011-Service Tax, dated the 14 th June,2011 was published vide number G.S.R 448(E) dated 14th June,2011.

[ TO BE PUBLISHED IN THE GAZETTE OF INDIA, EXTRAORDINARY, PART II SECTION 3, SUB-SECTION (I)]

Government of India Ministry of Finance (Department of Revenue)

New Delhi , 30th December , 2011

Notification No.50/2011-Service Tax

G.S.R. (E).- In exercise of the powers conferred by sub-section (1) of section 93 of the Finance Act, 1994 (32 of 1994) (hereinafter referred to as the Finance Act), the Central Government, on being satisfied that it is necessary in the public interest so to do, hereby makes the following amendment in the notification of the Government of India in the Ministry of Finance (Department of Revenue) No.08/2010-Service Tax, dated the 27 th February, 2010, published in the Gazette of India, Extraordinary ,Part II, section 3, sub-section(i), vide number G.S.R.152 (E), dated the 27 th February, 2010 namely:-

2. In the said notification, in para 2, for the word ‘January’; the word ‘April’, shall be substituted.

[F.No.B-1/2/2010-TRU]

Note.- The principal notification No.08/2010-Service Tax, dated the 27th February,2010, was published in the Gazette of India, Extraordinary, Part II, Section 3, Sub-section (i) vide number G.S.R. 152 (E), dated the 27 th February, 2010 and last amended vide Notification No.39/2011-Service Tax, dated the 14 th June,2011 was published vide number G.S.R 449(E) dated 14th June,2011.

[TO BE PUBLISHED IN THE GAZETTE OF INDIA, EXTRAORDINARY, PART II SECTION 3, SUB-SECTION (I)]

Government of India Ministry of Finance (Department of Revenue)

New Delhi, 30th December, 2011

Notification No.51/2011-Service Tax

36

Page 37: nwr.indianrailways.gov.innwr.indianrailways.gov.in/uploads/files/1350027498494-R…  · Web viewd. During the Journey, the passenger, whose identity card number has been indicated

G.S.R. (E).- In exercise of the powers conferred by sub-section (1) of section 93 of the Finance Act, 1994 (32 of 1994) (hereinafter referred to as the Finance Act), the Central Government, on being satisfied that it is necessary in the public interest so to do, hereby makes the following amendment in the notification of the Government of India in the Ministry of Finance (Department of Revenue) No.09/2010-Service Tax, dated the 27 th February, 2010, published in the Gazette of India, Extraordinary ,Part II, section 3, sub-section( i ), vide number G.S.R.153 (E), dated the 27 th February, 2010 namely:-

2. In the said notification, in para 3, for the word ‘January’; the word ‘April’, shall be substituted.

[F.No.B-1/2/2010-TRU]

Note.- The principal notification No.09/2010-Service Tax, dated the 27th February,2010, was published in the Gazette of India, Extraordinary, Part II, Section 3, Sub-section (i) vide number G.S.R. 153 (E), dated the 27 th February, 2010 and last amended vide Notification No.40/2011-Service Tax, dated the 14 th June,2011 was published vide number G.S.R 450(E) dated 14th June,2011.

_____________________________________________________ LOCAL RATE ADVICE-GOODS (LRA) No.03 of 2012 ______________________________________________________________

Corrigendum No.08 to Rates Circular No.39/2008

Sub:-Guidelines for Electronic Payment System.

Ref:- Corrigendum No.04 to Rates Circular no.39/2008 Dt.04.12.09.

In terms of corrigendum No.04 to Rates Circular No.39/2008 dt. 04.12.09, modification in Para 5.2 of Rates Circular No.39/2008 containing instructions regarding the amount of LC/BG to be furnished by the customer opting for e-payment system, was issued.

2.0 The matter regarding the methodology of calculation of amount of LC/BG has been reviewed and it has been decided that the amount of LC/BG will be equal to the two (2) days average freight of the highest transaction month of the year. The formula for the calculation of the amount of LC/BG will be as under:-

Total freight during the highest freight transaction month of the year ----------------------------------------------- x 2 = Amount of LC/BG Actual days of transactions in concerned month

If the customer is willing to give LC/BG of more than 2 days average freight he may be allowed to do so.”

3.0 For the past cases, the amount of LC/BG need not to be recalculated till the validity of that LC/BG. However, when new agreement is entered or agreement is renewed or when the validity of LC/BG expires requiring fresh submission, the amount of LC/BG should be worked out in accordance with the changed instruction stipulated in the above para.

4.0 All other details of the circular under reference will remain unchanged.

5.0 These instructions will come into force from 10.01.2012.

6.0 This issues with the concurrence of Finance Directorate on Ministry of Railways.

37

Page 38: nwr.indianrailways.gov.innwr.indianrailways.gov.in/uploads/files/1350027498494-R…  · Web viewd. During the Journey, the passenger, whose identity card number has been indicated

(This disposed of ECR’s letter No.ECR/CRM/FMS/02/E-payment/NTPC-BTPS dated 21.11.11)

(Authority: Railway Baord’s letter No. TC-1/2009/104/1 date 30.12.2011) (Authority: CCM/NWR No. C-291/0(E-Banking) of date 04-01-2011)

_____________________________________________________

LOCAL RATE ADVICE-GOODS (LRA) No.04 of 2012 ______________________________________________________________

Rates Circular No.02 of 2012

Sub:- Hire Charge for utilization of Railway Brake Van by Container Train Operators. Ref:- Board’s letter No.2007/TC-1/302/1Pt.G dt.28.07.2011(Rates Circular No.27 of 2011)

In supersession of Board’s letter under reference, it has been decided to levy Hire Charge for utilization of Railway owned Brake Vans by container train operators as per the guidelines given below:

2.0 Guidelines

2.1 Hire Charge will be recovered from those container train operators who have not procured their own Brake Vans and are utilizing Railway owned brake vans.

2.2 Rate of Hire Charge for Railway Brake Van will be Rs.1500/- per brake van per day.

2.3 Hire charge for Railway Brake Van will be collected on monthly basis, for which billing will be done in the first week of each month by nodal Railway (i.e. Northern Railway).

2.4 In case an operator procures his brake van, the concerned operator will be exempted from the payment of Hire Charge in respect of such brake van from the subsequent month, as mentioned in Para 2.3 above.

Illustration:

If an operator ‘A’ (say) owns ten rakes and one brake van on 01.02.2012 and if he procures two brake vans in February 2012, then Hire Charge will be collected, as under: As on 01.02.2012, number of rakes and brake vans owned by the operator ‘A’ is ten rakes and one brake vanIn Fubruary2012, Hire Charge will be collected for (ten minus one i.e.) nine railway brake vansIf the operator procures two brake vans in February 2012As on 01.03.2012, number of rakes and brake vans owned by the operator is ten rakes and three brake vansIn March 2012, Hire Charge will be collected for (ten minus three i.e. ) seven railway brake vansIf the operator does not procure any additional brake van in March2012

As on 01.04.2012, number of rakes and brake vans owned by the operator is ten rakes and three brake vansIn April 2012, Hire Charge will be collected for (ten minus three i.e.) seven railway brake vans

2.5 CCM(FM)/NR will be the nodal officer for collection of Hire Charge for Railway brake vans.

2.6 CFTM/NR will maintain a record of rakes and brake vans in respect of each CTOs and supply it to the CCM(FM)/NR.

3.0 These guidelines will be effective from 01.02.2012.

4.0 This issues in consultation with Traffic Transportation Directorate and with the concurrence of Finance

38

Page 39: nwr.indianrailways.gov.innwr.indianrailways.gov.in/uploads/files/1350027498494-R…  · Web viewd. During the Journey, the passenger, whose identity card number has been indicated

Directorate of Ministry of Railways. (Authority: Railway Baord’s letter No. 2007/TC-I/302/1PT.G date 11.01.2012) (Authority: CCM/NWR No. C-78/1/54/CONCOR Vol III of dt 12.01.2012)

_____________________________________________________ LOCAL RATE ADVICE-GOODS (LRA) No.05 of 2012 ______________________________________________________________

Corrigendum 2 to Rates Circular No.05 of 2011

Sub:- Haulage Charge recoverable for movement of nine notified commodity groups in container

Ref: Board’s letter No.2007/TC-1/302/1Pt.H dt 14.02.2011(Rates Circular No.05 of 2011) Board’s letter No.2007/TC-I/302/1Pt.Hdt 30.08.2011(Corrigendum 1to Rates Circular No.05 of 2011)

Please refer to Board’s letters under reference regarding Haulage Charge recoverable for movement of nine notified commodity groups in container.

The matter has been examined and it has been decided to extend the validity of the instructions prescribed vide Board’s letters No.2007/TC-I/302/IPt.H dt.14 02.2011(Rates Circular No.05 of 2011) and dt 30.08.2011) Corrigendum 1 to Rates Circular No.05 of 2011) beyond 31.12.2011 upto 31.03.2012, unless otherwise revised earlier. Accordingly, the provisions of Para 3.0 of the Rates Circular No.05 of 2011 may be revised as under:

“3.0 These instructions will be effective 01.03.2011 and will remain valid till 31.03.2012, unless otherwise revised earlier.”

This issues in consultation with Traffic Transportation Directorate and concurrence of Finance Directorate of the Ministry of Railways.

(Authority: Railway Baord’s letter No. 2007/TC-I/302/1Pt.H date 22.12.2011) (Authority: CCM/NWR No. C-78/1/54/CONCOR Vol III of 10.01.2012)

_____________________________________________________ LOCAL RATE ADVICE-GOODS (LRA) No.06 of 2012 ______________________________________________________________

(Rates Circular No.01 of 2012) Sub:-Free time for loading/unloading of covered wagons

Ref:- Board’s letter No.TC-I/2005/201/2 dt.19.12.2005(Rates Circular No.74 of 2005) Board’s letter No.TC-I/2005/201/2 Pt.D. dt 10.10.2006 (Rates Circular No.84 of 2006)

In partial modification to Paras 2.2 and 2.4 of Rates Circular No.74 of 2005, it has been decided to revise the permissible free time for loading /unloading of covered wagons as given below:

Free time for loading/unloading of covered wagons at goods sheds/sidings (refer Para2.2 of Rates Circular No.74 of 2005

Type of wagons Permissible free time (in hours & minutes)

MECHANIZED MANUALLoading Unloading Loading Unloading

BCNHL wagons Not applicable Not applicable

5.00(1 to 20 wagons)

5.00(1 to 20 wagons)

7.00(21 to 30 wagons)

7.00(21 to 30 wagons)

39

Page 40: nwr.indianrailways.gov.innwr.indianrailways.gov.in/uploads/files/1350027498494-R…  · Web viewd. During the Journey, the passenger, whose identity card number has been indicated

09.00(31 to 45 wagons)

09.00(31 to 45 wagons)

11.00(46 wagons & above)

11.00(46 wagons & above)

Covered wagons other than BCNHL (like BCN,BCNA,BCNHS, BCX,BCNX etc.)

Not applicable Not applicable

5.00(1 to 20 wagons)

5.00(1 to 20 wagons)

7.00(21 to 30 wagons)

7.00(21 to 30 wagons)

9.00(31 wagons & above)

9.00(31 wagons & above)

Free time for loading/unloading of covered wagons at steel plants other than seven old steel plants (refer Para 2.4 of Rates Circular No.74 of 2005)

Type of wagons Number of wagons Permissible free time (in hours)Loading Unloading

BCNHL wagons Irrespective of number of wagons

11 11

Covered wagons other than BCNHL (like BCN,BCNA,BCNHS, BCX,BCNX etc.)

Irrespective of number of wagons

10 10

These instructions will be effective from 01.02.2012.

This issues in consultation with Traffic Transportation Directorate and concurrence of Finance Directorate of Ministry of Railways.

(Authority: Railway Baord’s letter No.TC-I/2005/201/2 Vol-II date 10.01.2012) (Authority: CCM/NWR No. C-299/0(Policy) of 12.01.2012)

_____________________________________________________ LOCAL RATE ADVICE-GOODS (LRA) No.07 of 2012 ______________________________________________________________

(Freight Marketing Circular No.11 of 2011)

Sub:- LIBERALIZED WAGON INVESTMENT SCHEME (LWIS)

Ministry of Railways has reviewed the existing Liberalized Wagon Investment Scheme (LIWS) issued vide Freight Marketing circular No.07 of 2008 dated 15.042008 and formulated a revised Liberalized Wagon Investment Scheme (LIWS).A copy of the revised Liberalized Wagon Investment Scheme (LIWS) is enclosed herewith. The revised scheme will be in supersession of existing Liberalized Wagon Investment Scheme (LIWS) issued vide Freight Marketing circular No.07 of 2008 dated 15.04.2008.

This scheme will come into force with immediate effect. The terms & conditions of the revised Liberalized Wagon Investment Scheme (LIWS) will also apply to the customers who have already made investment for procurement of wagons or obtained approval from Ministry of Railways for procurement of wagons under the existing LWIS.

40

Page 41: nwr.indianrailways.gov.innwr.indianrailways.gov.in/uploads/files/1350027498494-R…  · Web viewd. During the Journey, the passenger, whose identity card number has been indicated

This issues with the concurrence of Finance Directorate of Ministry of Railways.

The receipt of this letter may please be acknowledged

DA. As above

(Authority: Railway Baord’s letter No.2009/TC (FM)/4/6(LWIS)date 02.01.2012) (Authority: CCM/NWR No. C-88/0(Policy) of 11.01.2012) LIBERALIZED WAGON INVESTMENT SCHEME

1.0 GENERAL

The existing Liberalized wagon Investment Scheme (LWIS) circulated vide Freight Marketing Circular No.07 of 2008 along with all its amendments , stand superseded by the revised Liberalized Wagon Investment Scheme (LWIS).The terms & conditions of the revised Liberalized Wagon Investment Scheme (LWIS) shall also be made applicable to the customers who have already made investment for procurement of wagons or obtained approval from Ministry of Railways for procurement of wagons under the existing LWIS.

2.0 DEFINITIONS AND ABBREVIATIONS

Definitions and abbreviations of some of the terms used in this document are as under.

2.1 IR; Railway Administration

2.2 MOR: Ministry of Railways, Government of India.

2.3 Investors: This refers to End Users or WLCs.

2.4 End User: Rail customers who are producers or consumers of the goods transported by rail.

2.5 Wagon Leasing Company (WLC): A leasing Company engaged in the business of procuring railway wagons and making them available to other business entities authorized to deploy such wagons for operation over IR network in accordance with the extant policy of MOR.

2.6 Lessor: A WLC engaged in the business of leasing wagons to Lessee(S).

2.7 Lessee: It refers to End Users, Investors under Terminal Development Scheme or Operators under Concession granted by IR to run trains on IR network.

2.8 Leased Wagons: Wagons given on lease by a Lessor to a Lessee.

2.9 Idle leased Wagons: Wagons owned by a Lessor and held on IR network or a private siding awaiting nomination of a Lessee.

2.10 High Capacity Wagons (HCW) Wagons with payload which are at least 2 tonnes higher than the payload of extant similar wagons on IR for 25.0 or 22.9 tonne axle load route, as the case may be .The dimension of such wagons should be such that it gives commensurate higher payload in the full train length without changing the laid down standard composition of rakes . Such wagons will operate on specific routes approved by IR and will not form a part of the wagon pool of IR.

2.11 Special Purpose Wagons (SPW): Wagons designed for rail transportation of a specific commodity or group of commodities. Such wagons will operate on specific routes or close circuits approved by MOR and will not form a part of the wagon pool of IR.

2.12 Wagon Leasing Scheme (WLS): The Scheme introduced by MOR in the year 2008 for leasing of wagons

41

Page 42: nwr.indianrailways.gov.innwr.indianrailways.gov.in/uploads/files/1350027498494-R…  · Web viewd. During the Journey, the passenger, whose identity card number has been indicated

and their operation on IR.

2.13 Terminal Development Scheme: Scheme introduced by MOR in 2008 to encourage development of railway terminals through investment from private sector.

3.0 TYPES OF WAGONS PERMITTED FOR PRIVATE PROCUREMENT

Following types of wagons may be procured under this Scheme. (i) High Capacity Wagons (HCW) (ii) Special Purpose Wagons (SPW)

4.0 PORCUREMENT OF WAGONS

Following types of investors may procure wagons.

(i) WLC (for leasing to End users) (ii) End Users (for their own traffic only)

5.0 PROCEDURE FOR PROCUREMENT OF WAGONS

5.1 General conditions and procedure for procurement of wagons is laid down in Annexure-A.

5.2 Procurement of wagons will be allowed only with prior administrative approval of MOR.

5.3 Privately procured wagons will be inducted into service only after completion of the mandatory safety and quality inspections by authorized agencies as notified by MOR.

5.4 MOR reserves the right to terminate the Agreement with any investor procuring wagons under LWIS on payment of the residual value as assessed by IR.

6.0 OPERATION OF PRIVATELY OWNED WAGONS

HCW and SPW will be operated as per the provisions prescribed in Annexure-B.

7.0 MAINTENANCE OF WAGONS

Maintenance of Wagons will be undertaken by IR on payment as per agreements to be executed with the investor.

8.0 FREIGHT RATES AND CONCESSIONS

8.1 Freight concessions will be permitted to End Users only as indicated in Annexure-C

8.2 However, if the investor has availed of any concession, subsidy or any other financial benefit for procurement of wagons from any other Ministry or from Ministry of Railways under any other Scheme, he will not be eligible under this scheme. The investor will give an undertaking to this effect. In case of false undertaking, benefit given if any, shall be recovered through a suitable mechanism to be developed by the Railways.

9.0 RESTRICTED COMMODITIES

Transport of Coal and coke, ores and minerals including iron ore will not be permitted in privately owned wagons.

10.0 LIEN In cases of default of payment by the investor, IR may exercise lien on the privately owned wagons and the

consignment loaded in such wagons to recover its dues. However, in case of leased wagons the relevant

42

Page 43: nwr.indianrailways.gov.innwr.indianrailways.gov.in/uploads/files/1350027498494-R…  · Web viewd. During the Journey, the passenger, whose identity card number has been indicated

provisions of the WLS will apply.

11.0 DISPUTE RESOLUTION

All disputes in regard to implementation of the agreements with the Zonal Railways , under this scheme, will be referred to an Arbitrator nominated by General Manager of the Zonal Railways

Annexure-A

LIBERALIZED WAGON INVESTMENT SCHEME

General conditions and procedure for procurement of High Capacity and Special Purpose Wagons

Following procedure and conditions are laid down for procurement of wagons by prospective investors under LWIS:-

1. The Chief Operations Manager (COM) of the concerned loading railway should be contacted along with specific details of the proposal. The details should include number of rakes required type of wagons, commodity, loading station (S), destination station (s), proposed specific route (s) or close circuit (s) and any other information relevant to the proposal.

2. After examination of the proposal regarding its operational feasibility, No Objection Certificate (NOC) shall be issued by the COM of the loading railway in consultation with the COM of the destination railway.NOC should normally be issued within 10 days of receipt of application.

3. NOC should clearly indicate number of rakes, type of wagon loading station, unloading station (s), commodity, route or the close circuit for movement of the traffic in such rakes, etc.

4 Application along with NOC should be forwarded by the zonal railway to the Executive Director/Freight Marketing (EDFM), Railway Board for examination by the TT Directorate and issue of final approval of the Railway Board for permitting procurement of rakes under LWIS.

5. On the basis of the approval of the Railway Board , an Agreement will be signed between the Chief Commercial Manager (CCM) of the concerned Railway and Investor.

6. Wagons should be procured in units of rake with 4% maintenance spares and one brake van.

7. Rakes will be procured by customers directly from wagon manufacturers or through import subject to compliance with current applicable IRS designs and specifications and inspection by nominated agency of IR, namely, RDSO.

8. Customers will be required to incorporate following warranty clause in the purchase contract with the wagon manufacturer.

“ Supplies shall be guaranteed against any manufacturing defect/poor workmanship quality etc. for a period of 24 months of commissioning or 30 months from the date of delivery, whichever is earlier. During this period contractor will arrange to repair/replace any defective part free of cost or replace complete set if required. Further, since these wagons are to be utilized by the customers of Indian Railways, they are hereby authorized to invoke this warranty clause in case of any default on the part of wagon manufacturer.”

9. Information regarding placement of order for procurement of rakes may be advised to the COM of the concerned zonal railway as well as EDFM, Railway Board.

10. Date of actual induction of the rake on IR network may be informed to the COM and EDFM, Railway Board. The zonal railway will keep the details of the wagons and brake-vans procured for each rake.

43

Page 44: nwr.indianrailways.gov.innwr.indianrailways.gov.in/uploads/files/1350027498494-R…  · Web viewd. During the Journey, the passenger, whose identity card number has been indicated

11. On receipt of documents about commissioning of the rake under LWIS, a commercial notification will be issued by the CCM in consultation with COM.The notification should have all relevant details mentioning inter alia, the details of the concession, the date of commencement of the concession period, the name of the investor, wagon numbers, commodity, approved circuits, the base freight at the time of notification etc.

12. Each rake procured by investor will thus have an associated loading and unloading point(s) over specific route(s) or close circuit(s) as approved by the Railways as per the above procedure.

13 The associated loading and unloading point or points can be changed as per the requirement of the LWIS customer. This change is subject to the operational feasibility and NOC from the concerned Zonal Railway and approval of the Railway Board. The loading and unloading station will be of end users.

14. In case the LWIS customer wants to carry commodity other than for which permission has been given, the same may be permitted provided that commodity is produced/consumed by LWIS customer and can be carried in rakes for which permission has been granted. E.g .If BCCW rakes under LWIS have been procured for loading cement and fly ash and the investor desires to change the number of rakes dedicated to either of the commodity, it should be allowed.

15. However, in the case of leased wagons, changes in the associated loading and unloading point(s) and the route(s) or closed circuit (s) can be made as per the requirement of the WLC subject to the certification of operational feasibility and approval of the Railway Board. Each such case shall, however, be processed for issue of a fresh NOC from the concerned Zonal Railway and the approval of Railway Board as per the procedure prescribed above.

16. Rake(s) should be procured under this scheme within one year from the date of signing of the Agreement, unless specific prior extension is given by the Railway Board.

Annexure-B

LIBERALIZED WAGON INVESTMENT SCHEME

Conditions for operation of High capacity and Special Purpose Wagons

IR will operate HCW and SPW ad per the conditions prescribed below:-

1. Private wagons falling in this category will not be merged in the wagon pool of IR. Rakes comprising of such wagons will be identified as exclusively belonging to the private investor who has procured them.

2. Loading in wagons procured under this Scheme will be permitted only against indents registered by End Users subject to extant rules for allotment of wagons.

3. Indents for loading in such wagons will be placed at the approved loading point for the approved destination point for movement over specific route (s) or closed circuit (s) as approved by the Railways.

4. If the End User don’t not place any indents, these wagons will remain idle in his premises.

5. If IR has to stable these rakes in railway owned yards at the request of the End User or otherwise, stabling charges as notified by MOR will be payable

6 IR will have no right to use these wagons, except as stipulated in Para 7 below, for loading of traffic of any customer other than the End User for the wagons concerned.

7. Notwithstanding Para 3 and 6 above, HCW or SPW may be used by IR for traffic offered by customers other than the End User subject to a prior mutual written agreement between IR and such Investors or WLCs regarding the terms of such usage.

44

Page 45: nwr.indianrailways.gov.innwr.indianrailways.gov.in/uploads/files/1350027498494-R…  · Web viewd. During the Journey, the passenger, whose identity card number has been indicated

8. Investor will not be entitled to any residual value of the rake procured by him.

9. Freight traffic transported in the SPW in an approved close circuit will originate from a private siding or terminal and terminate at a private siding or terminal capable of handling the traffic in such special purpose wagons.

10. Wherever relevant, provisions of the Terminal Development Scheme will apply for operation of SPW.

Annexure-C

LIBERALIZED WAGON INVESTMENT SCHEME

FREIGHT CONCESSIONS

Freight concessions to the End Users that will be granted for each loading in the rakes consisting of new HCW and SPW procured under LWIS are as under:-

A. HCW operating on approved specified routes

1. Investments in HCW, with a payload of 2 tonnes more than the payload of extant similar wagons (as mentioned in Para 2.10 of the scheme) will be eligible for a freight concession of 12% for a period of 20 years.

2. For each additional tonne of payload in excess of what is prescribed in Para 1 above, an additional 0.5% of freight discount will be granted for 20 years.

3. Payload will be reckoned in terms of integral units of tonnes after rounding off the fractions to the lower integer.

B. SPW operating in approved Closed circuits

Freight concession of 15% will be granted for a period of 20 years for each loading of a new rake of SPW procured under LWIS operating between existing or new private terminals capable of handling the traffic in such special purpose wagons in an approved close circuit.

The above mentioned freight concessions of 12% and 15% will be granted in each case on the Base freight rate prevailing at the time of issue of commercial notification by the CCM (Para 11 of Annexure A) or the Base freight rate applicable at the time of booking, during the currency of the concession period of 20 years, whichever is lower

_____________________________________________________ LOCAL RATE ADVICE-GOODS (LRA) No.08 of 2012 ______________________________________________________________

Sub:- Wrong charging of 40 feet container by the system

Please refer to FOIS letter No.CAO/FOIS/TMS/Rly.Ref/Pt-I/2011 dt 01.11.11 on the above mentioned subject. Inter alia referring to Board’s letter No.2007/TT-III/73/8 dt.01.07.2008, FOIS has mentioned that the system is charging 40 feet loaded container at 1.8 times the rate notified for a TEU upto 20T irrespective of the fact whether gross weight of the loaded container is more than 20T

The matter has been examined. Attention in invited to Note (3) of Rate Table annexed with Board’s Letter No.2007/TT-III/73/8 dt. 01.07.2008, which clearly stipulates that rates for 40 feet container will be 1.8 times of the rates for a TEU and the Rate Table prescribes ‘Haulage Rate per TEU for loaded container in three slabs namely ‘upto20T’, ‘above 20 T & upto 20 T’ and ‘above 26 T’, Thus, as per extant instructions, the rates for 40 feet containers will be 1.8 times of the rates for a TEU in their respective weight category.

45

Page 46: nwr.indianrailways.gov.innwr.indianrailways.gov.in/uploads/files/1350027498494-R…  · Web viewd. During the Journey, the passenger, whose identity card number has been indicated

(Authority: Railway Baord’s letter No.2007/TC-I/302/I Pt.E of date 15.12.2012) (Authority: CCM/NWR No. C-78/1/54/CONCOR/VOL-III of 06.01.2012)

________________________________________________ LOCAL RATE ADVICE-GOODS (LRA) No.09 of 2012 ______________________________________________________________

Sub:- Charging of 40 feet container. Ref: Board’s letter No.2007/TC-I/302/1Pt.E dt.15.12.2011

Please refer to FOIS’ letter No.CAO/FOIS/TMS/ Rly. Ref/PT-I/2011 dt.20.12.2011 on the above mentioned subject.

As regards charging of 40 feet containers, it is stated that the instructions stipulated vide Board’s letter No.2007/TT-III/73/8 dt .01.07.2008, which are self contained , have only been reiterated vide this office’s letter of even number dt.15.12.2011.Therefore, the cause for any confusion at this stage in not readily apparent. The letter and spirit of the extant instructions that have been in force since July 2008 is, however, exemplified in the Illustration appended below:

Illustration: Let’s take the case of two wagons with same payload, one is loaded with two TEUs of 15 tonnes each and the other with one FEU weighing 30tonnes.One FEU is equivalent to two TEUs, as on one flat wagon one FEU or two TEUs can be accommodated. However, for haulage purposes, Haulage Rate per FEU will be 1.8 times of Haulage Rate per TEU in respective weight slab after converting weight of a FEU in equivalent TEU with conversion factor of 1FEU-2TEUs

Wagon carrying 2TEUs of 15tonnes each

Haulage Rate per TEU=‘P’(say). Haulage Charge for 2TEUs will be ‘P’+’P’=2P

Wagon carrying one FEU weighing 30tonnes.

In terms of TEU, the tonnage will be 30/2= 15tonnes per TEU.

Haulage Rate per TEU=’P’Haulage Rate per FEU+1.8 times ofHaulage Rate per TEU+1.8P

(Authority: Railway Baord’s letter No.2007/TC-I/302/I Pt.E of date 06.01.2012) (Authority: CCM/NWR No. C-78/1/54/CONCOR/VOL-III of 13.01.2012)

__________________________________________________________________ LOCAL RATE ADVICE-GOODS (LRA) No.10 of 2012

_____________________________________________________________ Corrigendum No.29 to Rates Circular No.62 of 2009

Sub:- Policy Guidelines-Freight Incentive Scheme and Transportation Products. Ref:- Rates Circular No.62 of 2009 and Corrigendum thereto.

1.0 In terms of the Rates Circular referred above, traffic loaded from Ports has been kept out of purview of all the Freight Incentive Schemes.

2.0 The matter has been reviewed. Sanction of the Central Government is hereby accorded, as a special case, to grant incentives, to the traffic of bagged consignment loaded from Ports also, under Incentive Scheme for Loading Bagged Consignments in Open & Flat wagons. These incentives will be applicable to those commodities only which have been specifically mentioned under Para 4.1 of the Rates Circular referred above

3.0 Necessary amendment in Rates Circular No.62 of 2009, amended from time to time, may be done accordingly.

4.0 All other details of Rates Circular No.62 of 2009, as amended from time to time will continue to apply unchanged.

5.0 These instructions will come into force with effect from 25.01.2012 and will remain valid up to further advice.

46

Page 47: nwr.indianrailways.gov.innwr.indianrailways.gov.in/uploads/files/1350027498494-R…  · Web viewd. During the Journey, the passenger, whose identity card number has been indicated

6.0 This issues in consultation with Traffic Transportation Directorate and with concurrence of Finance Directorate of Ministry of Railways.

(Authority: Railway Baord’s letter NoTCR/1078/2009/13 of date 17.01.2012) (Authority: CCM/NWR No. C-429/0/Vol-I of 23.01.2012)

___________________________________________________________________ LOCAL RATE ADVICE-GOODS (LRA) No.11 of 2012

_____________________________________________________________ (Rates Circular No.03 of 2012) Sub:- Charges for haulage of empty wagons on private account. Ref:- Board’s letter of even number dated 15.12.2008 (Rates Circular No.76 of 2008)

In term of Rates Circular No.76 of 2008, the charges for haulage of empty wagon on private account was notified. The matter has been reviewed. Sanction of the Central Government is hereby accorded to revise the charges for haulage of empty wagons on private account, as per the following:

i) when hauled by scheduled goods train

Rs.61.00 only per eight wheeled wagon per kilometer subject to a minimum of Rs.6100/-(Rupees Six Thousand One Hundred only) for all gauges.

ii) when hauled by special train

Rs.1708/-(Rupees One Thousand Seven Hundred Eight only) per kilometer subject to a minimum of Rs.1,70,800/-( Rupees One Lakh Seventy Thousand Eight Hundred only) per train for all gauges.

If the charges at the rate of Rs.61.00 per kilometer for the actual number of wagons hauled by a

special train work out higher than the charges at rates indicated in item (ii) above, the former would be leviable . No supplementary charges will be leviable in addition .These rates will also apply to railway wagons given on hire to outside parties for carrying out alteration to suit loading of their over dimensional consignments.

These charges will come into force from 01.02.2012.

This issues with the concurrence of the Finance Directorate of the Ministry of Railways.

Necessary amendment in Rule No.199(C) of IRCA Goods tariff No.41 Pt.1, Vol. I may be done accordingly

Please circulate these instruction to all concerned for strict compliance (Authority: Railway Baord’s letter NoTCR/2205/96/1 of date 17.01.2012) (Authority: CCM/NWR No. C-176/5I of 24.01.2012)

_________________________________________________________________ LOCAL RATE ADVICE-GOODS (LRA) No.12 of 2012 _____________________________________________________________ Sub: Signing of Private Siding Agreement. Ref:- Your letter No.CCM/Sdg/Plg/Policy/Pt.I/1122 dt.20.10.11

The following clarifications are given:

1. The Siding Agreement has to be signed at the Divisional level by the siding owner and the concerned Sr.DCM. Instructions in this regard were issued by Board to all railways vide FM Circular 34 of 2006 dated 26.07.2006 (copy enclosed).

2. The Siding Agreement is to be signed after the construction of the siding, but before the siding is operational

47

Page 48: nwr.indianrailways.gov.innwr.indianrailways.gov.in/uploads/files/1350027498494-R…  · Web viewd. During the Journey, the passenger, whose identity card number has been indicated

3. The contradictions between Siding Policy and para 1802 of Commercial Code are in the process of being resolved as the Commercial Code is being updated to bring it at par with the various policy letters issued from time to time. For present, the instructions as per the siding policy will prevail

(Authority: Railway Baord’s letter No 99/TC (FM)/26/1 of date 18.01.2012) (Authority: CCM/NWR No. C-491/0 of 27.01.2012) Freight Marketing Circular No.34 of 2006

(CORRIGENDUM)

Sub:- Liberalization of Siding Rules-Amendment to para 2.1.

Ref: Board’s letter of even number dated 8.11.2005.

Second sentence of para 1 may please be read as:-

“ It has been decided by Railway Board that the Chief Commercial Manager(FM) of the concerned zonal railway will be the nodal officer at the signing stage of the agreement instead of the Chief Traffic Planning Manager (CTPM) and siding agreement will be signed as usual in the division as per extant procedure.”

Please issue necessary correction slip to all concerned accordingly.

These instructions will come into force with immediate effect.

This issues with the concurrence of Finance Directorate of Ministry of Railways

(Authority: Railway Baord’s letter No 99/TC (FM)/26/1 of date 26.07.2006)

_ __________________________________________________________________ LOCAL RATE ADVICE-GOODS (LRA) No.13 of 2012 _____________________________________________________________

(Corrigendum No.28 to Rates Circular No.62 of 2009)

Sub:- Policy Guidelines-Freight Incentive Scheme and Transportation Products.

Ref:- Rates Circular No.62 of 2009 and Corrigendum thereto.

1.0 In continuation of Corrigendum No.27 to Rates Circular No.62 of 2009, sanction is hereby accorded for fixation of standard rake size of the Mixed Rakes (BG) of BCN group and BOST/BRN group of wagons mentioned in Annexure III, as per the following:-

Composition of Block RakesS.No Type of Wagon Standard Rake Size Minimum

Number of Wagons to be loaded

28 Mixed Rakes (BG) 43 41 (Minimum 10 of each typeBCN Group Covered

Wagons +BOST/BRN Group wagons #

#BCN groups of wagons refer to BCN,BCNA and BCNAHS/BCXN wagons.BRN groups of wagons refer to

BRN,BRNA, BRNAHS wagons.BCN group of wagons may be treated as one type and BOST/BRN group of wagons as other type for reckoning minimum 10 numbers of each types of wagon.

48

Page 49: nwr.indianrailways.gov.innwr.indianrailways.gov.in/uploads/files/1350027498494-R…  · Web viewd. During the Journey, the passenger, whose identity card number has been indicated

2.0 Necessary amendment in Annexure III for Rates Circular No.62 of 2009, amended from time to time, may be done accordingly.

3.0 All other details of Rates Circular No.62 of 2009, as amended from time to time will continue to apply unchanged.

4.0 These instructions will come into force with effect from 25.01.2012 and will remain valid up to Six months i.e.up to 24.07.2012

5.0 This issues in consultation with Traffic Transportation Directorate and with concurrence of Finance Directorate of Ministry of Railways.

(Authority: Railway Baord’s letter No TCR/1078/2009/13 of date 16.01.2012) (Authority: CCM/NWR No. C-429/0/Vol-I of 17.01.2012)

____________________________________ LOCAL RATE ADVICE-GOODS (LRA) No.14 of 2012 ____________________________________________________________

Sub:- Revision in Rule 1807 of Indian Railway Code for Traffic (Commercial ) Department Ref:- Board’s letter No.TC-1/99/214/11 Pt.I dt 24.09.2009 (Rates Circular No.57 of 2009)

A copy of Advance Correction Slip No.21 to Chapter-XVIII of ‘Indian Railway Code for Traffic (Commercial) Department’ is enclosed here with for information and necessary action please.

(Authority: Railway Baord’s letter No TC-I/99/214/11Pt.I of date 25.01.2012) (Authority: CCM/NWR No. C-491/1/Vol-IV of 31.01.2012)

Indian Railway Code for Traffic (Commercial) Department Chapter-XVIII (Sidings) Advance Correction Slip No.21

First paragraph of Rule 1807 of Indian Railway Code for Traffic (Commercial) Department may be replaced by the following:

“1807: Where freight is levied from and to the serving station and separate siding charges are levied for haulage of wagons between the serving station and the siding , the siding charges should normally be fixed on the basis of cost per engine hour and the average time for a round trip from the serving station to the siding and back for placement and/or removal of wagons whether loaded or empty .The charges per trip should be arrived at by multiplying the average time taken for the trip by the cost of engine hour, as per the formula given below:

Siding Charge= Average trip time in minutes X (Engine Hour Cost ÷ 60)

The resultant of the above formula will be rounded off to the next higher value to arrive at the net Siding Charge. In case ‘average trip time’ is less than one hour, the Siding Charge will be levied for a minimum of one hour. Siding Charges for originating station so fixed should be included in the Invoice along with freight instead of being separately collected from the siding holder.”

(Authority Board’s letter No.TC-I/99/214/11 Pt.I dt 25.01.2012)

____________________________________ LOCAL RATE ADVICE-GOODS (LRA) No.15 of 2012

____________________________________________________________

Sub:- The charging of mixed commodity in a rake Ref:-SER’s letter No.RA.41/Rates/IA/G/Pt.V/Cont.6dated 04.11.2011

Reference is invited to your letter under reference on the above cited subject wherein a clarification has been sought regarding booking and charging of a rake of mixed commodities.

49

Page 50: nwr.indianrailways.gov.innwr.indianrailways.gov.in/uploads/files/1350027498494-R…  · Web viewd. During the Journey, the passenger, whose identity card number has been indicated

It is hereby clarified that clubbing of Pyroxenite(Magnesium silicate) with Limestone or with coal may be permitted for availing trainload class rate subject to fulfillment of all other terms and condition as stipulated in Rates Circular No.62 of 2009 and Corrigendum thereto and freight charges may be levied at trainload class applicable to respective commodities.

(This disposes off SER’s letter No.RA.41/Rtaes/IA/G/Pt.V/Cont. dated 4.11.2011)

(Authority: Railway Baord’s letter No TCR/1078/2011/18 of date 16.01.2012) (Authority: CCM/NWR No. C-423/1 Vol.III of 30.01.2012)

____________________________________ LOCAL RATE ADVICE-GOODS (LRA) No.16 of 2012

____________________________________________________________ Sub:- Charges for providing Brakevans in Wagon Investment Scheme (WIS) rakes.

Ref: Railway Board’s letter of even number dated 19.04.07, 01.04.08, 20.03.09,16.03.10,14.07.10,31.12.2010&27.04.2011

Please refer to Board’s letter of even number dated 27.04.2011 in regard to interim orders of Board for levying of 0.5% additional charges on Normal Tariff Rates (undiscounted freight) as payment for attaching Railway’s Brakevan to WIS rakes. These orders were communicated to zonal railways vide above letters under reference. These instructions was valid up to 31.12.2011.

Approval of Ministry of Railways (Railway Board) is herby accorded for further continuance of the above orders upto 31.12.2012 (31st December 2012) or the date when the WIS Customer procures the Brakevan and it is actually inducted, whichever is earlier.

Matter may be taken up with WIS customers who have not procured Brakevans so for to expedite procurement of Brakevans within the stipulated target date of 31.12.2012.

This issues with the approval of Board (MT) (Authority: Railway Baord’s letter No 2007/TC (FM)/4/3 of date 23.01.2012) (Authority: CCM/NWR No. C-88/0 (Policy) I of 02.02.2012)

___________________________________________________________________ LOCAL RATE ADVICE-GOODS (LRA) No.17 of 2012

____________________________________________________________

Sub:- Classification of “Neem Coated Urea and “Boronated Suphala” Ref:- No.C/RB-Misc/2011/Classif.Dated 07.12.2011.

With reference to the above letter, it is to advise that a decision of Board regarding classification of “Neem Coated Urea and “Boronated Suphala” has already been communicated vide Rates Circular No.25 of 2011 dated 12.07.2011 and Board’s letter of even number dated 26.09.2011 that the Chemical Manures included in the Fertiliser Control Order issued by the Ministry of Agriculture and Rural Development (Department of Agriculture and Cooperation), would be treated as Chemical Manures and may be charges at Class 130-A as notified for Chemical Manures.” It is once again reiterated that these commodities may be included under the main Commodity Head ‘Chemical Manures’.

(Authority: Railway Baord’s letter No TCR/1015/2011/6 of date 3.02.2012) (Authority: CCM/NWR No. C-70/1 Vol II of 15.02.2012)

___________________________________________________________________ LOCAL RATE ADVICE-GOODS (LRA) No.18 of 2012

____________________________________________________________

50

Page 51: nwr.indianrailways.gov.innwr.indianrailways.gov.in/uploads/files/1350027498494-R…  · Web viewd. During the Journey, the passenger, whose identity card number has been indicated

Freight Marketing Policy Circular No.01 of 2012

Sub:- Policy Circular- Freight Marketing Circular No.01 of 2012 on Siding Matters-Liberalization of Siding Rules.

Ref:-In supersession to Railway Board’s letters no.99/TC (FM)/26/1, dated 31.03.2005,13.03.2006 and 14.01.2009.

Various rules/procedures relating to setting up and functioning of sidings were formulated and revised by Board vide letters under reference with subsequent modifications vide no.99/TC(FM)/26/1, dated 31.03.05, 01.03.06 & 14.01.09.The matter has been reviewed by board and accordingly, in supersession to all such instructions, revised guidelines with modifications have been approved by Board as enclosed in the form of Freight Marketing Circular No.01/2012.

This issues with the consent of Civil Engineering, Traffic, Mechanical Engineering & Electrical Engineering Directorates and concurrence of Finance Directorate of Ministry of Railway.

Enclosure/As Above (Authority: Railway Board ’s letter No 99/TC/(FM)/26/1Pt.-II of date 30.01.2012) (Authority: CCM/NWR No. C-491/1 Vol IV of 07.02.2012) Freight Marketing Policy Circular No.01 of 2012 on Siding Matters

Liberalization of Siding Rules

Various rules/ procedures relating to setting up and functioning of sidings were formulated and revised by Board vide letter no.99/TC (FM) /26/1, dated 29.09.2000 with subsequent modifications vide no.99/TC(FM)/26/1, dated 31.03.05, 01.03.06 and 14.01.09.The matter has been reviewed by Board & accordingly, in supersession to all these instructions, revised guidelines have been approved by Board as under in the form of Policy Circular:

1. Nodal Agency: In order to provide a ‘Single Window Service’ to the customers, Board have decided that for all siding matters during pre-construction stage and for signing of the agreement, Chief Traffic Planning Manager (CTPM) at the Zonal Railway shall be the Nodal Officer. However, throughout the construction stage including activities for approval of Plans and sanctioning of Estimates, Chief General Engineer (CGE) shall be the Nodal Officer. Further , as soon as the siding is notified for commissioning, CCM(FM) shall take over as the Nodal Officer.

In Railway Board’s office, EDCE(G) shall be the Nodal Officer during construction stage. Executive Director(Freight Marketing) shall be the Nodal Officer both prior to construction and also after the siding is notified for commercial operation.

2. Time Frame: To avoid complaints from users regarding delay in whole process of survey, approval of plan, final inspection etc., Railways shall observe a time frame as under:

(i) Six months to one year depending on the size of the project, where survey is done by the Railway and work is executed under Railway’s supervision.

(ii) When survey is done by empanelled consultants and work is supervised by them, the Preliminary Plan shall be approved within two months and the final approval within four months of submission of the detailed project report.

3. Overhead Charges: The overhead charges, in terms of provisions of Engineering Code, shall be payable by the party, desirous to set up a siding. These charges shall have respective applicability for the Deposit Works, as to be executed by Railways by the Party under Railway’s supervision or by the Party through

51

Page 52: nwr.indianrailways.gov.innwr.indianrailways.gov.in/uploads/files/1350027498494-R…  · Web viewd. During the Journey, the passenger, whose identity card number has been indicated

Railway’s Approved Consultants respectively as per following Table:

SL Purpose Execution By Charges1. Departmental Charges:

(inclusive of cost of tools & plant and establishment supervision)

Railway 12½ % % of Cost of project excluding cost of OHE and S&T Works

Party 6¼%

Approved Consultant 4%

2 Departmental Charges for OHE and S&T Works(inclusive of cost of tools & plant and establishment supervision)

Railway 12½ % % of Cost of OHE and S&T Works for Railway’s mandatory supervision

Party 6¼%

Approved Consultant 6¼%

3 D&G Charges:(for work-charged establishments and other than establishment supervision)

Railway As per actual, if any [Ref: Para-1829E] Party

Approved Consultant

4. Capital Cost :

4.1 The siding owner shall bear the capital cost of the siding from the take-off point at the serving station including OHE.

4.2 The capital cost of all traffic facilities such as ‘Y’ connection, additional lines at the serving station, crossing stations, patch doubling of the section etc. shall be fully borne by the Railways. The distance for charging of tariff, for each Y’ connection shall, however be inflated/increased by 5(five) kilometers. However, the capital cost for augmenting the facilities, within the premises of siding owner shall be borne by the siding owner. The license of land for ‘Y’ connection for providing connectivity to the private siding on Railway land or any other connection serving the private party exclusively will be done as per extant policy, as revised from time to time by Railways, at its sole discretion.

4.3 In case the siding owner desires to bear the capital cost of traffic facilities to expedite commissioning of siding, The following will be permissible:

(i) ‘Y’ connection and any additional loop line at the serving station, which is to be used as a common user facility, may also be executed by the siding owner.

(ii) The license of land for ‘Y’ connection for providing connectivity to the private siding on Railway land or any other connection serving the private party exclusively shall be done as per extant policy, as revised from time to time by Railways, at its sole discretion.

(iii) No license fee will be charged on the common user traffic facility at the station from the siding owner. Common user traffic facilities are those facilities which facilitate the Railway traffic operations at the station Classification of any facility as a ‘Common User Traffic Facility” shall be certified by CTPM on the siding plan during the approval of the plan by the competent authority

(iv) The common user facilities may also be executed by the Party through Railway’s approved contractors/Consultants with the approval of General Manager. The provisions given in various Railway Codes and Manuals, extant instructions issued by Railway from time to time and

52

Page 53: nwr.indianrailways.gov.innwr.indianrailways.gov.in/uploads/files/1350027498494-R…  · Web viewd. During the Journey, the passenger, whose identity card number has been indicated

statutory provisions stipulated in various Acts of Government of India shall be followed in all respect.

(v) The facilities at the station, so created by the siding owner shall be used not only by the party who financed these, but also by other users and the assets, so created, shall belong to the Indian Railways and shall be maintained & used as any other Railway asset by the Railway. The investors shall not be eligible for any return/concession in lieu of such use of these assets by the Railway or other rail users. The investors shall also not qualify for any preferential treatment in the matter of utilization of these assets.

(vi) The common user traffic facility shall become property of Railway Administration and the investor shall have no claim to these assets.

(vii) All developments for the proposed traffic facility work shall be as per Railway’s approved designs and constructed as per Railways approved standards & specifications. The investor shall be required to deposit the full cost of construction calculated alongwith departmental charges as per codal provisions, in advance, before commencement of the work

(viii) Maintenance and operation of these assets at the station including staff costs shall be the responsibility of the Railways.

4.4 Sidings shall normally take off from the existing serving stations. However, in case when it is operationally not feasible to provide a connection from an existing serving station, for a siding owner’s request for a connection from a location between two existing stations at his own cost, then a proposal for provision of a new block station may be considered provided;

(i) All aspects including the operational feasibility of constructing a new crossing station with desired number of loops and impact of splitting of block section on train operations has been examined to the satisfaction of the Zonal Railways.

(ii) The entire capital cost of the new crossing station including staff quarters, loop lines, signaling, electrification and other infrastructure shall be borne by the siding owner.

(iii) The siding owner will also pay a lumpsum amount which would be equal to recurring cost towards maintenance & staff and employment for a period of 10 years on the basis of initial deployment of staff at the station Such payment shall be made before the commissioning of siding.

(iv) The siding taking off from such a crossing station shall be constructed private sidings only.

5. Cost of Gauge Conversion: The gauge conversion being Railways operational requirement, its cost shall be shared with the party in terms of para 1822E to 1826E of the Engineering Code ,provided the investment made by the Railways is financially viable with a minimum ROR of 14% vis-à-vis traffic offered by the siding in the last 24 months. Where the investment is not financially justified , the siding owners shall bear the full cost or the siding will be closed.

6 Guidelines For Cost Sharing For New As Well As Existing Sidings:

6.1 Electrification Cost:

New Siding Existing SidingFor a new siding in the electrified territory or the territory approved for electrification, the capital cost of OHE shall be borne by the siding owner. This shall also

a) For sidings of length upto 5TKM:Non-electrified sidings in an electrified territory or undergoing new electrification shall be electrified at Railway’s cost , if required in operational interest, for ensuring seamless operations Such siding shall be identified with the personal approval of COM.b) For sidings of length more than 5TKM:For all Sidings, if the rate of return (ROR) is at least 14% on traffic

53

Page 54: nwr.indianrailways.gov.innwr.indianrailways.gov.in/uploads/files/1350027498494-R…  · Web viewd. During the Journey, the passenger, whose identity card number has been indicated

apply to the military sidings

offered in the previous 24 months, the entire cost of electrification shall be borne by the Railways.If the ROR is less than 14% the cost of electrification shall be borne by the siding owner.

6.2 Maintenance Cost (Civil Engg.)

New Siding Existing Siding Maintenance shall be got done by the party at his own cost.Howevre, it has been decided that Railways would not charge “Inspection Charges”.

The existing practice of siding owners getting the maintenance done at their own cost shall continue.However, Railways shall not charge the “Inspection Charges”. Wherever track maintenance is being done by Railways at the cost of siding owner, the party shall continue to bear this cost.

6.3 Maintenance of OHE:

OHE maintenance cost for existing as well as new sidings shall be borne by the Railways

6.4 C&W Examination:

New Siding Existing Siding Normally no C&W facility shall be developed inside the plant/Yard. However, in exceptional cases , if on operational ground it becomes necessary to develop the maintenance facility including prescribed equipments inside the siding, capital cost on one time basis shall be borne by the party, Regular upkeep of facilities provided by the party shall remain Party’s responsibility. Running repairs of rolling stocks including material and staff cost in all cases shall, however, be borne by the Railway.Only in case of POL and other hazardous materials, some facilities exclusive to those commodities such as permanent catwalks, steam cleaning and flame proof lighting may be developed at party’s cost in the Railway yard, if required.

As per existing instructions, regular facilities for C&W examination shall be planned only if the level of loading /unloading is two or more rakes per day.Apportionment of the cost shall be done as per Board’s letter no.84IWI/SP/24, dated 8.1.85 except for siding dealing in POL and other hazardous goods. In case of sidings other than POL,C&W cost shall be borne by the Railways as per above mentioned letter.

6.4.2 Assessment and recovery of damages, caused to wagons in private sidings shall be as per extant rules

6.5 Cost of Railway Staff:

In all private sidings others than ‘Engine On Load’ only, barring the cost of one commercial staff per shift, Railways shall bear the cost of all other Railway staff. The cost of all staff at ‘Engine On Load (EOL) sidings shall be borne by Railways

7. ‘Engine On Load’ (EOL) Policy: Instructions issued vide Board’s letter No.TC-I/94/214/9/Vol.II , dated 18.03.05 regarding EOL system shall be applicable.

8. Revival of Assisted Sidings:

8.1 It has been decided to revive the concept of Assisted Sidings. Under this concept Railways shall share the cost of a new Railway siding, if the industry comes up with a long-term commitment of traffic for 10 years or

54

Page 55: nwr.indianrailways.gov.innwr.indianrailways.gov.in/uploads/files/1350027498494-R…  · Web viewd. During the Journey, the passenger, whose identity card number has been indicated

more, commensurate with the investment of Railways

(i) Under this arrangement, Siding owners shall be required to bear cost of the land, earthwork, sub structure of the track, ballast and buildings outside the premises of the siding owner.

(ii) Cost of the removable super-structure including track, sleepers, fastenings girders of bridges, points & crossings fencing signaling & interlocking appliances, machineries of any kind and the overhead electric equipment outside the premises of the siding owner, shall be borne by the Railways.

(iii) Entire cost of the siding within the applicant’s (siding owner) premises shall be borne by the siding owner.

8.2 However, in all other cases (where commitment of traffic for 10 years or more is not forthcoming), the siding owner shall bear the capital cost of the siding from the take off point at the serving station including OHE, in terms of Para4.1 and 6.1 (New Sidings)

9. Detailed Instructions For Sidings:

(i) The capital cost of all traffic facility works, such as ‘Y’ connection, yard remodeling, additional lines at the serving station, crossing stations, patch doubling of the section etc. shall be fully borne by the Railway, unless the customer decides to construct the facilities as per Para-4.3 of this Circular.

(ii) Regarding expenditure to be incurred on account of construction of the new siding, the private entrepreneur shall get detailed estimate of their siding vetted by the Division concerned. The detailed estimate shall include the break-up of their share as also Railway’s share of the total expenditure. The detailed estimate of Railway’s shall be according to the standardized cost of superstructure per km of track as issued by Civil Engineering Department. Separate cost shall be laid down for steel girders and PSC girders in case of bridges.

(iii) No supervision, inspection or establishment charges shall be payable by the siding owner for the above work, since in that case the expenditure incurred for these aspects would have to be paid back to them by Railways

(iv) The detailed estimate shall be approved by the DRM keeping the GM duly informed .Thereafter, the private entrepreneur shall undertake construction of the siding entirely at their cost.

(v) After completion of the siding, the actual expenditure incurred by the siding owner on behalf of Railways shall be verified by the Division. This verification shall be based on the certified audited accounts of the siding owner. Railways shall bear the actual cost incurred on the constructions, if it is found to be less than the estimated cost; otherwise the estimated cost shall be borne by the Railways.

(vi) Meanwhile, Division shall analyze the projected outward traffic volumes estimated to emanate annually from the siding after commissioning. This analysis shall be based on the traffic volumes projected by the siding owner in their application for Rail Transport Clearance (RTC) submitted to Planning Directorate of Railway Board.

(vii) Based on the projected outward traffic volumes,OD flows and commodity-wise freight charges per rake, Division shall work out the approximate duration for which a freight discount of 10% is required to be given.

(viii) The freight discount shall remain fixed at 10%.

(ix) The duration for which this discount is to be given shall depend on the time period of repayment of the expenditure incurred by the siding owner on behalf of Railways .However, such discount shall be admissible for a maximum period of 10 years only, irrespective of whether the investment made on behalf of Railways are recovered or not. The duration of freight discount shall be for less than 10 years in case the expenditure incurred is recovered in less time period.

(x) The above freight discount shall actually be the repayment of investment made on behalf of Railways, and is not really a freight rebate in the strictest sense of the term. As such, this freight discount shall be admissible in addition to all other rebates that the siding owner may become eligible for; such as lean season policy, empty flow direction, incremental loading etc.

55

Page 56: nwr.indianrailways.gov.innwr.indianrailways.gov.in/uploads/files/1350027498494-R…  · Web viewd. During the Journey, the passenger, whose identity card number has been indicated

(xi) Once the approximate duration of discount for a new siding has been worked out and approved by the Division, this discount shall be admissible on outward traffic booked from the siding.

(xii) All outward traffic loaded from the siding shall be the ‘paid’ traffic.

(xiii) For outward traffic originating from new sidings this discount shall be given up front in freight charges at the time of booking.

The Goods Clerk shall maintain a separate register containing details of all outward traffic moved alongwith discount given and the balance amount of repayment due to the siding owner.TIA and sectional CMI shall conduct post checks regarding this account-keeping on a quarterly basis.

(xiv) Discount shall be automatically discontinued and normal freight charged once the siding owner has been repaid the entire amount spent, or after 10 years period whichever is earlier.

(xv) Siding owner shall provide all facilities for provision of FOIS terminal in the siding.

(xvi) A part from the above aspect of sharing of cost for such sidings, all other rules pertaining to private sidings shall apply with respect to maintenance charges engine hire charges , demurrage rules etc.

(xvii) Division shall sign an Agreement with the siding owners stipulating details of removable structures whose expenditure has been charged to Railway and which Railways shall remove and take away in case of closure of siding for any reason whatsoever.

(xviii) The Agreement shall also stipulate commodity-wise projected level of outward traffic duration of freight discount etc.

10. Applicability of Liberalized siding Policy:

(i) New siding of a new plant being set up.

(ii) New siding of an existing plant that was earlier getting its inward & outward traffic dealt with at a nearby Railway Goods Shed.

(a) However, since the traffic being offered is not altogether new, the discount shall be given only for incremental outward traffic that is handled at the new siding over and above what was earlier being dealt with at Railway’s Goods Shed during the previous year.

(b) The incremental traffic mentioned above shall be calculated in terms of money value of freight paid (during the previous year after indexing for increase in freight charges), if any

(c ) The discount shall be given up front in freight charges at the time of booking. The goods clerk shall maintain details of all such outward traffic alongwith discount given in a separate register, as mentioned in Para 9(xiii) above.

(iii) It shall be applicable to all the sidings which are commissioned after 01.04.2005. This shall apply to both categories falling under para 10. (i) & (ii) above.

11. The Standard Siding Agreement shall be in the revised format , being issued separately.

12. This issues with the consent of Civil Engg., Traffic, Mechanical Engg.& Electrical Engg., Directorates and concurrence of Finance Directorate of Ministry of Railways.

(Railway Board No.99/TC(FM)/26/1/Pt.-dt.--.01.2012)

___________________________________________________________________ LOCAL RATE ADVICE-GOODS (LRA) No.19 of 2012

56

Page 57: nwr.indianrailways.gov.innwr.indianrailways.gov.in/uploads/files/1350027498494-R…  · Web viewd. During the Journey, the passenger, whose identity card number has been indicated

____________________________________________________________

Sub:- Implementation of e-payment System of freight.

Ref:- North Western Railway’s letter No.C-291/E-B/1 Binani dt.02.09.2011& 02.12.2011 Attention is invited to North Western Railway’s above mentioned letter vide which clarification has

been sought whether pooling account of Railway is required to be necessarily in the same bank where the customer bank is operative for e-payment facility.

The matter has been examined and it is to clarify that handling of both Railway’s as well as party’s account by the same bank is required to ensure seamless 27 x 7 transactions. Incidentally pooling account is an internal system requirement of SBI. This may not be necessary in case of other banks who are accredited for government business. A clarification vide Board’s letter No.2007/AC-II/45/12 dt.21.01.08 has been issued in this regard (copy enclosed).Further, Railway Board vide letter No.TC-1/2004/104/1-pt.dated 02.03.07 (superseded by Rates Circular No.39/2008) have already authorized all nationalised banks to participate in e-payment system of freight. Therefore, Railway can enter into tri-partite agreement with any Public sector Bank accredited to them

This issues in consultation with Account Directorate of Ministry of Railways

DA/As Above

(Authority: Railway Board ’s letter No TC- 1/2011/104/4 pt.2 of date 09.02.2012) (Authority: CCM/NWR No. C-291/0(E-Banking) of 21.02.2012)

Sub:- E-transfer of funds in government accounts-operation of pooling account by State Bank of India.

Please refer to Board’s letter of even no. dated 16.01.08 on the above subject.

Some of the railways have expressed doubts over operation of pooling account. In this regard it is clarified that pooling account of State Bank of India is an internal account of the Bank.SBI maintain that this account is required due to system-requirement after introduction of CORE banking system by them. It may, therefore, be appreciated that pooling account is an inherent system requirement of SBI. This may not be necessary in case of other banks who are accredited for government business. Further, the pooling account being an internal account of SBI, there is no formal requirement of opening of pooling account. The procedure of remittance of Railway monies through pooling account as accepted by CGA and RBI should be followed subject to conditions as indicated in letters of even No.dt.4.1.2008 (copy enclosed) and 16.01.2008. Further, the basic standard norm of T+3/T+5’ would be required to be observed whether pooling account is maintained or not maintained by the banks.

This also disposes of reference made by West Central Railway vide their letter no.HQ/TA/T.Fin/EPs/07-08 dt 10.01.2008

(Authority: Railway Board ’s letter No 2007/AC-11/45/12 of date 21.01.08)

__________________________________________________________________ LOCAL RATE ADVICE-GOODS (LRA) No.20 of 2012

____________________________________________________________ (R.C.No.07 of 2012)

Sub:- Rationalization of Freight rate effective from 06.03.2012

1. Sanction of the Central Government is hereby accorded to rationalize the freight rates. A copy of the revised freight rate tables is enclosed herewith.

2. The sanction of the Central Government is also accorded for the following:

57

Page 58: nwr.indianrailways.gov.innwr.indianrailways.gov.in/uploads/files/1350027498494-R…  · Web viewd. During the Journey, the passenger, whose identity card number has been indicated

2.1 The intermediate Class 130-A stands abolished; in other words, the Class rate of commodities under Class 130-A is restored to Class-130.

3. Zonal Railways should ensure that requisite number of copies of the revised Freight Rates Tables (Goods Tariff No.46, Part-II) are collected from the General Secretary, IRCA by deputing staff.

4. Steps should be taken to ensure that the staff fully understand the changes in the method of charging in Freight Rates Table (Goods Tariff No.46, Part-II) and all other related instructions and implement them correctly. Commercial Inspectors(CMIs) and Traffic Inspectors of Accounts (TIAs) should be deputed to goods sheds/stations/sidings etc. for ensuring correct implementation of the instructions and rationalization of undercharges if any.

5. These instructions will come into force w.e.f.06.03.2012

6. This issues with the concurrence of the Finance Directorate of the Ministry of Railways. (Authority: Railway Board ’s letter No TCR/1078/2012/04 of date 05.03.2012) (Authority: CCM/NWR No. C-423/1Vol.III of 06.03.2012)/

FREIGHT RATE PER TONNE

Diatance Kilometres

ClassLR4(Rs)

ClassLR3(Rs)

ClassLR2(Rs)

ClassLR1(Rs)

Class100(Rs)

(1) (2) (3) (4) (5) (6)

1.100 60.10 70.10 80.10 90.10 100.10 101-125 70.90 82.70 94.50 106.30 118.10 126-150 82.40 96.10 109.80 123.60 137.30 151-175 92.30 107.70 123.10 138.50 153.90 176-200 103.20 120.40 137.60 154.80 172.00 201-225 113.30 132.20 151.00 169.90 188.80 226-250 124.10 144.80 165.50 186.20 206.90 251-275 134.90 157.40 179.90 202.40 224.90 276-300 145.80 170.10 194.40 218.70 243.00 301-325 155.90 181.90 207.80 233.80 259.80 326-350 166.40 194.20 221.90 249.70 277.40 351-375 176.90 206.40 235.80 265.30 294.80 376-400 187.70 219.00 250.20 281.50 312.80 401-425 198.40 231.40 264.50 297.50 330.60 426-450 209.20 244.10 279.00 313.80 348.70 451-475 219.70 256.30 293.00 329.60 366.20 476-500 230.70 269.20 307.60 346.10 384.50 501-550 252.50 294.60 336.60 378.70 420.80 551-600 274.00 319.70 365.40 411.00 456.70 601-650 295.40 344.70 393.90 443.20 492.40 651-700 316.70 369.50 422.30 475.10 527.90 701-750 338.10 394.50 450.80 507.20 563.50

58

Page 59: nwr.indianrailways.gov.innwr.indianrailways.gov.in/uploads/files/1350027498494-R…  · Web viewd. During the Journey, the passenger, whose identity card number has been indicated

751-800 359.30 419.20 479.00 538.90 598.80 801-850 380.40 443.80 507.20 570.60 634.00 851-900 401.30 468.20 535.10 602.00 668.90 901-950 422.30 492.70 563.10 633.50 703.90 951-1000 443.20 517.10 591.00 664.80 738.701001-1100 485.70 566.70 647.60 728.60 809.501101-1200 528.10 616.10 704.10 792.10 880.101201-1300 570.30 665.40 760.40 855.50 950.501301-1400 612.40 714.40 816.50 918.50 1020.601401-1500 654.40 763.40 872.50 981.50 1090.601501-1750 748.60 873.30 998.10 1122.80 1247.601751-2000 821.00 957.90 1094.70 1231.60 1368.402001-2500 932.70 1088.20 1243.60 1399.10 1554.502501-3000 1050.20 1225.30 1400.30 1575.40 1750.403001-3500 1161.10 1354.60 1548.10 1741.60 1935.10

FREIGHT RATE PER TONNE

Diatance Kilometres

Class110(Rs)

Class120(Rs)

Class130(Rs)

Class140(Rs)

Class150(Rs)

(1) (7) (8) (9) (10) (11)

1.100 110.10 120.10 130.10 140.10 150.20 101-125 129.90 141.70 153.50 165.30 177.20 126-150 151.00 164.80 178.50 192.20 206.00 151-175 169.30 184.70 200.10 215.50 230.90 176-200 189.20 206.40 223.60 240.80 258.00 201-225 207.70 226.60 245.40 264.30 283.20 226-250 227.60 248.30 269.00 289.70 310.40 251-275 247.40 269.90 292.40 314.90 337.40 276-300 267.30 291.60 315.90 340.20 364.50 301-325 285.80 311.80 337.70 363.70 389.70 326-350 305.10 332.90 360.60 388.40 416.10 351-375 324.30 353.80 383.20 412.70 442.20 376-400 344.10 375.40 406.60 437.90 469.20 401-425 363.70 396.70 429.80 462.80 495.90 426-450 383.60 418.40 453.30 488.20 523.10 451-475 402.80 439.40 476.10 512.70 549.30 476-500 423.00 461.40 499.90 538.30 576.80 501-550 462.90 505.00 547.00 589.10 631.20 551-600 502.40 548.00 593.70 639.40 685.10 601-650 541.60 590.90 640.10 689.40 738.60 651-700 580.70 633.50 686.30 739.10 791.90 701-750 619.90 676.20 732.60 788.90 845.30 751-800 658.70 718.60 778.40 838.30 898.20 801-850 697.40 760.80 824.20 887.60 951.00 851-900 735.80 802.70 869.60 936.50 1003.40 901-950 774.30 844.70 915.10 985.50 1055.90

59

Page 60: nwr.indianrailways.gov.innwr.indianrailways.gov.in/uploads/files/1350027498494-R…  · Web viewd. During the Journey, the passenger, whose identity card number has been indicated

951-1000 812.60 886.40 960.30 1034.20 1108.101001-1100 890.50 971.40 1052.40 1133.30 1214.301101-1200 968.10 1056.10 1144.10 1232.10 1320.201201-1300 1045.60 1140.60 1235.70 1330.70 1425.801301-1400 1122.70 1224.70 1326.80 1428.80 1530.901401-1500 1199.70 1308.70 1417.80 1526.80 1635.901501-1750 1372.40 1497.10 1621.90 1746.60 1871.401751-2000 1505.20 1642.10 1778.90 1915.80 2052.602001-2500 1710.00 1865.40 2020.90 2176.30 2331.802501-3000 1925.40 2100.50 2275.50 2450.60 2625.603001-3500 2128.60 2322.10 2515.60 2709.10 2902.70

FREIGHT RATE PER TONNE

Diatance Kilometres

Class160(Rs)

Class170(Rs)

Class180(Rs)

Class190(Rs)

Class200(Rs)

(1) (12) (13) (14) (15) (16)

1.100 160.20 170.20 180.20 190.20 200.20 101-125 189.00 200.80 212.60 224.40 236.20 126-150 219.70 233.40 247.10 260.90 274.60 151-175 246.20 261.60 277.00 292.40 307.80 176-200 275.20 292.40 309.60 326.80 344.00 201-225 302.10 321.00 339.80 358.70 377.60 226-250 331.00 351.70 372.40 393.10 413.80 251-275 359.80 382.30 404.80 427.30 449.80 276-300 388.80 413.10 437.40 461.70 486.00 301-325 415.70 441.70 467.60 493.60 519.60 326-350 443.80 471.60 499.30 527.10 554.80 351-375 471.70 501.20 530.60 560.10 589.60 376-400 500.50 531.80 563.00 594.30 625.60 401-425 529.00 562.00 595.10 628.10 661.20 426-450 557.90 592.80 627.70 662.50 697.40 451-475 585.90 622.50 659.20 695.80 732.40 476-500 615.20 653.70 692.10 730.60 769.00 501-550 673.30 715.40 757.40 799.50 841.60 551-600 730.70 776.40 822.10 867.70 913.40 601-650 787.80 837.10 886.30 935.60 984.80 651-700 844.60 897.40 950.20 1003.00 1055.80 701-750 901.60 958.00 1014.30 1070.70 1127.00 751-800 958.10 1018.00 1077.80 1137.70 1197.60 801-850 1014.40 1077.80 1141.20 1204.60 1268.00 851-900 1070.20 1137.10 1204.00 1270.90 1337.80 901-950 1126.20 1196.60 1267.00 1337.40 1407.80 951-1000 1181.90 1255.80 1329.70 1403.50 1477.401001-1100 1295.20 1376.20 1457.10 1538.10 1619.001101-1200 1408.20 1496.20 1584.20 1672.20 1760.201201-1300 1520.80 1615.90 1710.90 1806.00 1901.00

60

Page 61: nwr.indianrailways.gov.innwr.indianrailways.gov.in/uploads/files/1350027498494-R…  · Web viewd. During the Journey, the passenger, whose identity card number has been indicated

1301-1400 1633.00 1735.00 1837.10 1939.10 2041.201401-1500 1745.00 1854.00 1963.10 2072.10 2181.201501-1750 1996.20 2120.90 2245.70 2370.40 2495.201751-2000 2189.40 2326.30 2463.10 2600.00 2736.802001-2500 2487.20 2642.70 2798.10 2953.60 3109.002501-3000 2800.60 2975.70 3150.70 3325.80 3500.803001-3500 3096.20 3289.70 3483.20 3676.70 3870.20

__________________________________________________________________ LOCAL RATE ADVICE-GOODS (LRA) No.21 of 2012

____________________________________________________________

Addendum No.15 to Rates Circular No.36 of 2009 Sub:-Classification of Iron Ore

1.0 In terms of Rates Circular No.36 of 2009, and addendum thereto, sanction of the Central Government was accorded for fixation of classification of Iron ore and levy of distance based charge on the booking of Iron Ore traffic meant for other than domestic consumption for manufacture of Iron &Steel and Cement.

2.0 The matter has been reviewed. In continuation of Addendum No.14 to Rates Circular No.36 of 2009, dated 01.03.2011, sanction of the Central Government is hereby accorded for revising the existing Distance Based Charge on the booking of Iron Ore traffic meant for other than domestic consumption over all distance slabs. Accordingly, the table given in para 1.0 of Rates Circular No.36 of 2009 may be replaced with the following table:

Distance In Kms Distance Based Charge 0-200 125 % of Base Freight Rate plus Rs.1125/- 201-300 90 % of Base Freight Rate plus Rs. 1125/- 301-400 75 % of Base Freight Rate plus Rs. 1125/- 401-500 45 % of Base Freight Rate plus Rs. 1125/- 501-600 25 % of Base Freight Rate plus Rs. 1125/- 601-700 10 % of Base Freight Rate plus Rs. 1125/- >700 Rs. 1125/- only

3.0 All other terms and conditions stipulated in Rates Circular No.36 of 2009 will continue to apply unchanged.

4.0 Monthly appreciation report should be furnished by 7th of following month for Board’s consideration.

5.0 These instructions will come into force w.e.f. 06-03.2012 and will remain valid till further advice.

6.0 This issues with the concurrence of Traffic Transportation and Finance Directorate of the Ministry of Railways.

(Authority:-Railway Board’s letter No.TCR/1078/2007/3 dt 05-03-2011) (Authority:-CCM/NWR No. C-423/1/Vol.III of dt 06-03-2011) __________________________________________________________________

LOCAL RATE ADVICE-GOODS (LRA) No.22 of 2012 ____________________________________________________________ (R.C.No 04 of 2012)

Sub:- Notified Stations. Ref:- Rly Board’s letter no.TC-1/2001/223/1Pt.C dtd .24.02.2012

Vide Gazette Notification S.O.No.233 (E) dt. 21 st February, 2012, following Stations are declared

61

Page 62: nwr.indianrailways.gov.innwr.indianrailways.gov.in/uploads/files/1350027498494-R…  · Web viewd. During the Journey, the passenger, whose identity card number has been indicated

as ‘Notified Stations’ over N.W.Rly.for the purpose of removal of goods without delay for a period of six months, w.e.f.25.02.2012:-

I All Division II JP Division

1. Abu Road (Parcel) 1. Jaipur (Parcel) 2. Ajmer (Parcel) 2. Kanakpura (Goods) 3. Marwar Jn. (Parcel) 3. Alwar Goods Shed (AGS) 4. Nasirabad (Parcel) 4. Khori (Goods) 5. Falna (Parcel) III BKN Division 6. Udaipur City (Parcel) 1 Sri Ganga Nagar (Goods) 7. Beawar (Parcel) IV JU Division 8. Bhilwara (Parcel) 1. Jodhpur (Parcel)

Divisions are requested that the name of stations required to be notified from 25.08.2012 may be intimated to this office latest by 27.06.2012 with small justification.

(Authority:-Railway Board’s letter No.TC-1/2001/223/1 Pt C dtd 24.02.2012) (Authority:-CCM/NWR No. C-. 494/1 of dt 29-02-12)

__________________________________________________________________ LOCAL RATE ADVICE-GOODS (LRA) No.23 of 2012

____________________________________________________________ ( Corrigendum to Rates Circular No.02 of 2012)

Sub:- Hire Charge for utilization of Railway Brake Van by Container Train Operators. Ref:- Board’s letter No.2007/TC-I/302/1Pt.G dt.11.01.2012(Rates Circular No.02 of 2012) Inter alia referring to Rates Circular No.02 of 2012, a clarification has been sought whether only ‘Hire

Charge’ is leviable for utilization of railway brake van by container train operators or ‘Haulage Charge’ is also be leviable in addition to hire Charge.

The matter has been examined and it has been decided that the guidelines prescribed vide Rates Circular

No.02 of 2012 regarding levy of Hire Charge for utilization of Railway’s brake van by container train operators may be made effective from 1 st April 2012 instead of 1 st February 2012 . Further, it is clarified that from 1st

April 2012, no Haulage Charge will be separately levied either for railway brake van or privately owned brake van.

Para 3.0 and Illustration given below Para 2.4 of Rates Circular No.02 of 2012 may be modified accordingly.

This issues in consultation with Traffic Transportation Dte.and with the concurrence of Finance Dte. of Ministry of Railways.

(Authority:-Railway Board’s letter No.2007/TC-I/302/I Pt.G dtd 29.02.2012) (Authority:-CCM/NWR No. C-.78/1/54/CONCOR/Vol-III of dt 29-02-12)

__________________________________________________________________ LOCAL RATE ADVICE-GOODS (LRA) No.24 of 2012

____________________________________________________________ (R.C.No 05 of 2012) Sub:- Inflation in distance for charging of freight on Chavaj-Bharuch-Dahej Section

Sanction of the Central Government is hereby accorded to inflate the distance for charge by 50% (Fifty percent) for the purpose of charging the freight on the Chavaj-Bharuch-Dahej section of Western Railway.

2.0 This inflation will apply uniformly for all description of traffic.

62

Page 63: nwr.indianrailways.gov.innwr.indianrailways.gov.in/uploads/files/1350027498494-R…  · Web viewd. During the Journey, the passenger, whose identity card number has been indicated

3.0 These instruction will come into force w.e.f 01.03.2012 and will remain in force till further advice.

4.0 This issues in consultation with Planning Directorate and with the concurrence of Finance Directorate in the Ministry of Railways.

(Authority:-Railway Board’s letter No.TCR/1099/2012/03 of dt 28.02.2012) (Authority:-CCM/NWR No. C-543/8/2/W.Rly of dt 07.03.12)

__________________________________________________________________ LOCAL RATE ADVICE-GOODS (LRA) No.25 of 2012

____________________________________________________________

(Corrigendum No.1 to Rates Circular No.05 of 2012) Sub:- Inflation in distance for charging of freight on Chavaj-Bharuch-Dahej Section.

Ref:- Board’s Letter of even number dated 28.02.2012(RC.No.05 of 2012)

In terms of above referred Board’s Rates Circular it was notified to inflate the distance for charge by 50% (Fifty percent) for the purpose of charging the freight on the Chavaj-Bharuch-Dahej section of Western Railway.

2.0 The matter has been reviewed and it has been decided to inflate the distance for charge by 50% (Fifty percent) in Kilometers for the purpose of charging the freight for the portion of the line under the SPVs control between Chavaj-Bharuch-Dahej.

3.0 All other terms and conditions stipulated in Rates Circular No.05 of 2012 will remain unchanged.

4.0 This issues in consultation with Planning Directorate and with the concurrence of Finance Directorate in the Ministry of Railways.

(Authority:-Railway Board’s letter No.TCR/1099/2012/03 of dt 29.02.2012) (Authority:-CCM/NWR No. C-543/8/2/W.Rly of dt 07.03.12)

__________________________________________________________________

LOCAL RATE ADVICE-GOODS (LRA) No.26 of 2012 ____________________________________________________________

(R.C.No.06 of 2012) Sub:- Inflation in distance for charging freight on Banspani-Tomka BG section on South

Eastern Railway.

Ref:- Board’s letter No.TCR/1099/2006/3 dated 26.02.2007 (Board’s Rates Circular No.14 of 2007)

1. In terms of Rates Circular No.14 of 2007, inflation of the distance for charge by 30% (thirty percent) for the purpose of charging freight on the Banspani-Tomka BG section on South Eastern Railway was notified for the period commencing from 01.03.2007 to 28.02.2012.

2. The matter has been reviewed. It has now been decided that inflation of the distance for charge by 30%(thirty percent) for the purpose of charging freight on the Banspani - Tomka BG section on South Eastern Railway may be permitted for the period beyond 28.02.2012 and up to 31.05.2012.

3. All other details of Rates Circular No.14 of 2007 will remain unchanged.

63

Page 64: nwr.indianrailways.gov.innwr.indianrailways.gov.in/uploads/files/1350027498494-R…  · Web viewd. During the Journey, the passenger, whose identity card number has been indicated

4. This issues in consultation with Traffic Transportation Directorate and with the concurrence of Finance Directorate of Ministry of Railways

(Authority:-Railway Board’s letter No.TCR/1099/2012/01 of dt 28.02.2012) (Authority:-CCM/NWR No. C-543/7/2/S.E.Rly of dt 07.03.12)

__________________________________________________________________ LOCAL RATE ADVICE-GOODS (LRA) No.27 of 2012

____________________________________________________________

( Corrigendum No.2 to Rates Circular No.28 of 2011)

Sub:-Permissible Carrying Capacity (PCC) of 8 Wheeler BG Wagons. Ref:-Board’s letter of even number dated 29.07.2011.(Rates Circular No.28 of 2011 and corrigendum thereto)

Ministry of Railways have decided that for the purpose of charging , PCC of different wagons for loading of Coke may be treated at par with Coal.

2.0 Necessary modification in the Rates Circular No.28 of 2011 may be made accordingly.

3.0 All other details of Rates Circular No.28 of 2011, as amended from time to time , will remain unchanged.

4.0 These instructions will come into force w.e.f.20.03.2012.

5.0 This issues in consultation with Traffic Transportation Directorate and with the concurrence of Finance Directorate of Ministry of Railways.

(This disposes off SCR’s letter number C.No.C474/Genl/Vol.X dated 13.09.2011) (Authority:-Railway Board’s letter No.TCR/1394/2003/11 of dt 12.03.2012) (Authority:-CCM/NWR No. C-176/4 Vol.III of dt 13.03.12)

__________________________________________________________________ LOCAL RATE ADVICE-GOODS (LRA) No.28 of 2012

____________________________________________________________

(Corrigendum 3 to Rates Circular No.5 of 2011)

Sub:- Haulage Charges recoverable for movement of notified commodity groups in container.

Ref:- (i) Baord’s letter No.2007/TC-I/302/I Pt.H dt 14.02.2011(Rates Circular No.05 of 2011) (ii) Baord’s letter No.2007/TC-I/302/I Pt.H dt 30.08.2011( Corrigendum 1 to Rates Circular

No.05 of 2011) (iii) Baord’s letter No.2007/TC-I/302/I Pt.H dt 22.12.2011( Corrigendum 2 to Rates Circular

No.05 of 2011)

In partial modification to Rates Circular No.05 of 2011, it has been decided to modify the list of notified commodity groups from nine to six,as listed below:

“Cement other white cement; Pig Iron,Sponge Iron & Slag (except Metal Scrap); Iron & Steel; Bricks & Stones other than Marble & Ceramic tiles; Alumina; and Petroleum products & Gases( as classified in Goods Tariff No.46 Pt.I Vol.II)”

It has also been decided that ‘ Container Class Rate’ for notified commodity groups will continue to be levied on the basis of ‘Applicable Class Rate i.e.Goods Tariff Rate (as revised from time to time) minus 15% concession’. Accordingly, Rate Table for the above mentioned notified commodity groups is given in Annexure- I & II.

All other instructions contained in Rates Circular No.05 o 2011, amended from time to time, will continue to apply unchanged.

64

Page 65: nwr.indianrailways.gov.innwr.indianrailways.gov.in/uploads/files/1350027498494-R…  · Web viewd. During the Journey, the passenger, whose identity card number has been indicated

These instructions will be effective from 01.04.2012.

This issues in consultation with Traffic Transportation Directorate and concurrence of Finance Directorate and concurrence of Finance Directorate of the Ministry of Railways.

(Authority:-Railway Board’s letter No. 2007/TC-I/302/I Pt.H of dt 13.03.2012) (Authority:-CCM/NWR No. C-78/1/54/CONCOR/Vol III of dt 15.03.12)

Annexure-I

CONTAINER CLASS RATES (w.e.f.01.04.2012) Cement (other than white Cement), Bricks and Stones (other than Marble & Caremic Tiles)

Pig Iron, Sponge Iron & Slag (except Metal Scrap)

Iron & Steel, Alumina

Petroleum products & Gases

Distance Kilometres

Rate per 20’TEU Rate per 20’TEU Rate per 20’TEU

Rate per 20’TEU

(Rs) (Rs) (Rs) (Rs) 1-100 3830 4085 4595 5105 101-125 4519 4820 5421 6023 126-150 5253 5602 6301 7002 151-175 5888 6278 7064 7849 176-200 6579 7018 7895 8772 201-225 7222 7704 8665 9629 226-250 7915 8441 9496 10552 251-275 8604 9175 10322 11470 276-300 9295 9914 11154 12393 301-325 9937 10600 11924 13250 326-350 10611 11317 12732 14147 351-375 11276 12028 13530 15035 376-400 11965 12763 14357 15953 401-425 12645 13490 15175 16861 426-450 13339 14226 16006 17784 451-475 14007 14940 16810 18676 476-500 14708 15688 17649 19610 501-550 16096 17169 19314 21461 551-600 17470 18633 20964 23292 601-650 18834 20089 22601 25112 651-700 20193 21537 24230 26923 701-750 21555 22991 25865 28739 751-800 22904 24432 27484 30539 801-850 24251 25867 29101 32334 851-900 25587 27290 30702 34114 901-950 26925 28718 32309 35899 951-1000 28257 30138 33907 376741001-1100 30965 33028 37156 412851101-1200 33665 35909 40397 448851201-1300 36358 38780 43628 484761301-1400 39038 41642 46846 520511401-1500 41715 44498 50059 556211501-1750 47721 50903 57265 636281751-2000 52341 55830 62809 697882001-2500 59461 63424 71352 79280

65

Page 66: nwr.indianrailways.gov.innwr.indianrailways.gov.in/uploads/files/1350027498494-R…  · Web viewd. During the Journey, the passenger, whose identity card number has been indicated

2501-3000 66953 71415 80343 892703001-3500 74019 78953 88822 98690Note:- 1. Rates in the above tables are published for distance upto 3500 kilometers.The rates for distance beyond 3500 kms will be calculated by adding to the rates for 3500kms the amount of variation between the rates in the distance slabs of 2501-3000 and 3001-35002. The rates for 40’ TEUs will be double of the 20’TEUs3.Double Stack container will not be permitted.4.The haulage charges for empty flat/wagons will be charged as per RC 32 of 2010.

Annexure-II

CONTAINER CLASS RATE FOR NOTIFIED COMMODITIES (w.e.f 01.04.2012) MARKED AS ‘*’ IN THE GOODS TARIFF NO 46 Pt.I(Vol.II)

Fly Ash Bricks broken, Fire bricks,Steel Pipes Wire rod coils

Coal Tar, Coal Tar Pitch, Bitumen

Kerosene Oil, Liquefied Petroleum Gas (LPG)

Distance Kilometres Rate per 20’TEU Rate per 20’TEU Rate per 20’TEU Rate per 20’TEU(Rs) (Rs) (Rs) (Rs)

1-100 3063 3318 4340 4595 101-125 3613 3914 5120 5421 126-150 4202 4552 5952 6301 151-175 4710 5103 6671 7064 176-200 5263 5702 7456 7895 201-225 5778 6258 8186 8665 226-250 6332 6860 8968 9496 251-275 6882 7456 9749 10322 276-300 7436 8055 10534 11154 301-325 7951 8611 11263 11924 326-350 8489 9195 12026 12732 351-375 9022 9772 12781 13530 376-400 9573 10368 13561 14357 401-425 10116 10960 14331 15175 426-450 10669 11559 15116 16006 451-475 11205 12141 15874 16810 476-500 11766 12747 16669 17649 501-550 12878 13949 18243 19314 551-600 13974 15139 19798 20964 601-650 15068 16323 21346 22601 651-700 16154 17501 22884 24230 701-750 17243 18681 24429 25865 751-800 18324 19849 25959 27484 801-850 19400 21017 27484 29101 851-900 20469 22175 28996 30702 901-950 21540 23335 30513 32309 951-1000 22603 24488 32023 339071001-1100 24771 26836 35093 371561101-1200 26931 29175 38153 403971201-1300 29085 31510 41205 436281301-1400 31230 33833 44243 468461401-1500 33372 36154 47277 500591501-1750 38176 41358 54083 572651751-2000 41874 45362 59321 62809

66

Page 67: nwr.indianrailways.gov.innwr.indianrailways.gov.in/uploads/files/1350027498494-R…  · Web viewd. During the Journey, the passenger, whose identity card number has been indicated

2001-2500 47568 51533 67389 713522501-3000 53563 58025 75880 803433001-3500 59214 64148 83887 88822Note:- 1. Rates in the above tables are published for distance upto 3500 kilometers.The rates for distance beyond 3500 kms will be calculated by adding to the rates for 3500kms the amount of variation between the rates in the distance slabs of 2501-3000 and 3001-35002. The rates for 40’ TEUs will be double of the 20’TEUs3.Double Stack container will not be permitted.4.The haulage charges for empty flat/wagons will be charged as per RC 32 of 2010. __________________________________________________________________

LOCAL RATE ADVICE-GOODS (LRA) No.29 of 2012 ____________________________________________________________

( Rates Circular No.08 of 2012)

Sub:-In private /assisted siding where placement/release of a rake from /to interchange point is done through siding owner’s loco,the guidelines for reckoning of excess detention when a loaded rake, after unloading, is back-loaded.

Ref:-Board’s letter No.TC-1/2005/201/2 dt.19.12.2005(Rates Circular No.74 of 2005) Board’s letter No.TC-1/2005/201/2 dt.05.12.2006(Rates Circular No.106 of 2006) Board’s letter No.TC-1/2005/201/2 dt.28.09.2007(Rates Circular No.95 of 2007)

Suggestions have been received as regards reckoning of excess detention when a loaded rake, after unloading, stands allotted for back-loading in a private/assisted siding where placement/release of a rake from /to interchange point is done through siding owner’s loco.Particularly, NWR may please connect COM/NWR’s letter No.T-2/88/1/SHREE CEMT dt.25.12.2011

2. Extant guidelines regarding Demurrage rules in case of private/assisted sidings where placement/release of a rake from/to interchange point is done through siding owner’s loco are stipulated vide Para 2.2.3 of Rates Circular No.74 of 2005, which has been incorporated vide Rates Circular No.106 of 2006 and further modified vide Rates Circular No.95 of 2007.

3. The matter has been examined and it has been decided to add ‘Para 2.2.3 (a)’ below the ‘Para 2.2.3.’ of Rates Circular No.74 of 2005, as given below:

“2.2.3(a) In private /assisted sidings where placement/release of a rake from /to interchange point is done through siding owner’s loco,the guidelines for reckoning of excess detention when a loaded rake, after unloading, is allotted for back-loading shall be governed by the following guidelines:

The ‘excess’ detention (for the purpose of levying Demurrage Charge) would be reckoned after the expiry of total of the free time permitted separately for two activities, i.e.first unloading and then loading; total time taken for unloading and loading shall commence from the time of placement of the rake for unloading and conclude at the time the loaded rake is handed back to the railway at the designated point.

However, additional free time that may presently be extended in such situation, on account of shunting of the rake from the unloading point to the loading point within the siding would no longer be permissible; the time presently allowed for movement of the rake from the interchange point to the siding and vice versa, if any, would continue to be reckoned for calculation of admissible free time for loading/unloading.

67

Page 68: nwr.indianrailways.gov.innwr.indianrailways.gov.in/uploads/files/1350027498494-R…  · Web viewd. During the Journey, the passenger, whose identity card number has been indicated

Extant provisions in respect of Bunching Allowance on subsequent rakes shall continue to apply.”

4. This issues in consultation with Traffic Transportation Dte.and with the concurrence of Finance Dte.of Ministry of Railways.

5. These instructions will be effective from 01.04.2012. (Authority:-Railway Board’s letter No. TC-I/2005/201/2 Vol-II of dt 19.03.2012)

(Authority:-CCM/NWR No. C-299/0(Policy) of dt 20.03.12)

_______________________________________________________________ LOCAL RATE ADVICE-GOODS (LRA) No.30 of 2012

____________________________________________________________

( Rates Circular No.09 of 2012)

Sub;- Dynamic Pricing Policy-Congestion Charge. Ref:- Board’s letter of even number dated 29.03.2011(Rates Circular No.13 of 2011)

1. Vide Para 2 of Rates Circular No.13 of 2011, sanction of the Central Government was conveyed for levy of Congestion Charge @ 20% on the applicable Base Freight Rates (as published in the Goods Tariff Part-II) on all traffic booked to Bangladesh and Pakistan. These rates are valid from 1st April 2011 to 31st March 2012.

2. The matter has been reviewed and it has been decided that the existing rate of Congestion Charge applicable for all traffic to Bangladesh and Pakistan will remain in force for a further period of one year beyond 31st March 2012 i.e.upto 31st March 2013.

3. All other details of Rates Circular No.13 of 2011, regarding levy of Congestion Charge, will continue to apply unchanged.

4. This issues in consultation with Traffic Transportation Directorate and with the concurrence of Finance Directorate of Ministry of Railways.

(Authority:-Railway Board’s letter No. TCR/1078/2008/11 of dt 22.03.2012) (Authority:-CCM/NWR No. C-423/1Vol.III of dt 22.03.12)

68

Page 69: nwr.indianrailways.gov.innwr.indianrailways.gov.in/uploads/files/1350027498494-R…  · Web viewd. During the Journey, the passenger, whose identity card number has been indicated

SORTRC GOODS

________________________ GOODS (SORTRC) No : 01 of 2012 from NORTHEAST FRONTIER RAILWAY_________________________________________________________________

1.Sub:- Opening of Changsari (CGS) station for Chassis stuffing /destuffing operation only.

CCM/N.F Rly letter No. C.215/RD-9/Container of date 14.10.2011 is reproduced below:With immediate effect the Competent authority has decided to open Changsari (CGS)

station under RNY Division as Container Rail Terminal (CRT) for a period of six months for Chassis Stuffing /Destuffing operation only. All concerned to please note and act accordingly. (Authority: CCM/N.F Rly No. C/215/RD-9/Container of date 14.10.2011)

2. Sub:- Opening of New Jalpaiguri (NJP) station as a Container Rail Terminal.

CCM/N.F Rly letter No. C/215/RD-9/Container of date 25.10.2011 is reproduced below:With immediate effect the Competent authority has decided to open New Jalpaiguri

(NJP) Station under KIR Division as Container Rail Terminal (CRT) for a period upto 30.4.2012 subject to condition chassis stuffing /destuffing operation only. All concerned to please note and act accordingly. (Authority: CCM/N.F Rly No. C/215/RD-9/Container of date 25.10.2011)

3. Sub:- Opening of Manu, Jirania Churaibari, Karimganj MG Stations & Lamsakhang BG station for Out ward and Inward booking of RMC traffic.

CCM/N.F Rly letter No. C/407/RD-109/Pt. XIV /LMG (Loose-I) of date 27.10.2011 is reproduced below:

With immediate effect Competent authority has agreed to open Manu (MANU), Jirania (JRNA), Churaibari (CBZ), Karimganj(KXJ) MG Stations & Lamsakhang (LKG) BG station under LMG Division for outward and Inward Booking of RMC traffic for a period of one year. All conerned to please note and act accordingly.(Authority: CCM/N.F Rly No. C/407/RD-109/Pt. XIV/LMG (LOOSE-I) of date 27.10.2011)

5. Sub:- Opening of Lakwa (LXA) station for Inward traffic.

CCM/N.F Rly letter No. C/407/RD-109/Pt. XIII (South) of date 03.11.2011 is reproduced below:

With immediate effect LAKWA (LXA) station under TSK Division is opened for Inward traffic till, further order except Coal POL, Live stock, Explosive & Crane Consignment.

69

Page 70: nwr.indianrailways.gov.innwr.indianrailways.gov.in/uploads/files/1350027498494-R…  · Web viewd. During the Journey, the passenger, whose identity card number has been indicated

All conerned to please note and act accordingly.(Authority: CCM/N.F Rly No.C/407/RD-109/Pt. XIII (South) date 03.11.2011)

6. Sub:- Opening of Furkating (FKG) for handling of Inward crane consignment of Iron Pipes.

CCM/N.F Rly letter No. C/407/RD-109/Pt. XIII (South) of date 01.11.2011 is reproduced below:

With immediate effect FURKATING (FKG) station under TSK Division is opened for handling of Inward Crane Consignment of Iron Pipes. All concerned to please note and Act accordingly.

(Authority: CCM/N.F Rly No. C/407/RD-109/Pt. XIII (South) of date 01.11.2011)

7. Sub:- Opening of Bihara (BHZ) MG for Out ward booking of Coal traffic

CCM/N.F Rly letter No. C.407/RD-109/Pt. XIV /LMG of date 04.11.2011 is reproduced below:

With immediate effect BIHARA (BHZ) MG station under LMG Division is opened for Outward booking of Coal traffic for a period of One year in block Rake. All concerned to please note and Act accordingly.

(Authority: CCM/N.F Rly No. C/407/RD-109/Pt. XIV/LMG of date 04.11.2011)

8. Sub:- Opening of New Guwahati (NGC) for Container Rail Terminal (CRT)

CCM/N.F Rly letter No. C/215/RD-9/Container of date 03.11.2011 is reproduced below:With immediate effect NEW GUWAHATI (NGC) station under LMG Division is

opened for Container Rail Terminal (CRT) for a period upto 30.04.2012 for Chassis stuffing /Destuffing operation only. All concerned to please note and Act accordingly.

(Authority: CCM/N.F Rly No. C/215/RD-9/Container of date 03.11.2011)

9. Sub:- Railway Wagons allowed for loading of Sawn Timber pertaining to Arunachal Pradesh.

In Exercise of powers vested with the sit vide Hon’ble Supreme Court’s order dated 12.5.2001 and in modification of the earlier orders /guidelines issued from time to time the sit in consultation with the principal Chief Conservator of forests, Arunachal Pradesh Forest Department, Head North East Cell of MoEF and additional Principal Chief Conservator of Forests, Regional Office, MoEF Shillong has taken the following decision regarding the Loading of timber pertaining to Arunachal Pradesh

i) The loading and transportation of Timber from following Railway station will hereinafter remain suspended /Not permitted.

ii) In Lieu of above said loading stations, the loading of Timber pertaining to ArunachalPradesh will be permitted from Amoni Railway Station.

70

Page 71: nwr.indianrailways.gov.innwr.indianrailways.gov.in/uploads/files/1350027498494-R…  · Web viewd. During the Journey, the passenger, whose identity card number has been indicated

iii) For Transportation of Sawn Timber pertaining to Arunachalpradesh, 40 Wagons are allowed in each quarter starting from the quarter september –Novemnber,2011 from Amoni Railway Station.

iv) The permissible quantity of Sawn Timber tobe transported from various Saw Mills during each of the quarter to Amoni for the purpose of Transportation outside Northeast through Railway Wagons will be decided by the principal Chief Conservator of Forests, Arunachal pradesh.

v) The issue of Transit passes/permits for this purpose from the respective Saw Mills to Amoni will be restricted to the total quantity of Sawn Timber so permitted by the Principal Chief Conservator of Forests, Arunachal Pradesh. In the Transit Permits /Passes will be clearly recorded that the Sawn Timber is being transported to Amoni for further Transportation from therein to outside the Northeast through Railways Wagons.

vi) The Loading of Sawn Timber from Amoni will be permissible only in respect of Timber Transported as per the above procedure. Loading of any other Sawn Timber will not be permissible. The authorised Gazatted forest Officer while forwarding the Applications (Forwarding Note ) of the Registered Timber Transporters for Rgistration of wagons and the designated forest officer who is supervising the loading of timber shall ensure that no Sawn Timber is permitted to be loaded /loaded except the Sawn Timber Transported to amoni as per the above procedure.

(Authority: CCM/N.F Rly No.C/30/RG/1/PT.XII date 31.10.2011)(Authority: CCM/NW Rly No. C-543/5/2 N.F Rly Date: 03. 1.12)

_______________________________ GOODS (SORTRC) No. : 02 of 2012 from NORTHEAST FRONTIER RAILWAY

________________________________________________________________

1.Sub:-Chargeable Distance Kilometers between Katihar –Teznarayanpur after Gauge conversion from MG to BG.

Ref:- Dy. CE /CON vide letter No.W/260/CON/KIR-TNPR dt. 24.6.11 duly vetted by FA&CAO /MLG

Newly Gauge conversion MG to BG in between Katihar –Teznarayanpur Section will be open shortly and the chargeable distance of new BG Section and vetted by Associate Finance is as under Annexure ‘A’

CHARGEABLE DISTANCE IN KILOMETRES BETWEEN KATIHAR –TEZNARAYANPUR AFTER GAUGE CONVERSION FROM MG TO BG

S.N

o.

Station

Kat

ihar

Jn

Man

sahi

Kum

arip

ur H

alt

Mah

iarp

ur

Bag

hmar

a H

alt

Man

ihar

i

Kan

tako

sh

Tezn

aray

anpu

r D

K(T

erm

inal

S

tatio

n)

1 Katihar Jn. 0.00

71

Page 72: nwr.indianrailways.gov.innwr.indianrailways.gov.in/uploads/files/1350027498494-R…  · Web viewd. During the Journey, the passenger, whose identity card number has been indicated

2 Mansahi 8.685 0.00

3 Kumaripur Halt 13.153 4.468 0.00

4 Mahiarpur 15.962 7.277 2.809 0.00

5 Baghmara Halt 21.378 12.693 8.225 5.416 0.00

6 Manihari 23.973 15.288 10.820 8.011 2.595 0.00

7 Kantakosh 29.983 21.298 16.830 14.021 8.605 6.010 0.00

8 Teznarayanpur DK(Terminal Station)

33.820 25.135 20.667 17.858 12.442 9.847 3.837 0.00

(Authority: CCM/N.F Rly No. C/486/RCS/L/KILLO/R/Pt.III date 19.08.2011)

2.Sub:- Closure of Stations.

CCM/N.F Rly letter No. C/441/RD-17/Pt. VI of date 08.09.2011 is reproduced below:

In continuation to N.F Rly’ Rates Circular General No. 35 of 2011 circulated under XXR No. C/441/RD-17/Pt. VI dated 08.08.2001. This is to inform you that, North Lakhimpur (NLP), Bindukuri (BKTB), Tangla (TNL), Tatibehar (TBH), Dhemaji(DMC), Bhalukpong (BHNG), Harmuti (HMY), Silapathar (SPTR), Tezpur (TZTB), Gogamukh(GOM) Goods sheds are closed for booking of both Inward and Outward traffic W.E. F 01.09.2011 till further orders due to Gauge conversion works of Rangiya –Murkongselek MG Section of RNY Division including MG Branch Lines.All concern to please note and act accordingly.(Authority: CCM/N.F Rly No. C/441/RD-17/Pt. VI date 08.09.2011)

3. Sub:- Chargeable distance from and to Kamalpur (KMPH) halt station between AZR –KWE Railway stations in BOE-MLDT section (Main Line)

Ref:- DRM (C)/KIR’s letter No. c/191/1-Kamalpur Halt dt. 17.9.11 vide case No. C /286/RCS/L/KILLO/R/Pt.III vetted by FA&CAO /MLG.

The Associate finance has vetted the distance from and to Kamalpur (KMPH) halt station between AZR and KWE Railway station in BOE-MLDT (Main Line) of Katihar division are as under.

Annexure-1CHARGEABLE DISTANCE TABLE FOR KAMALPUR HALT (KMPH) BETWEEN AZR AND KWE RAILWAY STATIONS IN BOE-KDPR SECTION (MAIN LINE)

72

Page 73: nwr.indianrailways.gov.innwr.indianrailways.gov.in/uploads/files/1350027498494-R…  · Web viewd. During the Journey, the passenger, whose identity card number has been indicated

S.N

o.Station

Muk

uria

(MFA

)

Bha

wan

ipur

Bih

ar

Hal

t (B

WP

B)

Aza

mna

gar

Roa

d (A

ZR)

Kam

alpu

r

Hal

t (K

MP

H)

Khu

rial (

KW

E)

Bah

hang

aon

(BA

HN

)

Kum

edpu

r (K

DP

R)

1 Mukuria(MFA) 149.07 0.002 Bhawanipur

Bihar Halt (BWPB)

153.43 4.36 0.00

3 Azamnagar Road (AZR)

157.93 8.86 4.50 0.00

4 Kamalpur Halt (KMPH)

162.58 13.51 9.15 4.65 0.00

5 Khurial (KWE) 165.60 16.53 12.17 7.67 3.02 0.006 Bahhangaon

(BAHN)167.37 18.30 13.94 9.44 4.79 1.77 0.00

7 Kumedpur (KDPR)

171.70 22.63 18.27 13.77 9.12 6.10 4.33 0.00

(Authority: CCM/N.F Rly No.C/486/RCS/L/KILLO/R/Pt.III date 29/9/2011)

4. Sub:- Opening of Teznarayanpur (TNPR) station for Inward Booking of RMC Traffic only.

CCM/N.F Rly letter No. C/407/RD-109/Pt. XIII (North) of date 30.09.2011 is reproduced below:

With immediate effect Teznarayanpur (TNPR) Station under KIR Division is opened for Inward Booking of RMC traffic only. All concerned to please note and act accordingly.(Authority: CCM/N.F Rly No. C/407/RD-109/Pt. XIII(North) date 30.09.2011)

5. Sub:- Re-Opening of Amoni (AONI) Station under LMG Division for both Inward and Outward booking of Goods traffic.

CCM/N.F Rly letter No. C/407/RD-109/Pt. XIV /LMG of date 03.10.2011 is reproduced below:

Fenian even dated 06.09.2011 under Rates circular General No. 37 of 2011. Now it has been decided to Re-open Amoni (AONI) station under LMG Division for both Outward and Inward Booking of Goods Traffic except Coal, POL Live Stock, Explosive and crane consignments with immediate effect. All concerned to please note and act accordingly.(Authority: CCM/N.F Rly No. C/407/RD-109/Pt. XIV /LMG of date 03.10.2011)

6. Sub:- Opening of Bathnaha (BTF) station for Inward booking of stone chips.

CCM/N. F Rly letter No. C/407/RD-109/pt. XIII (North) of date 10.10.2011 is

73

Page 74: nwr.indianrailways.gov.innwr.indianrailways.gov.in/uploads/files/1350027498494-R…  · Web viewd. During the Journey, the passenger, whose identity card number has been indicated

reproduced below:With immediate effect Bathnaha (BTF) Station under KIR Division is open for

Inward Booking of Stone Chips only on Train Load basis for a period of Six months only. All concerned to please note and act accordingly.(Authority: CCM/N.F Rly No. C/407/RD/-109/Pt. XIII(North) date 10.10.2011)(Authority: CCM/NW Rly No. C-543/5/2 N.F Rly Date: 05. 1.12)

_______________________________ GOODS (SORTRC) No. : 03 of 2012 from CENTRAL RAILWAY

_________________________________________________________________1. Sub:- Errata to Central Railway local distance Table No.5 inforce from

01.01.2005

CCM/C.Rly No. C/636/R/RBS/2011 of date 29.7.2011 circulated by CCM/N.F Rly letter No. C/421/RCS/CR-7/Pt.II of date 28.9.2011 is reproduced below:

Errata to Central Railway local distance Table No. 5 inforce from 01.01.2005 is shown below for carrying out corrections immediately.

Sl No. Page Ref. To LDT Stations Distances KMsFrom To As printed Should be

1 39 Pardhade (PHQ)

Pachora Jn(PC)

7.85 7.45

2 43 Sewagram (SEGM)

Wardha (WR) 2.57 2.48

3 22 Dapodi (DAPD)

Kasarwadi (KSWD)

3.87 3.37

(Authority: CCM(FS)/C.Rly CL No. C/636/R/RBS/2011 dt. 29.7.2011)(Authority: CCM/N.F Rly No. C/421/RCS/CR-7/Pt.II of date 28.9.2011)

2.Sub:- Permission to co-use Private siding of M/s Lloyd Steel Industries Ltd served by Wardha by M/s. Gopani Iron and Power (India ) Pvt. Ltd.

Permission is granted to Co-use private siding of M/s Lloyd Steel Industries Ltd. served by Wardha by M/s. Gopani Iron and Power (India ) Pvt. Ltd Tadali for inward traffic of coal for a period upto 31.3.2012 or till the operationalisation of the siding as are Brown field PFT whichever is earlier.(Authority: CCM(FS)/C.Rly No. C/698/M/839/1 dt. 27.7.2011)(Authority: CCM/N.F Rly No. C/421/RCS/CR-7/Pt.II of date 28.9.2011)

3. Sub:- Opening of Daund and Goods shed for loading of Malasses in tank wagons.

Daund Goods shed on Solapur Division is open for only Bagged consignment.

Now, it has been decided to open Daund Goods Shed for loading of Malasses in tank wagons with immediate effect.

(Authority: CCM/C.Rly No. C/RB/205/TL-VII dt. 8.8.2011)(Authority: CCM/N.F Rly No. C/421/RCS/CR-7/Pt.II of date 28.9.2011)

74

Page 75: nwr.indianrailways.gov.innwr.indianrailways.gov.in/uploads/files/1350027498494-R…  · Web viewd. During the Journey, the passenger, whose identity card number has been indicated

(Authority: CCM/C.Rly No. C-543/1/2/C Rly Date: 06. 01.12)

_______________________________ GOODS (SORTRC) No. : 04 of 2012 from WESTERN RAILWAY

________________________________________________________________Sub:- Notification of Railway Electronic –in-motion weighbridge installed at

Nandurbar yard. Ref:- Board’s letter No. 99/TC-I/108/5 dtd 15/10/2001

CCM/W.Rly letter No. C.616/5/Vol.XVII/B of date 20/12/2011 is reproduced below:

The competent authority has approved the use of Railway Electronic –in-motion weighbridge installed at Nandurbar yard, for weighment with immediate effect.(Authority: CCM/W.Rly No. C.616/5 Vol. XVII/B of date 20/12/2011)(Authority: CCM/W.Rly No. 543/8/2/W. Rly Date: 06. 01.12)

________________________________ GOODS (SORTRC) No. : 05 of 2012 from CENTRAL RAILWAY

_________________________________________________________________1.Sub:- Permission to co-use private siding of M/s. Vimla Infrastructure India

Pvt. Ltd. served by Tadali by M/s. Nair Coal Services Ltd. as Liaisoning Agent on behalf of Gujarat State Electricity Corp.Ltd.

Ref:- 1) ARN No. 192 of 2011 (Goods) dt. 15.11.2011

Permission is granted to co-use private siding of M/s. Vimla Infrastructure India Pvt. Ltd. served by Tadali by M/s. Nair Coal Services Ltd. as Liaisoning Agent on behalt of Gujarat State Electricity Corpn. Ltd. for outward and inward traffic of Coal under priority ‘D’ for a period upto 14.06.2012.

This co-use is permitted subject to the following conditions.

a) Full rake handling capacity is available at the siding (PVIT)b) Existing traffic is not affected at the siding (PVIT)c) RR is issued on the basis of weighment.d) Environmental issues are taken care of.e) Loading of non programmed Coal under Priority ‘D’ will be done with the

permission of EDRM, Kolkatta. Division to keep record.f) All instructions in vogue for dealing of coal traffic should be followed by

Operating and Commercial branch of the division, any aberration /violation of the existing instruction observed by the division to be immediately brought to the notice of this office.This has the approval of CCM/COM(Authority: CCM/C.Rly No. C/698/M/1011 date 15/12/2011)

2. Sub:- Permission to co-use siding of M/s. PNP Maritime Services Ltd. (PPDP) Dharamtar Creek served by Pen on Mumbai Division.

Ref:- ARN No 196 of 2011 (Goods) dt. 18.11.2011

Permission is granted to co-use private siding of M/s. PNP Maritime

75

Page 76: nwr.indianrailways.gov.innwr.indianrailways.gov.in/uploads/files/1350027498494-R…  · Web viewd. During the Journey, the passenger, whose identity card number has been indicated

Services Ltd. (PPDP) served by Pen on Mumbai Division by the following customers for the outward and inward traffic mentioned against each of them on experimental basis upto 18.12.2012 or till in principal approval of General manager for conversion of siding into Brownfield PFT whichever is earlier, subject to the condition of payment of terminal charges at applicable rates on the traffic dealt by the co-users.

S.N Name of customer Inward traffic Outward traffic01 Gupta Coal (India) Limited Coal, Iron Ore, Mill Scale,

PET CokeMill Scale, non programmed coal under priority ‘D’

02 Bhatia Global Trading Limited

Coal, Iron Ore, Mill Scale, PET Coke

Mill Scale, non programmed coal under priority ‘D’

03 Coastal Energy Pvt. Ltd Coal, Iron Ore, Mill Scale, PET Coke.

Mill Scale, Non programmed coal under Priority ‘D’

04 Gandhar Coal & Mines Coal, Iron Ore, Mill Scale, PET Coke

Mill Scale, non programmed coal under Priority ‘D’

05 Agarwal Coal Corporation Private Limited

Coal, Iron Ore, Mill Scale, Pet Coke

Mill Scale, non programmed coal under Priority ‘D’

06 Rama Phosphates Ltd. Rock Phosphate Sulphur Rock Phosphate Sulphur

Loading of non programmed Coal under Priority ‘D’ will be done with the Permission of EDRM, Kolkatta. Division to keep record.

All instructions in vogue for dealing of coal traffic should be followed by Operating and Commercial branch of the division, any aberration /violation of the existing instruction observed by the division to be immediately brought to the notice of C.Rly office.

This has the approval of CCM & COM.(Authority: CCM/C.Rly No. C/698/M/990/Pt.I 19/12/2011)

3. Sub:- Extension of permission for handling BCN Rakes by M/s. Navkar Corporation Ltd. at PNCS Siding.

Ref:-i) ARN No 82 of 2011 (Goods) dated 26.4.2011 ii) ARN No. 159 of 2011 (Goods) dated 16.09.2011

Permission to handle bagged consignment in BCN rakes by M/s Navkar Corporation Ltd. at their siding (PNCS) served by Somtane on Mumbai Division is extended upto 15.09.2012 or till the operationalisation of the siding as Brownfield PFT whichever is earlier.

This has the approval of CCM & COM(Authority : CCM/C.Rly No. C.698/M/1013 date 20.12.2011)(Authority: CCM/N.W.Rly No. C-543/1/2/C Rly Date: 09. 01.12)

_______________________________ GOODS (SORTRC) No. : 06 of 2012 from SOUTH WESTERN RAILWAY

_________________________________________________________________

1.Sub:-Inter distance in two decimals of Anandapuram-Talguppa BG (converted from MG ) section on Mysore Division over South Western Railway.

76

Page 77: nwr.indianrailways.gov.innwr.indianrailways.gov.in/uploads/files/1350027498494-R…  · Web viewd. During the Journey, the passenger, whose identity card number has been indicated

The Chargeable inter distance (in Kms) in two decimals of Anandapuram-Talguppa BG (converted from MG) section on Mysore Division over South Western Railway is as under:

Station Anandapuram

Adderi Halt

Balegundi Halt

Sagar Jambaguru

Kanale Halt

Talguppa

Anandapuram 0.00Adderi Halt 10.75 0.00Balegundi Halt 16.07 5.32 0.00Sagar Jambagaru 26.37 15.62 10.30 0.00Kanale Halt 35.31 24.56 19.24 8.94 0.00Talguppa 41.70 30.95 25.63 15.33 6.39 0.00

(Authority: CCM/SW Rly No. C.297/LDT/JDT/2011 dated 27.7.2011 )(Authority: CCM/SE Rly No. RA.42/4/SWRly/Pt.I date 17.11.2011)

2. Sub:-Extension of Bellary Cantonment (BYC) station for handling Inward Goods Traffic.

Ref:- S.W Rly’s Comml. (Goods) No. 22 of 2011 dated 25.3.2011Please connect S.W Rly’s Commercial Circular (Goods) No.22 of 2011 dtd.

25.3.2011, wherein it was notifed that Bellary Cantonment (BYC) station of Hubli division on South Western Railway was opened for handling inward Goods traffic in trainloads except POL upto 07.09.2011. Now, the competent authority has approved for the extension of Bellary Cantonment (BYC) statiion for handling Inward Goods Traffic for a further period of (06) six months i.e from 08.09.2011 to 07.03.2012.

(Authority: CCM/SW Rly No. C.206/TL/11-12 Vol.VIII date 20.12.2011)(Authority: CCM/NWR No. C-543/15/2/SW Rly Date: 10. 01.12)

_______________________________ GOODS (SORTRC) No. : 07 of 2012 from NORTHERN RAILWAY

________________________________________________________________

Sub:-Opening of Tarn Taran Station for handling of inward Coal traffic.

CCM/N.Rly letter No. 1329-R/O & C/Part-XIII & N.Rly Rates circular (Opening & Closing) No. 33 of 2011 date 26.12.2011 is reproduced below:

The competent authority has accorded the administrative approval for Opening of Tarn Taran station on FZR division for handling of Inward Coal traffic. With effect from 26.12.2011.(Authority: CCM/N.Rly No. 1329-R/O & C/Part-XIII date 26.12.2011)(Authority: CCM/NW Rly No. . C-543/3/2/N Rly Date: 10. 01.12)

______________________________ GOODS (SORTRC) No. : 08 of 2012 from CENTRAL RAILWAY

________________________________________________________________

Sub:- Permission to co-use private siding of M/s. Vimla infrastructure India Pvt. Ltd. served by Tadali by M/s. Anshul Impex Pvt. Ltd., and M/s. Ultra Tech Cement Ltd.

77

Page 78: nwr.indianrailways.gov.innwr.indianrailways.gov.in/uploads/files/1350027498494-R…  · Web viewd. During the Journey, the passenger, whose identity card number has been indicated

Ref:- 1) ARN No. 192 of 2011 (Goods) dt. 15.11.2011 2) ARN No. 193 of 2011 (Goods) dt. 15.11.2011 3) ARN No. 194 of 2011 (Goods) dt. 16.11.2011 4) ARN No. 213 of 2011 (Goods) dt. 15.12.2011

Permission is granted to co-use private siding of M/s. Vimla Infrastructure India Pvt Ltd. served by Tadali on Nagpur Division by the following customers for the traffic mentioned against each of them on experimental basis upto 28.06.2012 or till the operationalisation of the siding as brownfield PFT whichever is earlier.

S.No. Name of Customer Traffic1 M/s. Anshul Impex Pvt Ltd Inward and outward traffic of non programmed

Coal, Reject Coal, wash Coal& Imported Coal under priority ‘D’

2 M/s. Ultra Tech. Cement Ltd. Only outward traffic of cement.

Loading of non programmed coal under Priority ‘D’ will be done with the permission of EDRM, Kolkatta, Division to keep record.

All instructions in vogue for dealing of coal traffic should be followed by operating and Commercial branch of the division, any aberration/violation of the existing instruction observed by the division to be immediately brought to the notice of C.Rly office.

This has the approval of CCM/COM.(Authority: CCM/C.Rly No.C/698/M/1011 date 29/12/2011)

(Authority: CCM/N.W Rly No. C-543/1/2/C Rly Date: 11. 01.12)

______________________________ GOODS (SORTRC) No. : 09 of 2012 from WESTERN RAILWAY

_________________________________________________________________

1.Sub:- W.Rly’s Station Code list section I/II (2003 Edition) Ref:- W.Rly’s office ARN No. 142 (Genl) of 2011 dt. 17/11/2011

Attention is invited to W.Rly’s ARN No. 142 (Genl) of 2011 dt. 17/11/2011 wherein M/s. KRIBHCO Infrastructure Ltd siding served by Kosad and Gothangaon was notifed with two alpha /numerical code.

Now competent authority has decided to retain only one Alpha Code and numerical code for M/s. KRIBHCO Infrastructure Ltd siding served by Kosad and Gothangaon as “MKIG” and 08224399.

The Alpha Code “MKIK” and Numerical Code “08224399” may be treated as cancelled.

(Authority: CCM/W.Rly No. C-543/1/25 date 03/1/2012)

2. Sub:- Permission for Co-Use of Kribhco Infrastructure Ltd. Siding at Hazira served by Kosad /Gothangam by M/s. Essar Steel Ltd.

Ref: i) W.Rly office ARN No. 43 (Goods) of 2011 dated 21.04.2011 ii) W.Rly office ARN No. 132 (Goods) of 2011 dated 21.10. 2011

78

Page 79: nwr.indianrailways.gov.innwr.indianrailways.gov.in/uploads/files/1350027498494-R…  · Web viewd. During the Journey, the passenger, whose identity card number has been indicated

CCM/W.Rly letter No. C.491/1/750 date 2/1/2012 is reproduced below: Consequent to the notification of separate siding of M/s. Kribhco Infrastructure

Ltd, the competent authority has permitted M/s. Essar Steel Ltd to co-use M/s. Kribhco Infrastructure Ltd’s siding (KRIL) instead of M/s. KRIBHCO’s siding for the period upto 20.04.2012.

In view of clarification received from Railway Board vide letter No. 2011/TC/FM/14/24 dated 08.11.2011, the Terminal Charges levied on traffic of M/s. Essar Steel Ltd as notified vide ARN No. 132 (Goods) of 2011 dated 21.10.2011 has been withdrawn with immediate effect.

All other terms and conditions stipulated in the siding agreement and instructions issued from time to time may strictly be adhered to.

This has the approval of CCM.(Authority: CCM/W.Rly No.C.491/1/750 date 2/1/2012) (Authority: CCM/NW Rly No. C-543/8/2/W Rly Date: 11. 01.12)

______________________________ GOODS (SORTRC) No. : 10 of 2012 from EAST CENTRAL RAILWAY

_________________________________________________________________

1. Sub:- Co-use permission of siding M/s. Khalari Cements Ltd. served by KLRE Railway station for Lanco Anpara (Anpara C) TPS siding over Dhanbad division.

CCM/E.C Rly letter No. C.ECR/CRM/FMS/0 –LCL –Khalari of date 09.12.2011 is reproduced below:The competent authority has accorded approval to permit M/s Lanco Anpara

(Anpara C) TPS siding to use the Khalari cements limited siding over DHN division as co-user temporarily.

Booking of non –programmed Coal by the Co-user is applicable on same terms & conditions as siding M/s. Khalari Cements Ltd. The following terms & conditions are reproduced below for its rigid compliance.

i) Suitable arrangement for coal loading exists or is provided for so as not to

effect existing traffic being handled as such sidings.ii) All coal rake loaded at such sidings can be weighed & RRs are issued on the

basis of such weighment reports.All other commercial formalities should be followedAll concerned to please note and act accordingly. The above instruction shall be

applicable with immediate effect.(Authority: CCM/E.C Rly No. ECR/CRM/FMS/0 LCL-Khalari dtd 09.12.2011)

2. Sub:- Co-user permission for siding KDH line no. II (Code KASN for Monnet Daniels Coal Washeries Pvt. Ltd.) over DHN division.

The competent authority has accorded approval to permit M/s. Monnet Daniels Coal Waheries Pvt. Ltd. to use the KDH line no.II siding over DHN division as co-user

79

Page 80: nwr.indianrailways.gov.innwr.indianrailways.gov.in/uploads/files/1350027498494-R…  · Web viewd. During the Journey, the passenger, whose identity card number has been indicated

for 6 month only.

Booking of non-programmed Coal by the Co-user is applicable on same terms & conditions as siding KDH line no.-II. The following terms & conditions are reproduced below for its rigid compliance:

i) Suitable arrangement for coal loading exists or is provided for so as not to effect existing traffic being handled as such sidings.

ii) All coal rake loaded at such sidings can be weighed & RRs are issued on the basis of such weighment reports.All other commercial formalities should be followed.

All concerned to please note and act accordingly. The above instruction shall be applicable with immediate effect.(Authority: CCM/EC Rly No. C.ECR/CRM/FMS/04/MDCWPL-Siding dtd 08.12.11)(Authority: CCM/NW Rly No. C-543/3/2/E.C Rly Date: 11. 01.12)

______________________________ GOODS (SORTRC) No. : 11 of 2012 from SOUTH EASTERN RAILWAY

_______________________________________________________________

1. Sub:- Amendment to Note No.2 below Clause (15) (e) of Rule 201 regarding ‘forfeiture of registration fee’ contained in chapter –II on Indian Railway conference Association, Goods Tariff No. 41, part-I (Volume-I).

Ref:- S.E Rly office circular letter No. OP.212/1 dt. 14.10.2011 (SL No. 152(G)/2011 dt. 14.10.2011)

The issue of notifying congested goods sheds in connection with the above subject has since been reviewed. As decided by the competent authority (GM), none of the Iron ore loading goods sheds under Chakradharpur division of S.E Railway is classified as ‘congested’ for the purpose for the period beyond 17.11.2011 for one month i.e commencing from 18.11.2011 to 17.12.2011. (Authority: CCM/SE Rly No. OP.212/1 date 24/11/11)

2. Sub:- Temporary opening lead line of M/s. Adhunik Alloys and Power Ltd. for Traffic served by Kandra Station.

Ref:- S.E Rly office Spl. Rates Circular letter no. RG.46/4335 Sl No. 96(G)/2010 Dt. 15.7.10 Sl No. 170(G)/2010 dt. 21.12.10 & 67 (G)/2011 dt. 23.5.2011 & Sl No.105 (G)/2011 dt. 20.7.2011, Sl.No.136(G)/2011 dt. 5.9.2011 Sl No.163 (G)/2011 dt. 04.11.2011

In continuation to S.E Rly office Spl. Rates Circular mentioned above it is notified for information and guidance of all concerned that the lead line of M/s Adhunik Alloys and Power Ltd. served by Kandra Station had been temporarily opened for booking of inward goods traffic in rake load only and extended upto 30/11/2011 as per circular under reference.

Now as per approval of the competent authority, the validity for

80

Page 81: nwr.indianrailways.gov.innwr.indianrailways.gov.in/uploads/files/1350027498494-R…  · Web viewd. During the Journey, the passenger, whose identity card number has been indicated

movement of the traffic in lead line of M/s. Adhunik Alloys & Power Ltd. Served by Kandra station is hereby , once again extended with immediate effect upto one month from the date of issuing of this letter or till issue of commercial notification of the siding for inward traffic whichever is earlier. All other terms and conditiion in the earlier letters will remain unaltered.

All staff concerned may please note and act accordingly.(Authority: CCM/SE Rly No. RG.46/4335 date 05.12.2011)(Authority: CCM/NWR No. C-543/7/2 S.E Rly Date: 13. 1.12)

______________________________ GOODS (SORTRC) No. : 12 of 2012 from SOUTH CENTRAL RAILWAY

________________________________________________________________

1.Sub:- Re-opening of Wangapalli station for handling goods traffic. Ref:- 1. Joint Commercial and Operating circular letter No. 302 of 2007.

2.Joint Commercial and Operating circular letter No. 52 of 2008. 3. Commercial circular letter No. 58 of 2011.

CCM/S.C. letter no. C.473/990/TL/98/Vol.VII/Pt. date 16.11.2011 is reproduced below:

With effect from 13.4.2011 Wangapalli station was closed vide Commercial Circular letter No. 58 of 2011 for handling all types of goods traffic both inward and outward.

Now, it has been decided by competent authority to re-open Wangapalli (WP) Station on Secunderabad division of South Central Railway for handling outward goods traffic for all commodities except POL, Steel, Coal and Crane Consignments and inward for all commodities except POL, Steel and Crane Consignments in trainloads with immediate effect.

(Authority : CCM/S.C Rly No.C.473/990/TL/98/Vol.VII/pt. date 16.11.2011)

Corrigendum 2. Sub:-Change of name of M/s. SJK Steel Plant Limited, siding served by

Challavaripalli to M/s. Kalyani Gerdau Steel Limited.

CCM/S.C.Rly No. C.490/GTL/SJK/CLPE/5 date 01.12.2011 is reproduced below:

While communicating change of name of M/s. SJK Steel Plant Limited, siding served by Challavaripalli vide Commercial circular no. 206 of 2011, the existing code was erroneously communicated as NGFS instead of SSCC.

Please note and act accordingly.(Authority: CCM/S.C Rly No. C.490/GTL/SJK/CLPE/5 date 01/12/2011)

3. Sub:- Change of name M/s. S.J.K Steel Plant Limited, siding served by Challavaripalli to M/s. Kalyani Gerdau Steel Limited.

M/s. S.J.K Steel Plant Limited siding served by Challavaripalli requested to change the name of the siding from M/s. S.J.K. Steel Plant Limited siding served by Challavaripalli to M/s. Kalyani Gerdau Steel Limied siding with the certification of the register of Companies Andhra Pradesh, Hyderabad.

81

Page 82: nwr.indianrailways.gov.innwr.indianrailways.gov.in/uploads/files/1350027498494-R…  · Web viewd. During the Journey, the passenger, whose identity card number has been indicated

Competent authority has approved the change of name from M/s S.J.K Steel Plant Limited, siding served by Challavaripalli to M/s. Kalyani Gerdau Steel Limited siding served by Challavaripalli with effect from 21.11.2011 (Twenty first November Two thousand eleven).

The present Alphabetical Code of the siding NGFS will continue till the new Alphabetical code of the siding is received from GS/IRCA/NDLS. (Authority: CCM/S.C Rly No, C.490/GTL/SJK/CLPE/5 date 21.11.2011)

4. Sub:- Notification of Permission for allowing M/s. Zuari Industries Limited Goa as a co-user of M/s. Coramandal International Limited at Kakinada Port.

On request of M/s. Zuari Industries Limited /Goa, permission of the competent authority is here by granted to M/s Zuari Industries Limited/Goa to use M/s. Coramandal International Limited siding at Kakinada Port as co-user for the purpose of loading 12000 (Twelver thousands only) MTS of NPK Complex Fertilizer (10-26-26) (SAMARTH BRAND) under the provision of clause 15 of siding Agreement.

Any freight, siding, shunting and all other charges due should be levied as per rules and instruction in force from time to time. This permission is valid from 22-11-2011 to 31-03-2012.

(Authority: CCM/SC Rly No. C.490/SCZ/BZA/39/III date 22-11-2011)

5. Sub:- Opening of Domestic Container Terminal Siding of M/s.CONCOR served by nagalapalle Station on Secunderabad Division of S.C.Rly.

CCM/S.C Rly No. C.490/Sdg/CONCOR/NPL/2010 date 06/12/2011 is reproduced below:

With immediate effect i.e from 06.12.2011 (Six Twelve Two Thousand Eleven ) Domestic Container Terminal Siding of M/s CONCOR served by nagalapalle Station on Secunderabad Division of South Central Railway is opened for handling both inward and outward domestic container traffic. The siding is not opened for charging freight on through distance basis since the siding is not electrified. Hence, the siding charges are to be levied as per rules.

The Alphabetical Code and numerical Code of the siding is as under:-

Siding Name Alpha Code Numerical Code Domestic Container Terminal Siding of M/s. CONCOR / Nagalapalle.

CMCN 09528538

(Authority: CCM/S.C Rly No. 490/Sdg./CONCOR/NPL/2010 date 06-12-11)(Authority: CCM/NW Rly No. C-543/9/2 S.C Rly Date: 13. 1.12)

_____________________________ GOODS (SORTRC) No. : 13 of 2012 from EAST COAST RAILWAY

________________________________________________________________

1. Sub:- Opening of Angul Station for inward & Outward goods traffic.

Vide E.Co. Rly office Commercial Circular No.120(G)/2011 dated 13.10.2011.

82

Page 83: nwr.indianrailways.gov.innwr.indianrailways.gov.in/uploads/files/1350027498494-R…  · Web viewd. During the Journey, the passenger, whose identity card number has been indicated

Angul station (Alpha Code-ANGL, Numerical Code 12121016 ) of Khurda Division over East Coast Railway was closed for inward & Outward Goods traffic w.e.f dated 13.10.2011.

Now, with approval of the competent authority, it has been decided to open Angul station (Alpha Code-ANGL,Numerical Code-12121016) of Khurda Road Division as a full rake handling point for inward & outward goods traffic except outward coal and POL with immediate effect.

All concerned to note and act accordingly.(Authority: CCM/E.Co. Rly No. CCM/353/THT/Pt.III date 01.11.2011)

2. Sub:- Opening of new private siding of Balaram Siding of M/s. MCL /Talcher.

It is notified for information and guidance of all concerned that Balaram Siding (Spur-9) of M/s. MCL served by Talcher over Khurda Road Division is here by opened as a full rake handling point for booking of outward Coal only in Train load /wagon load.

Alphabetical Code of the siding :BBMT Numerical code of the siding : 12121100The siding is notified on through distance basis and distance for charging to be

reckoned as Talcher plus 18.88 Km(Eighteen decimal eight eight Km ) (the distance as certified by DEN (Central)/KUR vide letter No. Engg./Drg/Pvt-Sid/Agt/594/Pt.-II/132 Dt. 24.08.2011)

Necessary shunting charges are required to be levied for any shunting operation performed in the siding.

All concerned to note and act accordingly.(Authority: CCM/E.Co. Rly No. CCM/FS/Sdg/Balagra/Pt.-I date 03.11.2011)

3. Sub:- Permission of handling Inward Alumina at Private siding of M/s Vedanta Aluminium Ltd (Alpha Code: MVAA, Numeric Code: 12221470 ) served by Ambodala Station of SBP Division.

Ref:- 1) CCM/E.Co. Rly’s Commercial Circular No.153(G)/2010 Dt. 13.10.2010.

2) CCM/EcoR’s Commercial circular NO. 58 (G)/2011 Dt. 31.05.2011

The lists of commodities for inward & outward traffic at the subject siding had been notified vide this office’s circulars under references.

With the approval of competent authority, it has been decided to allow Alumina as inward traffic in trainload/wagon load at the above siding in addition to the commodities as notified in the above circulars. Accordingly the commodities for inward & outward traffic at the subject siding are as follows:

Inward OutwardCoal, Caustic Soda, Fuel Oil, Bauxite and Alumina

Calcined Alumina

This instruction will come into force with immediate effect.Necessary shunting charges are required to be levied for any shunting operation

performed in the siding.

83

Page 84: nwr.indianrailways.gov.innwr.indianrailways.gov.in/uploads/files/1350027498494-R…  · Web viewd. During the Journey, the passenger, whose identity card number has been indicated

(Authority: CCM/E.Co. Rly No. CCM/FS/Sdg/Vedanta /AMB/Pt-I date 08.11.2011)

4. Sub:- Inward & Outward traffic at Private siding of M/s. Vedanta Aluminium Ltd (Alpha Code: MVAA, Numeric Code: 12221470) served by Ambodala Station for SBP Division.

Ref:- CCM/E.CoR’s Commercial Circular No. 126(G)/2011 Dt. 08.11.2011.

The list of commodities for inward & outward traffic at the subject siding was last notified vide CCM/E CoR’s Commercial circular under reference.

In supersession to the circular under reference, the siding is hereby notified open for all inward and outward traffic in Train Load/Wagon Load except outward Iron Ore & Outward coal.

This instruction will come into force with immediate effect. Necessary shuntng charges are required to be levied for any shunting

operation performed in the siding. This issues with the approval of competent authority. All concerned to note and act accordingly.

(Authority: CCM/E.Co. Rly No. CCM/FS/Sdg/Vedanta /AMB/Pt-I date 09.11.2011)(Authority: CCM/NW Rly No. C- 543/12/2 E.Co.Rly Date: 17.1.2012 )

______________________________ GOODS (SORTRC) No. : 14 of 2012 from INDIAN RAILWAY CONFERENCE

ASSOCIATION_______________________________________________________________

Sub:-Addition /Correction /Deletion in the Numerical Code list of Various Zonal Railways.

In reference to above, the following addition/correction/Deletion which is received from various Zonal Railways may please be incorporated /updated in the concern Railways station code list (coding & decoding section)Addition /Correction/Deletion;-

Name of Station /Siding /CBA Alpha Code

Numerical Code

Gauge Railway Remarks

CANDRABANDA HALT STN 09428565 BG S.C.R AdditionM/sPNP MARITIME SERVICE Ltd.At DHARAMTAR (CREEK) S/B PEN STATION

---- 01127233 BG CR Addition

CONTAINER TERMINAL SIDING OF M/s. CONCOR S/B NAGALAPALLE

... 09528538 BG S.C.R Addition

M/s. BENGAL ENERGY Ltd S/B BENAPUR

MBEB 07319163 BG S.E.R Addition

M/s. MY HOME INDUSTRIES LTD SDG. S/B MELLACHERUVU

….. 09528653 BG SCR Addition

BHILAI JAYPEE CEMENT LTD. SAKARIYA

…. 16223488 BG W.C.R Addition

CHHOTI PADOLI CPW 01727171 BG CR AdditionMATHNASHIPUR H.P MTIP 07119298 BG S.E.R Addition

84

Page 85: nwr.indianrailways.gov.innwr.indianrailways.gov.in/uploads/files/1350027498494-R…  · Web viewd. During the Journey, the passenger, whose identity card number has been indicated

(Authority:S&AO /NWR No. HQ/NWR/Stats/STN Code/NWR/2011-12 date 17.01.12)(Authority: CCM?NWR No. C-3/IRCA Vol IV Date: 25 .1.12)

______________________________ GOODS (SORTRC) No. : 15 of 2012 from SOUTH CENTRAL RAILWAY

_________________________________________________________________

1. Sub:- Closure of M/s. India Cements Limited Siding Served by Yerraguntla.

CCM/SC Rly No.C.490/GTL/ICL/YA/47 date 15.12.2011 is reproduced below:

With effect from 3rd JAN 2012 (Third January Two Thousand Twelve ) M/s India Cements Limited Siding Served by Yerraguntla station on Guntakal Division of South Central Railway is closed for all types of traffic.(Authority: CCM/S.C Rly No. C.490/GTL/ICL/YA/47 of date 15.12.2011)

2. Sub:- Closure of M/s. Penna Cements Industries Siding Served by Tadipathri.

CCM/SC Rly No. C.490/GTL/PCIL/TU/57 date 13.12.2011 is reproduced below:With effect from 9th Dec 2011 (Ninth December Two Thousand Eleven ) M/s.

Penna Cements Industries Siding Served by Tadipathri Station on Guntakal Division of South Central Railway is closed for all types of traffic.(Authority: CCM/S.C Rly No.C.490/GTL/PCIL/TU/57 date 13.12.2011)(Authority: CCM/NW Rly No. C-9/2/SC Rly Date: 30 .1.12 )

______________________________ GOODS (SORTRC) No. : 16 of 2012 from EAST COAST RAILWAY

______________________________________________________________

1. Sub :- Chgargeable distance for M/s Mahanadi Coalfields Limited’s siding served by Talcher over Khurda road Division.

Ref:- 1) SER’s Commercial Circular No. RG.46/261 dated 19.12.1962. 2) ECoR’s Provisional Notification No. CCM/Sdg/Notification /98/1 dated

06.06.2003. 3)ECoR’s Commercial Circular No.125(G)/2011(LrNo.CCM/FS /Sdg/Balaram

/Pt.-I dated 03.11.2011)

The Chargeable distances of various loading/unloading points of M/s. MCL siding /TLHR notified vide circulars under reference have been hereby superseded.

The chargeable distance for all the loading /unloading points of M/s. MCL’s siding served by Talcher to be reckoned on through distance basis as Talcher +19 Km (Nineteen Km).

Necessary shunting charges to be levied for any shunting operation performed in the siding as per extant rule.

These instructions will come into force with effect from 20.12.2011.(Authority: CCM/E.Co.Rly No. CCM/Sdg/MCL/TLHR/Pt.-1 date 19.12.2011)

85

Page 86: nwr.indianrailways.gov.innwr.indianrailways.gov.in/uploads/files/1350027498494-R…  · Web viewd. During the Journey, the passenger, whose identity card number has been indicated

2.Sub:- Issue of RR in the case of M/s. DPCL siding in ECOR.Ref:- Board’s letter No. 2009/TCFM/18/32 Dt. 20.09.2011 (CCM/ECoR’s Circular No. 106 (G)/2011 Dt. 21.09.2011)

Please refer to Board’s letter No. 2009/TCFM/18/32 Dt. 20.09.2011 (CCM/ECoR’s Circular No. 106 (G)/2011 Dt. 21.09.2011) vide which it has been decided that in the case of trafic originating /terminating from/to the M/s. DPCL siding in ECoR, RRs will be issued in the name of the consignor/consignee instead of the port authority. This instructions is valid upto 19.12.2011.

The matter has been examined and it has been decided to extend the validity of the afore-mentioned instruction regarding issue of RR upto 19.03.2012.

This is issued in consultation with Traffic Transportation & Planning Directorates and concurrence of Finance Directorate of the Ministry fo Railways.(Authority: CCM/E.Co.Rly No. CCM/FS/Sdg/DPCL/BHC/ Pt-II date 19.12.2011)

3. Sub:- Notification of Bobbilli (VBL) station as CRT for chasis stuffing /destuffing & loading /unloading operation.

Ref:- 1) CCM/E.CoR’s Commercial Circular No. 100(G)/2010 dtd 05.07.20102) CCM/ECoR’s Commercial Circular No. 111(G)/2011 dtd

27.09.2011.

Vide CCM/ECoR’s Commercial Circular under reference (1) notification of Railway Terminals as CRT for chasis stuffing /destuffing & loading /unloading were made for operation of container trains by Private Container Operators (PCO) and the validity of which has been extended upto 30.04.2012 vide E.Co. Rly’s various commercial circulars issued from time to time.

At para 3.0 of CCM/ECoR’s Commercial Circular under reference (1) the list of stations permitted for loading/unloading as well as chasis stuffing /destuffing operation of containers has been notified. Now, with the approval of competent authority Bobbilli station (VBL) of Waltair division is hereby added to the list of existing stations in Para 3.0 of the said circular and hence Bobbilli (VBL) is now open for loading /unloading operation of containers along with chasis stuffing /destuffing operation.

All other terms and conditions as well as rates notified by E.Co. Rly through Commercial Circulars related to containers will remain unchanged.(Authority: CCM/E.Co. Rly No. CCM/431/Container/Pt-I date 23.12.2011)

4.Sub:- Notification of Vizianagram (VZM) Goods Shed for outward booking of Timber Waste.

CCM/E.Co. Rly No. CCM/19/Goods opening /Pt. V of date 27.12.2011 is reproduced below:

Vide E.Co. Rly office commercial circular No. 159 (G)/2010 dated 11.11.2010, Vizianagram Alpha code –VZM, Numerical Code -12328622) station of Waltair Division over East Coast Railway has been notified as a full rake handling point for inward & Outward goods traffic for all commodities except Coal & Coke , POL,Minerals & Ores

86

Page 87: nwr.indianrailways.gov.innwr.indianrailways.gov.in/uploads/files/1350027498494-R…  · Web viewd. During the Journey, the passenger, whose identity card number has been indicated

and Loose consignments.In addition to the above, now with the approval of competent authority,

Vizianagram (Alpha Code –VZM, Numerical Code-12328622) station of Waltair Division is hereby opened for outward booking of Timber Waster with immediate effect.(Authority: CCM/E.Co. Rly No. CCM/19/Goods opening /Pto-V of date 27.12.2011)(Authority: CCM/NWR No. C- 543/12/2 E.Co.Rly Date: 30 .1.12 )

_______________________________ GOODS (SORTRC) No. : 17 of 2012 from CENTRAL RAILWAY

_________________________________________________________________

Sub:- Permission to co-use of private siding of M/s. Vimla Infrastructure India Pvt. Ltd. served by Tadali by M/s. Jaibharat Enterprises and M/s. Murli Industries Ltd.

Ref:- 1) ARN No. 192 of 2011 (Goods) dt. 15.11.20112) ARN No. 193 of 2011 (Goods) dt. 15.11.20113) ARN No. 194 of 2011 (Goods) dt. 16.11.20114) ARN No. 213 of 2011 (Goods) dt. 15.12.2011

5) ARN No. 217 of 2011 (Goods) dt. 29.12.2011 6) ARN No. 03 of 2012 (Goods) dt. 10/01/2012

Permission is granted to co-use private siding of M/s. Vimla Infrastructure India Pvt Ltd. served by Tadali on Nagpur Division by the following customers for the traffic mentioned against each of them upto 19.07.2012 or till the operationalisation of the siding as Brownfield PFt whichever is earlier.

Sr. No. Name of customer Traffic

1 M/s. Jaibharat Enterprises Inward and Outward traffic of non programmed Coal, Reject Coal, Wash Coal & Imported Coal under Priority ‘D’

2 M/s. Murli Industries Ltd. Outward traffic of cement Clinker, Inward traffic of Coal, Gypsum & Bausxite

Loading of non programmed Coal under Priority ‘D’ will be done with the permission of EDRM, Kolkatta. Division to Keep record.

All instructions in vogue for dealing of coal traffic should be followed by Operating and Commercial branch of the division, any aberration /violation of the existing instruction observed by the division to be immediately brought to the notice of this office.

This has the approval of CCM/COM.(Authority: CCM/C.Rly No. C/698/M/1011 date 20/01/2012)(Authority: CCM/NWR No. C-543/1/2/C Rly Date: 01. 02.12)

87

Page 88: nwr.indianrailways.gov.innwr.indianrailways.gov.in/uploads/files/1350027498494-R…  · Web viewd. During the Journey, the passenger, whose identity card number has been indicated

______________________________ GOODS (SORTRC) No. : 18 of 2012 from SOUTH WESTERN RAILWAY

________________________________________________________________

1. Sub:- Extension of Amritapura (AMC) Station for handling outward goods traffic.Ref:-S.W Rly’s office Commercial Circular (Goods) No. 104 of 2010 dtd 08.12.2010

Please connect S.W Rly’s office Commercial Circular (Goods) No. 104 of 2010 dtd. 08.12.2010, wherein it was notified that Amritapura (AMC ) station was opened for outward goods traffic of Maize consignment in trainload upto 07.12.2011 in addition to existing Iron ore traffic. Now , the competent authority has approved for the extension of Amritapura (AMC) station of Mysore Division over S.W Railway for handling outward goods traffic in trainloads on permanent basis to load bagged consignments including maize.(Authority: CCM/SW Rly No. C.206/TL/11-12 Vol.IX date 11.01.2012)

2. Sub:- Opening of Kolar Station for handling inward goods traffic.Ref:- CE/CN/Plg/BNC’s letter No. W.315/CN/BNC/Rails dt. 05.01.2012.

CCM/SW Rly’s letter No. C.206/TL/11-12 Vol.IX of date 11.01.2012 is reproduced below;

The competent Authority (COM) has approved for opening of Kolar station for handling inward RMC traffic only for a period of (03) three months with effect from 11.01.2012. (Authority: CCM/SW Rly’s No. C.206/TL/11-12Vol.IX date 11.01.2012)(Authority: CCM/NW Rly No. C-543/15/2/SW Rly Date: 01. 02.12)

______________________________ GOODS (SORTRC) No. : 19 of 2012 from NORTHERN RAILWAY

_______________________________________________________________

1.Sub:- Temporary permission of 6 months for using CCIL Siding /GZB by M/s Innovative B2B Logistics Solutions Ltd.

Ref:- CCM/Northern Rly’s Letter No. 100-R/General Circular /2011 dt. 11.09.11

The Competent authority has accorded temporary permission of 6 months to M/s. Innovative B2B Logistics Solutions Ltd. a category -1 Container Train Operator for handling and transportation of CBFS Commodity Siding GZB subject to fulfillment of all Commercial and Operational to CCIL formalities.

1. Railway Receipts will be issued in favour of M/s. Innovative B2B Logistics Solutions Ltd.

2. Innovative B2B Logistics Solutions Ltd., will carry traffic belonging to M/s CCIL Sidings, GZB only : no third party cargo will be permitted on CTO’s

88

Page 89: nwr.indianrailways.gov.innwr.indianrailways.gov.in/uploads/files/1350027498494-R…  · Web viewd. During the Journey, the passenger, whose identity card number has been indicated

train.3. For rail movement of traffic from and to siding, preference will be given to

the traffic in railway owned wagons over container trains.4. Innovative B2B Logistics Solutions Ltd. will be responsible for all the

payment liabilities such as haulage , stabling charges etc. in case of non-payment M/s. CCIL Sidings, GZB, shall pay the same to the railways.

5. Railway will not be responsible for any dispute between M/s Innovative B2B Logistics Solutions Ltd. and M/s CCIL Siding /GZB, for use of siding and for violation of the terms and conditions thereof. Final responsibility will be of M/s CCIL Siding /GZB . For any violation of agreement.

6. Railway reserves the right to withdraw the temporary permission at any time without serving any prior notice.

7. The Co-user permission is granted for loading of containers as per the provisions of Board’s policy guidelines and Memorandum of Concession Agreement (MCA) in order to avoid possibilities of overloading container rakes may be weighed either at loading point or enroute.

8. Permission for handling and transportation of CBFS product at M/s CCIL Siding /GZB in favour of M/s Innovative B2B Logistics Solutions Ltd shall be valid for a period of six months. Further extension may be granted on the basis of party’s request and performance in accordance with policy guidelines.

In case of violation of this provision, access to M/s CCIL Siding, GZB to M/s. Innovative B2B Logistics Solutions Ltd, will be cancelled and further movement from any private siding by M/s. Innovative B2B Logistics Solutions Ltd, will be restricted for one year.All commercial and operational formalities should be complied with for transportation and handling of this traffic.

2 Sub:- Corrigendum – Temporary permission of 6 months for using CCIL Siding /GZB by M/s Innovative B2B Logistics Solutions Ltd.Ref :- CCM/Northern Rly’s letter No. 100-R /General Circular /2011 dt. 16.11.11

Please refer to CCM/N.Rly’s notification Rates General Circular No. 54 of 2011 dt. 03.11.2011 M/s. Innovative B2B Logistics Solutions Pvt Ltd was mentioned as category –I Container Train Operator. This should be read as Category –IV Container Train Operator.

All other instruction shall be unchanged.All concerned to note and act accordingly.(Authority: CCM/SEC Rly No. C/SECR/BSP/N.Rly Rates Goods /Cir/4652 date 7/12/2011)

(Authority: CCM/NW Rly No. . C-543/3/2/N Rly Date: 03. 02.12)

_______________________________ GOODS (SORTRC) No. : 20 of 2012 from NORTH CENTRAL RAILWAY

________________________________________________________________

89

Page 90: nwr.indianrailways.gov.innwr.indianrailways.gov.in/uploads/files/1350027498494-R…  · Web viewd. During the Journey, the passenger, whose identity card number has been indicated

Sub: Opening of Malanpur (MLAR) station for Goods Traffic. Time Limit Extension

Ref:- N.C Rly/Rates Branch circular No. 39 of 2010 (Goods) , dated 29.10.10

In terms of the N.C Rly. /Rates Branch Circular No. 39 of 2010 (Goods), dated 29.10.10 the Malanpur (MLAR) station over Jhansi division of N.C Rly was opened for Outward & Inward traffic for a period of one year valid upto 28-10-11.

Now, the matter has been reviewed and it has been decided by Competent Authority that the aforesaid station will be opened on permanent basis beyond 28-10-2011.

All other details of the Circular under reference will continue to apply unchanged.

This has the approval of COM and CCM of N.C Railway.(Authority: CCM/N.C Rly No. 2004/Comml./M&R/242/FRH./Pt.-1 dated 03.10.2011)(Authority: CCM/NW Rly No. C-543/13/2/NC Rly Date: 03. 02.12 )

_______________________________ GOODS (SORTRC) No. : 21 of 2012 from SOUTH EAST CENTRAL RAILWAY

________________________________________________________________

1. Sub:- Extension of permission for outward booking of non-programmed Coal from goods sheds/sidings.Ref:- SEC Rly R.C No. 111 (G)/2009 dt. 29.06.09

Reference is invited to SEC Railway Rates Circular cited above, wherein Uslapur goods shed was notifed for loading on non-programmed coal with handling capacity of 10 rakes per month.

With the approval of competent authority, the handling capacity of Uslapur goods shed is enhanced upto 30 rakes per month.

All other terms and conditions notified time to time will remain unaltered. All concerned to please note and act accordingly.(Authority: CCM/SEC Rly No.C/SECR/BSP/BKG/Coal/Pt.I /3458 dated 28.09.2009)

2. Sub:- Temporary Suspension of Goods Shed at Akaltara for a period of 04(four) months w.e.f 21.11.2011.

CCM/SEC Rly No. C/SECR/BSP/GS/Pt.II /4211 & Rates circular No. 130 (G)/2011 of date 16/11/2011 is reproduced below:

With the approval of competent authority Akaltara Goods shed falling in between Bilaspur –Champa section under Bilaspur Division will be temporary suspended for both inward and outward traffic for a period of 04 (four) months w.e.f 21.11.2011 for consturction of Road Over Bridge at Akaltara at Km.690 /34-691/2.(Authority: CCM/SEC Rly No. C/SECR/BSP/GS/Pt.II /4211 date 16/11/2011)(Authority: CCM/NW Rly No. C-543/14/2/SEC Rly Date: 06. 02.12 )

_______________________________

90

Page 91: nwr.indianrailways.gov.innwr.indianrailways.gov.in/uploads/files/1350027498494-R…  · Web viewd. During the Journey, the passenger, whose identity card number has been indicated

GOODS (SORTRC) No. : 22 of 2012 from EASTERN RAILWAY_________________________________________________________________

Sub:- Opening of Tarakeswar Station as Container Rail Terminal (CRT) under HWH Division.

CCM/E.Rly letter No. C.424/M&S/Cont. Trans (4 ) dated 22.08.2011 circulated by CCMSEC Rly No C/SECR /BSP/S.W Rly & E.Rly /Rates Goods /Cir /3421 & Rates Circular No. 112(G) /2011 of date 27/09/2011 is reproduced below ;

With immediate effect Tarakeswar(TAK) Station of Howrah Division is opened as Container Rail Terminal (CRT) for dealing Container traffic.

After inclusion of Tarakeswar Station the updated list of CRT under E. Railway is as under:

List of CRT over E.RlyName of CRT Division Name of CRT Division 1.CossipurRoad(CED),LineNo. 1& 2 Sealdah 11. Bandel (BDC) Howrah2. Tarakeswar (TAK) Howrah 12.Serampore (SRP) Howrah3.Chitpur (CP) Sealdah 13. Magra (MUG) Howrah 4. Sainthia (SNT) Howrah 14. Talit (TIT) Howrah5. Dankuni (DKAE) Sealdah 15. Bangoan (BNJ) Sealdah6.Budge Budge (BGB) Line No. 7 & NSS for molasses only

Sealdah ` 16. Barasat (BT) Sealdah

7. Raniganj (RNJ) Asansol 17.Cossimbazar (CSZ) Sealdah8. Durgapur (DGR) Asansol 18. Krishnanagar (KNJ) Sealdah 9.Asansol (ASN) Asansol 19. Behrampore court (BPC) Sealdah10. Malda Town (MLDT) Malda 20. Court Malda (GZM) Malda

The Container Rail Terminal mentioned under Item No. 3 to 20 has been permitted only for chassis stuffing and destuffing.(Authority: CCM/SEC Rly No.C/SECR/BSP/S.WRly&E.Rly /R.G /Cir/3421 dt 27/9/11) (Authority: CCM/NW Rly No. C-543/2/2/E Rly Date: 06. 02.12)

________________________________ GOODS (SORTRC) No. : 23 of 2012 from EAST CENTRAL RAILWAY

_________________________________________________________________

Sub:- Opening of Janakpur Road Station for inward Goods traffic.

CCM/ECR/CRM/FMS/2/SPJ Div.of date 17.10.11 circulated by CCM/SC Rly letter No. 473/990/TL/OR/03/Vol. XVII of date 5-12-2011 is reproduced below:

The competent authority has accorded approval for opening of Janakpur Road

station for dealing with inward goods traffic with full rake handling capacity for a further period of six months on experimental basis with immediate effect.(Authority: CCM/SC Rly No.473/990/TL/OR/03/Vol.XVII dt 05/12/11) (Authority: CCM/E.C Rly No. 543/3/2/E.C Rly Date: 07. 02.12 )

______________________________ GOODS (SORTRC) No. : 24 of 2012 from WEST CENTRAL RAILWAY

_________________________________________________________________

91

Page 92: nwr.indianrailways.gov.innwr.indianrailways.gov.in/uploads/files/1350027498494-R…  · Web viewd. During the Journey, the passenger, whose identity card number has been indicated

Sub:- Opening of Kaima station for goods traffic over Jabalpur Division on West Central Railway.

CCM/W.C Rly letter No. 423/Opening station dt. 21.10.2011 circulated by CCM/S.C Rly No.473/990/TL/OR/03/Vol.XVII of date 5-12-2011 is reproduced below:

Kaima station over Jabalpur division on West Central Railway is opened for goods traffic with immediate effect.

Station Alpha Code

Numerical code

Rake capacity

Traffic Description Remarks

Kaima KMA 16223377 Full Rake Outward Bagged /Loose consignment

For a period of six months working hours will remain round the clock

(Authority: CCM/SC Rly No. 473/990/TL/OR/03/Vol.XVII of date 5-12-2011 ) (Authority: CCMWC Rly No. 543/5/2/W.C Rly Date: 07. 02.12 )

________________________________ GOODS (SORTRC) No. : 25 of 2012 from CENTRAL RAILWAY

_________________________________________________________________

Sub:- Updated list of full rake /half rake goods shed/sidings two point combinations (Originating ) for outward loading in Jumbo /Coal in BOX ‘N’ wagons and two point combination (Destination ) for Inward Jumbo over Central Railway.Ref:- C.Rly’s ARN No. 253 of 2009 (Goods) dt. 25.11.2009 and amendments thereto.

In supersession of ARN No. 253 of 2009 (Goods) dt. 25.11.2009, the updated list of full rake/half rake goods shed /sidings, two point combinations (Originating ) for outward loading in Jumbo rakes, Coal in BOX ‘N’ wagons and two point combination (Destination) for inward Jumbo over Central Railway is enclosed herewith for information and necessary action.(Authority: CCM/C.Rly No. C/RB/205/TL-VIII date 16/1/2012)(Authority: CCM/NW Rly No. C-498/G Vol.III Date: 09. 02.12)

DA/- As above (7 pages) RAKE LIST OF FREIGHT TERMINALS ON CENTRAL RAILWAY

A) List of full rake Goods shed

Sr. No.

Divn. Name of Terminals Remarks

1 BB Kalamboli KLMG All except POL /Coal/Cement 2 BB Kalyan KYN All except POL/Out ward Coal3 BB Nagothane NGTN All except POL4 BB New Mulund NGSM Bagged consignment & bamboo5 BB Pen PEN All except POL/Coal6 BB Roha ROHA All except POL/Inward Coal7 BB Taloja

PanchanandTPND All except POL/Coal

92

Page 93: nwr.indianrailways.gov.innwr.indianrailways.gov.in/uploads/files/1350027498494-R…  · Web viewd. During the Journey, the passenger, whose identity card number has been indicated

8 BB Turbhe TAPG Bagged & packed consignment only9 BB Wadi Bunder WB Bagged & Pakced consignment only10 BSL Akola AK All except POL/Coal11 BSL Badnera BD All except POL/Coal12 BSL Borgaon BGN All except POL/Coal13 BSL Dhule DHI All except POL/Coal14 BSL Jalgaon JL All except POL/Coal15 BSL Khamgaon KMN All except POL/Coal16 BSL Khandwa KNW All except POL/Coal17 BSL Kherwadi KW Bagged consignment only18 BSL Lasalgaon LS All except POL/Coal19 BSL Malkapur MKU All except POL/Coal20 BSL Manmad MMR Bagged Consignment only21 BSL Nandgaon NGN All except POL/Coal22 BSL Nasik Road NK All except POL/Coal23 BSL Paras PS Bagged Consignment only24 BSL Raver RV All except POL/Coal25 BSL Savda SAV All except POL/Coal26 NGP Ballarshah BPQ All except POL/ Outward Coal27 NGP Betul BZU All except POL/Coal28 NGP Butibori BTBR All except POL/ Outward Coal29 NGP Chandrapur CD All except POL/Coal/Loose Commodity30 NGP Chikni Road CKNI All except POL/Inward coal31 NGP Dhamangaon DMN All except POL/Coal32 NGP Ghugus GGS O/w Coal only33 NGP Hinganghat HGT All except POL /Coal34 NGP Kalmeshwar KSWR All except POL /Coal /Loose commodity35 NGP Kayar KAYR All except POL/Coal36 NGP Khapri KRI POL Tfc only37 NGP Nagpur NGP All except POL/Coal38 NGP Pimpalkutti PMKT All except POL/Coal39 NGP Pulgaon PLO All except POL/Coal40 NGP Rajur RAJR Coal tfc only

Sr. No.

Divn. Name of Terminals Remarks

41 NGP Tadali TAE All except POL42 NGP Wani WANI Only O/W All except POL43 NGP Wardha WR All except POL/Coal44 PUNE Baramati BRMT All except POL/Coal45 PUNE Jejuri JJR All except POL /out ward coal46 PUNE Gudmarket GRMT All except POL/Coal47 PUNE Karad KRD All except POL/Coal48 PUNE Khadki KK All except POL/Coal/Food grain49 PUNE Lonand LNN All except POL/Outward Coal50 PUNE Loni LONI Only I/W Cement /Iron-Steel/Fertilizer51 PUNE Miraj MRJ All except Outward Coal52 PUNE Pune PUNE Only Bagged consignment except

Salt & Food grain53 PUNE Sangli SLI All except POL/Coal54 PUNE Sasvad Road SSV Bagged consignment only55 PUNE Satara STR All except POL/Coal

93

Page 94: nwr.indianrailways.gov.innwr.indianrailways.gov.in/uploads/files/1350027498494-R…  · Web viewd. During the Journey, the passenger, whose identity card number has been indicated

56 SUR Ahmednagar ANG All except POL/Coal57 SUR Barsi Town BTW Bagged consignment only58 SUR Belapur BAP All except POL/Coal59 SUR Bhigvan BGVN All except POL/ Outward Coal60 SUR Daund DD All except POL/Coal61 SUR Gulbarga GR All except POL/Coal62 SUR Kavathe

MahankalKVK Bagged consignment only

63 SUR Kopergaon KPG Bagged consignment(HalfRakeG/Sfor\ I/W Coal & Loose Commodities)

64 SUR Kuruduwadi KWV All except POL/Coal65 SUR Latur LUR All except POL/Outward Coal66 SUR Osmanabad UMD All except POL/Coal67 SUR Pandharpur PVR All except POL/Coal68 SUR Rahuri RRI All except POL/Coal69 SUR Solapur SUR All except POL/Coal70 SUR Wadi WADI All except POL/Outward Coal71 SUR Yeola YL All except POL/Outward Coal

Mumbai Port Trust RailwayMBPT Mumbai Port Trust

Railway BPTG/BPTV All traffic of

Mumbai Port

B) List of Half rake Goods shed

1 BSL Burhanpur BAU Bagged consignment only2 BSL Bhusawal BSGS All except POL/Coal3 BSL Chalisgaon CSN All except POL/Coal4 BSL Niphad NR All except POL/Coal5 BSL Pachora PC All except POL/Coal6 NGP Multai MTY All except POL/Coal7 NGP Pandurna PAR All except POL/Coal8 NGP Parasia PUX All except POL/Coal9 NGP Godhani GNQ All except POL/Inward Coal10 NGP Hirdagarh HRG Only O/W Coal11 PUNE Cinchwad CCH Only automobile traffic

C) List of Full rake sidings

Sr. No.

Divn. Name of Terminals Remarks

1 BB Adani Agro logistics Ltd., Taloja

PATP Food grain traffic

2 BB BCC Sdg , Kalamboli

BCCK Cement traffic

3 BB BPCL Sdg, Trombay

BRSG POL & LPG tfc only

4 BB BPCL Sdg,Uran MBPP LPG tfc only5 BB CONCOR Depot

Sdg., New MulundCRNM Container Tfc.Export traffic

consigned to CONCOR in Rly wagons (except POL/ Coal/ Loose Commodities)

6 BB CONCOR Sdg. CRTK Container Tfc.I/W Jumbo Tfc.

94

Page 95: nwr.indianrailways.gov.innwr.indianrailways.gov.in/uploads/files/1350027498494-R…  · Web viewd. During the Journey, the passenger, whose identity card number has been indicated

Turbhe7 BB Dronagiri Rail

Terminal DRTA Container Tfc. EXIM Traffic of

CONCOR in Rly. Wagons (except POL/Coal/Loose Commodities ) both I/W and O/W

8 BB FCI sdg, Kalamboli

KFCG FCI traffic

9 BB HPCL Sdg, Trombay

VOSG POL tfc only

10 BB Hind Terminal Pvt Ltd.sdg

HTSD Container traffic. Export Traffic (except POL/Coal / LooseCommodities) consinged to HTPL in Railway wagons

11 BB Innovative B2B Logistics Sdg

MILK Container traffic Export Traffic (except POL/Coal /Loose Commodities ) consigned to B2B in Railway wagons

12 BB IOC Sdg, Jasai MIOJ POL tfc only13 BB Jawahar Lal Nehru

Port JNPT Container Tfc only

14 BB NRC Sdg Kalyan NRSG Loose commodities only15 BB RCF SDG,Thal TVSG Fertilizer & POL16 BB RCF Sdg,Trombay FZSG Fertilizer, POL & Loose commodities 17 BB SAIL Sdg,

Kalamboli KSAG I/Steel Tfc

18 BB Tata TPS Sdg, Trombay

TTPS Coal & POL

19 BB TISCO Sdg, Kalamboli

KTIG All except POL/coal

20 BB Vikram Ispat Sdg, Roha

VIR Loose commodities only

21 BB Vishakhapatnam Steel Project, Kalamboli

VSPG I/Steel Tfc.

22 BB Navkar Corporation Ltd, Somtane

PNCS Container Tfc.

23 BB Cotton Corporation of India

CCI All except POL, Coal and Loose commodities.

24 BB PNP Maritime Services Pvt. Ltd.

PPDP All except POL

25 BSL BPCL Sdg, Panewadi

BPCP POL Tfc only

26 BSL CONCOR Sdg Bhusawal

ICBD Container Tfc only

27 BSL CWC Sdg Khandwa

CWHS Food grain tfc

28 BSL FCI sdg, Manmad GDSG FCI Traffic 29 BSL IOC Sdg Shirud IOC POL Tfc only30 BSL MSEB Sdg

Bhusawal MFSG Coal & POL

31 BSL MSEB Sdg Nasik MQSG Coal & POL32 BSL MSEB Sdg Paras BESG Coal & POL33 BSL Orient Cement

Sdg. Bhadli OCSB Loose commodities & Cement

34 BSL Paper Mill sdg, Nepanagar

NMSG All except POL

95

Page 96: nwr.indianrailways.gov.innwr.indianrailways.gov.in/uploads/files/1350027498494-R…  · Web viewd. During the Journey, the passenger, whose identity card number has been indicated

35 BSL POL sdg, Gaigaon POLG POL Tfc only36 BSL RPD Mily Sdg,

Bhusawal BZSG Military Traffic

37 SUR ACC Sdg Wadi WDSG Loose commodities & Cement 38 SUR Birla super

Cement Sdg. Hotgi

MBSH Loose commodities & Cement

39 SUR Jawar Cement Sdg, Shahabad

SDSG I/W-Coal, O/W –Cement only

40 SUR POL Sdg, Hirenandur

HPSG POL Tfc only

41 SUR POL Sdg, Akolner PSIA POL Tfc only42 SUR POL sdg, Pakni PIOP POL Tfc only 43 PUNE CONCOR sdg

Chinchwad CRCC Container Tfc only

44 PUNE CONCOR sdg Miraj

CRMM Container Tfc only

45 PUNE CWC Sdg Miraj CWHC Food grain traffic 46 PUNE HPCL Sdg Loni HPLG POL Tfc only47 PUNE HPCL Sdg,

Bhilwadi HPLC POL & LPG Only

48 PUNE Military Sdg Khadki

KASG Military Traffic

49 PUNE Rama Krishi Rasayani sdg Loni

KRYL Loose Commodities

50 NGP ACC Sdg Ghugus CESG I/W Clinker, Coal, Gypsum O/W Cement, Clinker

51 NGP AF Sdg Amla AMSG Military Traffic52 NGP Ballarpur Colliery

Sdg Ballarshah MBCB Only O/W Coal

53 NGP BPCL Sdg, Borkhedi

BROL POL Tfc only

54 NGP Chargaon sdg Majri

CGM Only O/W Coal

55 NGP Colliery Sdg (New), Majri

MJSG Only O/W Coal

56 NGP CONCOR Sdg Ajni

ACDA Container Tfc only

57 NGP FCI sdg Ajni FNSG FCI traffic 58 NGP FCI sdg Sevagram FBSG FCI traffic 59 NGP Karnataka Emta

Coal Mines Majri KECM Only O/W Coal

60 NGP Kartikeya coal washeries

Sdg.

MKCW Coal Traffic only

61 NGP LSI sdg Wardha MLSW Commodities as per PFT Policy62 NGP Wardha Power

Co., Warora PWCL I/W Coal traffic

63 NGP Vimla Infrastructure Sdg. Tadali

PVIT All except POL

64 NGP MEL sdg Chandrapur

MELG Loose commodities

65 NGP Military Sdg Bhandak

FFSG Military traffic

96

Page 97: nwr.indianrailways.gov.innwr.indianrailways.gov.in/uploads/files/1350027498494-R…  · Web viewd. During the Journey, the passenger, whose identity card number has been indicated

66 NGP Military Sdg Pulgaon

POSG Military traffic

67 NGP MPEB SDG, Sarni MPBG Coal & POL68 NGP MSEB sdg,

Chandrapur NTPG Coal & POL

69 NGP POL Sdg, Tadali IOBT Pol Tfc only70 NGP Rajur Colliery sdg

RajurRJSG Only O/W Coal

71 NGP Umred Colliery sdg Butibori

UMSG Only O/W coal

72 NGP Ghugus colliery sdg (Old)

GSG Only O/W Coal

D) List of Half Rake sidings

1 BB Concrete India sdg, Lonavla LNL I/W Cement & O/W Sleeper Traffic

2 NGP Colliery Sdg (Old) , Majri MNSG Only O/W Coal 3 NGP EDC Sdg Parasia DCSG Only O/W Coal 4 NGP Hindustan Lalpeth sdg Babupeth HLSG Only O/W Coal 5 NGP LPG sdg Khapri LPSG LPG tfc only 6 NGP Nandan washery sdg Hirdagarh HNWG Only O/W Coal 7 NGP Mohan colliery Sdg, Palachouri CSID Only O/W Coal 8 NGP Rawanwara BG sdg Parasia RKSG Only O/ W coal 9 NGP Chanda Rayatwari sdg

Chandrapur RCXG Only O/W Coal

E). List of Two Point Combination (Originating ) for Outward Loading in Jumbo

SN Terminal -1 Terminal -21 AK Akola BD Badnera 2 AK Akola BGN Borgaon3 AK Akola MKU Malkapur4 AK Akola BSGS Bhusawal5 BD Badnera MKU Malkapur 6 BD Badnera HGT Hinganghat 7 BSGS Bhusawal Jl Jalgaon 8 BSGS Bhusawal MKU Malkapur 9 BSGS Bhusawal PC Pachora 10 BZU Betul MTY Multai11 BZU Betul PUX Parasia 12 BAU Burhanpur KNW Khandwa13 CSN Chalisagaon DHI Dhule 14 GRMT Gudmarket MRJ Miraj15 GRMT Gudmarket SLI Sangli16 HGT Hinganghat NGP Nagpur 17 HGT Hinganghat WR Wardha18 JL Jalgaon PC Pachora19 KMN Khamgaon MKU Malkapur20 KNW Khandwa RV Raver21 KRD Karad STR Satara22 KW Kherwadi LS Lasalgaon23 KW Kherwadi MMR Manmad24 KW Kherwadi NK Nasik

97

Page 98: nwr.indianrailways.gov.innwr.indianrailways.gov.in/uploads/files/1350027498494-R…  · Web viewd. During the Journey, the passenger, whose identity card number has been indicated

25 KW Kherwadi NR Niphad26 KPG Kopergaon MMR Manmad27 KPG Kopergaon RRI Rahuri28 LS Lasalgaon NGN Nandgaon29 LS Lasalgaon NR Niphad30 LS Lasalgaon YL Yeola31 LS Lasalgaon MMR Manmad32 MMR Manmad NGN Nandgaon33 MMR Manmad NK Nasik Road34 MMR Manmad NR Niphad35 MMR Manmad RRI Rahuri36 MMR Manmad YL Yeola37 NGN Nandgaon NK Nasik Road38 NGN Nandgaon NR Niphad39 NGN Nandgaon YL Yeola40 NR Niphad YL Yeola41 GRMT Gudmarket KRD Karad42 SLI Sangli KRD Karad

F) List of Two Point Combinations (Originating ) for Ldg coal in BOX N wagons

SN TERMINAL-1 TERMINAL -21 HLSG Babupeth HLC sdg RCXG Chanda Rayatwari sdg2 HRG Darnua Sdg Hirdagarh HNWG Nandan Washery sdg3 HRG Darnua Sdg Hirdagarh CSID JNO Palachori Sdg4 CSID JNO Palachori Sdg DCSG Parasia EDC sdg5 CSID JNO Palachori Sdg RKSG Parasia BG sdg6 RKSG Parasia BG sdg DCSG Parasia EDC sdg7 WANI Wani Good shed RAJR Rajur Goodshed

G) List of Two Point Combinations (Destination) for Inward Jumbo

SN TERMINAL-1 TERMINAL -21 AK Akola BD Badnera2 AK Akola KMN Khamgaon3 AK Akola MKU Malkapur 4 ANG Ahmednagar BAP Belapur 5 BD Badnera WR Wardha 6 BD Badnera DMN Dhamangaon7 BGVN Bhigwan KWV Kurdwadi 8 BGVN Bhigwan DD Daund9 BZU Betul MTY Multai 10 BZU Betul ET Itarsi (WCR)11 CSN Chalisgaon DHI Dhule12 CSN Chalisgaon PC Pachora 13 BAP Belapur KPG Kopergaon 14 DMN Dhamangaon WR Wardha 15 DMN Dhamangaon PLO Pulgaon 16 JL Jalgaon PC Pachora17 KWV Kurdwadi PVR Pandhapur 18 STR Satara SLI Sangli19 KRD Karad MRJ Miraj20 LNN Lonand STR Satara21 LNN Lonand SSV Sasvad

98

Page 99: nwr.indianrailways.gov.innwr.indianrailways.gov.in/uploads/files/1350027498494-R…  · Web viewd. During the Journey, the passenger, whose identity card number has been indicated

22 MKU Malkapur KMN Khamgaon 23 MRJ Miraj SLI Sanglli 24 MTY Multai PAR Pandurna25 NK Nasik NGN Nandgaon

H) Two –Point combination for Inward Steel traffic : NIL

______________________________ GOODS (SORTRC) No. : 26 of 2012 from CENTRAL RAILWAY

_________________________________________________________________

Sub:- Permission to co-use private siding of M/s. Vimla Insfrastructure India Pvt. Ltd., served by Tadali by M/s. Gupta Energy (p) Ltd.,

Ref:- 1) ARN No. 192 of 2011 (Goods) dt. 15.11.2011 2) ARN No. 193 of 2011 (Goods) dt. 15.11.2011

3) ARN No. 194 of 2011 (Goods) dt. 16.11.2011 4) ARN No. 213 of 2011 (Goods) dt. 15.12.2011 5) ARN No. 217 of 2011 (Goods) dt. 29.12.2011

Permission is granted to co-use private siding of M/s. Vimla Insfrastructure India Pvt. Ltd, served by Tadali an Nagpur Division by M/s. Gupta Engergy (P) Ltd for inward traffic of coal, for a period of six months upto 09.07.2012 or till the operationalisation of the siding as Brownfield PFT whichever is earlier.

This has the approval of CCM/COM.(Authority: CCM/C.Rly No. C/698/M/1011 of date 10/01/2011)(Authority: CCM/NW Rly No. 543/1/2 C.Rly Date: 15. 02.12 )

_______________________________ GOODS (SORTRC) No. : 27 of 2012 from SOUTH WESTERN RAILWAY

____________________________________________________________

Sub:-Opening of Dodballapur (DBU) station for handling of inward coal traffic.

CCM/SW Rly letter No. C.206/TL/11-12 Vol.IX of date 25.01.2012 is reproduced below:

The competent Authority (COM) has approved for opening of Dodballapur (DBU) station on DMM-YNK section of Bangalore Division over S.W Railway for handling inward coal traffic with immediate effect.(Authority: CCM/SW Rly No. C.206/TL/11-12 Vol.IX date 25.01.2012)(Authority: CCM/NW Rly No. C-543/15/2 SW.Rly Date: 16. 02.12 )

_______________________________ GOODS (SORTRC) No. : 28 of 2012 from NORTHERN RAILWAY

_________________________________________________________________

Sub:- Updated /Fresh list of stations /sidings capable for handling full block rake and half rake of (BG) goods traffic on Northern Railway.

Ref:- Northern Railway Rates Opening /Closing circular No. 12 of 2010 dt.

99

Page 100: nwr.indianrailways.gov.innwr.indianrailways.gov.in/uploads/files/1350027498494-R…  · Web viewd. During the Journey, the passenger, whose identity card number has been indicated

23.6.2010.

The competent authority has accorded administrative approval for Gurgaon station on Delhi division is declared as full rake handling station as per rake handling list. But after construction of Road over Bridge/Gurgaon station is now only capable to handle half rake in one placement. Hence Gurgaon station is open for half rake handling station instead of full rake handling station.(Authority:CCM/N.Rly No. 1329-R/O& C/2012 date 6.2.12)(Authority: CCM/NWR No. C-543/3/2 N.Rly Date: 16. 02.12 )

________________________________ GOODS (SORTRC) No. : 29 of 2012 from WEST CENTRAL RAILWAY

_________________________________________________________________

Sub:- Opening of Bina Refinery Plant Siding, served by Mahadeokhedi station of BPL Division.

CCM/WC Rly letter No. WCR/HQ/Comml./Goods 474A/BPCL/BORL of date 31.01.2012. is reproduced below:

Private Siding owned by Bharat Petroleum Corporation Limited, served by Mahadeokhedi station of BPL Division (WCR), is hereby notified opened with immediate effect. Delhi are as under;

Full Name of the siding Bina Refinery Plant SidingServing Station Mahadeokhedi (MDVK)Division BhopalAlpha Code BRSMNumerical Code 16123472Traffic to be handled O/W- Pet Coke, I/W- Coal, Lime StoneDistance of siding from Centre line of Mahadeokhedi station up to the buffer end of the Siding

6.465 KM

The traffic booked to/from the siding in full rake loads will be charged on “through distance basis”.

Siding will work on round the clock basis.BRSM Siding will be co-used by Bharat Oman Refineries Limited .Sr.DCM/BPL to ensure signing of siding agreement with siding owner, at the earliest.These instructions will be enforced with immediate effect.

(Authority: CCM/WC Rly No. WCR/HQ/Comml/Goods 474 A/BPCL/BORLdate 31.01.12)(Authority: CCM/NWR No. C-543/16/2 WC Rly Date:21 02.12 )

_______________________________ GOODS (SORTRC) No. : 30 of 2012 from NORTHEAST FRONTIER RAILWAY

_________________________________________________________________

1. Sub:- Opening of New Alipurduar (NOQ) Station for outward booking of all Goods traffic.

100

Page 101: nwr.indianrailways.gov.innwr.indianrailways.gov.in/uploads/files/1350027498494-R…  · Web viewd. During the Journey, the passenger, whose identity card number has been indicated

CCM/N.F Rly letter No. C/407/RD-109/Pt. XII/APDJ of date 22.11.2011 is reproduced below:

With immediate effect new Alipurduar (NOQ) station under APDJ Division is open for outward booking of all goods traffic except Coal, POL, Live Stock, Explosive and Crane consignments. All concern to please note and act accordingly.(Authority: CCM/N.F Rly No. C/407/RD-109/Pt. XII/APDJ date 22.11.2011)

2. Sub:- Opening of Bamunigaon (BMGN) BG Station for outward booking of All Goods traffic.

CCM/N.F Rly letter No. C/407/RD-109/Pt. XIII/RNY of date 30.11.2011 is reproduced below:

With immediate effect Bamunigaon (BMGN) BG Station under RNY Division is open for outward booking of All goods traffic except Coal, POL, Live Stock, Explosive and Crane Consignment. All concern to please note and act accordingly.(Authority: CCM/N.F Rly letter No. C/407/RD-109/Pt. XIII/RNY of date 30.11.2011)

3. Sub:- Opening of New Tinsukia (NTSK) BG Station for outward booking of CPC consignment.

CCM/N.F Rly letter No. C/407/RD-109/Pt. XIII (South) of date 13.12.2011 is reproduced below:

With immediate effect New Tinsukia (NTSK) (BG) Station under TSK Division opened for outward booking of CPC consignment. All concern to please note and act accordingly.(Authority: CCM/N.F Rly No. C/407/RD-109/Pt. XIII(South) date 13.12.2011)

4. Sub:- Opening of Bamunigaon (BMGN) Station for outward booking of coal traffic in block rake.

CCM/N.F Rly letter No. C/407/RD-109/Pt. XIII/RNY of date 09.01.2012 is reproduced below:

With immediate effect Bamunigaon (BMGN) (BG) Station under RNY Division is open for outward booking of Coal traffic in Block Rake. All concern to please note and act accordingly.

(Authority: CCM/N.F Rly No. C/407/RD-109/Pt. XIII/RNY date 09.01.2012)(Authority: CCM/NWR No. C-543/5/2 N.F Rly Date: 22. 2.12)

_______________________________ GOODS (SORTRC) No. : 31 of 2012 from SOUTH CENTRAL RAILWAY

_________________________________________________________________

Sub:- Change in Alpha Code for M/s. SJK Steel Plant Limited siding Served by Challavaripalli.

Ref:- Commercial Circular No. 206 of 2011 and Corrigendum dated 21.11.2011 and 01.12.2011.

101

Page 102: nwr.indianrailways.gov.innwr.indianrailways.gov.in/uploads/files/1350027498494-R…  · Web viewd. During the Journey, the passenger, whose identity card number has been indicated

General Secretary, Indian Railway Conference Association , New Delhi has allotted revised alphabetical code to the following siding on South Central Railway.

Sl No.

Existing Name New Name of the Siding

Serving Station Existing code

Revised Code

Division

1 M/s. SJK Steel Plant Limited

M/s. Kalyani Gerdau Steel Ltd

Challavaripalli SSCC MKGC Guntakal

(Authority:CCM/S.C Rly Letter No.C.490/GTL/SJK/CLPE/5 date 03.01.2012)(Authority: CCM/NW Rly No. . C-543/9/2 S.C Rly Date: 27. 2.12 )

] _______________________________ GOODS (SORTRC) No. : 32 of 2012 from CENTRAL RAILWAY

_________________________________________________________________

Sub:- Change of name of siding of M/s. Vikram Sponge Iorn Ltd., to Welspun Maxsteel Ltd.,

Ref:- ARN No. 95 of 1997 (Goods) dt. 12.11.1997.

The change of name of siding of M/s. Vikram Sponge Iron Ltd.( transferred from M/s. Vikram Ispat Ltd.) at Roha in Mumbai Division to M/s. Welspun Maxsteel Ltd., in the records of Railways is approved.

The Alpha Code, VIR and Numerical Code 1127610 shall remain unchanged .This has the approval of the competent authority.

(Authority:CCM/C Rly Letter No. C.698/M/898/I date 09.02.2012)(Authority : CCM/NWR No. C-543/1/2 C. Rly Date: 27. 2.12 )

________________________________ GOODS (SORTRC) No. : 33 of 2012 from WESTERN RAILWAY

_________________________________________________________________

Sub:- Permission for co-use of Kribhco Infrastructure Siding (served by Kosad & Gothangaon) by M/s. Trans Rail Logistics Limited.

CCM/W.Rly letter No. C.491/1/750 of date 24.2.2012 is reproduced below:

With immediate effect permission is granted to M/s. Trans Rail Logistics Limited to co-use M/s Kribhco Infrastructure Siding served by Kosad & Gothangaon station for handling of Container traffic for a period of six months.

The above permission is subject to the terms and all other conditions stipulated in the siding agreement and Railway Board’s letter no. 2009/TT-III/73/9 dt. 10/12/2010.

(Authority: CCM/W.Rly No. C.491/1/750 date 24.2.2012)(Authority: CCM/NWR No. C-543/8/2 W. Rly Date: 28. 2.12 )

________________________________ GOODS (SORTRC) No. : 34 of 2012 from WESTERN RAILWAY

_________________________________________________________________

102

Page 103: nwr.indianrailways.gov.innwr.indianrailways.gov.in/uploads/files/1350027498494-R…  · Web viewd. During the Journey, the passenger, whose identity card number has been indicated

Sub:- Opening of Bardoli (BIY) goods shed of Mumbai Division for Inward Coal traffic.

Ref:- W.Rly office ARN No. 133 (goods) of 2011 dated 21/10/11.

CCM/W.Rly letter No. C.498/1/6 Vol.II of date 15.2.2012 is reproduced below:

In terms of W.Rly office ARN No. 133 (goods) of 2011 dated 21/10/2011 Bardoli (BIY) goods shed of Mumbai Division is opened for outward Coal traffic.

It has now been decided by competent authority to open Bardoli (BIY) goods shed of Mumbai division of W.Rly for inward Coal traffic also.

Necessary instructions may be issued to all concerned accordingly under advice to this office.(Authority: CCM/W.Rly No. C.498/1/6 Vol.II date 15.2.2012)(Authority: CCM/NWR No. C-543/8/2 W. Rly Date: 28. 2.12 )

_______________________________ GOODS (SORTRC) No. : 35 of 2012 from EASTERN RAILWAY

_________________________________________________________________

Sub:- Notification of Distance of Howrah/ Sealdah /Kolkata as “0” Distance

It is clarified that Howrah /Sealdah /Kolkata stations are situated in different locations in the city of Kolkata though having rail route but no passenger services has been provided. Passengers are compelled to avail road route to go to any of route these three stations from either of these three stations. The rail route is meant for carrying foods traffic only. But all these three stations are serving only one city i.e Kolkata.

For this reason, the distance calculation from any station of other railways especially south bound train Mail /Exp and EMU services, becomes complex and not passenger friendly and are calculated via some unreasonable route. With a view to streamlining the process, the distances between any pair of these three stations are to be treated as “0’ distance at the time of calculation of distance from other railways. The distance calculation for combination of the sections should be rounded off to the next higher distance Kms only once e.g. Howrah- Kharagpur +115.50 Kms + Sealdah-Baruipur =24.74 Kms, Total= 140.24 Kms. Rounded off =141 Kms for Kharagpur – Baruipur Via Howrah/Sealdah. But it will be applicable for passenger traffic travelling in actual carried route.

In view of the above, the competent authority has decided that the distance between the above three stations is to be treated as ‘0’ distance henceforth.(Authority: CCM/E.Rly No. C.332/Junction Distance Table /Pt. IV /BF date 20.1.2012)(Authority : CCM/NWR No. C-543/2/2 E Rly Date: 01. 3.12 )

_______________________________ GOODS (SORTRC) No. : 36 of 2012 from CENTRAL RAILWAY

_________________________________________________________________

Sub:- Permission to co-use private siding of M/s. Vimla Infrastructure India Pvt

103

Page 104: nwr.indianrailways.gov.innwr.indianrailways.gov.in/uploads/files/1350027498494-R…  · Web viewd. During the Journey, the passenger, whose identity card number has been indicated

Ltd., served by Tadali by M/s. Shaping Dream Project Ltd., Ref:- 1) ARN No. 192 of 2011 (Goods) dt. 15.11.2011 2) ARN No. 194 of 2011 (Goods) dt. 16.11.2011 3) ARN No. 213 of 2011 (Goods) dt. 15.12.2011

4) ARN No. 217 of 2011 (Goods) dt. 29.12.2011 5) ARN No. 03 of 2012 (Goods) dt. 10.01.2012.

6) ARN No.09 of 2012 (Goods) dt. 20.01.2012

Permission is granted to co-use private siding of M/s. Vimla Infrastructure India Pvt. Ltd, served by Tadali on Nagpur Division by M/s. Shaping Dream Project Pvt. Ltd, for outward traffic of Dolomite, for a period of six months upto 07.08.2012 or till the operationalisation of the siding as Brownfield PFT which ever is earlier.

This has the approval of CCM/COM.(Authority: CCM/C.Rly No. C/698/M/1011 date 08/2/2012)(Authority: CCM/NWR No. C-543/1/2/C Rly Date: 01. 03.12 )

________________________________ GOODS (SORTRC) No. : 37 of 2012 from EAST COAST RAILWAY

_________________________________________________________________

1. Sub:- De-notification of goods sheds and sidings from the list of Rake handling points of East Coast Railway.

Ref:- E.Co. Rly office Commercial Circular No. 159 (G) /2010 dated 11.11.2010.

Vide E.Co. Rly office Commercial circular No. 159 (G)/2010 dated 11.11.2010 the up-dated list of Goods sheds /sidings having Full/Half rakes handling capacity and two point combinations over East Coast Railway was notified.

The following 03 (Three) stations /sidings under Khurda Road & Sambalpur Division of East Coast Railway are to be deleted from the list of Full/ Half rake handling points (circulated vide Commercial Circular No. 159 (G)/2010 dated 11.11.2010) of E.Co. Rly.

S.No. Name of Station/siding Alpha Code Numerical Code Rake handling Capacity1 Brahmapur BAM 12121466 Full2 Sambalpur SBP 12221451 Half3 M/s. Jayashree Chemicals Ltd. JCLG 12121460 Half

However, the above 03 stations/siding will remain open for handling of goods traffic and the freight will be charged at “Wagon load rate” as per extant rule for all traffic booked from/to the above station/siding.

This has the approval of the competent authority.All concerned to note and act accordingly.

(Authority: CCM/E.Co. Rly No.CCM/353/THT/Pt.III date 04.01.2012)

2.Sub:- Revision in the rate of siding charges.Ref:- E.Co. Rly office’s circular No. 60 (G)/10 dt. 19.04.2010 and No. 83 (G)/2011 dt. 01.08.2011.

104

Page 105: nwr.indianrailways.gov.innwr.indianrailways.gov.in/uploads/files/1350027498494-R…  · Web viewd. During the Journey, the passenger, whose identity card number has been indicated

It is notified for inofrmation and guidance of all concerned that consequent upon the revision of All india Engine Hour Cost, the existing rates of Siding Charges for the following private sidings over East Coast Railway, notified by E.Co. Rly office’s circular cited under reference, have been further revised w.e.f 01.07.2010 to 30.06.2011 and w.e.f 01.07.2011 onwards till further order as follows:

Division : KHURDA ROADSl No. Name of the siding Serving

Station Type of traction Siding charge per

trip wef 01.07.2010 to 30.06.2011 (in Rs.)

Siding charge per trip wef 01.07.2011 (in Rs.)

1 M/s.HPCL’s LPG Bottling Plant

Khurda Road Electric 22548 24047

2 India Oil Corporation Ltd.

Khurda Road Electric 15640 16680

3 Food Corporation of India

Khurda Road

Electric 11339 12093

4 M/s. HPCL’s Siding Paradeep Diesel 11588 133225 Jayshree Chemicals

Ltd.Ganjam Electric 20723 22101

6 Talcher Thermal Power Station

Talcher Electric 76897 82010

Division : WALTAIR

Sl No. Name of the Siding Serving Station Type of Traction Siding charge per trip wef 01.07.2010 to 30.06.2011 (in Rs)

Siding charge per trip wef 01.07.2011 (in Rs)

1* Diesel Loco Shed Visakhapatnam Town

Diesel 6750 7760

2 Ferro Manganese Plant Garividi Electric 7820 83403 Jeypore Sugar Co. Ltd. Rayagada Diesel 6750 77604 J.K. Corporation Ltd. Singapuram

Road Diesel 9675 11123

5 NMDC’s Mallinger Valley Kirandul Diesel 6750 77606** Iron Ore Loading Deposit

No. 5Bacheli Electric 28543 30441

Division : SAMBALPUR

Sl No.

Name of the Siding Serving Station

Type of station Siding charge per trip wef 01.07.2010 to 30.06.2011 (in Rs.)

Siding charge per trip wef 10.07.2011 (in Rs.)

1 M/s.Food Corporation of India

Mandir Hasaud

Diesel 17438 20047

2 M/s. ACC unit Bargarh Cement Works

Bargarh Road

Diesel 13500 15520

3. M/s. Indian Metal & Ferrow Alloys Ltd.

Theruvali Diesel 17775 20435

Note:-

105

Page 106: nwr.indianrailways.gov.innwr.indianrailways.gov.in/uploads/files/1350027498494-R…  · Web viewd. During the Journey, the passenger, whose identity card number has been indicated

1. The above rate of siding charges are to be levied per trip irrespective of number of engine attached to the rakes.

2. Siding charges to be collected locally by the serving station.3. No. Suplementary charge is leviable on siding charges.4. The above rate of siding Charges are to be leived in addition to the frieght to /from

serving station of the concerned siding.5. “*” Mark shows that the rate is leviable when traffic booked at Public Tariff rate

only.6. “**” Mark shows that the rate of siding Charges are to be levied in addition to the

freight to /from serving station Bacheli +2(two ) Kms.7. Other conditions notified earlier will remain unaltered.8. Staff concerned to note and act accordingly.(Authority: CCM/E.Co. Rly No. CCM/Sdg.Chr.Rev /Pt.-I date 12.01.2012)(Authority : CCM/NWR No. C- 543/12/2 E.Co.Rly Date: 5.3.2012 )

________________________________ GOODS (SORTRC) No. : 38 of 2012 from INDIAN RAILWAY CONFERENCE

ASSOCIATION _________________________________________________________________

1. Sub:- Allotment of Numerical Codes.Ref:- Letter No. WCR/HQ/C/G-474 /BORL dated 30/01/2012 from WCR JBP

In reference to above, Numerical Code for the New Siding on West Central Railway has been allotted as under.

S.No. Station Division /Railway Alpha Codes

Numerical code

Remarks

1 BINA REFINERY PLANT SIDING

BHOPAL/WCR N/A 16123472 Served by Mahadeokhedi(MDVK)

This for information and necessary action please.( CCM/W.C Rly No. WCR/HQ/STAT/569/Num.Code / date 30-01-2012)

2. Sub:- Name and Code Initials of Stations,Sidings, PRS etc. Sanctioned to be adopted.

In continuation of IRCA letter of even no. dt. 02-11-2011 a list of names and code initials of stations, PRS etc., which have been sanctioned during the period between October 2011 to December 2011 for adoption over the Indian Railways is as under :

List of names and code initials of stations, siding, PRS etc. which have been sanctioned by General Secretary /IRCA during the period between October 2011 to December 2011 for adoption over the Indian Railways.

106

Page 107: nwr.indianrailways.gov.innwr.indianrailways.gov.in/uploads/files/1350027498494-R…  · Web viewd. During the Journey, the passenger, whose identity card number has been indicated

Railway STATIONS, SIDINGS, PRS etc. CODE

INITIALSE.C Rly Lanco Anpara (Anpara “C”)TPS served by Krishanshilla (KRSL) LAKSS.C Rly PRS Bidar Head PO Dist. Bidar BHPBS.C Rly PRS at Raichur Head PO Dist. Raichur RHORS.C Rly PRS at National Police Academy Post office NPAPS.C. Rly PRS at Jogipet Post Office Dist. Medak JPOMS.Rly PRS Ernakulam Kakkanadu ERNKS.Rly PRS at Madurai Thirunagar MDUA S.E.C Rly PRS at Baloda PBLDS.E.C Rly PRS at Katghora PKGAS.E.C Rly PRS at Mungeli PMGIW.Rly M/s. Kribhco Infrastructure Ltd. Siding served by Kosad MKIKW.Rly M/s. Kribhco Infrastructure Ltd. Siding served by Gothangaon MKIG S.C Rly Container Terminal Siding of M/s. CONCOR served by Nagalapalle CMCNN.W Rly M/s. Jhajjar Power Ltd. Jharli Served by Jharli MJPJC.Rly Private Siding for M/s. PNP Maritime Services Ltd Dharamtar Creek

Served by Pen stationPPDP

W.Rly Tham (BG) THMAW.Rly Samni (BG) SAMN W.Rly Vagra (BG) VGRAW.Rly Pakhajan (BG) PKJNW.Rly Dahej (BG) DGFJW.C Rly Bhilai Jaypee Cement Limited, Sakariya Served by Sakariya BJCSW.Rly M/s. ADANI PETRONET (DAHAJ) PORT PVt. Siding Served by Dahej MAPDS.Rly PRS at NedumKandam Block Panchayat Office District Idukki NDKMS.Rly PRS at Sivatgiri Post Office, Tirunelveli District SGTNS.C Rly M/s. My Home Industries Ltd. Siding served by Mellacheruvu MMHME.Rly PRS at Mahagama PMGADMRC Civil Lines (Jaipur) CLJPN.Rly PRS at Jawahar Bhawan Lucknow (TEMPORARY) PJBLE.Rly TALPUR HALT TLPH E.Rly KAMARDANGA HALT KMDHE. Rly BALLY BLY C.Rly Astegaon ASTGC.Rly Morshi MRSHC.Rly Pala PAALC.Rly Benoda BNOD

Railways STATIONS,SIDINGS,PRS ETC. CODE INITIALSC.Rly Warud Orange City WOC C.Rly Pusla PUSA C.Rly Mowad MWADS.Rly Tirumalairayanpattinam TMPTE.C Rly PATLIPUTRA PPTAC.Rly PARSIK CABIN PARKSECR PRS AT BELODA BAZAR POST OFFICE PBBPSECR PRS AT BEMETARA POST OFFICE PBPO

As at Present Tobe alteration toRailways Station Name and siding Code

initialsStation Name and siding Code Inials

N.Rly Sub out Agencies Hamirpur SOAH Sub Out Agencies –Chandigarh SOAH

107

Page 108: nwr.indianrailways.gov.innwr.indianrailways.gov.in/uploads/files/1350027498494-R…  · Web viewd. During the Journey, the passenger, whose identity card number has been indicated

Railway Station N.Rly Sub Out Agencies Kullu SOAK Kullu Out Agencies- Chadigarh

Railway StationSOAK

S.C. Rly SJK Steel Plant Ltd., served by Challavaripalli

SSCC M/s. Kalyani Gerdau Steel Limited Served by Challavaripalli

MKGC

(Authority: General Secretary /IRCA No. AL-89/B/III dated 31.01.2012) (Authority: CCM/NW Rly No. C- 3/IRCA Date: 7.3.2012)

_______________________________ GOODS (SORTRC) No. : 39 of 2012 from SOUTH WESTERN RAILWAY

_________________________________________________________________

1. Sub:-Extension of Thondebhavi (TDV) station for handling Outward Cement traffic.Ref:- S.W Rly office Commercial Circular (Goods) No. 90 of 2011 dt. 08.09.2011.

CCM/SW Rly office letter No. C.206/TL/11-12 Vol.IX of date 24.02.2012 is reproduced below: Please connect SW Rly office Commercial Circular (Goods) No. 90 of 2011 dt. 08.09.2011, wherein it was notified that Thondebhavi station (TDV) of Bangalore Division was opened for handling inward & outward goods traffic (except POL & Crane consignments) in trainload upto 23.8.2012 or till commissioning of ACC siding whichever is earlier. Further, ACC Ltd. siding served by TDV is commissioned w.e.f 03.02.2012 vide S.W Railway office Commercial Circular (Goods) No. 08 of 2012 dtd. 03.02.2012. Therefore , TDV station is closed for outward Cement traffic.

Now the competent authority has approved for extension of Thondebhavi station (TDV) of Bangalore Division over S.W Railway for handling outward Cement traffic in trainload for a period of 06 (Six) months with immediate effect.(Authority: CCM/SW Rly No. C.206/TL/11-12 Vol.IX date 24.02.2012)

2. Sub:- Opening of Nidvanda Station (NDV) for outward goods traffic (NMG).

CCM/SW Rly office letter No. C.206/TL/11-12 Vol.IX of date 23.02.2012 is reproduced below: Please connect SW Rly office Commercial Circular (Goods) No. 57 of 2011 dtd. 21.6.2011, wherein it was notified that Nidvanda station (NDV) on YPR-TK section of Bangalore division over South Western Railway is opened for handling inward Automobile traffic upto 20.06.2012, Now the competent authority has approved for handling outward goods traffic for loading cars by NMG rakes at Nidvanda Station (NDV) on YPR-TK section of Bangalore division over South Western Railway with immediate effect.(Authority: CCM/SW Rly letter No. C.206/TL/11-12 Vol.IX date 23.02.2012)(Authority: CCM/NW Rly No. C-543/15/2/SW Rly Date: 13. 03.12 )

________________________________ GOODS (SORTRC) No. : 40 of 2012 from CENTRAL RAILWAY

_________________________________________________________________1. Sub:- Commercial Notification of private siding of M/s Navkar Corporation Ltd.

as Brownfield PFT.

108

Page 109: nwr.indianrailways.gov.innwr.indianrailways.gov.in/uploads/files/1350027498494-R…  · Web viewd. During the Journey, the passenger, whose identity card number has been indicated

Ref:- 1) C.Rly ARN No. 86 of 2010 (Goods) dt. 02.06.2010(FM Circular No. 14 of 2010 dt. 31.05.2010)

2) C.Rly ARN No. 97 of 2010 (Goods) dt. 29.06.2010 (FM Circular No. 15 of 2010 dt. 14.06.2010) 3) C.Rly ARN No. 113 of 2011 (Goods) dt.23.06.2011 (Amendment of FM Circular No. 14 of 2010) 4) C.Rly ARN No. 159 of 2011 (Goods) dt. 16.09.2011

In terms of Railway Board’s letter No. 2008/TC(FM)/14/2 dt. 31.05.2010 (FM) circular No. 14 of 2010) Private siding of M/s. Navkar Corporation Ltd., Somtane in Mumbai Division is notified as Brownfield PFT. The operation of PFT will be governed by above policy.

Revenue sharing on the traffic other than PFT owner’s i.e Terminal Management Company’s (TMC) traffic will start after two full years of commissioning of the PFT (excluding the financial year of commissioning ) i.e from 01.04.2014 at the rates specified in PFT policy and as amended from time to time.

Consignment booked from and to PFT will be pre paid. The consignment booked to PFT will be consigned to the cosignee, for which the TMC shall give consent to handle the traffic of the said consignee and a copy of the consent letter should be made available at the booking station while booking the rake. Rake booked to PFT will be unloaded by the TMC with out any liability of Indian Railway.

For the out ward booking from the PFT, the TMC will enter into an agreement with the consigner and submit a copy of the agreement with the Railway Commercial staff posted at the PFT.

Demurrage charges shall be levied as per the extant rules and will be payable by TMC to the Railway.

The TMC must pay freight through e-payment system for their own traffic and bring their co-users in the ambit of e-payment system.

List of consigners and consignees proposing to use the PFT shall be given by TMC i.e PFT owner to CCM, Central Railway for information.

This has the approval of CCM.

(Authority: CCM/C.Rly No. C/698/M/1013 date 02/03/2012)

2. Sub:- Commercial notification of private siding of M/s. Vimla Infrastructure (India) Pvt. Ltd. as Brownfield PFT.

Ref:- 1) C.Rly ARN No. 86 of 2010 (Goods) dt. 02.06.2010 (F.M Circular No.14 of 2010 dt. 31.05.2010)

2) C.Rly ARN No. 97 of 2010 (Goods) dt. 29.06.2010.(F.M. Circular No. 15 of 2010 dt. 14.06.2010)

109

Page 110: nwr.indianrailways.gov.innwr.indianrailways.gov.in/uploads/files/1350027498494-R…  · Web viewd. During the Journey, the passenger, whose identity card number has been indicated

3) C.Rly ARN No. 113 of 2011 (Goods) dt. 23.06.2011 (Amendment of FM circular No. 14 of 2010)

4) C.Rly ARN No. 192 of 2011(Goods) dt. 15.11.2011

In terms of Railway Board’s letter No. 2008/TC(FM)/14/2 dt. 31.5.2010 (FM) Circular No. 14 of 2010 ) Private siding of M/s. Vimla Infrastructure (India ) Pvt. Ltd., Tadali in Nagpur division is notified as Brownfield PFT. The operation of PFT will be governed by above policy.

Revenue sharing on the traffic other than PFT owner’s i.e Terminal Management Company’s (TMC) traffic will start after two full years of commissioning of the PFT (excluding the financial year of commissioning ) i.e from 01.04.2014 at the rates specified in PFT policy and as amended from time to time.

Consignment booked from and to PFT will be prepaid. The consignment booked to PFT will be consigned to the consignee, for which the TMC shall give consent to handle the traffic of the said consignee and a copy of the consent letter should be made available at the booking station while booking the rake. Rake booked to PFT will be unloaded by the TMC with out any liability of Indian Railway.

For the outward booking from the PFT, the TMC will enter into an agreement with the consigner and submit a copy of the agreement with the Railway Commercial Staff posted at the PFT.

Demurrage charges shall be levied as per the extant rule and will be payable by TMC to the Railway.

The TMC must pay freight through e-payment system for their own traffic and bring their co-users in the ambit of e-payment system.

List of consigners and consignees proposing to use the PFT shall be given by TMC i.e PFT owner to CCM, Central Railway for information.

This has the approval of CCM(CCM/C.Rly No. C/698/M/1011 date 02/03/2012)

3. Sub:- Opening of MEL Siding Chandrapur for outward traffic of Coke/Coal.Ref:- C.Rly’s Sr. DCM NGP’s letter No. NGP/c/152/G/MEL-CD./Opening dt. 03/02/2012.

Loading of Non programmed Coal under priority ‘D’ has been permitted with immediate effect at Chandrapur Ferro Alloy Plant of M/s. SAIL (MELG siding) subject to compliance of following conditions:-

a) Full rake handling capacity is availableb) Existing traffic is not affected.c) RRs are issued on the basis of weighment and d) Environmental issues are take care ofLoading of non programmed Coal under priority ‘D’ will be done with the

permission of EDRM, Kolkatta. Division to keep record.All instructions in vogue for dealing of coal traffic shoould be followed by operating and Commercial branch of the division.

This has the approval of COM and CCM.

110

Page 111: nwr.indianrailways.gov.innwr.indianrailways.gov.in/uploads/files/1350027498494-R…  · Web viewd. During the Journey, the passenger, whose identity card number has been indicated

(Authority: CCM/C.Rly No.C/698/594/II/DUP date 02/03/2012)(Authority: CCM /NW Rly No. C-543/1/2/C Rly Date: 15.3.12 )

________________________________ GOODS (SORTRC) No. : 41 of 2012 from CENTRAL RAILWAY

_________________________________________________________________

1. Sub:- Permission to access container terminal /siding of M/s. Innovative B2B Logistics Solutions Ltd., at Kalamboli (MILK) by other approved CTOs.

Ref:- M/s Innovative B2B Logistics Solution Ltd’s L. No. NIL dt. 16.02.2012.

CCM/C.Rly letter No. C.659/RD/B2B Logistics dated 24/2/2012 is reproduced below:

Permission to access container terminal /siding of M/s. Innovative B2B Logistics Solutions Ltd., at Kalamboli (MILK Siding) in Mumbai Division is granted to following approved Container Train Operators for dealing their container traffic for a period of one year with immediate effect.

1. M/s. Hind Terminals Pvt. Ltd.2.M/s. Central Warehousing Corporation

The container traffic of the above CTOs should be dealt as per the concession agreement signed by the CTOs with the Railway administration.

This has the approval of CCM.(Authority: CCM.C.Rly No. C.659/RD/B2B Logistics date 24/02/2012)

2. Sub:- Permission to co-use siding of M/s. PNP Maritime Services Ltd. (PPDP) Dharamtar Creek served by Pen on Mumbai Division.

Ref:- C.Rly ARN No. 196 of 2011 (Goods) dt. 18.11.2011 C.Rly ARN No. 214 of 2011 dt. 19.12.2011

Permission is granted to co-use private siding of M/s. PNP Maritime Services Ltd (PPDP) served by Pen on Mumbai Division by the following cutomers for the outward and inward traffic mentioned against each of them on experimental basis upto 05.03.2013 or till in principal approval of General Manager for conversion of siding into Brownfield PFT which ever is earlier, subject to the condition of payment of terminal charges at applicable rates on the traffic dealt by the co-users.

Sr. No. Name of customer Inward traffic Outward traffic01 Adani Enterprises Limited Coal Non programmed coal under

priority ‘D’02 Tourian Iron & Steel Co. Pvt. Ltd., Coal Non programmed coal under

priority ‘D’03 Phoenix Comtrade Pvt. Ltd Coal Non programmed coal under

priority ‘D’04 R.C Fertilizers Pvt. Ltd Rock

Phosphate, Sulpher and Fertilizer

Rock Phosphate , Sulphur and Fertilizer (as permitted)

111

Page 112: nwr.indianrailways.gov.innwr.indianrailways.gov.in/uploads/files/1350027498494-R…  · Web viewd. During the Journey, the passenger, whose identity card number has been indicated

05 Jubilant Industries Ltd. Rock Phosphate and Sulphur

Rock Phosphate and Sulphur

06 Gandhar Oil Refinery (I) Ltd. -- Non programmed coal under priority ‘D’

Loading of non programmed Coal under Priority ‘D’ will be done with the permission of EDRM, Kolkatta. Division to keep record.

All instructions in vogue for dealing of coal traffic should be followed by Operating and Commercial branch of the division, any aberration /violation of the existing instruction observed by the division to be immediately brought to the notice of. C.Rly.

The siding owner should encourage the co-users to make payment of freight through e-payment system and should approach the office of CCM, Central Railway within a week of the issue of C.Rly ARN to initiate the e-payment process .

This has the approval of CCM & COM.(Authority: CCM/C.Rly No. C/698/M/990/Pt.-I of date 06.03.2012)

(Authority: CCM/NW .Rly No. C-543/1/2/C Rly Date: 23.3.12 )

________________________________ GOODS (SORTRC) No. : 42 of 2012 from NORTH CENTRAL RAILWAY

_________________________________________________________________1. Sub:- Opening of a new Private Siding, namely M/s. Kanpur Logistics Park

Private Limited at Panki.Ref:- M/s. KLPPL’s letter dated 26.9.11 and 09.11.11

CCM/N.C Rly No. 2011/Comml/M&R/424/MKPP Siding dated 03.01.2012 is reproduced below:

With effect from 10.01.2012 a new Private siding, namely M/s. Kanpur Logistics Park Private Limited having the siding code MKPP and Numerical code 13209276 served by Panki station of Allahabad Division of North Central Railway is opened for handling of outward and inward Container traffic only, in block rakes, with full rake handling capacity for round the clock working.

The siding is not qualified for charging freight on through distance basis. Hence Freight will be charged upto Panki serving station and beyond that towards siding, siding charges will be levied on the basis of trip time decided by the Railway. For any shunting done beyond the point of Interchange, separate shunting charges are leviable. All siding rules will be applicable.(Authority: CCM/N.C Rly No. 2011/Comml/M&R/424/MKPP siding date 03.01.2012)

2. Sub:- Opening of Saktesgarh (SKGH) station for outward half rake loading of stone traffic.

CCM/N.C Rly No. 2004/Comml. M&R/201 /O&C /Pt-I dated 24.01.2012 is reproduced below:

With immediate effect the competent authority has accorded their administrative

112

Page 113: nwr.indianrailways.gov.innwr.indianrailways.gov.in/uploads/files/1350027498494-R…  · Web viewd. During the Journey, the passenger, whose identity card number has been indicated

approval for opening of Saktesgarh (SKGH) Railway station of Allahabad Division for outward half rake loading of Stone traffic.(Authority: CCM/N.C Rly No. 2004/Comml/M&R/201/O&C /Pt-I dated 24.01.2012)(Authority: CCM/NW Rly No. C-543/13/2/NC Rly Date: 27.3.12 )

_______________________________ GOODS (SORTRC) No. : 43 of 2012 from SOUTH WESTERN RAILWAY

____________________________________________________________________

1.Sub:- Extension of Vyasa Colony (VC) station for handling Inward Goods Traffic. Ref:- S.W Rly office Commercial Circular (Goods) No. 113 of 2011 dt. 20.10.11

Please connect SW Rly office Commercial Circular (Goods) No. 113 of 2011 dtd 20.10.2011, wherein it was notified that Vyasa Colony (VC) station of Hubli Division over South Western Railway was opened for handling “Inward Coal Traffic” upto 07.01.2012. Now, the competent authority has approved for extension of “Vyasa Colony” ( VC) station for handling ‘Inward Coal Traffic” in train load temporary for a further period of (03) three months i.e from 08.01.2012 to 07.04.2012.(Authority: CCM/SW Rly No. C.206/TL/11-12 Vol.IX date 27.02.2012)

2.Sub:- Opening of Yelahanka (YNK) station for handling inward goods traffic. Ref:- CE/CN/Plg/BNC’s letter No. W.315/CN/BNC/Rails dt. 30.01.2012

CCM/SW Rly No.C.206/TL/11-12 Vol.IX dtd 28.02.2012 is reproduced below:

The competent Authority (COM) has approved for opening of Yelahanka (YNK) station of Bangalore division on South Western Railway for handling inward RMC traffic only for a period of (03) three months with immediate effect.(Authority: CCM/SW Rly No. C.206/TL/11-12 Vol.IX dated 28.02.2012)(Authority: CCM/NW Rly -543/15/2/SW Rly Date: 28.3.12)

________________________________ GOODS (SORTRC) No. : 44 of 2012 from INDIAN RAILWAY CONFERENCE

ASSOCIATION ____________________________________________________________________

Sub:- Addition/Correction /Deletion in the Numerical Code list of Various Zonal Railways.

The following addition /correction/deletion which is received from various Zonal Railways may please be incorporated /updated in the concern Railways station code list (coding & decoding section)

Addition/Correction/Deletion:-

Name of Station /siding /CBA Alpha code

Numerical code

Gauge Railways Remarks

BINA REFINERY PLANT …… 16123472 BG WCR Addition

113

Page 114: nwr.indianrailways.gov.innwr.indianrailways.gov.in/uploads/files/1350027498494-R…  · Web viewd. During the Journey, the passenger, whose identity card number has been indicated

SIDINGM/s. KRIBHCO INFRASTRUCTURE Ltd. Sdg. S/B KOSAD & GOTHANGAON

MKIG 08224399 BG WR Addition

M/S HINDALCO Sdg. S/B SAMBALPUR STATION

…. 12221472 BG E.Co. Addition

M/s. KALYANI GERDAU STEEL Ltd. S/B CHALLAVARIPALLI

MKGC NA BG SCR Addition

M/S WELSPUN MAXSTEEL LTD

VIR 1127610 BG CR Addition

NOWROZABAD BALLAST Sdg. S/B NOWROZABAD STATION

…. 14123952 BG SEC Addition

KOLVIHIR …. 01727213 BG CR AdditionASTEGAON ASTG 01727214 BG CR AdditionMORSHI MRSH 01727215 BG CR AdditionPALA PAAL 01727216 BG CR AdditionHIWARKHED …. 01727217 BG CR AdditionBENODA BNOD 01727218 BG CR AdditionWARUD ORANGE CITY WOC 01727219 BG CR AdditionPUSLA PUSA 01727220 BG CR AdditionMOWAD MWAD 01727221 BG CR Addition

(Authority: S&AO/NWR No.HQ/NWR/Stats/STN Code /NWR /2011-12 date 21.03.12)(Authority: CCM/NW Rly No. C-3/IRCA Vol.IV Date: 29.3.12)

SORTRC COACHING

________________________________ COACHING (SORTRC) No. : 01 of 2012 from EAST CENTRAL RAILWAY_____________________________________________________________________

Sub:- Closing of Mansi (MNE) station over Sonepur division for parcel traffic both inward/outward.

CCM/E.C Rly’s Circular No. ECR/CRM/FMS/03/C&O/MNE dated 29.9.2011 & Rate Circular Parcel (OT) 15/2011 circulated by CCM/SE Rly’s letter No. RA.42/3/E.C Rly /Pt.I of date 24/11/2011 is reproduced below:

On review of parcel traffic handled at Mansi (MNE) station over Sonepur Division of East Central it is observed that Parcel Traffic both inward &outward of this station is very negiligible.

As such, the competent authority of East Central Railway has decided to close down Mansi (MNE) station for dealing of parcel traffic both inward /outward parcel w.e.f 29.09.2011.

Please note and act accordingly.(Authority: CCM/E.C Rly’s Circular No. ECR/CRM/FMS/03/C&O/MNE dated 29.9.2011 & Rate Circular Parcel (OT) 15/2011)(Authority: CCM/S.E Rly No. RA.42/3/E.C Rly /Pt.I of date 24.11.2011)(Authority: CCM/NW Rly No. . C-498/1/Parcel Date: 09. 01.12)

114

Page 115: nwr.indianrailways.gov.innwr.indianrailways.gov.in/uploads/files/1350027498494-R…  · Web viewd. During the Journey, the passenger, whose identity card number has been indicated

__________________________________ COACHING (SORTRC) No. : 02 of 2012 from SOUTH WESTERN RAILWAY_____________________________________________________________________

Sub:-Opening of Anandapuram (ANF)-Talguppa (TLGP) BG Section for booking of passenger, luggage and parcel traffic.

CCM/SE Rly letter No. RA.42/4/SW Rly /Pt.II of date 17/11/2011 is reproduced below: W.e.f 04.08.2011 Anandapuram (ANF )-Talguppa (TLGP) section of Mysore Division

on South Western Railway is opened for booking of passenger, luggage and parcel traffic. The inter distance between Anandapuram (ANF)-Talguppa (TLGP) BG section of

Mysore Division on South Western Railway has already been notified vide S.E Rly office Special Circular letter of even No. dated 17.11.2011 under serial No. S.L NO. 167 (G)/2011.

(Authority: CCM/S.E.C Rly’s Circular No. C.143/Opening of Section /ANF-Talguppa /Mys dated 04.08.2011 under Commercial Circular (Coaching) No. 30 of 2011 ad Rate Advie No. 08 of 2011)(Authority: CCM/S.E Rly No. RA.42/3/E.C Rly /Pt.I of date 24.11.2011)(Authority: CCM/NW Rly No. C-498/1/Parcel Date: 09. 01.12 )

_________________________________ COACHING (SORTRC) No. : 03 of 2012 from WEST CENTRAL RAILWAY_____________________________________________________________________

Sub:-Correction of distance of Semerkhedi Station.Ref:- No. RA.42/2/WC Rly of 16-11-2011. Semerkhedi Station of Bhopal division over W.C R between BINA-GUNA

section has been newly opened for passenger traffic. Previously it was a halt station corrected distance as per the distances provided by the engineering department for Mahadevkhedi, Semerkhedi, Kanjia and Malkhedi Stations are as follows;

Station to Station Distance Semerkhedi to Kanjia 7.73 Kms.Semerkhedi to Mahadeokhedi 5.215 KmsBina to Mahadeokhedi 7.525 KmsMalkhedi to Mahadeokhedi 8.955 Kms

(Authority : CCM/S.C.Rly No.478/RQ/Circulars /Vol.I date 02-12-2011)(Authority: CCM/NW Rly No. 543/16/2 W.C Rly Date: 10. 01.12 )

__________________________________ COACHING (SORTRC) No. : 04 of 2012 from NORTHERN RAILWAY

_____________________________________________________________________Sub:-Allotment of 8 digit numerical code.

The opening of new PRS station for six months over LKO division the Alpha and Numerical codes is given below:

115

Page 116: nwr.indianrailways.gov.innwr.indianrailways.gov.in/uploads/files/1350027498494-R…  · Web viewd. During the Journey, the passenger, whose identity card number has been indicated

S.No. Name of Station Alpha Code Numerical code1 PRS JAWAHAR BHAWAN PJBL 03309238

(Authority: CCM/N.Rly No. 13-ST/STn.Code /1/2010 of date 16-12-2011)(Authority: CCM/NW Rly No. C-3/IRCA Vol.IV Date: 11. 01.12 )

_________________________________ COACHING (SORTRC) No. : 05 of 2012 from NORTHEAST FRONTIER

RAILWAY_____________________________________________________________________

1.Sub:- Parcel package booked Dibrugarh Town (BDRT).

In continuation to N.F Railways rates circular Gen. No. 02 of 2012 circulated under XXR of even number dated 10.01.2012 It is again clarified that parcel package booked for Dibrugarh Town (DBRT) should be booked and despatched to Dibrugarh (DBRG) as all Mail/Express trains including train No. 12235/12236 originate /terminate at Dibrugarh (DBRG). Other conditions will remain unchanged. This issues with the approval of the competent authority.(Authority: CCM/N.F Rly No. C/163/RD-5/Parcel/Pt. IV date 13.01.2012)

2.Sub:- Opening of Pandu Parcel Siding (Alpha code PNOP)

In order to decongest the New Guwahati yard with effect from 28.09.2011 it has been decided to open Pandu Parcel siding (Alpha code PNOP ) over lumding division for handling of millennium parcels and other parcel trains etc.

All parcel traffic transported through millennium parcels, VPU special etc., will be handled at Pandu parcel siding (PNOP).(Authority: CCM/N.F Rly No. C/163/RD-3/Parcel Rake Sdg dt. 01.08.2011)

3. Sub:- Closure of new Guwahati station for parcel traffic.

W.e.f 20.09.2011 New Guwahati station (NGC) over lumding division is closed for handling of millennium parcels and other parcel trains.

All parcel traffic transported through millennium parcels, VPH special etc., will be handled at Pandu parcel siding (Alpha code PNOP & Numerical code :05718400).(Authority: CCM/N.F Rly No. C/163/RD-3/Parcel Rake Sdg dt. 12.09.2011)(Authority: CCM/SC Rly No. 248/DEV/ORS/G.C/Vol.I of date 13.12.2011)(Authority: CCM/NW Rly No. C-498/1/Parcel Date: 02. 02.12)

________________________________ COACHING (SORTRC) No. : 06 of 2012 from NORTHERN RAILWAY

_____________________________________________________________________

Sub:- Preventive check conducted by Norhern Railway Vigilance in Parcel office New Delhi on 27.8.2011.

Ref:- CCM/N.Rly No. C/36/RD/SLR/VP/Vig Case dt. 11.11.11

116

Page 117: nwr.indianrailways.gov.innwr.indianrailways.gov.in/uploads/files/1350027498494-R…  · Web viewd. During the Journey, the passenger, whose identity card number has been indicated

With effect from 16.12.2010 Ghaziabad station over Delhi division has been closed for local and through booking both for inward /outward parcel traffic.

In this regard please issue instruction to all concerned not to book parcel traffic to Ghaziabad station over N.Rly and ensure compliance.(Authority: CCM/N.Rly No. CCM/N.Rly No. C/36/RD/SLR/VP/Vig case dt. 11.11.11)(Authority: CCM/SC Rly No. 248/Dev/ORS/GC/Vol.I date 13.12.2011) (Authority: CCM/NW Rly No. C-498/1/Parcel Date: 02. 02.12 )

__________________________________ COACHING (SORTRC) No. : 07 of 2012 from EAST COAST

RAILWAY_____________________________________________________________________

1. Sub:- Rationalisation of rates for parcel traffic – methodology for reckoning the percentage utilization of SLR to determine categorization of each train for the purpose of charging freight for parcel and luggage traffic.Ref:- Railway Board’s letter No. TC-II/2046/06/1 dt. 14.5.2007 and dt. 26.2.2010

The list of trains originating from East Coast Railway has been classified for booking of non-leased parcel and luggage traffic w.e.f 1.6.2011. The following trains are categorized Scale-‘R’ and Scale ‘P’ for charging of parcel traffic and Scale L for luggage traffic.

Sl No. Train No. Name From To Scale W.E.F. 1.6.2011

Parcel Luggage

1 12805 Janmabhoomi Exp VSKP SC P L2 18412 Intercity Exp VSKP BBS R L3 18405 Puri –ADI Exp PURI ADI P L4 12875 Nilanchal PURI NDLS R L5 17479 Tirumala Exp PURI TIRUPATI R L6 18452 Tapaswaini Exp PURI HATIA P L7 12584 Puri –Valsad Exp PURI BL P L8 12822 Dhauli Exp PURI HWH P L9 15643 Puri –Kamakha Exp PURI KYQ R L10 17015 Visakha Exp BBS SC R L11 18496 BBS-Rameshwar Exp BBS RMM R L12 12830 BBS-CEN Exp BBS CEN R L13 18463 Prasanti Exp BBS SBC R L14 12898 BBS-PDY Exp BBS PDY R L15 12582 BBS-PUNE BBS PUNE P L16 18411 Intercity Exp BBS VSKP R L17 12586 SBP-HWH Exp SBP HWH P L18 58417 Puri –PSA Pass PURI PSA P L19 58001 Puri-HWH Pass Puri HWH R L

117

Page 118: nwr.indianrailways.gov.innwr.indianrailways.gov.in/uploads/files/1350027498494-R…  · Web viewd. During the Journey, the passenger, whose identity card number has been indicated

All other Mail Express and Passenger trains originating from E.Co. Railway may be charged as per E.Co. Rly office previous Commercial Circular No. 64 (C )/2010 dt. 7.6.2010.

Meanwhile if any regular Mail/Express trains or summer specials, Puja specials , X-Mas Specials, Holiday Special trains are introduced after dt. 1.6.2011 shall be charged at Scale- P for parcel and Scale-L for luggage till the next review is conducted.

These instructions will come into force with effect from 1.6.2011.All concerned to note and act accordingly.

(Authority: CCM/E.Co. Rly No.CCM/Premier Parcel Service/444/2010/Pt.II date 27.5.2011)

2. Sub:- Rationalisation of rates for parcel traffic-methodology for reckoning the percentage utilization of SLR to determine categorization of each train for the purpose of charging freight for parcel and luggage traffic.Ref:-Railway Baord’s letter No. TC-II/2046/06/1 dt. 14.5.2007 and dt. 26.2.2010

In continuation with E.Co.Rly’s Commercial Circular No. 32( C)/2011 dt. 27.5.2011 the following trains originating from East Coast Railway has been classified under Scale ‘P’ and Scale L for charging of non-leased parcel and luggage traffic:-

Sl No.

Train No. Name From To Scale W.E.F 1.6.2011

Parcel Luggage

1 18108 KRPU-ROU Exp KRPU ROU P L2 12580 PURI-DIGHA Exp PURI DGHA P L3 12278 Duronto Exp PURI HWH P L

These instructions will come into force with effect from 1.6.2011(Authority: CCM/E.Co.Rly No. CCM/Premier Parcel Service /444/2010 /Pt.II of date 30.5.11)(Authority : CCM/NW Rly No. C- 375/3/Vol.II E.Co.Rly Date: 13 .2.2012)

__________________________________ COACHING (SORTRC) No. : 08 of 2012 from SOUTH EAST RAILWAY

_____________________________________________________________________

Sub:- Withhold of indent /Demand Non-lease Millennium Parcel Cargo Exp In view of development of Shalimar as Coaching terminal.

CCM/SE Rly’s letter No. C.375/Dev/Parcel /VPH date 09/02/2012 is reproduced below: The development works of Shalimar station as coaching terminal all activities of

existing Millennium Parcel Cargo Express dealt at Shalimar has been ordered to shift to Sankrail station for freight /parcel handling instead of Shalimar and is to be effected from 01.02.2012 in a phased manner. This has the approval of the competent authority.

118

Page 119: nwr.indianrailways.gov.innwr.indianrailways.gov.in/uploads/files/1350027498494-R…  · Web viewd. During the Journey, the passenger, whose identity card number has been indicated

You are, therefore requested to examine the matter and advise necessary instructions to all concerned to stop acceptance of indent for Shalimar of non-lease as well as leased Millennium Parcel Cargo. However, Piecemeal VPs in train services will continue to be dealt at Shalimar station.(Authority: CCM/SE Rly No. C.375/Dev/Parcel /VPH date 09/02/2012)(Authority: CCM/NW Rly No. C-498/1/Parcel Date: 21. 02.12)

Note: if the staff have any doubt about the meaning of any item or are uncertain of the correct method of applying any rate or fare notified herein, an immediate reference should be made to the Chief Commercial Manager, North Western Railway, Jaipur.

KEEP ALL YOUR TARIFFS,RATE BOOKS, etc UP-TODATE

G.L. MEENA Chief Commercial Manager

Jaipur : 31st March 2012

Prepared and Compiled By : 1. Ram snehi Gupta, Chief Rate Inspector, CCM Office 2. Trilok Raj Khinchi, Chief Rate Inspector, CCM Office

119

Page 120: nwr.indianrailways.gov.innwr.indianrailways.gov.in/uploads/files/1350027498494-R…  · Web viewd. During the Journey, the passenger, whose identity card number has been indicated

120