nura-ishim river basin management project dfid cwr department for international developmentcommittee...
TRANSCRIPT
Nura-Ishim River BasinManagement Project
DFID CWR
Department for International Development Committee for Water Resources
KAZGIPROVODHOZ
Nura-Ishim River Basins Water Management Project
• Purpose: to improve management of water resources throughout Kazakhstan.
• Goal: sustainable access to safe, reliable and affordable water supply for all.
This is a Capacity Building project aimed at strengthening the WRC and the RBOs
Nura-Ishim River BasinManagement Project
DFID CWR
Department for International Development Committee for Water Resources
KAZGIPROVODHOZ
Nura-Ishim River Basins Water Management Project
Phase 1 - Legal Reform and InstitutionalCapacity Building
– Reviewed the institutional structure of water management and made recommendations for building capacity
– Reviewed and recommended improvements in the Water Code to support effective, river basin oriented Integrated Water Resources Management
– Both of these components are continuing now, into the Phase 2 period
Nura-Ishim River BasinManagement Project
DFID CWR
Department for International Development Committee for Water Resources
KAZGIPROVODHOZ
Nura-Ishim River Basins Water Management Project
Phase 2 - Integrated Water Resources Planning and Management
• Focuses on the Nura and Ishim River Basins as pilot basins• Develops institutional and technical processes and methods to
support the adoption of Integrated Water Resources Management
Two main outcomes of Phase 2:1) An Institutional Development Strategy to support improved
planning, development and management of water at the river basin level
2) A Water Resources Development Strategy for the river basins
Nura-Ishim River BasinManagement Project
DFID CWR
Department for International Development Committee for Water Resources
KAZGIPROVODHOZ
Nura-Ishim River Basins Water Management Project
Phase 3 – Replication of Integrated Planning Procedures
– Extends the methods and procedures developed in the Nura and Ishim Basins to all the river basins of Kazakhstan
– It is the first step in the adoption of Integrated Water Resources Management (IWRM) across Kazakhstan
Nura-Ishim River BasinManagement Project
DFID CWR
Department for International Development Committee for Water Resources
KAZGIPROVODHOZ
Why Water Management Must Change
• Reliable access to safe water supplies is not sufficient
• Insufficient access is less a resource problem and more a management problem
• Water quality is poor
• Environmental and ecological needs of water are not addressed
Nura-Ishim River BasinManagement Project
DFID CWR
Department for International Development Committee for Water Resources
KAZGIPROVODHOZ
Why Water Management Must Change
• to meet international commitments to provision of safe water for all– UNGA – to halve, by the year 2015, the proportion of people
who are unable to reach or afford safe drinking water
– To stop the unsustainable exploitation of water resources through developing water management strategies at local, regional and national levels
• Government has an obligation to ensure provision of safe water to all
Nura-Ishim River BasinManagement Project
DFID CWR
Department for International Development Committee for Water Resources
KAZGIPROVODHOZ
Why Water Management Must Change
• Water is essential to economic and social development
• Inappropriate and ineffective water management results in:– wasted money
– wasted water
– reduced availability of and access to water
– reduced economic and social development
Nura-Ishim River BasinManagement Project
DFID CWR
Department for International Development Committee for Water Resources
KAZGIPROVODHOZ
Integrated Water Resources Management (IWRM)
• Integrated planning and management of water resources and land
• Takes account of social, economic and environmental factors together
• Integrates surface, groundwater and the ecosystems through which they flow
Nura-Ishim River BasinManagement Project
DFID CWR
Department for International Development Committee for Water Resources
KAZGIPROVODHOZ
Integrated Water Resources Management (IWRM)
• Emphasises the importance of public participation in water decision making– Water is managed for the sole purpose of providing
water to the people and the environment
• Emphasises accountability and transparency in water decision making
• Emphasises that the River Basin is the appropriate level for effective water management
Nura-Ishim River BasinManagement Project
DFID CWR
Department for International Development Committee for Water Resources
KAZGIPROVODHOZ
Integrated Water Resources Management (IWRM)
The change to IWRM requires:
• Institutional development of RBOs, WRC and other organisations to ensure the capacity to adopt IWRM
• Government support for adoption of IWRM– Financial
– Legal
Nura-Ishim River BasinManagement Project
DFID CWR
Department for International Development Committee for Water Resources
KAZGIPROVODHOZ
Management by Basin Organisation
Typical overall structure to support River Basin IWRM:
• Central government
• National level coordinating and policy body
• River Basin Organisation
• River Basin Council
Nura-Ishim River BasinManagement Project
DFID CWR
Department for International Development Committee for Water Resources
KAZGIPROVODHOZ
Role of Central Government
Central government is obliged to ensure that all people and the environment have access to water of adequate quantity and good quality.
This means:• Ensuring water management is properly financed• Ensuring cooperation between all organisations and
institutions related to water management• Ensuring the legal framework supports effective water
management
Nura-Ishim River BasinManagement Project
DFID CWR
Department for International Development Committee for Water Resources
KAZGIPROVODHOZ
Role of Central Government
The WILL TO CHANGE exists
• -- in the new Water Code
• -- in international commitments
• -- in this World Bank project
Nura-Ishim River BasinManagement Project
DFID CWR
Department for International Development Committee for Water Resources
KAZGIPROVODHOZ
Role of Central Government
• Steady reduction in budgets for water management institutions over the last few years
• Loss of competencies for groundwater• WRC lost independence• WRC move under Minister of Agriculture –
impossible to balance water needs equitably• Only a portion of water fees collected is returned
to water management activities.
Nura-Ishim River BasinManagement Project
DFID CWR
Department for International Development Committee for Water Resources
KAZGIPROVODHOZ
Role of National Level Body
The National Body leads the work of Central Government in key areas:
• Developing Water Policy• Coordinating all organisations and institutions related
to water management• Decision-making on national programmes, laws,
regulations• Planning and management at national level,
including inter-basin and international trans-boundary issues
• Raising public awareness and understanding
Nura-Ishim River BasinManagement Project
DFID CWR
Department for International Development Committee for Water Resources
KAZGIPROVODHOZ
Role of Basin Organisations
Basin organisations are the main authority for water resources planning, development and management
• Planning for water resources development within the
basin• Day-to-day management of water resources (allocation,
licensing, etc.) • Raising local awareness of problems and solutions• A Water Council serves also to coordinate with
stakeholders
Nura-Ishim River BasinManagement Project
DFID CWR
Department for International Development Committee for Water Resources
KAZGIPROVODHOZ
The Water Code
Nura-Ishim River BasinManagement Project
DFID CWR
Department for International Development Committee for Water Resources
KAZGIPROVODHOZ
The old Water LawProblems
• NO Integrated water management policy• NO Planning goals and competencies• NO Need-based budgeting, No self-financing• NO Regulation of relationships between Government and private entities• NO Legal obligation to share information• NO Integration of national and transboundary water management• NO Focus on river basin management• Possible conflicts of interest – regulator, monitor, licensee, manager of
facilities
Nura-Ishim River BasinManagement Project
DFID CWR
Department for International Development Committee for Water Resources
KAZGIPROVODHOZ
Practical problems with old Water Law
• Did not allow privatization of water facilities
• Lack of clear obligations and procedures between governmental organizations
– Example: exchange of information• No transboundary problems with different States
• Did not define rights and obligations of water users, public
• Did not regulate private water management companies
Nura-Ishim River BasinManagement Project
DFID CWR
Department for International Development Committee for Water Resources
KAZGIPROVODHOZ
Why the New Water Code?
• Law is a foundation and a framework
• Water is everybody’s business
• Kazakhstan involved in several transboundary disputes on water
• UN Watercourses Convention (1997)
• We must unite national and international water management
Nura-Ishim River BasinManagement Project
DFID CWR
Department for International Development Committee for Water Resources
KAZGIPROVODHOZ
The new Water Code
• Objectives and Principles• New Competencies• New Obligations• Strong Basin Organisations• Stronger Enforcement• Possibilities of financing and
growth
Nura-Ishim River BasinManagement Project
DFID CWR
Department for International Development Committee for Water Resources
KAZGIPROVODHOZ
New Water Code- New Competencies
• Integration of water management responsibilities in government
• Coordination on water issues (RBOs) • Licensing of ground and surface waters by one agency (WRC,
RBOs) • Regulation and Rule-making (WRC)• Information and Public Participation
(WRC, RBOs)
Nura-Ishim River BasinManagement Project
DFID CWR
Department for International Development Committee for Water Resources
KAZGIPROVODHOZ
New Water CodeTransboundary Waters
• Definition (Art. 15.1) includes surface & groundwater
• Legal basis (Art. 15.2) – The present Code – laws of the Republic of Kazakhstan on the State Border – international agreements ratified in accordance with the
established procedure
• Primacy of International Law (Art. 2.2)– If the International Agreements contain rules different from the
Code, the rules of the International Agreements apply
Nura-Ishim River BasinManagement Project
DFID CWR
Department for International Development Committee for Water Resources
KAZGIPROVODHOZ
Nura-Ishim River Basin ManagementDecision Support System
Nura-Ishim River BasinManagement Project
DFID CWR
Department for International Development Committee for Water Resources
KAZGIPROVODHOZ
River Basin Management Decision Support SystemOBJECTIVES
• Information System to assist in river basin planning and management
• Database of water resources and water quality data for each river basin
• Assessment of current water use in each river basin
• Prediction of future water usage over 20 year planning horizon
• Assessment of current and future predicted water balance in each basin
• Basis for determining basin-wide water allocations
• Analysis of alternative water management strategies
• Analytical tool for evaluating alternative water development options
• Application of systematic approach to development of river basin plans
Nura-Ishim River BasinManagement Project
DFID CWR
Department for International Development Committee for Water Resources
KAZGIPROVODHOZ
River Basin Management Decision Support SystemCOMPONENTS
• Geographic Information System (GIS)
GIS database showing location of catchment areas, rivers, river gauging stations, reservoirs, lakes, aquifers, river abstraction points, wellfields, trans-basin diversion schemes and principal demand centres for municipal, industrial and irrigation water users;
• Database
MicroSoft Access database, containing detailed data for use in the integrated water resources model, such as historic monthly time-series river flow data, groundwater yields, water quality data, rainfall data, evaporation data, reservoir characteristics and water demand projection data for municipal, industrial and irrigation water users;
• Integrated Water Resources Planning Model
Integrated Water Resources Planning Model for simulating the water resources system within each river basin, for the purposes of assessing the present water demand/supply balance across each basin and for evaluating alternative future water resources development scenarios as well as assessing their impacts, in terms of both water quality and quantity, across each basin
Nura-Ishim River BasinManagement Project
DFID CWR
Department for International Development Committee for Water Resources
KAZGIPROVODHOZ
River Basin Management Decision Support SystemSYSTEM STRUCTURE
MicroSoft Access Database ArcView 8.2 GIS
Integrated Water ResourcesPlanning Model
Nura-Ishim River BasinManagement Project
DFID CWR
Department for International Development Committee for Water Resources
KAZGIPROVODHOZ
• Country boundaries• Oblast boundaries• District boundaries• River basin boundaries• Sub-catchment areas• Rivers• Reservoirs, lakes & wetlands• Protected conservation areas• Recreation & angling facilities• Commercial fisheries• River gauging stations• River abstraction points• Groundwater aquifers• Groundwater wellfields• Wastewater discharge points
• Water quality monitoring points• Trans-basin diversion canals• Irrigation canals• Water transfer pipelines• Pumping stations• Hydropower stations• Water treatment plants• Wastewater treatment plants• Urban areas• Industrial areas• Irrigation areas• Municipal demand centres• Industrial demand centres• Irrigation demand zones• Rural water supply schemes
River Basin Management Decision Support SystemGeographic Information System (GIS)
GIS database to comprise a spatial data covering the following features:
Nura-Ishim River BasinManagement Project
DFID CWR
Department for International Development Committee for Water Resources
KAZGIPROVODHOZ
River Basin Management Decision Support SystemGeographic Information System – ArcView 8.2 GIS
Nura-Ishim River BasinManagement Project
DFID CWR
Department for International Development Committee for Water Resources
KAZGIPROVODHOZ
River Basin Management Decision Support SystemMicroSoft Access Database
• Time-series inflow data for each gauging station;• Groundwater yields for each aquifer source;• Water quality data for relevant contaminants at each source;• Rainfall data from selected stations where data is available;• Evaporation data from reservoirs;• Reservoir characteristics;• Municipal water demand data;• Industrial demand data;• Irrigation demand data;• Development option data;• Capital cost data;• Operating cost data;• Economic criteria.
Database comprising the following non-spatial data:
Nura-Ishim River BasinManagement Project
DFID CWR
Department for International Development Committee for Water Resources
KAZGIPROVODHOZ
River Basin Management Decision Support SystemIntegrated Water Resources Planning Model
Application to assist Integrated River Basin Planning and Management:
• Assessment of water resource yields (surface water and groundwater);• Water demand forecasting (municipal, industrial and irrigation);• Assessment of environmental/ecological flow requirements;• Assessment of water quality requirements;• Derivation of water demand/supply balance projections;• Formulation of alternative demand management strategies;• Formulation of alternative resource development strategies;• Derivation of water allocations for licensing purposes;• Estimation of cost of raw water delivery to principal users;• Evaluation of range of development scenarios;• Identification of least cost development scenario.
Nura-Ishim River BasinManagement Project
DFID CWR
Department for International Development Committee for Water Resources
KAZGIPROVODHOZ
River Basin Management Decision Support SystemIntegrated Water Resources Planning Model
• Water resources database;• Water demand forecasting module;• Water balance module;• Water quality module;• Water allocation/costing module;• Resource management/development option module;• Development scenario evaluation module.
Time-series Water Balance Model, comprising the following:
Nura-Ishim River BasinManagement Project
DFID CWR
Department for International Development Committee for Water Resources
KAZGIPROVODHOZ
River Basin Management Decision Support SystemIntegrated Water Resources Planning Model
Demand Forecasting module:
• Municipal water supply demands;• Commercial/institutional demands;• Industrial water supply demands;• Irrigation water demands;• Rural water supply demands;• Environmental/ecological water requirements.
Demand Forecasting criteria:
• Population projections for each identified urban centre;• Projected service ratio (% of population served);• Forecast per-capita consumption;• Forecast un-accounted for water (leakage losses etc);• Industrial economic forecasts;• Agricultural forecasts (irrigated areas, crop mix, livestock etc);• Ecological habitat criteria.
Nura-Ishim River BasinManagement Project
DFID CWR
Department for International Development Committee for Water Resources
KAZGIPROVODHOZ
River Basin Management Decision Support SystemIntegrated Water Resources Planning Model
• River network flow simulation;• Reservoir operations simulation;• Conjunctive use of groundwater/surface water;• Simulation of abstractions/discharges;• 70 year time-series simulation in monthly time-steps;• Target supply reliability criteria; • Operations optimization;• System yield maximization;• Demand/supply balance analysis.
Basin Water Balance module:
Water Quality module:
• Simulates variation in water quality through river network;• Preserves dissolved solids balance for conservative parameters;• Takes account of concentration effects of reservoirs / mixing.
Nura-Ishim River BasinManagement Project
DFID CWR
Department for International Development Committee for Water Resources
KAZGIPROVODHOZ
River Basin Management Decision Support SystemIntegrated Water Resources Planning Model
• New groundwater developments;• Development of snow-melt interception reservoirs;• Dam raising of existing reservoirs;• Rehabilitation of water transfer schemes (Irtysh-Karaganda canal);• River/reservoir clean-up projects (Nura river clean-up);• Demand management options (leakage reduction, metering etc);• Improved water and wastewater treatment.
Resource development / Demand management options module:
Development scenario evaluation module:
• Incremental yields for range of options;• Capital and O&M costs for range of options;• Option ranking;• Evaluation of alternative development scenarios;• Identification of optimum least-cost development scenario.
Nura-Ishim River BasinManagement Project
DFID CWR
Department for International Development Committee for Water Resources
KAZGIPROVODHOZ
River Basin Management Decision Support SystemUse of the Decision Support System in this Study
1. Analysis of particular water supply issues relating to:• Astana• Karaganda• Temirtau
2. Analysis of general water management issues in:• Nura river basin• Ishim river basin
3. Replication of generalised model into the other six basins:• Irtysh river basin;• Balkash-Alakol river basin;• Shu-Talas river basin;• Tobol-Torgay river basin;• Ural-Caspian river basin;• Syr Darya river basin.
Nura-Ishim River BasinManagement Project
DFID CWR
Department for International Development Committee for Water Resources
KAZGIPROVODHOZ
Integrated River Basin Management Decision Support SystemNura-Ishim Water Resources Planning Model