nuclear power: “too cheap to meter” ready kilowatt
DESCRIPTION
Nuclear Power: “Too cheap to meter” Ready Kilowatt. Uranium production in the U.S. What is “nuclear fission”?. U-235 + 1 neutron = U-236 U-236 splits into: 2 neutrons + byproducts + ENERGY. Light Water Reactors Boiling Water Reactor. Light Water Reactors Pressurized Water Reactor. - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: Nuclear Power: “Too cheap to meter” Ready Kilowatt](https://reader036.vdocuments.mx/reader036/viewer/2022062518/568147c7550346895db50917/html5/thumbnails/1.jpg)
Nuclear Power: “Too cheap to meter”
Ready Kilowatt
![Page 2: Nuclear Power: “Too cheap to meter” Ready Kilowatt](https://reader036.vdocuments.mx/reader036/viewer/2022062518/568147c7550346895db50917/html5/thumbnails/2.jpg)
Uranium production in the U.S.
![Page 3: Nuclear Power: “Too cheap to meter” Ready Kilowatt](https://reader036.vdocuments.mx/reader036/viewer/2022062518/568147c7550346895db50917/html5/thumbnails/3.jpg)
What is “nuclear fission”?
U-235 + 1 neutron = U-236
U-236 splits into:
2 neutrons + byproducts + ENERGY
![Page 4: Nuclear Power: “Too cheap to meter” Ready Kilowatt](https://reader036.vdocuments.mx/reader036/viewer/2022062518/568147c7550346895db50917/html5/thumbnails/4.jpg)
Light Water Reactors
Boiling Water Reactor
![Page 5: Nuclear Power: “Too cheap to meter” Ready Kilowatt](https://reader036.vdocuments.mx/reader036/viewer/2022062518/568147c7550346895db50917/html5/thumbnails/5.jpg)
Light Water Reactors
Pressurized Water Reactor
![Page 6: Nuclear Power: “Too cheap to meter” Ready Kilowatt](https://reader036.vdocuments.mx/reader036/viewer/2022062518/568147c7550346895db50917/html5/thumbnails/6.jpg)
Heavy Water Reactor
Nuclear fission reactors used in Canada use heavy water as the moderator in their reactors. Since the deuterium in heavy water is slightly more effective in slowing down the neutrons from the fission reactions, the uranium fuel needs no enrichment and can be used as mined. The Canadian style reactors are commonly called CANDU reactors.
![Page 7: Nuclear Power: “Too cheap to meter” Ready Kilowatt](https://reader036.vdocuments.mx/reader036/viewer/2022062518/568147c7550346895db50917/html5/thumbnails/7.jpg)
Moderator = graphite blocks
Problems:
1. Instability
of graphite
2. Lack of
containment
at Chernobyl
![Page 8: Nuclear Power: “Too cheap to meter” Ready Kilowatt](https://reader036.vdocuments.mx/reader036/viewer/2022062518/568147c7550346895db50917/html5/thumbnails/8.jpg)
Fast Breeder Reactors
Under appropriate operating conditions, the neutrons given off by fission reactions can "breed" more fuel from otherwise non-fissionable isotopes. The most common breeding reaction is that of plutonium-239 from non-fissionable uranium-238. The term "fast breeder" refers to the types of configurations which can actually produce more fissionable fuel than they use. France has made the largest implementation of breeder reactors with its large Super-Phenix reactor and an intermediate scale reactor (BN-600) on the Caspian Sea for electric power and desalinization.
![Page 9: Nuclear Power: “Too cheap to meter” Ready Kilowatt](https://reader036.vdocuments.mx/reader036/viewer/2022062518/568147c7550346895db50917/html5/thumbnails/9.jpg)
Gas-Cooled Reactors: Pebble bed
![Page 10: Nuclear Power: “Too cheap to meter” Ready Kilowatt](https://reader036.vdocuments.mx/reader036/viewer/2022062518/568147c7550346895db50917/html5/thumbnails/10.jpg)
World Nuclear Reactors
![Page 11: Nuclear Power: “Too cheap to meter” Ready Kilowatt](https://reader036.vdocuments.mx/reader036/viewer/2022062518/568147c7550346895db50917/html5/thumbnails/11.jpg)
NUCLEAR POWER TIMELINE
1946 Atomic Energy Act passed creating AEC
1957 Price Anderson Act passed
1960-80 Many US nuclear plants constructed
1970s: increasing anti-nuclear activism
1978:
• Three Mile Island accident
• China syndrome
1986: Chernobyl
![Page 12: Nuclear Power: “Too cheap to meter” Ready Kilowatt](https://reader036.vdocuments.mx/reader036/viewer/2022062518/568147c7550346895db50917/html5/thumbnails/12.jpg)
NUCLEAR POWER TIMELINE
Since TMI decline of nuclear power in U.S.; cancellation of plants, etc. Business in rest of the world is mixed, at best.
Politics: Seabrook / MUSE
“prudency reviews” / TMI, Ginna
Evacuation plans and licensing
Decommissioning
new designs
Licensing Process:
• US
• Elsewhere
![Page 13: Nuclear Power: “Too cheap to meter” Ready Kilowatt](https://reader036.vdocuments.mx/reader036/viewer/2022062518/568147c7550346895db50917/html5/thumbnails/13.jpg)
• Low-Level Waste (LLW) - includes radioactively contaminated protective clothing, tools, filters, rags, medical tubes, and many other items
• High-Level Waste (HLW)- "irradiated" or used nuclear reactor fuel; some fuel processing wastes
• Uranium Mill Tailings - the residues remaining after the processing of natural ore to extract uranium and thorium
Radioactive Wastes
![Page 14: Nuclear Power: “Too cheap to meter” Ready Kilowatt](https://reader036.vdocuments.mx/reader036/viewer/2022062518/568147c7550346895db50917/html5/thumbnails/14.jpg)
Waste Disposal
1. Low-level wastes: LLRWPA/compacts
2. High level wastes:
a. NWPA: Indiana case
b. Yucca Mountain
![Page 15: Nuclear Power: “Too cheap to meter” Ready Kilowatt](https://reader036.vdocuments.mx/reader036/viewer/2022062518/568147c7550346895db50917/html5/thumbnails/15.jpg)
High level Nuclear Waste (Dry Cask) Storage
![Page 16: Nuclear Power: “Too cheap to meter” Ready Kilowatt](https://reader036.vdocuments.mx/reader036/viewer/2022062518/568147c7550346895db50917/html5/thumbnails/16.jpg)
High level Nuclear Waste (Wet) Storage (fuel rods)
![Page 17: Nuclear Power: “Too cheap to meter” Ready Kilowatt](https://reader036.vdocuments.mx/reader036/viewer/2022062518/568147c7550346895db50917/html5/thumbnails/17.jpg)
Nuclear Waste (Wet) Storage
![Page 18: Nuclear Power: “Too cheap to meter” Ready Kilowatt](https://reader036.vdocuments.mx/reader036/viewer/2022062518/568147c7550346895db50917/html5/thumbnails/18.jpg)
Conceptual diagram of the Yucca Mountain facility
![Page 19: Nuclear Power: “Too cheap to meter” Ready Kilowatt](https://reader036.vdocuments.mx/reader036/viewer/2022062518/568147c7550346895db50917/html5/thumbnails/19.jpg)
Opposition to Yucca Mountain Disposal Site
![Page 20: Nuclear Power: “Too cheap to meter” Ready Kilowatt](https://reader036.vdocuments.mx/reader036/viewer/2022062518/568147c7550346895db50917/html5/thumbnails/20.jpg)
What should be done with American high-level nuclear waste? Why?
Nuclear power comprises roughly 15-20% of US (and worldwide) electric generation.
How much should the U.S. rely on it in the future? Why?