    Nuclear Power In Pakistan

    By:

    Shahrukh Saleem

    M.Sc Electrical Power

  • 8/3/2019 Nuclear Power in Pakistan

    3/32

    Synopsis

    Pakistan is the 7th nuclear weapon state and nuclearpower.

    As of 2009, the nuclear power plants make up to 2.4%share of the total generation, where the electricity made

    by fossil fuel (coal, gas & oil) is 65.2 % and 33.9% of itis from the Hydro power.

    At present, Pakistan has two nuclear reactors of 425MW power to generate electricity. The third nuclearreactor will be operational in mid-2010.

    Pakistan Atomic Energy Commission (PAEC) isresponsible for all nuclear energy and researchapplications in the country.

  • 8/3/2019 Nuclear Power in Pakistan

    4/32

    Generation Share In Pakistan

    2.40%

    65.20

    %

    33.90

    %

    1

    2

    3

    Generation Share in Pakistan

    Nuclear Generation

    Thermal Generation

    Hydel Generation

  • 8/3/2019 Nuclear Power in Pakistan

    5/32

    Civilian Nuclear Program

  • 8/3/2019 Nuclear Power in Pakistan

    6/32

    Brief Introduction

    Pakistans first nuclear power reactor is a small (125MWe) Canadian pressurized heavy water reactor(PHWR) which started up in 1971 and which is underinternational safeguards KANUPP near Karachi,which is operated at reduced power. KANUPP-2 and

    KANUPP-3 are under construction and are being builtby PAEC.

    The KANUPP-2 (1000 MWe) and KANUPP-3 (1000Mwe) are a part of Pakistan's civilian nuclear program.

    The three units of nuclear power plant are under IAEA

    safeguards. KANUPP is supplying power to KESC & is not

    controlled by National Power Control Center.

  • 8/3/2019 Nuclear Power in Pakistan

    7/32

  • 8/3/2019 Nuclear Power in Pakistan

    8/32

    Contd..

    The third nuclear power reactor is Pakistan Nuclear

    Power Fuel Complex (1000 MWe) pressurized water

    reactor, constructed indigenously by Pakistan's PAEC,

    under IAEA safeguards.

    The main part of the plant is designed on the model of

    CHASMA Nuclear Power Plant.

    The 90% of work of plant is done and will generate

    electricity in 2010.

  • 8/3/2019 Nuclear Power in Pakistan

    9/32

    Pakistan Nuclear Power Reactors

  • 8/3/2019 Nuclear Power in Pakistan

    10/32

    Fuel - Uranium

  • 8/3/2019 Nuclear Power in Pakistan

    11/32

    Fuel cycle

    Enriched fuel for the PWRs is imported from China.

    China then in 2007 deferred development of its CNP-

    1000 type which is the only one able to be exported.

    Pakistan is now exploring the possibility of smaller unitswith higher local content.

    The government has set a target of producing 350

    tonnes U3O8 per year from 2015 to meet one third of

    anticipated requirements then. Low grade ore is knownin central Punjab at Bannu Basin and Suleman Range.

  • 8/3/2019 Nuclear Power in Pakistan

    12/32

    Fuel Enrichment Plants

    A small uranium centrifuge enrichment plant at Kahuta

    has been operated by the PAEC since 1984.

    A newer plant is reported to be at Gadwal. It is not

    under safeguards.

    Other plants in the pipeline are, Pakistan Nuclear

    Power Fuel Complex which would be under IAEA

    safeguards & the enrichment plant at Chak Jhumra,

    Faisalabad, in Punjab.

  • 8/3/2019 Nuclear Power in Pakistan

    13/32

    Radioactive Waste Management

  • 8/3/2019 Nuclear Power in Pakistan

    14/32

    Nuclear Wastes

    The PAEC has responsibility for radioactive waste

    management.

    A Radioactive Waste Management Fund is proposed in

    a new proposed policy.

    Waste Management Centres are proposed for Karachi

    and Chashma.

    Used fuel is currently stored at each reactor in pools.

    Longer-term dry storage at each site is proposed. The

    question of future reprocessing remains open.

  • 8/3/2019 Nuclear Power in Pakistan

    15/32

    Nuclear Regulation

  • 8/3/2019 Nuclear Power in Pakistan

    16/32

    Regulatory Authority

    Pakistan Nuclear Regulatory Authority is responsible for

    licensing and supervision, and in respect to the Chashma

    reactors it works closely with China's NNSA, National Nuclear

    Security Administration.

  • 8/3/2019 Nuclear Power in Pakistan

    17/32

    Nuclear Power Plants in Pakistan

    CHASHNUPP-1

    KANUPP-1

  • 8/3/2019 Nuclear Power in Pakistan

    18/32

    Active Nuclear Power Plants inPakistan

  • 8/3/2019 Nuclear Power in Pakistan

    19/32

    Karachi Nuclear Power PlantKANUPP

  • 8/3/2019 Nuclear Power in Pakistan

    20/32

  • 8/3/2019 Nuclear Power in Pakistan

    21/32

    PLANT DESCRIPTION

  • 8/3/2019 Nuclear Power in Pakistan

    22/32

  • 8/3/2019 Nuclear Power in Pakistan

    23/32

    General Plant Features

    Owner/Operator: Pakistan Atomic Energy Commission Prime contractor and designer: Canadian General

    Electric Company Ltd. Reactor type: CANada Deutrium Uranium (CANDU)

    Pressurized Heavy Water (PHWR) Heat transferred to steam cycle: 432.8 MW (thermal) Gross output: 137,000 kWe Net station output: 125,000 kWe

    Generation/ transmission voltage: 15/132 kV Capital cost (1971): Rs. 428.026 Million Overall station efficiency: 27.42%

  • 8/3/2019 Nuclear Power in Pakistan

    24/32

    Waste Management

    Radioactive waste released from KANUPP occur in solid, liquidand gaseous forms.

    Solid waste and resins are stored within plant site in adequatelyshielded places. Over 99% of the radioactive substancesproduced in the reactor remain entrapped inside the fuel.

    Used nuclear fuel discharged to-date is stored in water-filled bays- a safe arrangement for storage.

    The low level solid waste is stored in concrete trenches located inan isolated area near the plant. The trenches are capped andtheir surface is regularly monitored for any activity.

    Liquid waste is disposed after chemical and radiological analysis. Gaseous wastes are passed through high efficiency filters before

    discharge. On line monitors are also installed on the stack tomeasure the activity released to the atmosphere.

  • 8/3/2019 Nuclear Power in Pakistan

    25/32

    Chashma Nuclear PowerPlant CHASNUPP 1

  • 8/3/2019 Nuclear Power in Pakistan

    26/32

    CHASNUPP - 1

    The Plant is located in the province of Punjab near

    Chashma Barrage on the left bank of River Indus

    The construction of Chashma Nuclear Power Plant

    Unit-1 (CHASNUPP-1), the second nuclear power plant

    in Pakistan, was started in 1992 with the help of

    People's Republic of China. It has been in commercial

    operation since September 2000.

    CHASNUPP-1 is a two-loop, single unit, PWR plant with

    gross output of 325 MWe & net output of 300 MWe andlife span of 40 years.

  • 8/3/2019 Nuclear Power in Pakistan

    27/32

    PLANT DESCRIPTION

  • 8/3/2019 Nuclear Power in Pakistan

    28/32

    Plant Technical Features

    Ch h N l P Pl

  • 8/3/2019 Nuclear Power in Pakistan

    29/32

    Chashma Nuclear Power PlantII, III & IV

    Chashma Nuclear Power Plant II is a nuclear power

    station under construction at Kundian, Punjab,

    Pakistan.

    The site is located south of Mianwali, near the

    Chashma Barrage and on the left bank of the Indus

    River.

    CHASNUPP-2 will be a single-unit plant of 300 MWe

    class and include a two-loop pressurized water reactor

    nuclear steam supply system furnished by CNNC. CHASNUPP III & IV units will both have generation

    capacity of 340MWe and a design life of 40 years

  • 8/3/2019 Nuclear Power in Pakistan

    30/32

    Nuclear Power Research& Development

  • 8/3/2019 Nuclear Power in Pakistan

    31/32

    R&D and Other Activities

    Research is also being carried out by Pakistan Atomic Energy

    Commission for safe operation of the Nuclear Power Plants.

    Applied System Analysis group of Pakistan Atomic Energy

    Commission is commissioned for Energy, electricity and nuclear

    power planning for Pakistan and analysis of related economic,

    financial and environmental issues.

    Pakistan also has a 10 MW research reactor, PARR-Reactor, of

    1965 vintage operated by the Pakistan Institute of Nuclear

    Science and Technology.

    Another "multipurpose" reactor, a 50 MWt PHWR near Khushab,started operating in 1998 and is evidently for producing weapons-

    grade plutonium. A similar or possibly larger heavy water reactor

    has been under construction at Khushab since about 2002