Nuclear Materials Management
H Canyon and HB Line Processing
K Area Plutonium Storage
L Area Spent Fuel Storage
![Page 2: Nuclear Materials Management](https://reader034.vdocuments.mx/reader034/viewer/2022051319/586cd6c41a28abcf5c8b90a4/html5/thumbnails/2.jpg)
2
Agenda
• Overview of facilities and possible application for advanced robotics
– H Canyon
– HB Line
– L Area
– K Area
![Page 3: Nuclear Materials Management](https://reader034.vdocuments.mx/reader034/viewer/2022051319/586cd6c41a28abcf5c8b90a4/html5/thumbnails/3.jpg)
3
Savannah River Site
SRNS – Savannah River Nuclear SolutionsSRR – Savannah River RemediationMOX – Mixed Oxide
• 310 square miles
• Major site contractors: SRNS, SRR
• Located on site: – Savannah River National Laboratory
– 5 reactor areas (not operational)• Materials Storage Facility (K Area)
• Spent Fuel Storage (L Area)
– 2 chemical separations facilities (1 operational)• H Canyon
• HB Line
– 2 waste storage tank areas
– 2 waste processing facilities
– Tritium facility
– MOX Fuel Fabrication Facility
• Many facilities were constructed in the 1950’s
![Page 4: Nuclear Materials Management](https://reader034.vdocuments.mx/reader034/viewer/2022051319/586cd6c41a28abcf5c8b90a4/html5/thumbnails/4.jpg)
Nuclear Materials Disposition Process
4FRR – Foreign Research Reactor DRR – Domestic Research Reactor WIPP – Waste Isolation Pilot Plant AFS – Alternate Feed StockSNF – Spent Nuclear Fuel MOX – Mixed Oxide
![Page 5: Nuclear Materials Management](https://reader034.vdocuments.mx/reader034/viewer/2022051319/586cd6c41a28abcf5c8b90a4/html5/thumbnails/5.jpg)
5
H Canyon
• Built between 1951 and 1954
And began operating in 1955.
• Recovers uranium from spent
reactor fuels.
• Also has recovered Neptunium
and Plutonium.
• About 1000’ x 120’ x 75’ .
• Two canyons – Hot and warm
each divided into 18 sections.
• No entry permitted into the Hot Canyon due to radiation rates and limited entries into the Warm Canyon.
• All work in canyons performed by overhead cranes.
• Use of nitric acid in processing has degrade concrete in some areas.
![Page 6: Nuclear Materials Management](https://reader034.vdocuments.mx/reader034/viewer/2022051319/586cd6c41a28abcf5c8b90a4/html5/thumbnails/6.jpg)
6SRNS – Savannah River Nuclear Solutions
H Canyon Cross Section
10-23-0101E03053-38
CANYON CROSS SECTION
AIROUT
GANGVALVES
CELL COVER
HOT CANYON
CRANE
CAB
SAMPLEAISLE
AIRIN
ELECTRICAL
CONTROL ROOM
COLDFEEDTANKS
COLD PIPING
MISC EQUIPMENT& STORAGE
SAMPLEAISLE
AIRIN
AIR OUT
GANGVALVES
WARM CANYON
CRANE
CAB
![Page 7: Nuclear Materials Management](https://reader034.vdocuments.mx/reader034/viewer/2022051319/586cd6c41a28abcf5c8b90a4/html5/thumbnails/7.jpg)
7
Warm Canyon with Cell Covers Removed
![Page 8: Nuclear Materials Management](https://reader034.vdocuments.mx/reader034/viewer/2022051319/586cd6c41a28abcf5c8b90a4/html5/thumbnails/8.jpg)
8
Hot Canyon Crane
Crane Control Room
Hot Crane just outside of the crane maintenance area
![Page 9: Nuclear Materials Management](https://reader034.vdocuments.mx/reader034/viewer/2022051319/586cd6c41a28abcf5c8b90a4/html5/thumbnails/9.jpg)
9
H Canyon Process Air Exhaust Tunnel – looking west
![Page 10: Nuclear Materials Management](https://reader034.vdocuments.mx/reader034/viewer/2022051319/586cd6c41a28abcf5c8b90a4/html5/thumbnails/10.jpg)
10SRNS – Savannah River Nuclear SolutionsDOE – Department of Energy
Potential Robotics Applications in H Canyon
• Removal of concrete degradation products from canyon cells and sumps and in-cell repair of concrete walls.
• Inspection and repair of canyon structures such as the Canyon Air tunnel or exhaust stack.
• Size reduction of failed canyon equipment to reduce waste volume.
• Transfer of high dose material from shipping drums into fuel tubes.
• Inspect and repair piping in difficult to access locations such as confined spaces.
• Interior inspection of piping.
• Waste drum movements and assay.
• Emergency response to chemical and/or radiological solution spills.
![Page 11: Nuclear Materials Management](https://reader034.vdocuments.mx/reader034/viewer/2022051319/586cd6c41a28abcf5c8b90a4/html5/thumbnails/11.jpg)
11
HB Line
• Built in early 1980’s and began
operating in 1955.
• Recovers neptunium and
plutonium from solution.
• Sits atop H Canyon
• Most operations are hands-on
Inside glove boxes with little
potential for application of robotics.
![Page 12: Nuclear Materials Management](https://reader034.vdocuments.mx/reader034/viewer/2022051319/586cd6c41a28abcf5c8b90a4/html5/thumbnails/12.jpg)
12
K Area Complex Plutonium Storage
• Originally built as a production reactor, it was refurbished at the
end of the cold war to store excess Pu.
• It also contains one glovebox to examine
Pu storage containers to ensure
continued safe storage.
• Provides plutonium metal feed to HB Line
for conversion to oxide. Plutonium oxide
Is then shipped back to K Area.
Pu Storage containers
![Page 13: Nuclear Materials Management](https://reader034.vdocuments.mx/reader034/viewer/2022051319/586cd6c41a28abcf5c8b90a4/html5/thumbnails/13.jpg)
13
Potential Robotics Applications in K Area
• Movement and stacking of drums in the material storage area to improve safety and reduce radiation dose to workers.
• Semi-autonomous inspection and scanning of building structures and components.
• Unpacking high-risk plutonium storage drums.
• Movement of drums of heavy water.
Heavy water drum storage
![Page 14: Nuclear Materials Management](https://reader034.vdocuments.mx/reader034/viewer/2022051319/586cd6c41a28abcf5c8b90a4/html5/thumbnails/14.jpg)
14
L Area Spent Fuel
SRNS – Savannah River Nuclear Solutions
• Originally built as a production reactor, now only the fuel basin is used to receive and store US origin spent nuclear fuel from both foreign and domestic research reactors.
• Also ships fuel to H Area for dissolution and recovery of uranium.
Fuel bundle being placed in a storage rack(all work is done underwater for shielding)
![Page 15: Nuclear Materials Management](https://reader034.vdocuments.mx/reader034/viewer/2022051319/586cd6c41a28abcf5c8b90a4/html5/thumbnails/15.jpg)
15
Potential Robotics Applications in L Area
Cask decontaminationand surveying
• Fuel integrity inspections during storage
• Fuel inspections before opening a transportation package (enter package through vent/drain ports)
• Building inspections similar to K Area including underwater
• Nuclear Material Accountability of dry fuel storage area
• Underwater Cask lid bolt removal
• Inspection of Basin water filtration system
• Emergency response radiological events.
![Page 16: Nuclear Materials Management](https://reader034.vdocuments.mx/reader034/viewer/2022051319/586cd6c41a28abcf5c8b90a4/html5/thumbnails/16.jpg)
16
Summary
• Many applications of robotics in H, K and L Areas
• Remove personnel from hazardous environments
• Perform repetitive tasks to reduce human error
• Questions?