NTPC Summer Internship
-Sathiyaseelan M [10BM60080]
![Page 3: Ntpc summer internship - 10BM60080](https://reader036.vdocuments.mx/reader036/viewer/2022082915/547936c3b4af9fc9158b476f/html5/thumbnails/3.jpg)
Installed Capacity
NO. OF PLANTS Number of plants CAPACITY (MW)NTPC OwnedCoal 15 26,875
Gas/Liquid Fuel 7 3,955
Total 22 30,830Owned By JVsCoal & Gas 6 3,364Total 28 34,194
REGION COAL GAS TOTAL
Northern 8,015 2,312 10,327
Western 6,860 1,293 8,153
Southern 4,100 350 4,450
Eastern 7,900 - 7,900
JVs 1,424 1,940 3,364
Total 28,299 5,895 34,194
Reference : http://www.ntpc.co.in
![Page 4: Ntpc summer internship - 10BM60080](https://reader036.vdocuments.mx/reader036/viewer/2022082915/547936c3b4af9fc9158b476f/html5/thumbnails/4.jpg)
![Page 5: Ntpc summer internship - 10BM60080](https://reader036.vdocuments.mx/reader036/viewer/2022082915/547936c3b4af9fc9158b476f/html5/thumbnails/5.jpg)
![Page 6: Ntpc summer internship - 10BM60080](https://reader036.vdocuments.mx/reader036/viewer/2022082915/547936c3b4af9fc9158b476f/html5/thumbnails/6.jpg)
Kind of Projects We expect NTPC is on expansion spree; Identifying Facility locations
for NTPC. NTPC is diversifying across the power value chain by
considering backward and forward integration into areas such as power trading, transmission, distribution, coal mining, coal beneficiation, Ash Business etc. ; Expect Supply chain related projects in these areas.
Projects on procurement process. Projects on coal import, transportation and handling. Projects on improving capacity utilization. Projects on Renewable Energy & Distributed Generation.
![Page 7: Ntpc summer internship - 10BM60080](https://reader036.vdocuments.mx/reader036/viewer/2022082915/547936c3b4af9fc9158b476f/html5/thumbnails/7.jpg)
Internship plan
To get an overall view of production and operations management processes followed in NTPC.
Thorough study of projects where we would be put. Problem Formulation. Problem Analysis. Application of relevant methodologies discusses in
class. Submission of our proposals.