Savannah River Site Spent Fuel Program Status. NSNFP Technical Exchange Meeting Bethesda, MD April 14, 2005. L-Basin. Receipts Since Last Meeting. Foreign: 5 casks from Japan Domestic: 7 casks HFIR/MURR/MIT. Work in Process. L-Area Storage Racks (temp. hold) - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: NSNFP Technical Exchange Meeting Bethesda, MD April 14, 2005](https://reader030.vdocuments.mx/reader030/viewer/2022020320/56814491550346895db12fe7/html5/thumbnails/1.jpg)
NSNFP TechnicalExchange Meeting
Bethesda, MDApril 14, 2005
Savannah River SiteSpent Fuel Program
Status
![Page 2: NSNFP Technical Exchange Meeting Bethesda, MD April 14, 2005](https://reader030.vdocuments.mx/reader030/viewer/2022020320/56814491550346895db12fe7/html5/thumbnails/2.jpg)
L-Basin
![Page 3: NSNFP Technical Exchange Meeting Bethesda, MD April 14, 2005](https://reader030.vdocuments.mx/reader030/viewer/2022020320/56814491550346895db12fe7/html5/thumbnails/3.jpg)
ReceiptsSince Last Meeting
Foreign: 5 casks from Japan
Domestic: 7 casks HFIR/MURR/MIT
![Page 4: NSNFP Technical Exchange Meeting Bethesda, MD April 14, 2005](https://reader030.vdocuments.mx/reader030/viewer/2022020320/56814491550346895db12fe7/html5/thumbnails/4.jpg)
Work in Process
• L-Area Storage Racks (temp. hold)
• RBOF Cask Pad Cleanup
• Treatment and Storage Facility
![Page 5: NSNFP Technical Exchange Meeting Bethesda, MD April 14, 2005](https://reader030.vdocuments.mx/reader030/viewer/2022020320/56814491550346895db12fe7/html5/thumbnails/5.jpg)
02 04 06 08 10 12 14 16 18 20 22 24 26
5000
10000
15000
20000
25000
30000
Fiscal Year
Eq
uiv
alen
t M
TR
Es
Capacity with LASR ~ 19000 MTRE
L-Basin Inventory – Without TSF
LASR = L-Area Storage Rack project (FY00-06)MTRE = Material Test Reactor Equivalent
![Page 6: NSNFP Technical Exchange Meeting Bethesda, MD April 14, 2005](https://reader030.vdocuments.mx/reader030/viewer/2022020320/56814491550346895db12fe7/html5/thumbnails/6.jpg)
L-Basin HFIR Projection – Without TSF
02 04 06 08 10 12 14 16 18 20 22 24 26
50
100
150
200
250
300
Fiscal Year
HF
IR C
ore
s
Capacity After LASR 208 cores
350
LASR = L-Area Storage Rack project (FY00-06)HFIR = High Flux Isotope Reactor (Oak Ridge)
![Page 7: NSNFP Technical Exchange Meeting Bethesda, MD April 14, 2005](https://reader030.vdocuments.mx/reader030/viewer/2022020320/56814491550346895db12fe7/html5/thumbnails/7.jpg)
Work in Process
• L-Area Storage Racks (temp. hold)
• RBOF Cask Pad Cleanup
• Treatment and Storage Facility
![Page 8: NSNFP Technical Exchange Meeting Bethesda, MD April 14, 2005](https://reader030.vdocuments.mx/reader030/viewer/2022020320/56814491550346895db12fe7/html5/thumbnails/8.jpg)
RBOF Cask Pad
![Page 9: NSNFP Technical Exchange Meeting Bethesda, MD April 14, 2005](https://reader030.vdocuments.mx/reader030/viewer/2022020320/56814491550346895db12fe7/html5/thumbnails/9.jpg)
Work in Process
• L-Area Storage Racks (temp. hold)
• RBOF Cask Pad Cleanup
• Treatment and Storage Capability
![Page 10: NSNFP Technical Exchange Meeting Bethesda, MD April 14, 2005](https://reader030.vdocuments.mx/reader030/viewer/2022020320/56814491550346895db12fe7/html5/thumbnails/10.jpg)
Status:SNF Treatment and Storage Facility
• CD-O package in approval process
![Page 11: NSNFP Technical Exchange Meeting Bethesda, MD April 14, 2005](https://reader030.vdocuments.mx/reader030/viewer/2022020320/56814491550346895db12fe7/html5/thumbnails/11.jpg)
04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
Spent Nuclear Fuel Program Schedule
Final closure/Disposition
Basin Operations
TSF Project
Foreign SNF Receipt Program
Domestic SNF Receipt Program
TSC Operations
Shipments to Repository
Deactivate
(By FY)
![Page 12: NSNFP Technical Exchange Meeting Bethesda, MD April 14, 2005](https://reader030.vdocuments.mx/reader030/viewer/2022020320/56814491550346895db12fe7/html5/thumbnails/12.jpg)
Issues
• Lack of formal, written program direction
• No TSF funding Identified
• Global Threat Reduction Initiative impacts
• Potential receipt of INEEL FRR shipments
• H-Canyon processing – near term decision