Page 1: NRC Public Meeting Public Meeting Davis Besse Shield Building Cracks January 5, 2012

8/3/2019 NRC Public Meeting Public Meeting Davis Besse Shield Building Cracks January 5, 2012

http://slidepdf.com/reader/full/nrc-public-meeting-public-meeting-davis-besse-shield-building-cracks-january 1/24

 

Davis Besse Shield Building CracksJanuary 5, 2012

Page 2: NRC Public Meeting Public Meeting Davis Besse Shield Building Cracks January 5, 2012

8/3/2019 NRC Public Meeting Public Meeting Davis Besse Shield Building Cracks January 5, 2012

http://slidepdf.com/reader/full/nrc-public-meeting-public-meeting-davis-besse-shield-building-cracks-january 2/24

Welcome

2

yn a e ersonActing Regional Administrator 

NRC Region III

Page 3: NRC Public Meeting Public Meeting Davis Besse Shield Building Cracks January 5, 2012

8/3/2019 NRC Public Meeting Public Meeting Davis Besse Shield Building Cracks January 5, 2012

http://slidepdf.com/reader/full/nrc-public-meeting-public-meeting-davis-besse-shield-building-cracks-january 3/24

NRC Safety Mission

• The Nuclear Regulatory Commission (NRC)is an independent federal agency created

y . . ongress.• The mission of the NRC is to license and

regulate the Nation’s civilian use of 

nuclear materials in order to protect publichealth and safety, promote the commondefense and security, and protect theenvironment.

3

Page 4: NRC Public Meeting Public Meeting Davis Besse Shield Building Cracks January 5, 2012

8/3/2019 NRC Public Meeting Public Meeting Davis Besse Shield Building Cracks January 5, 2012

http://slidepdf.com/reader/full/nrc-public-meeting-public-meeting-davis-besse-shield-building-cracks-january 4/24

Page 5: NRC Public Meeting Public Meeting Davis Besse Shield Building Cracks January 5, 2012

8/3/2019 NRC Public Meeting Public Meeting Davis Besse Shield Building Cracks January 5, 2012

http://slidepdf.com/reader/full/nrc-public-meeting-public-meeting-davis-besse-shield-building-cracks-january 5/24

Meeting Purpose

• Inform the public about the safety of the

Davis Besse shield building through:

- A presentation by the licensee on theresults of their tests and analysis.

- A presentation by the NRC on the NRC’s

inspection of the shield building and

actions taken to ensure safety.

5

Page 6: NRC Public Meeting Public Meeting Davis Besse Shield Building Cracks January 5, 2012

8/3/2019 NRC Public Meeting Public Meeting Davis Besse Shield Building Cracks January 5, 2012

http://slidepdf.com/reader/full/nrc-public-meeting-public-meeting-davis-besse-shield-building-cracks-january 6/24

Meeting Information

Kenneth O’Brien

6

epu y rec or, v s on oReactor Safety

NRC Region III

Page 7: NRC Public Meeting Public Meeting Davis Besse Shield Building Cracks January 5, 2012

8/3/2019 NRC Public Meeting Public Meeting Davis Besse Shield Building Cracks January 5, 2012

http://slidepdf.com/reader/full/nrc-public-meeting-public-meeting-davis-besse-shield-building-cracks-january 7/24

Meeting Agenda

• Introductions

• Background

7

• Licensee Presentation

• NRC Inspection & Conclusion

• Additional NRC Safety Actions

• Summary

• Public Questions and Comments

Page 8: NRC Public Meeting Public Meeting Davis Besse Shield Building Cracks January 5, 2012

8/3/2019 NRC Public Meeting Public Meeting Davis Besse Shield Building Cracks January 5, 2012

http://slidepdf.com/reader/full/nrc-public-meeting-public-meeting-davis-besse-shield-building-cracks-january 8/24

Introductions - NRC

• Cynthia Pederson, Acting Regional Administrator,Region III

• Kenneth O’Brien, Deputy Director, Division of Reactor Safet

8

• Patrick Hiland, Director, Division of Engineering, Officeof Nuclear Reactor Regulation

• David Hills, Chief, Engineering Branch 1

• Jamnes Cameron, Chief, Reactor Projects Branch 6

• Daniel Kimble, Senior Resident Inspector 

• Adam Wilson, Resident Inspector 

• Jared Heck, Meeting Facilitator 

Page 9: NRC Public Meeting Public Meeting Davis Besse Shield Building Cracks January 5, 2012

8/3/2019 NRC Public Meeting Public Meeting Davis Besse Shield Building Cracks January 5, 2012

http://slidepdf.com/reader/full/nrc-public-meeting-public-meeting-davis-besse-shield-building-cracks-january 9/24

Meeting Contacts

• Followup Questions - Contact the

NRC Region III Office of Public

Affairs / Viktoria Mitlyng / PremaChandrathil 630-829-9500

9

Page 10: NRC Public Meeting Public Meeting Davis Besse Shield Building Cracks January 5, 2012

8/3/2019 NRC Public Meeting Public Meeting Davis Besse Shield Building Cracks January 5, 2012

http://slidepdf.com/reader/full/nrc-public-meeting-public-meeting-davis-besse-shield-building-cracks-january 10/24

First Energy Nuclear 

10

 (FENOC) Introductions

and Presentation

Page 11: NRC Public Meeting Public Meeting Davis Besse Shield Building Cracks January 5, 2012

8/3/2019 NRC Public Meeting Public Meeting Davis Besse Shield Building Cracks January 5, 2012

http://slidepdf.com/reader/full/nrc-public-meeting-public-meeting-davis-besse-shield-building-cracks-january 11/24

NRC Inspection &Conclusions

11

David Hills

Engineering Branch Chief NRC Region III

Page 12: NRC Public Meeting Public Meeting Davis Besse Shield Building Cracks January 5, 2012

8/3/2019 NRC Public Meeting Public Meeting Davis Besse Shield Building Cracks January 5, 2012

http://slidepdf.com/reader/full/nrc-public-meeting-public-meeting-davis-besse-shield-building-cracks-january 12/24

NRC Safety Focused Inspection

• At discovery of cracking, NRCinspectors already onsite inspecting

12

 

replacement.

• Added extra NRC structural expertise.

• Approximately 10 NRC engineersinvolved during the almost 8 weektime period.

12

Page 13: NRC Public Meeting Public Meeting Davis Besse Shield Building Cracks January 5, 2012

8/3/2019 NRC Public Meeting Public Meeting Davis Besse Shield Building Cracks January 5, 2012

http://slidepdf.com/reader/full/nrc-public-meeting-public-meeting-davis-besse-shield-building-cracks-january 13/24

NRC Safety Focused Inspection

• NRC inspectors onsite independentlyobserved and evaluated licensee’s

13

ac v es o e erm ne e ex en ocracking.

• NRC structural engineers performedextensive, independent, & rigorousreview of the licensee’s analysisincluding structural calculations.

Page 14: NRC Public Meeting Public Meeting Davis Besse Shield Building Cracks January 5, 2012

8/3/2019 NRC Public Meeting Public Meeting Davis Besse Shield Building Cracks January 5, 2012

http://slidepdf.com/reader/full/nrc-public-meeting-public-meeting-davis-besse-shield-building-cracks-january 14/24

NRC Safety Focused Inspection

• The NRC team engaged the licensee’sengineers and consultants in intense

14

 

licensee’s actions and analysis.

• Numerous technical questions were

posed and answered – some inwriting/many verbally.

14

Page 15: NRC Public Meeting Public Meeting Davis Besse Shield Building Cracks January 5, 2012

8/3/2019 NRC Public Meeting Public Meeting Davis Besse Shield Building Cracks January 5, 2012

http://slidepdf.com/reader/full/nrc-public-meeting-public-meeting-davis-besse-shield-building-cracks-january 15/24

NRC Safety Focused Inspection

• NRC questions resulted in additionallicensee actions to determine the

15

 

of more extensive/detailed structuralcalculations.

15

Page 16: NRC Public Meeting Public Meeting Davis Besse Shield Building Cracks January 5, 2012

8/3/2019 NRC Public Meeting Public Meeting Davis Besse Shield Building Cracks January 5, 2012

http://slidepdf.com/reader/full/nrc-public-meeting-public-meeting-davis-besse-shield-building-cracks-january 16/24

• The licensee performed impulseresponse mapping and confirmatory

NRC Conclusion Basis

16

 cracking.

• Structural calculations reflected extent

of cracking that was verified throughtesting.

16

Page 17: NRC Public Meeting Public Meeting Davis Besse Shield Building Cracks January 5, 2012

8/3/2019 NRC Public Meeting Public Meeting Davis Besse Shield Building Cracks January 5, 2012

http://slidepdf.com/reader/full/nrc-public-meeting-public-meeting-davis-besse-shield-building-cracks-january 17/24

• Licensee calculation assumptions andengineering judgments were

NRC Conclusion Basis

17

.• Calculation modeling adequately

reflected the building condition

including structural load path.

17

Page 18: NRC Public Meeting Public Meeting Davis Besse Shield Building Cracks January 5, 2012

8/3/2019 NRC Public Meeting Public Meeting Davis Besse Shield Building Cracks January 5, 2012

http://slidepdf.com/reader/full/nrc-public-meeting-public-meeting-davis-besse-shield-building-cracks-january 18/24

• The licensee evaluated the shield building’s

ability to withstand the design basis

NRC Conclusion Basis

18

, ,

missiles.

• The licensee’s calculations confirmed that

building stresses remained within limits setin the original licensing basis.

18

Page 19: NRC Public Meeting Public Meeting Davis Besse Shield Building Cracks January 5, 2012

8/3/2019 NRC Public Meeting Public Meeting Davis Besse Shield Building Cracks January 5, 2012

http://slidepdf.com/reader/full/nrc-public-meeting-public-meeting-davis-besse-shield-building-cracks-january 19/24

Shield building remains capable of 

NRC Safety Conclusion

19

per orm ng s sa e y unc on esp e e

cracking and therefore licensee could safely

restart plant.

19

Page 20: NRC Public Meeting Public Meeting Davis Besse Shield Building Cracks January 5, 2012

8/3/2019 NRC Public Meeting Public Meeting Davis Besse Shield Building Cracks January 5, 2012

http://slidepdf.com/reader/full/nrc-public-meeting-public-meeting-davis-besse-shield-building-cracks-january 20/24

• NRC structural engineers continue in their evaluation of whether the shield building

meets licensin commitments. If NRC

NRC Safety Conclusion

20

concludes commitments are not met, thenlicensee will need to correct.

• NRC inspection team is evaluating licensee’s

ongoing root cause activities and

determination of longer term corrective

actions.

20

Page 21: NRC Public Meeting Public Meeting Davis Besse Shield Building Cracks January 5, 2012

8/3/2019 NRC Public Meeting Public Meeting Davis Besse Shield Building Cracks January 5, 2012

http://slidepdf.com/reader/full/nrc-public-meeting-public-meeting-davis-besse-shield-building-cracks-january 21/24

Additional NRC Safety

Actions

21

amnes ameronChief, Reactor Projects Branch 6

NRC Region III

Page 22: NRC Public Meeting Public Meeting Davis Besse Shield Building Cracks January 5, 2012

8/3/2019 NRC Public Meeting Public Meeting Davis Besse Shield Building Cracks January 5, 2012

http://slidepdf.com/reader/full/nrc-public-meeting-public-meeting-davis-besse-shield-building-cracks-january 22/24

Additional NRC Actions to Ensure Continued

Safety of the Shield Building

Confirmatory Action Letter issued on December 2, 2011 –

22

,

and implement corrective actions, including a long-term monitoring program.

• Licensee to implement a short-term monitoringprogram.

NRC will conduct a followup inspection of root cause

evaluation and proposed corrective actions.

Page 23: NRC Public Meeting Public Meeting Davis Besse Shield Building Cracks January 5, 2012

8/3/2019 NRC Public Meeting Public Meeting Davis Besse Shield Building Cracks January 5, 2012

http://slidepdf.com/reader/full/nrc-public-meeting-public-meeting-davis-besse-shield-building-cracks-january 23/24

Summary

23

ynt a e ersonActing Regional Administrator 

NRC Region III

Page 24: NRC Public Meeting Public Meeting Davis Besse Shield Building Cracks January 5, 2012

8/3/2019 NRC Public Meeting Public Meeting Davis Besse Shield Building Cracks January 5, 2012

http://slidepdf.com/reader/full/nrc-public-meeting-public-meeting-davis-besse-shield-building-cracks-january 24/24

• NRC structural engineers conducted an

extensive, independent, and rigorousevaluation.

Summary

24

 

capable of performing its safety function.

• NRC determined that plant safety was notcompromised. NRC has taken actions to

ensure the plant remains safe going forward.

• NRC has continued to communicate to themedia, public officials, and members of thepublic.