  • www.rosenergoatom.ru

    NPPUNITSDECOMMISSIONING

    NikitaKonstantinov

    CEOadviser,ROSENERGOATOMCONCERNJSC

    ROSENERGOATOMELECTRICPOWERDIVISIONOFROSATOM

  • www.rosenergoatom.ru

    2

    ExistingNPPunitsandunitsandunderconstructioninRussianFederation

    LeningradNPP

    KolaNPP

    BilibinoNPP

    KalininNPP

    SmolenskNPP

    NovovoronezhNPP

    BalakovoNPPRostovNPP

    BeloyarskNPP

    4XVVER440

    Underconstruction

    4XRBMK1000 2XVVER1200

    4XVVER1000

    3XRBMK1000

    Operation

    1XVVER1000 1XVVER1200 2 XVVER440 1XVVER1200

    Decommissioning

    2XVVER(210,365)

    4XRBMK1000

    4XVVER1000

    3 XVVER1000

    1 XVVER1000

    Shutdownstage

    BN600BN8002XAMB(100,200)

    4XEGP 6

    Inoperation:10NPPs(34powerunits) 26.3GWh;2powerunitsinpilotoperation.Over16%ofelectricitygeneratedinRussiaUnderconstruction: 4largepowerunitsandFNPP.

    KurskNPP

  • www.rosenergoatom.ru

    3

    2016 2 NPP units are shut down, 2 NPP units are being decommissioned

    2028 13 NPP units are shut down, 4 NPP units are being decommissioned

    10 years' readiness for massscale decommissioning of NPP units

    Currentsituation

  • www.rosenergoatom.ru

    4

    PlannedtermsofNPPunitsshutdown

    Source:

    VVER440 EGP6 RBMK1000 BN600

    Roadmapasof06.15.2016,approvedbyA.M.Lokshin

    2017

    2018

    2019

    2020

    2021

    2022

    2023

    2024

    2025

    2026

    2027

    NOVOVORONEZHNPPUNITNo.3VVER440

    LENINGRADNPPUNITNo.1RBMK1000

    BILIBINONPPUNITNo.1EGP6

    LENINGRADNPPUNITNo.2RBMK1000

    KURSKNPPUNITNo.1RBMK1000

    KURSKNPPUNITNo.2RBMK1000

    LENINGRADNPPUNITNo.3RBMK1000

    LENINGRADNPPUNITNo.4RBMK1000

    BELOYARSKNPPUNITNo.3BN600

    SMOLENSKNPPUNITNo.1RBMK1000

    417MWTOTAL

    1,012MWTOTAL

    1,000MWTOTAL

    1,036MWTOTAL

    1,000MWTOTAL

    1,000MWTOTAL

    1,600MWTOTAL

    1,000MWTOTAL2028

    BILIBINONPPUNITSNos.24EGP6

  • www.rosenergoatom.ru

    5

    15years

    5 10years

    NPPpowerunitdecommissioningoptions

    RepositoryoperationBurial

    REMOVALOFSPENTNUCLEARFUEL

    DECOMMISSIONING

    LiquidationConservationundersurveillance

    PREPARATIONFORDECOMMISSIONING

    Preparationforconservation

    LiquidationPreparationforliquidation2

    Preparationforburial3

    1

    Finalshutdown

    AlicenseforDC

    OPERATION

    Alicensetooperatetherepository

    Releasefromregulatorycontrol

    LIQUIDATIONAFTERCONSERVATIONUNDERSURVEILLANCE(deferreddismantling)

    LIQUIDATION IMMEDIATEDISMANTLING

    BURIAL

    50years 5years

    15years 5years

    5years

    or

    or

  • www.rosenergoatom.ru

    6

    CurrentconceptofNPPpowerunitpreparationfordecommissioning

    Deferred dismantling is determined for the following NPP'sunits*:

    Novovoronezh NPP, Units Nos. 1, 2 Kola NPP, Units Nos. 14 Bilibino NPP, all Units

    An approach is adopted to multiunit NPP decommissioning,where the first NNP unit, located on the site, isdecommissioned under deferred dismantling option:

    Balakovo NPP, Unit No. 1 Kalinin NPP, Unit No. 1 Rostov NPP, Unit No. 1

    For all other units, including RBMK, the concept "immediatedismantling" decommissioning option is adopted.

    ForthemajorityofNPPunitsdecommissioningis

    determinedunder"immediatedismantling"strategy

    *Decommissioningprograms

  • www.rosenergoatom.ru

    7

    IntroductionofmeasuresforpreparationanddecommissioningofNPPunits

    BilibinoNPP

    NovovoronezhNPP

    BeloyarskNPP

    Shutdownyear Completed/ongoingactivities

    Unit1

    Unit2

    LeningradNPP

    Unit1

    Unit2

    Unit1

    Unit2

    Unit1

    Unit2

    Unit3

    Unit4

    construction of diesel fuel base stock of 16.0 thousand tons, including selfcontained powersource (2017) construction of a backup dieselgenerator station with the capacity of 8.9 MW (2017) construction of 110/35/6 kV substation and 6 kV VL6 "Bilibino 1. NPP "Dam" (2017)

    implementation of comprehensive engineering and radiation survey of unit 1 (2016) developing a set of supporting documents for obtaining a license to operate unit 1 after the finalshut down (2016) development of decommissioning project for units No. 1, 2 for the period of up to 2019 (2019) removal of leaky spent fuel assemblies from unit No. 1 (2018)

    Design documentation has been developed works are carried out to prepare for the removal of spent nuclear fuel and for decommissioning(individual decisions)

    dismantling works were carried out in unit 1 turbine building surface decontamination of machine pile drainage montejus boxes' equipment is carried out radioactive waste, produced at gasholder accidents' localization, is removed

    Decommissioning project is developed 8 turbine units and 1st unit deaerator stack equipment are dismantled 1 and 2 units of Novovoronezh NPP are signed off to Pilot Demonstration Engineering Center fordecommissioning branch decommissioning works are carried out since 2015, after obtaining a decommissioning license

    1984

    1990

    1981

    1989

    2019

    2021

    2019

    2022

    2022

    2022

  • www.rosenergoatom.ru8

    Additionalfinancingsources DecommissioningfinancingDECOMMISSIONINGRESERVE

    Decommissioningreserve

    3.2% Electricitysalesrevenue

    2

    1

    Reimbursablefunds Commercialactivity

    Up to 90% of dismantled equipment should be decontaminatedand returned into economic turnover

    The amount of reimbursable funds from metal sales equals up to10% of project cost

    Mechanismsfordecommissioningfinancing

  • www.rosenergoatom.ru

    9

    NPPUnitOperation

    EnsuringminimumcostofNPPsunitsdecommissioningworks

    Implementationof"immediatedismantling"strategy

    Operationalconfiguration Startofdecommissioningworksafterunitshutdownunderindividualtechnicalsolutions

    Regulatoryframeworkimprovement

    Rapidremovalofspentnuclearfuel