Regional Connector Transit Project Construction Update Flower St/Financial District CLC Meeting November 8, 2016 1

Upload: others

Post on 10-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: November 8, 2016 - Flower St/Financial District CLC ...€¦ · Deck Installation Closure Details > Flower St (3rd to 5th St) and 4th St (Figueroa to Flower St) > Traffic lane reduction,

Regional Connector Transit Project Construction Update Flower St/Financial District CLC Meeting November 8, 2016

1

Page 2: November 8, 2016 - Flower St/Financial District CLC ...€¦ · Deck Installation Closure Details > Flower St (3rd to 5th St) and 4th St (Figueroa to Flower St) > Traffic lane reduction,

CONSTRUCTION UPDATE Flower St/Financial District

2

Page 3: November 8, 2016 - Flower St/Financial District CLC ...€¦ · Deck Installation Closure Details > Flower St (3rd to 5th St) and 4th St (Figueroa to Flower St) > Traffic lane reduction,

Flower St/Financial District Ongoing/Look Ahead Schedule

Activity NOV DEC JAN FEB MAR APR

24” waterline relocation 5th–6th St. (nights)

Deck installation 4th–5th St. (weekends only)

Pre-trenching (weekdays) and piling 5th–6th St (east side)

Tieback removal at 3rd St. 3

Page 4: November 8, 2016 - Flower St/Financial District CLC ...€¦ · Deck Installation Closure Details > Flower St (3rd to 5th St) and 4th St (Figueroa to Flower St) > Traffic lane reduction,

Deck Installation Closure Details

> Flower St (3rd to 5th St) and 4th St (Figueroa to Flower St)

> Traffic lane reduction, followed by full street closure, start at 7 p.m., Friday. Street reopens at 5 a.m., Monday

> 14 weekends

> Activities include: – Roadway removal

– Excavation

– Hanging of utilities

– Cap beam installation

Flower St/Financial District 4

− Deck beam installation − Deck panel installation − Grade deck transition

Page 5: November 8, 2016 - Flower St/Financial District CLC ...€¦ · Deck Installation Closure Details > Flower St (3rd to 5th St) and 4th St (Figueroa to Flower St) > Traffic lane reduction,

Local Access Map – Through 12/5/16

> Local access maintained – Bank of America Plaza & World Trade Center enter from 3rd St

– Citigroup Center, J2 Garage and The Bonaventure Hotel enter from 5th St. Drivers must turn right onto Flower St from 5th St

5 Flower St/Financial District

Page 6: November 8, 2016 - Flower St/Financial District CLC ...€¦ · Deck Installation Closure Details > Flower St (3rd to 5th St) and 4th St (Figueroa to Flower St) > Traffic lane reduction,

Local Access Map – Starting 12/9/16

> Local access maintained – Bank of America Plaza & World Trade Center enter from 3rd St – Citigroup Center, J2 Garage and The Bonaventure Hotel enter

from 4th & 5th St. Drivers must turn right onto Flower St from 5th St

6 Flower St/Financial District

Page 7: November 8, 2016 - Flower St/Financial District CLC ...€¦ · Deck Installation Closure Details > Flower St (3rd to 5th St) and 4th St (Figueroa to Flower St) > Traffic lane reduction,

Detour Map

> Alternate routes: – Grand Ave to 5th St – 3rd St to Beaudry to 6th St

7 Flower St/Financial District

Page 8: November 8, 2016 - Flower St/Financial District CLC ...€¦ · Deck Installation Closure Details > Flower St (3rd to 5th St) and 4th St (Figueroa to Flower St) > Traffic lane reduction,

Deck Installation Closure Dates

> Initial weekend closure dates: > 7pm on 10/14/16 - 5am on 10/17/16 - Completed > 7pm on 10/21/16 - 5am on 10/24/16 - Completed > 7pm on 10/28/16 - 5am on 10/31/16 - Completed > 7pm on 11/4/16 - 5am on 11/7/16 - Completed > 7pm on 11/18/16 - 5am on 11/21/16 > 7pm on 12/2/16 - 5am on 12/5/16 > 7pm on 12/9/16 - 5am on 12/12/16 > 7pm on 12/16/16 - 5am on 12/19/16 > 7pm on 1/6/17 - 5am on 1/9/17 > Four additional weekends are scheduled in January/February

Flower St/Financial District 8

Page 9: November 8, 2016 - Flower St/Financial District CLC ...€¦ · Deck Installation Closure Details > Flower St (3rd to 5th St) and 4th St (Figueroa to Flower St) > Traffic lane reduction,

Deck Installation Progress Photos

9 Flower St/Financial District

Page 10: November 8, 2016 - Flower St/Financial District CLC ...€¦ · Deck Installation Closure Details > Flower St (3rd to 5th St) and 4th St (Figueroa to Flower St) > Traffic lane reduction,

Deck Installation Progress Photos

10 Flower St/Financial District

Page 11: November 8, 2016 - Flower St/Financial District CLC ...€¦ · Deck Installation Closure Details > Flower St (3rd to 5th St) and 4th St (Figueroa to Flower St) > Traffic lane reduction,

Decking on Flower St, 4th to 5th St

> Mitigations – Activities such as saw cutting, grinding and

roadway removal will be performed before 9 pm

– Sound barriers will be in place

– Lights will be directed toward the work zone

– Use of back-up alarms will be minimized

– Flaggers will assist motorists

– In-language 24/7 hour hotline—213.922.7277

11 Flower St/Financial District

Page 12: November 8, 2016 - Flower St/Financial District CLC ...€¦ · Deck Installation Closure Details > Flower St (3rd to 5th St) and 4th St (Figueroa to Flower St) > Traffic lane reduction,

Ongoing Activities

> Tieback removal at 3rd Street, over 40’ deep (on photo)

> 24” water line relocation on Flower St, at the 5th and 6th St intersections

Flower St/Financial District 12

Page 13: November 8, 2016 - Flower St/Financial District CLC ...€¦ · Deck Installation Closure Details > Flower St (3rd to 5th St) and 4th St (Figueroa to Flower St) > Traffic lane reduction,

Contact Us

metro.net/RegionalConnector twitter.com/MetroConnector facebook.com/MetroRegionalConnector 213.922.7277 [email protected]

13