November 24th, 2005 OPERA General meeting 1
CS facility
A. Ariga, M. Kazuyama, S. Hiramatsu
Nagoya University
OverviewIntroduction of components
![Page 2: November 24th, 2005OPERA General meeting1 CS facility A. Ariga, M. Kazuyama, S. Hiramatsu Nagoya University Overview Introduction of components](https://reader036.vdocuments.mx/reader036/viewer/2022062409/56649d555503460f94a32c15/html5/thumbnails/2.jpg)
November 24th, 2005 OPERA General meeting 2
CS barrack in Hall B
![Page 3: November 24th, 2005OPERA General meeting1 CS facility A. Ariga, M. Kazuyama, S. Hiramatsu Nagoya University Overview Introduction of components](https://reader036.vdocuments.mx/reader036/viewer/2022062409/56649d555503460f94a32c15/html5/thumbnails/3.jpg)
November 24th, 2005 OPERA General meeting 3
CS facility
Refresh
Packing
Clinching
top floor : CS production facilitybottom floor : CS development facility
Loading to CS box
![Page 4: November 24th, 2005OPERA General meeting1 CS facility A. Ariga, M. Kazuyama, S. Hiramatsu Nagoya University Overview Introduction of components](https://reader036.vdocuments.mx/reader036/viewer/2022062409/56649d555503460f94a32c15/html5/thumbnails/4.jpg)
November 24th, 2005 OPERA General meeting 4
CS Facility status• Refresh Chamber HIRAMATSU
– COMPLETED in underground in July
• Packing machine KAZUYAMA– 3/3 system COMPLETED in lab– Demonstrated in Nagoya emulsion workshop
• Clinching equipment HIRAMATSU– 2/2 COMPLETED in lab– Demonstrated in Nagoya emulsion workshop…
• Emulsion film (conventional gels)– first batch film was shipped from Tono on Sep 22nd.
![Page 5: November 24th, 2005OPERA General meeting1 CS facility A. Ariga, M. Kazuyama, S. Hiramatsu Nagoya University Overview Introduction of components](https://reader036.vdocuments.mx/reader036/viewer/2022062409/56649d555503460f94a32c15/html5/thumbnails/5.jpg)
November 24th, 2005 OPERA General meeting 5
CS Facility ScheduleNov 18th 28th~
all equipment shipping to LNGSStart to construction
Dec construction & test emulsion shipment 25%
Jan test operation & feedbackFeb operation start
emulsion shipment 25%Mar
Production capacity 2800 CS / day (1 CS refresh) 1400 CS / day (2 CS refresh)
today
![Page 6: November 24th, 2005OPERA General meeting1 CS facility A. Ariga, M. Kazuyama, S. Hiramatsu Nagoya University Overview Introduction of components](https://reader036.vdocuments.mx/reader036/viewer/2022062409/56649d555503460f94a32c15/html5/thumbnails/6.jpg)
November 24th, 2005 OPERA General meeting 6
Refresh & chamber construction
S. Hiramatsu, A. Ariga
![Page 7: November 24th, 2005OPERA General meeting1 CS facility A. Ariga, M. Kazuyama, S. Hiramatsu Nagoya University Overview Introduction of components](https://reader036.vdocuments.mx/reader036/viewer/2022062409/56649d555503460f94a32c15/html5/thumbnails/7.jpg)
November 24th, 2005 OPERA General meeting 7
Barrack drawings
Refresh Room Completed
Packing room
Clinching roomtop floor : CS production facilitybottom floor : CS development facility
Packing system construction will startfrom next week.
![Page 8: November 24th, 2005OPERA General meeting1 CS facility A. Ariga, M. Kazuyama, S. Hiramatsu Nagoya University Overview Introduction of components](https://reader036.vdocuments.mx/reader036/viewer/2022062409/56649d555503460f94a32c15/html5/thumbnails/8.jpg)
November 24th, 2005 OPERA General meeting 8
Chamber construction 22/07/05
![Page 9: November 24th, 2005OPERA General meeting1 CS facility A. Ariga, M. Kazuyama, S. Hiramatsu Nagoya University Overview Introduction of components](https://reader036.vdocuments.mx/reader036/viewer/2022062409/56649d555503460f94a32c15/html5/thumbnails/9.jpg)
November 24th, 2005 OPERA General meeting 9
Chamber construction 22/07/05
![Page 10: November 24th, 2005OPERA General meeting1 CS facility A. Ariga, M. Kazuyama, S. Hiramatsu Nagoya University Overview Introduction of components](https://reader036.vdocuments.mx/reader036/viewer/2022062409/56649d555503460f94a32c15/html5/thumbnails/10.jpg)
November 24th, 2005 OPERA General meeting 10
Refresh Chamber in CS Barrack
Heater
humidifier humidifier
Chamber1 Chamber2
Electric fan
Sensor(temperature,humidity)
outlet
![Page 11: November 24th, 2005OPERA General meeting1 CS facility A. Ariga, M. Kazuyama, S. Hiramatsu Nagoya University Overview Introduction of components](https://reader036.vdocuments.mx/reader036/viewer/2022062409/56649d555503460f94a32c15/html5/thumbnails/11.jpg)
November 24th, 2005 OPERA General meeting 11
Good collaboration in 1st construction ,July
• Japan
– Nagoya Ariga, Hiramatsu
• Italy
– Salerno Chiara,Fulvio
– Rome G.Rosa(Barrack) Romolo, Paola
– Bari Vito
– Bologna Emilia, Claudia, Luigi
• Turkey
– Ankara Murat
Many country collaborators contributed!!Thanks a lot !
![Page 12: November 24th, 2005OPERA General meeting1 CS facility A. Ariga, M. Kazuyama, S. Hiramatsu Nagoya University Overview Introduction of components](https://reader036.vdocuments.mx/reader036/viewer/2022062409/56649d555503460f94a32c15/html5/thumbnails/12.jpg)
November 24th, 2005 OPERA General meeting 12
Test Running• 30 films inside chamber.• Temperature : 27℃• Humidity : more than 98%• Sensitivity GD (8/16 Okazaki UVSOR electron beam ~100MeV)
– Ch1 35.2 +- 0.9 grains / 100 micron– Ch2 36.2 +- 0.9– reference 35.4+- 1.2
• Fog Density– Ch1 2.3 +-0.2 grains / 1000μm3
– Ch2 2.2 +-0.2– reference 1.7 +- 0.3
• No damage from GS environment.
![Page 13: November 24th, 2005OPERA General meeting1 CS facility A. Ariga, M. Kazuyama, S. Hiramatsu Nagoya University Overview Introduction of components](https://reader036.vdocuments.mx/reader036/viewer/2022062409/56649d555503460f94a32c15/html5/thumbnails/13.jpg)
November 24th, 2005 OPERA General meeting 13
Packing system
M.Kazuyama
![Page 14: November 24th, 2005OPERA General meeting1 CS facility A. Ariga, M. Kazuyama, S. Hiramatsu Nagoya University Overview Introduction of components](https://reader036.vdocuments.mx/reader036/viewer/2022062409/56649d555503460f94a32c15/html5/thumbnails/14.jpg)
November 24th, 2005 OPERA General meeting 14
Packing system
Air Bag(press sealer)
Sealer
1.Insert CS doublet to support
2. Close
Vacuum
Seal3. FINISH!
Seal here
Support(Hold CS doublet)
![Page 15: November 24th, 2005OPERA General meeting1 CS facility A. Ariga, M. Kazuyama, S. Hiramatsu Nagoya University Overview Introduction of components](https://reader036.vdocuments.mx/reader036/viewer/2022062409/56649d555503460f94a32c15/html5/thumbnails/15.jpg)
November 24th, 2005 OPERA General meeting 15
Into CS doublet
Laminated pack
sealed
150mm
140mm
110mm
…Production by company
![Page 16: November 24th, 2005OPERA General meeting1 CS facility A. Ariga, M. Kazuyama, S. Hiramatsu Nagoya University Overview Introduction of components](https://reader036.vdocuments.mx/reader036/viewer/2022062409/56649d555503460f94a32c15/html5/thumbnails/16.jpg)
November 24th, 2005 OPERA General meeting 16
CS doublet in laminated pack
And set into Packing system
Close
Vacuum
Seal
Leak
Open
Next step to clinching
Auto sequence
~15 sec
Manual sequence
Manual sequence
Sequence of Packing system
![Page 17: November 24th, 2005OPERA General meeting1 CS facility A. Ariga, M. Kazuyama, S. Hiramatsu Nagoya University Overview Introduction of components](https://reader036.vdocuments.mx/reader036/viewer/2022062409/56649d555503460f94a32c15/html5/thumbnails/17.jpg)
November 24th, 2005 OPERA General meeting 17
Clinching system
S. Hiramatsu
![Page 18: November 24th, 2005OPERA General meeting1 CS facility A. Ariga, M. Kazuyama, S. Hiramatsu Nagoya University Overview Introduction of components](https://reader036.vdocuments.mx/reader036/viewer/2022062409/56649d555503460f94a32c15/html5/thumbnails/18.jpg)
November 24th, 2005 OPERA General meeting 18
Longitudinal-clinchingLateral side-clinching
Clinching system
![Page 19: November 24th, 2005OPERA General meeting1 CS facility A. Ariga, M. Kazuyama, S. Hiramatsu Nagoya University Overview Introduction of components](https://reader036.vdocuments.mx/reader036/viewer/2022062409/56649d555503460f94a32c15/html5/thumbnails/19.jpg)
November 24th, 2005 OPERA General meeting 19
Clinching equipment 1
2 3
set CS
heaterclinching and heat
![Page 20: November 24th, 2005OPERA General meeting1 CS facility A. Ariga, M. Kazuyama, S. Hiramatsu Nagoya University Overview Introduction of components](https://reader036.vdocuments.mx/reader036/viewer/2022062409/56649d555503460f94a32c15/html5/thumbnails/20.jpg)
November 24th, 2005 OPERA General meeting 20
Clinching system
• Last page photo is prototype.
• I can success to put into CS box with prototype.
• Real machines are more durable system.
• 3 lateral, 3 longitudinal machines were made.
• Last Friday, sent from Nagoya to here.
![Page 21: November 24th, 2005OPERA General meeting1 CS facility A. Ariga, M. Kazuyama, S. Hiramatsu Nagoya University Overview Introduction of components](https://reader036.vdocuments.mx/reader036/viewer/2022062409/56649d555503460f94a32c15/html5/thumbnails/21.jpg)
November 24th, 2005 OPERA General meeting 21
Emulsion shipment
![Page 22: November 24th, 2005OPERA General meeting1 CS facility A. Ariga, M. Kazuyama, S. Hiramatsu Nagoya University Overview Introduction of components](https://reader036.vdocuments.mx/reader036/viewer/2022062409/56649d555503460f94a32c15/html5/thumbnails/22.jpg)
November 24th, 2005 OPERA General meeting 22
CS Film Shipping
25 non refreshed film Boxeswere Shipped, Sep 22nd
= 25 box × 2000 films= 50000 film= 25 %
In the future, we will send films for CSat the same timing of refreshed filmsshipment from Tono mine.
![Page 23: November 24th, 2005OPERA General meeting1 CS facility A. Ariga, M. Kazuyama, S. Hiramatsu Nagoya University Overview Introduction of components](https://reader036.vdocuments.mx/reader036/viewer/2022062409/56649d555503460f94a32c15/html5/thumbnails/23.jpg)
November 24th, 2005 OPERA General meeting 23
Summary
• 1st construction (July) finished successfully.
• Start to 2nd construction from next week.
• We can provide refreshed film from the middle of December.
• Mass production can start from February.
![Page 24: November 24th, 2005OPERA General meeting1 CS facility A. Ariga, M. Kazuyama, S. Hiramatsu Nagoya University Overview Introduction of components](https://reader036.vdocuments.mx/reader036/viewer/2022062409/56649d555503460f94a32c15/html5/thumbnails/24.jpg)
November 24th, 2005 OPERA General meeting 24
![Page 25: November 24th, 2005OPERA General meeting1 CS facility A. Ariga, M. Kazuyama, S. Hiramatsu Nagoya University Overview Introduction of components](https://reader036.vdocuments.mx/reader036/viewer/2022062409/56649d555503460f94a32c15/html5/thumbnails/25.jpg)
November 24th, 2005 OPERA General meeting 25
![Page 26: November 24th, 2005OPERA General meeting1 CS facility A. Ariga, M. Kazuyama, S. Hiramatsu Nagoya University Overview Introduction of components](https://reader036.vdocuments.mx/reader036/viewer/2022062409/56649d555503460f94a32c15/html5/thumbnails/26.jpg)
November 24th, 2005 OPERA General meeting 26
Fog up check by heatingx : 12V 35A ~ 1secy: 8.4V 44A ~ 0.5sec
2.1±0.3(reference)1.9±0.3
2.1±0.3 2.2±0.3 2.3±0.3
2.3±0.3
Non effect by heating!
![Page 27: November 24th, 2005OPERA General meeting1 CS facility A. Ariga, M. Kazuyama, S. Hiramatsu Nagoya University Overview Introduction of components](https://reader036.vdocuments.mx/reader036/viewer/2022062409/56649d555503460f94a32c15/html5/thumbnails/27.jpg)
November 24th, 2005 OPERA General meeting 27
CS doublet connectionshift value CS(U) to CS(D)
CS
Cosmic ray
Exposed Time
Shift in X
Shift in Y
Method
by
CS1 1min -40 64 Drill
CS2 5min -108 -186 Drill
CS3 20min -147 -281 tracks
CS4 1min -161 -198 Drill
CS5 5min -40 -80 tracks
CS6 8h35min 227 -92 tracks
Mechanical ShiftBetween doublet wasAround 0.1-0.3mmBy realistic packing machine
Feeling is well less than 0.5mm
Unit in micron