nov intelliserv august 28, 2009 houston, texas

45
IntelliServ Broadband Network™ and Along- String Evaluation™ services for high- definition downhole and sub-surface operations NOV IntelliSer August 28, 200 Houston, Texa

Upload: ishmael-hopkins

Post on 02-Jan-2016

29 views

Category:

Documents


3 download

DESCRIPTION

IntelliServ Broadband Network™ and Along-String Evaluation™ services for high-definition downhole and sub-surface operations. NOV IntelliServ August 28, 2009 Houston, Texas. What is the Value?. More Wells. Better Wells. 1MM bbls additional reserves. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: NOV IntelliServ August 28, 2009 Houston, Texas

IntelliServ Broadband Network™ and Along-String Evaluation™ services for high-definition downhole and sub-surface operations

NOV IntelliServAugust 28, 2009

Houston, Texas

Page 2: NOV IntelliServ August 28, 2009 Houston, Texas

What is the Value?

10% reduction in drilling time with

increased downlinking

efficiency.

1+ trips saved per Well

⁻ Memory fill-up⁻ Neutron sensor

failure⁻ Rotary Steerable

System, diagnostics and resets

⁻Reamer activation

20-68% increased circulating hours

by managing downhole vibrations,

MSE based on downhole

measurements

1MM bbls additional reserves

0.36Deg/100ft vs 1.32 cumulative dogleg severity in 8 ½” section

6 days saved by wellbore quality, back-reaming practice

1 casing string saved by time lapse wellbore image logs

1,300 ft deeper shoe with Formation Pressure Test with QC in real time

More Wells Better Wells

57,600 bps vs 2bps

Courtesy of Schlumberger

Courtesy of Baker Hughes

Courtesy of Halliburton Courtesy of Halliburton

Courtesy of Schlumberger

Courtesy of Schlumberger

Page 3: NOV IntelliServ August 28, 2009 Houston, Texas

Talking Points

What is the value today and paradigms tomorrow?

What is our service performance?

Which factors impact quality of service?

Ask the R&D Managers…

Page 4: NOV IntelliServ August 28, 2009 Houston, Texas

Today’s Challenge for Telemetry Systems

Mud Pulse

10 bits

/sec

Seq

uential

data

Data transferred in 2-5 sec pulses

gam

ma

resi

stivi

ty

pres

sure

vibr

ation

Source: Bateman 2009

Page 5: NOV IntelliServ August 28, 2009 Houston, Texas

Wiring is the Only Option

Continuous bi-directionaldata transfer

IntelliServ Broadband Network

vibr

ation

Soni

c

Imag

e Lo

gs

Etc,

Etc

57,00

0 bits

/sec

Sim

ultan

eous

data

High

band

width

H

igh de

finiti

on

High V

olum

e

Rea

l tim

e

Tool actuation

Mud Pulse

10 bits

/sec

Seq

uential

data

Data transferred in 2-5 sec pulses

gam

ma

resi

stivi

ty

pres

sure

vibr

ation

Source: Bateman 2009

Page 6: NOV IntelliServ August 28, 2009 Houston, Texas

Networked Components

Page 7: NOV IntelliServ August 28, 2009 Houston, Texas

Next

Page 8: NOV IntelliServ August 28, 2009 Houston, Texas

Operational EfficiencyValue Seen for the IntelliServ Broadband Network

7.16

7.35

7.43

7.70

7.77

7.77

7.84

7.89

5.0 5.5 6.0 6.5 7.0 7.5 8.0 8.5 9.0

HIGH RESOLUTION DRILLING DYNAMICSDATA TRANSMISSION IN REAL TIME

MONITOR ALL DOWNHOLE TOOLSPERFORMANCE IN REAL TIME

ENABLE 'MEMORY QUALITY' LWDFORMATION EVALUATION IN REAL TIME

TRANSMISSION OF DATA REGARDLESS OFFLUID CONDITIONS

INSTANTANEOUS DOWN-LINKING TO RSSTOOLS/ ENHANCED WELL PLACEMENT

ENABLE HIGH RESOLUTION BOREHOLEIMAGING IN REAL TIME

ENHANCE 'LOOK AHEAD OF BIT'TECHNOLOGY/ SEISMIC WAVEFORMS

FULL TELEMETRY REDUNDANCY

AVERAGE RATING, SCALE 1-10 (10= EXTREMELY HIGH VALUE)

Welling & Company

Page 9: NOV IntelliServ August 28, 2009 Houston, Texas

Paradigm Shifts by the IntelliServ Network

1. Speed does matter:57,600 bits per second

Courtesy: NOV Downhole

Page 10: NOV IntelliServ August 28, 2009 Houston, Texas

Paradigm Shifts by the IntelliServ Network

1. Speed does matter:57,600 bits per min

2. Along String Measurement Service

6.43

7.04

7.14

7.71

7.91

5.0 5.5 6.0 6.5 7.0 7.5 8.0 8.5 9.0

DRILLSTRING VIBRATION /ROTATION

ANNULAR PRESSURE

DRILLSTRING BENDING,TORQUE & TENSION/

COMPRESSION

ULTRASONIC CALIPER

ANNULAR TEMPERATURE

Page 11: NOV IntelliServ August 28, 2009 Houston, Texas

Paradigm Shifts by the IntelliServ Network

1. 1. Speed does matter:57,600 bits per min

2. Along String Measurement Service

Page 12: NOV IntelliServ August 28, 2009 Houston, Texas

Paradigm Shifts by the IntelliServ Network

1. Speed does matter:57,600 bits per min

2. Along String Measurement Service

3. Access High Temperature Reservoirs Rotary Steerable

Near-bit Measurements

Along String Dynamics

Along String Formation Evaluation

Source: Derek MathiesonVice President, Chief Technology and Marketing Officer Baker Hughes Incorporated April 2009

Page 13: NOV IntelliServ August 28, 2009 Houston, Texas

Paradigm Shifts by the IntelliServ Network

1. Speed does matter:57,600 bits per min

2. Along String Measurement Service

3. Access High Temperature Reservoir

4. Transform OperationsCourtesy: BakerHughes, At Balance

Page 14: NOV IntelliServ August 28, 2009 Houston, Texas

Paradigms Uncovering A New Class of Facts

Existing New

Expe

cted

Une

xpec

ted

Network Always On. Trapped Pressure.

Vibration All Along the Drill String ROP Improvement with

Mechanical Specific Energy All Along the Drill String.

More Data, Less Time Required for Interpretation.

Impact on Formation Evaluation with Full Sonic Wave Forms.

Minimizing and Managing Downhole Vibration

Drilling Ahead when Memory Filled Drilling Ahead with diagnostics of

Sensor Failure Confirmation of Reamer

Functioning Wellbore Placement Increases

Productivity

High Resolution Wellbore Images Quality Assurance and Efficiency

of Formation Pressure Testing Dip Picking and Fault

Identification in Real Time Stabilization of Wellbore Stability Early Diagnostics of Tool Failure

Pack Off Determination and it’s Location with Along String Evaluation

Measurements while Tripping Multi-Pass Measurements Fast Downlinking, Re-

Programming/Configuring Tools Alter Formation Evaluation Program

with High Resolution Information while Drilling

Page 15: NOV IntelliServ August 28, 2009 Houston, Texas

IntelliServ Network-Ready Components

Page 16: NOV IntelliServ August 28, 2009 Houston, Texas

Current Commercial Network

Pipe Size Grade Length Connection

4” S135, CYX105 R2 XT38

5” S135, CYX105 R2 GPDS50

5-7/8” Z140, S135 R2, R3 XT57

Customer Bandwidth: 57,600 bps Functional Temperature: 302°F = 150°C Functional Pressure: 25,000 psi

Page 17: NOV IntelliServ August 28, 2009 Houston, Texas

Brunei

Colombia

Trinidad

Australia

Provo, Utah

Malaysia

United Kingdom

Mexico

Page 18: NOV IntelliServ August 28, 2009 Houston, Texas

Network Configured Components

Page 19: NOV IntelliServ August 28, 2009 Houston, Texas

Configured Drive Systems

Page 20: NOV IntelliServ August 28, 2009 Houston, Texas

Interface Subs to Connect to Service Companies

Page 21: NOV IntelliServ August 28, 2009 Houston, Texas

Extensible Tools - Jars

Page 22: NOV IntelliServ August 28, 2009 Houston, Texas

22

Valves, Etc – Configured PBL Tool

Page 23: NOV IntelliServ August 28, 2009 Houston, Texas

Others - Adapter Crossovers

Page 24: NOV IntelliServ August 28, 2009 Houston, Texas

Product Service Experience

Page 25: NOV IntelliServ August 28, 2009 Houston, Texas

Drilling Experience - Summary

Total Wells Drilled: 64 Total Footage Drilled: 640,422 ft Deepest Well Depth: 20,833 ft Highest Temperature: 298°F Highest Inclination: 98° Fluid Environments: OBM, WBM, Foam, Air Wireline Through String: 15,814ft

Data accurate as of 20 August 2009

Page 26: NOV IntelliServ August 28, 2009 Houston, Texas

Commercial Rollout

Page 27: NOV IntelliServ August 28, 2009 Houston, Texas

Footage Drilled with IntelliServ Broadband Network

Page 28: NOV IntelliServ August 28, 2009 Houston, Texas

Service Conditions Tested/Experienced

Page 29: NOV IntelliServ August 28, 2009 Houston, Texas

Wired Tubulars and Thru-string Operations

(Exaggerated Proportions)

Page 30: NOV IntelliServ August 28, 2009 Houston, Texas

Wiper Ball Compatibility - CatoosaTest

No adverse impact to foam wiper ball Leading and trailing ends of rubber wiper ball (large and small circles)

Minor scoring of hard rubber ball apparently from armored coax/coax

exit into bore

Page 31: NOV IntelliServ August 28, 2009 Houston, Texas

Wireline Tool Compatibility – Catoosa Test

Page 32: NOV IntelliServ August 28, 2009 Houston, Texas

Thru-string Operations – Field Experience

o Cementingo Number of Recorded Cementing Operations = 84No incidents related to IntelliServ system

o Wireline Operationso Number of Recorded Wireline Operations = 15o Greatest Recorded Wireline Depth = 15,814 ftNo incidents related to IntelliServ system; line drag

reported normal/below model on the deepest wireline operation

Page 33: NOV IntelliServ August 28, 2009 Houston, Texas

Shear Ram Compatibility – Cooper Cameron Test

o 5-7/8” S135 drill pipe (XT57 TJ)

No Impact of wiring components on shearing or ability to hold pressure after shearing

Unwired

Wired

Page 34: NOV IntelliServ August 28, 2009 Houston, Texas

Jar Compatibility – Lab Test

o 100 successive jar impacts in test facility (with collar and slinger)

Network components still passed data flawlessly during and after test

Field experience corroborates test results

Page 35: NOV IntelliServ August 28, 2009 Houston, Texas

Jar Compatibility – Field Experience

o Multiple stuck string events encountered:

oMultiple jar cycles employed without damage to network

o Jar detected by Network

Page 36: NOV IntelliServ August 28, 2009 Houston, Texas

Torsional Capacity – GRP Lab Testing

GPDS50 Recommended Make-Up Torque

Page 37: NOV IntelliServ August 28, 2009 Houston, Texas

Grant Prideco Lab Testing (cont’d)

XT57 Recommended Make-Up Torque

Page 38: NOV IntelliServ August 28, 2009 Houston, Texas

Grant Prideco Lab Testing (cont’d)

XT57 Recommended Make-Up Torque

Page 39: NOV IntelliServ August 28, 2009 Houston, Texas

Torsional Capacity – Field Experience Some damage to drill pipe incurred

Box end surface damage Excessive pin nose yielding Damage indicative of overtorque condition

Effect on telemetry: coil breakage/loosening

39

Page 40: NOV IntelliServ August 28, 2009 Houston, Texas

IntelliServ Standard Armor

Test Mat’l A Test Mat’l CTest Mat’l B

Other Environmental Conditions – Lab Testing of SCC Resistant Mat’ls

Significant SCC after 14 hours One site with significant pitting corrosion observed after 480 hours

No signs of SCC (die penetrant test) observed after 414 hours

No signs of SCC or pitting prior to 300 hours (21x mag)

No signs of SCC (die penetrant test) observed after 382 hours

21x magnification after 14 hours

21x magnification after 414 hours

21x magnification after 382 hours

Page 41: NOV IntelliServ August 28, 2009 Houston, Texas

Days into Drill Operations

0

50000

100000

150000

200000

250000

0 20 40 60 80 100 120 140 160

No SCCNo SCCSCC (after storage)

mg

/L C

hlo

rid

e

SCC

Water-based mud

Other Environmental Conditions -Field Experience

Page 42: NOV IntelliServ August 28, 2009 Houston, Texas

Service Performance of Broadband Network

Page 43: NOV IntelliServ August 28, 2009 Houston, Texas

Academy In Summary

Value Today with IntelliServ Broadband Network, Paradigms Shifts for Tomorrow

Converted Components are Available Today

The Network has seen Activity in a Variety of

Environments

Reliability Matters and is a Central Focus of

Ongoing Engineering Efforts

Page 44: NOV IntelliServ August 28, 2009 Houston, Texas

Q&A with R&D?

Page 45: NOV IntelliServ August 28, 2009 Houston, Texas

Thank You!Thank You for Your Interest in the Academy:

Topics for next Academy:

[ ] Along String Evaluation Service Roadmap [ ] [ ]