Notice to Mariners – Offshore Fugro Venturer, Fugro Seeker, Despina, Fugro Scout, Fugro Synergy, Argosy,
Hercules, Haven Seariser 2, Fugro Frontier, Margaret Mary, MTS Taktow and CRC
Lodestar
200054-NtM Offshore (09) | 15 June 2020
Final For Issue
Sofia Offshore Wind Farm Limited
Sofia Offshore Wind Farm Limited
200054-NtM Offshore 08 | Notice to Mariners – Offshore
Document Control
Document Information
Project Title Sofia Offshore Wind Farm Investigation 2020
Document Title Notice to Mariners – Offshore
Avalon No. TBA
Fugro Project No. 200054
Fugro Document No. 200054-NtM Offshore
Issue Number 9
Issue Status Final For Issue
Document Owner Sally Dalrymple
Entity FGBML
Client Information
Client Sofia Offshore Wind Farm Limited
Client Address Trigonos, Windmill Hill Business Park, Swindon, SN5 6PB
Client Contact Mike Gould
Client Document No. 003443917-01 Notice to Mariners – Offshore Site Investigation
Revision History
Issue Date Status Comments on Content Prepared
By
Checked
By
Approved
By
00 12 February
2020 For Review Awaiting client comments SD SW/MS SOWFL
01 14 February
2020
Final for
Issue Updated in line with comments SD SW SOWFL
02 3 March 2020 Final for
issue Updated in line with comments SW SD SOWFL
03 25 March
2020
Final for
issue SD SW SOWFL
04 8 April 2020 Final for
issue
Updated to correct error in survey area
co-ordinates SD SW SOWFL
05 17 April 2020 Final for
issue Updated to include nearshore area SD SW SOWFL
06 18 April 2020 Final for
issue
Updated FLO and guard vessel contact
details SD SD SOWFL
07 14 May 2020 Final for
issue Updated Vessels on site SW SD SOWFL
08
4 June 2020
Final for
issue
Updated for Nearshore vessels / jack
up / Frontier onsite SD SD SOWFL
Sofia Offshore Wind Farm Limited
200054-NtM Offshore 08 | Notice to Mariners – Offshore
09 15 June 2020 Final for
issue Updated for Jack Up support vessels SD SD SOWFL
Project Team
Initials Name Role
SD Sally Dalrymple Project Manager
SW Sydney Waters Assistant Project Manager
MS Mark Schreiber Vessel Manager
WR Ward Reid Vessel Manager
DF Daniel Ferguson Vessel Manager
FM Frank McConville Vessel Manager
MdB Marscha De Bruijn Vessel Manager
SM Sophie Minard Package Manager
TC Theo Cleave Project Manager
Innogy Renewables UK Limited
200054-NtM Offshore 07 | Notice to Mariners – Offshore
Page i of ii
Contents
1. Introduction 1
2. Area of Operations 2
3. Offshore Geophysical Investigation – Export Cable Corridor Nearshore 1
4. Offshore Geophysical Investigation – Export Cable Corridor – Gradiometer Survey 1
5. Nearshore Seismic Refraction Investigation 1
6. Nearshore Geotechnical Investigation 2
7. Offshore Geophysical Investigation – Array Area 2
8. Offshore Geotechnical Investigation – Array Area 2
9. Immediate Contacts 4
10. Survey Vessels 6
11. Distribution List 11
11.1 Maritime Notification and Authorities 11
11.2 Fishing Industry 12
11.3 Port Authorities 13
11.4 Client Group 13
11.5 Contractor Group 13
Appendices
Appendix A Buffer Zone Drawings
Figures in the Main Text
Figure 1: Project Location 1
Tables in the Main Text
Table 2.1: Survey Area Buffer Zone Coordinates 2
Table 10.1: Fugro Venturer 6
Table 10.2: Fugro Seeker 6
Table 10.3: Fugro Scout 7
Table 10.7: Fugro Synergy 8
Table 10.8: Fugro Frontier 9
Innogy Renewables UK Limited
200054-NtM Offshore 07 | Notice to Mariners – Offshore
Page ii of ii
Table 10.9: Guard Vessel – Margaret Mary 9
Table 10.11: CRC Lodestar 10
Table 10.12: MTS Taktow 10
Table 11.1: Maritime and Authorities 11
Table 11.2:Fishing Industry 12
Table 11.3: Port Authorities 13
Table 11.4: Client Group 13
Table 11.5: Contractor Group 13
Innogy Renewables UK Limited
200054-NtM Offshore 08 | Notice to Mariners – Offshore
Page 1 of 14
1. Introduction
Sofia Offshore Wind Farm Limited (SOWFL) has contracted Fugro GM Marine Limited (Fugro)
to carry out a geophysical and geotechnical site investigation off the north-east coast of the
UK for the proposed Sofia Offshore Wind Farm (SOWF) site.
The Sofia Offshore Wind Farm (SOWF) site is located in the North Sea located on the Dogger
Bank, 165 km off the north-east coast of the UK in water depths between 21 m and 35 m
Lowest Astronomical Tide (LAT).
Figure 1: Project Location
Innogy Renewables UK Limited
200054-NtM Offshore 08 | Notice to Mariners – Offshore
Page 2 of 14
2. Area of Operations
The accompanying drawings (003576747-01 - Offshore Site Investigation – Survey Area) in
Appendix A indicates the areas within which the survey will be carried out. The coordinates
of the survey area, including buffers, are also provided below.
Table 2.1: Survey Area Buffer Zone Coordinates
Label Lat_DDM Long_DDM Label Lat_DDM Long_DDM Label Lat_DDM Long_DDM
1 54° 42.459' N 0° 13.446' W 25 54° 35.922' N 1° 1.099' W 49 54° 53.265' N 1° 21.417' E
2 54° 43.566' N 0° 10.149' W 26 54° 36.254' N 1° 1.945' W 50 54° 54.040' N 1° 24.739' E
3 54° 43.653' N 0° 9.649' W 27 54° 36.480' N 1° 1.943' W 51 54° 54.079' N 1° 25.135' E
4 54° 43.885' N 0° 2.081' E 28 54° 36.973' N 1° 1.609' W 52 54° 53.917' N 1° 30.806' E
5 54° 44.787' N 0° 10.178' E 29 54° 37.189' N 1° 1.051' W 53 54° 53.837' N 1° 31.252' E
6 54° 43.453' N 0° 11.757' E 30 54° 36.812' N 0° 59.965' W 54 54° 52.911' N 1° 33.843' E
7 54° 42.408' N 0° 2.339' E 31 54° 36.920' N 0° 55.184' W 55 54° 52.362' N 1° 51.791' E
8 54° 42.196' N 0° 9.143' W 32 54° 37.189' N 0° 55.202' W 56 54° 57.268' N 1° 59.889' E
9 54° 41.128' N 0° 12.313' W 33 54° 37.259' N 0° 52.036' W 57 55° 0.726' N 1° 53.659' E
10 54° 41.017' N 0° 12.796' W 34 54° 38.392' N 0° 47.817' W 58 55° 11.049' N 2° 11.082' E
11 54° 39.345' N 0° 32.420' W 35 54° 38.455' N 0° 47.232' W 59 54° 58.641' N 2° 33.221' E
12 54° 37.940' N 0° 34.341' W 36 54° 38.464' N 0° 44.591' W 60 54° 48.370' N 2° 15.792' E
13 54° 37.730' N 0° 34.838' W 37 54° 38.738' N 0° 43.131' W 61 54° 50.724' N 2° 11.602' E
14 54° 37.199' N 0° 37.833' W 38 54° 38.659' N 0° 38.438' W 62 54° 50.743' N 1° 51.762' E
15 54° 37.147' N 0° 38.307' W 39 54° 39.073' N 0° 36.054' W 63 54° 51.310' N 1° 33.197' E
16 54° 37.251' N 0° 42.866' W 40 54° 40.559' N 0° 34.023' W 64 54° 51.794' N 1° 30.576' E
17 54° 36.963' N 0° 44.363' W 41 54° 40.757' N 0° 33.432' W 65 54° 51.969' N 1° 24.911' E
18 54° 36.982' N 0° 47.087' W 42 54° 45.159' N 0° 13.547' E 66 54° 51.651' N 1° 21.665' E
19 54° 35.888' N 0° 51.057' W 43 54° 48.743' N 0° 28.720' E 67 54° 51.741' N 1° 17.957' E
20 54° 35.800' N 0° 51.558' W 44 54° 48.776' N 0° 29.003' E 68 54° 49.798' N 0° 54.982' E
21 54° 35.730' N 0° 55.105' W 45 54° 48.784' N 0° 37.768' E 69 54° 47.318' N 0° 38.198' E
22 54° 36.000' N 0° 55.123' W 46 54° 51.240' N 0° 54.385' E 70 54° 47.301' N 0° 37.966' E
23 54° 35.908' N 0° 59.704' W 47 54° 51.273' N 0° 54.682' E 71 54° 47.291' N 0° 29.345' E
24 54° 36.013' N 1° 0.516' W 48 54° 53.322' N 1° 18.973' E 72 54° 43.752' N 0° 14.369' E
Innogy Renewables UK Limited
200054-NtM Offshore 08 | Notice to Mariners – Offshore
Page 1 of 14
3. Offshore Geophysical Investigation – Export Cable
Corridor Nearshore
The nearshore geophysical operations at the SOWF site are expected to be carried out from
the Fugro Seeker from the 8th May for approximately eight weeks however this survey may be
carried out earlier than the date mentioned above. Also please note that the exact start and
finish date will be dependent on the prevailing weather conditions and work progress.
As the Fugro Seeker will be towing survey equipment the vessel will require large
turning circles therefore it is requested that all vessels operating within this area keep
their distance, maintaining at least the 500 m exclusion including in the survey area
buffer (coordinates above), and pass at minimum speed to reduce vessel wash.
Survey operations will be conducted on a 12 hour basis.
4. Offshore Geophysical Investigation – Export Cable
Corridor – Gradiometer Survey
The gradiometer operations at the SOWF site are expected to be carried out from the Fugro
Frontier from the 15th June for approximately two weeks. Also please note that the exact start
and finish date will be dependent on the prevailing weather conditions and work progress.
As the Fugro Frontier will be towing survey equipment the vessel will require large
turning circles therefore it is requested that all vessels operating within this area keep
their distance, maintaining at least the 2,000 m exclusion including in the survey area
buffer (coordinates above), and pass at minimum speed to reduce vessel wash.
Survey operations will be conducted on a 24 hour basis.
5. Nearshore Seismic Refraction Investigation
The seismic refraction operations at the SOWF site are expected to be carried out from the
ribs Argosy and Hercules from 18th June for approximately four weeks, however this survey
may be carried out earlier than the date mentioned above. Also please note that the exact
start and finish dated will be dependent on the prevailing weather conditions and work
progress.
As the Argosy and Hercules will be towing survey equipment it is requested that all
vessels operating within this area keep their distance, maintain at least the 500m
Innogy Renewables UK Limited
200054-NtM Offshore 08 | Notice to Mariners – Offshore
Page 2 of 14
exclusion included in the survey area buffer (coordinates above), and pass at minimum
speed to reduce vessel wash.
Survey operations will be conducted on a 12 hour basis.
6. Nearshore Geotechnical Investigation
The nearshore Geotechnical operations at the SOWF site are expected to be carried out from
the Jack-Up barge Haven Seariser 2 from 22nd June for approximately four weeks, however
this survey may be carried out earlier than the date mentioned above. Also please note that
the exact start and finish date will be dependent on the prevailing weather conditions and
work progress.
Due to the Haven Seariser 2 having limited manoeuvrability whilst onsite It is
requested that all vessels operating within this area keep their distance. The required
exclusion zone is 500 m which is included in the survey area buffer of 2,000 m
(coordinates above).
Survey operations will be conducted on a 12 hour basis and it is to be noted that their will be
a crew transfer vessel operating twice a day to and from the Jack-Up.
7. Offshore Geophysical Investigation – Array Area
The Fugro Venturer will be carrying out geophysical operations within the offshore turbine
array with works commenced at the start of April 2020.
Survey operations at the offshore Array are expected to continue through to July 2020. Vessel
engaged in geophysical survey operations will deploy survey equipment behind the stern of
the vessel and will require a large turning circle. Buffer zones are detailed in section 3.
As the Fugro Venturer will be towing survey equipment the vessel will require large
turning circles therefore it is requested that all vessels operating within this area keep
their distance, maintaining at least the 2,000 m exclusion including in the survey area
buffer (coordinates above), and pass at minimum speed to reduce vessel wash.
Survey operations will be conducted on a 24 hour basis.
8. Offshore Geotechnical Investigation – Array Area
Fugro Scout and the Fugro Synergy will be carrying out geotechnical operations within the
offshore turbine array with works commenced at end of April 2020.
Innogy Renewables UK Limited
200054-NtM Offshore 08 | Notice to Mariners – Offshore
Page 3 of 14
Survey operations at the offshore Array are expected to continue through to end of July
2020. The exact start and finish date will be dependent on the prevailing weather conditions
and work progress. Vessels engaged in geotechnical survey operations. Buffer zones for the
Fugro Scout and Fugro Synergy are detailed in section 3.
Due to the Scout and Synergy having limited manoeuvrability whist working in DP
mode It is requested that all vessels operating within this area keep their distance. The
required exclusion zone is 500 m which is included in the survey area buffer of 2,000 m
(coordinates above).
Survey operations will be conducted on a 24 hour basis.
Innogy Renewables UK Limited
200054-NtM Offshore 08 | Notice to Mariners – Offshore
Page 4 of 14
9. Immediate Contacts
The contents of this notice are based upon our current site investigation programme and
upon Fugro’s planning at the time of submission. It should be noted that Fugro will
endeavour to update this notice as required.
Enquiries regarding the contents of this Notice to Mariners, or any other matters, should be
directed to Fugro (survey contractor):
For any fisheries related matters, please contact the projects Fisheries Liaison Officer
(Precision Marine Survey Limited (PMSL)), using the contact details provided below.
Sally Dalrymple – Project Manager
Tel: +44 (0) 1491 820 657, +44 (0) 7917 058 751 (mob), Email: [email protected]
Sydney Waters – Assistant Project Manager
Tel: +44 (0) 1491 820 846, Email: [email protected]
Ward Reid – Vessel Manager (Fugro Venturer)
Tel: +44 (0)7815 510099 (mob), Email: [email protected]
Dan Ferguson – Vessel Manager (Fugro Seeker)
Tel: +44 (0)7968 845551 (mob), Email: [email protected]
Sam Litchfield – Vessel Manager (Fugro Mercator)
Tel: +44 (0)7748 988393 (mob), Email: [email protected]
Marscha de Bruijn – Vessel Manager (Fugro Synergy)
Tel: +31618750691 (mob) Email: [email protected]
Innogy Renewables UK Limited
200054-NtM Offshore 08 | Notice to Mariners – Offshore
Page 5 of 14
Frank McConville – Vessel Manager (Fugro Scout)
Tel: +31638076617 (mob) Email: [email protected]
Sophie Minard – Package Manager (Seismic Refraction)
Tel: +33 6 20 86 03 17 (mob) Email: [email protected]
Theo Cleave – Project Manager (Haven Seariser 2)
Tel: +44 (0) 7785 517 417 (mob) Email: [email protected]
Kate Jackson – Vessel Manager (Fugro Frontier)
Tel: +31 628 349 097 (mob) Email: [email protected]
For enquiries related to Fishing, please contact the dedicated Fisheries Liaison Officer for the
Sofia Offshore Wind Farm:
Nigel Proctor – Fisheries Liaison Officer (FLO)
Tel: +44 (0) 7702 730 891 (mob), Email: [email protected]
Danny Proctor – Fisheries Liaison Officer (FLO)
Tel: +44 (0) 7507 556 582 (mob), Email: [email protected]
Innogy Renewables UK Limited
200054-NtM Offshore 08 | Notice to Mariners – Offshore
Page 6 of 14
10. Survey Vessels
Export cable corridor Nearshore operations will be conducted by the survey vessels Fugro
Seeker and Haven Seariser 2. The Array area operations will be conducted by the survey
vessel Fugro Venturer, Fugro Scout, Fugro Synergy and Despina. The Export Route area
operations will be conducted by the survey vessel Fugro Frontier. The guard vessel will be the
Hartlepool based fishing vessel the Margaret Mary and will support nearshore survey
operations. Client, contractor and fisheries liaison contact details are provided in the Notice
to Mariners distribution list in Section 6.
Table 10.1: Fugro Venturer
General Information
Name Fugro Venturer
Flag Bahamas
Call Sign C6CG3
Class
GL+100 A5 E1 BWM(D2)
Research Vessel, GL+MC E1
AUT DP 1 EP-D
Dimensions
Length 71.58 m
Beam 15.4 m
Draught (loaded) 5.86 m
Gross Tonnage 2716 t
Communication
Master +44 (0)1224 257 651
+44 (0)8450 345 281
Party Chief +44 (0)1224 257 650
+44 (0)8450 345 280
Email: [email protected]
Table 10.2: Fugro Seeker
General Information
Name Fugro Seeker
Flag UK
Call Sign C6CG3
Class MCA Cat2
Dimensions
Length 12.00 m
Beam 4.88 m
Draught
(loaded) 1.50 m
Innogy Renewables UK Limited
200054-NtM Offshore 08 | Notice to Mariners – Offshore
Page 7 of 14
Gross Tonnage 17 t
Communication
Master +44 (0)7814 803 228
Party Chief +44 (0)7961 046376
Email: [email protected]
Table 10.3: Fugro Scout
General Information
Name Fugro Scout
Flag Singapore
Call Sign 9V3887
Class
Dimensions
Length 82.94 m
Beam 75.269 m
Draught (loaded) 5.65 m
Gross Tonnage 4,644 tons
Communication
Master +47 22 40 96 85
Vessel Sat Phone +870 601 081 726
Email: [email protected]
Table 10.4: Argosy
General Information
Name CRC Argosy
Flag UK
Call Sign 2IHL8
Class MCA Category 2
Dimensions
Length 9.0m
Beam 3.1m
Draught (loaded) 0.8m
Gross Tonnage 3.8 t
Communication
Master +44 (0) 7973 148 773
Vessel Sat Phone n/a
Email: n/a
Innogy Renewables UK Limited
200054-NtM Offshore 08 | Notice to Mariners – Offshore
Page 8 of 14
Table 10.5: Hercules
General Information
Name CRC Hercules
Flag UK
Call Sign 2FOI5
Class MCA Category 2
Dimensions
Length 9m
Beam 3.1m
Draught (loaded) 0.8m
Gross Tonnage 3.80 t
Communication
CRC 24hrs Support +44 (0) 7788 288 258
Vessel Sat Phone n/a
Email: n/a
Table 10.6: Haven Seariser 2
General Information
Name Haven Seariser 2
Flag United Kingdom
Call Sign 2FWX9
Class Offshore Self Elevating Unit
Coastal
Dimensions
Length 29.26m
Beam 17.07m
Draught (loaded) 5.0m (with legs attached)
Gross Tonnage 314
Communication
Master Redford Moors
Vessel Sat Phone +44 (0) 7799 884 633
Email: [email protected]
Table 10.7: Fugro Synergy
General Information
Name Synergy
Flag Bahamas
Call Sign C6XR3
Innogy Renewables UK Limited
200054-NtM Offshore 08 | Notice to Mariners – Offshore
Page 9 of 14
Class
DNV GL 1A1 Ship-shaped
Drilling unit Clean COMF(V-
3) DK(+) Drill DYNPOS(AUTR)
E0 HELDK(S,H) Ice (C) SF R
Dimensions
Length 94.76 m
Beam 19.70 m
Draught (loaded) 7.7 m
Gross Tonnage 6593
Communication
Master +47 2240 8045
Vessel Sat Phone +870 764 904 575
Email: [email protected]
Table 10.8: Fugro Frontier
General Information
Name Fugro Frontier
Flag Bahamas
Call Sign C6BH4
Class GERMANISCHER LLOYD
Dimensions
Length 53 m
Beam 13 m
Draught (loaded) 3.3 m
Gross Tonnage 1308
Communication
Master +31 10 7130 936
Vessel Sat Phone +881 63 1419 009
Email: [email protected]
Table 10.9: Guard Vessel – Margaret Mary
General Information
Name Margaret Mary
Flag UK
Call Sign MGNM6
Class Fishing
Dimensions
Length 10 m
Innogy Renewables UK Limited
200054-NtM Offshore 08 | Notice to Mariners – Offshore
Page 10 of 14
Beam 5.5 m
Draught (loaded) 3.6m
Gross Tonnage 17.56t
Communication
Master +44 (0) 7785 538567
Vessel Sat Phone +88 1623 494 773
Email: [email protected]
m
Table 10.11: CRC Lodestar
General Information
Name CRC Lodestar
Flag British
Call Sign MCQS8
Class
MCA Category 2 – 60nm
offshore day & night
Category 1 capability
operating from mother ship
Load line exemption cert.
Dimensions
Length 11.0 m
Beam 3.3 m
Draught (loaded) 0.9 m
Gross Tonnage 5.5 t
Communication
Master Tim Carrie
Vessel Sat Phone +44 (0) 7940 253 859
Email: crclodestar@commercialribc
harter.co.uk
Table 10.12: MTS Taktow
General Information
Innogy Renewables UK Limited
200054-NtM Offshore 08 | Notice to Mariners – Offshore
Page 11 of 14
Name MTS Taktow
Flag United Kingdom
Call Sign C6DU5
Class
BV I 3/3 (E) Tug Deep Sea
unrestricted service, MCA Cat
1 – 150 miles
Dimensions
Length 22.5 m
Beam 6.8 m
Draught (loaded) 3.44 m
Gross Tonnage 109 t
Communication
Master Adam Smallbone
Vessel Sat Phone +881 6414 88921
Email: [email protected]
11. Distribution List
This Notice to Mariners has been distributed to the following authorities, companies and
individuals:
11.1 Maritime Notification and Authorities
Table 11.1: Maritime and Authorities
Organisation Address Phone E-mail Role
UK Hydrographic
Office
Admiralty Way
Taunton
Somerset
TA1 2DN
+44 (0) 1823 337
900
ov.uk
Radio Navigation
Warnings
H-Notes
MOD Portsmouth
desnbcp-cob-
UK Ministry of
Defence
UK Maritime and
Coastguard
Agency
Spring Place
105 Commercial
Road
Southampton
Hampshire
SO15 1EG
+44 (0) 23 8032
9486
navigationsafety@mc
ga.gov.uk UK Coastguard
Trinity House
Lighthouse
Service
Tower Hill
London
EC3N 4DH
+44 (0) 20 7481
6900
navigation.directorat
England/Wales
lights, marks and
buoys
Department for
Environment,
Nobel House
17 Smith Square
+44 (0) 20 7238
6951
Innogy Renewables UK Limited
200054-NtM Offshore 08 | Notice to Mariners – Offshore
Page 12 of 14
Food and Rural
Affairs (DEFRA)
London
SW1P 3JR
Marine
Management
Organisation
Pakefield Rd,
Lowestoft NR33
0HT
01502 573149 lowestoft@marinema
nagement.org.uk
Marine
Management
Organisation
Neville House
Central Riverside
Bell Street
North Shields
NE30 1LJ
+44 (0) 191 257
4520
northsheilds@marine
management.org.uk
Marine
Management
Organisation
Lancaster House
Hampshire Court
Newcastle upon
Tyne
NE4 7YH
+44 (0) 300 123
1032
Marine.consents@ma
rinemanagement.org.
uk
MCA Navigational
Safety Branch
Humber [email protected]
ov.uk
Thames [email protected]
ov.uk
The Crown Estate
1 St James’s
Market, London,
SW1Y 4AH
+44 (0) 20 7851
5077
Stuart.Curry@thecro
wnestate.co.uk Seabed owner
11.2 Fishing Industry
Table 11.2:Fishing Industry
Organisation Address Phone E-mail Role
National
Federation of
Fisherman’s
Organisations
30 Monkgate
York
YO31 7PF
+44 (0) 1904 635
Fishing Industry
Representatives
Sea Fish industry
Authority
Origin Way
Europarc
Grimsby
NE Lincs
+44 (0) 1472 252
300
kingfisher@seafish.
co.uk
Fishing industry
Notice / Publication
Kingfisher
Information Service
Redcar & Tees
Bay Fishermen’s
Association
[email protected] David Blount
Whitby
Fishermen’s
Association
[email protected] James Cole
(Chairman)
Innogy Renewables UK Limited
200054-NtM Offshore 08 | Notice to Mariners – Offshore
Page 13 of 14
11.3 Port Authorities
Table 11.3: Port Authorities
Organisation Address Phone E-mail Role
Hartlepool PD
Ports
Hartlepool Dock
Cleveland Road
Hartlepool
TS24 0UZ
+44 (0) 1642 77000 enquiries@pdports.
co.uk
Whitby Harbour
Harbour Office,
Endeavour Wharf,
Whitby,
YO21 1DN
+44 (0) 1947
602354
port.services@scarb
orough.gov.uk
Tees Port
Teesport,
Grangetown,
Middlesbrough
TS6 6UD
+44 (0) 1642
877000
enquiries@pdports.
co.uk
11.4 Client Group
Table 11.4: Client Group
Organisation Address Phone E-mail Role
Sofia Offshore
Wind Farm
Limited
Trigonos, Windmill
Hill Business Park,
Swindon, SN5 6PB
+44 (0)7384 806
514
michael.gould@inn
ogy.com Client: Mike Gould
11.5 Contractor Group
Table 11.5: Contractor Group
Organisation Address Phone E-mail Role
Fugro GB Marine
Limited
Fugro House
Hithercroft Road
Wallingford
Oxfordshire
OX10 9RB
+44 (0) 1491 820 657
+44 (0) 7917 058 751
Project
Manager :
Sally
Dalrymple
Fugro GB Marine
Limited
Fugro House
Hithercroft Road
Wallingford
Oxfordshire
OX10 9RB
+44 (0) 1491 820 846 [email protected]
Assistant
Project
Manager :
Sydney
Waters
Fugro GB Marine
Limited
Victory House
16 Trafalgar
Wharf
Hamilton Road
Portchester
Hampshire
PO6 4PX
+44 (0) 7968 845 551 [email protected]
Vessel
Manager :
Daniel
Ferguson
Innogy Renewables UK Limited
200054-NtM Offshore 08 | Notice to Mariners – Offshore
Page 14 of 14
Organisation Address Phone E-mail Role
Fugro
Netherlands
Marine Limited
Prismastraat 4,
2631 RT
Nootdorp
The Netherlands
+31 638 33 2210 [email protected]
Vessel
Manager :
Mark
Schreiber
Fugro
Netherlands
Marine Limited
Prismastraat 4,
2631 RT
Nootdorp
The Netherlands
+31 628 349 097 [email protected]
Vessel
Manager :
Kate Jackson
Fugro GB Marine
North Limited
Survey House,
Denmore Road,
Bridge of Don,
Aberdeen, AB23
8JW
+44 (0)7815 510099 [email protected]
Vessel
Manager :
Ward Reid
Fugro
Geoservices
Limited
Bickland
Industrial Park
Falmouth
Cornwall
TR11 4TA
+44 (0) 7785 517417 [email protected]
Project
Manager :
Theo Cleave
Fugro France
Le carillon
5-6 Esplanade
Charles de
Gaulle
92000 Nanterre
France
+33 6 20 86 03 17 [email protected]
Package
Manager :
Sophie Minard
Precision Marine
Survey Limited
Church Farm,
Main Road,
Thorngumbald,
East Yorkshire
HU12 9NE
+44 (0) 1964 624 423
+44 (0) 7702 730 891
n.proctor@precisionmarine.
co.uk
Fisheries
Liaison
Officer: Nigel
Proctor
Precision Marine
Survey Limited
Church Farm,
Main Road,
Thorngumbald,
East Yorkshire
HU12 9NE
+44 (0) 1964 624 423
+44 (0) 7507 556 582
d.proctor@precisionmarine.
co.uk
Assistant
Fisheries
Liaison
Officer: Daniel
Proctor
Guard Vessel Margaret Mary +44 (0) 7785 538 567 [email protected]
om
Master – Phil
Walsh
Appendix A
Buffer Zone Drawings
!
!!
!
!!!!
!!!
!!!!!!!
!!
!!! !
! !
!! !!
!!
!!
!
!!¬«3¬«2
¬«1
¬«9
¬«8¬«41¬«40
¬«39¬«38¬«37¬«36¬«35¬«34
¬«33¬«32¬«31¬«30
¬«29¬«28¬«27¬«26¬«25¬«24¬«23 ¬«22
¬«21 ¬«20¬«19
¬«18 ¬«17 ¬«16 ¬«15¬«14
¬«13¬«12
¬«11
¬«10
0°10'0"W
0°10'0"W
0°20'0"W
0°20'0"W
0°30'0"W
0°30'0"W
0°40'0"W
0°40'0"W
0°50'0"W
0°50'0"W
1°0'0"W
1°0'0"W
0°0'0"
54°50'0"N
54°40'0"N
54°30'0"N
54°20'0"N
0 4 82Kilom e tre s
Path: \\s060a0682\maps_offshore \Proje c tSpe c ific Maps\MajorProje c ts\16_UK_Dogge rBank\03_Environm e nt-and-c onstraints\003576747-01 - SO W F - O ffshore Site Investigation – Surve y Are a.mxd
0 10050km
Le ge nd
O ve rvie w map
Coord inate Syste m : UTM Zone 31Map Datum : W GS84© British Crown and O c e anW ise , 2020. All rightsre se rve d . Lic e nse No. EMS-EK001-593485. NO T TO BE USED FO R NAVIGATIO N
Sofia O ffshore W ind Farm Lim ite d W ind m ill Hill Busine ss Park
W hite hill W ay, Swind on, W iltshire , SN5 6PBSofia Offshore Wind Fa rm
DRAWN DATE@DIN A3
SCALE SIZE
PROJECT
TITLESOWF - Offshore Site Inv estiga tion – Su rv ey Area
1:250.00009.04.2020Matt FaulkDRAWING No. REV
003576747 01
Map inform ation
Cartographic inform ation
! O ffshor e Site Inve stigation – Surve y Corrid or Are a Coord inate s
O ffshore Site Inve stigation – Surve y Are a
µ
!!!
!
!
!
!
!¬«30
¬«29¬«28
¬«27
¬«26¬«25 ¬«24 ¬«23
!
!
!
!!
!! !
!!
!
!!!
!
¬«5¬«4
¬«7¬«6 ¬«72
¬«71 ¬«70¬«69
¬«68
¬«47¬«46
¬«45¬«44¬«43
¬«42
1°0'0"E
1°0'0"E
0°50'0"E
0°50'0"E
0°40'0"E
0°40'0"E
0°30'0"E
0°30'0"E
0°20'0"E
0°20'0"E
0°10'0"E
0°10'0"E0°0'0"55°0'0"N
54°50'0"N
54°40'0"N
54°30'0"N
0 4 82Kilom e tre s
Path: \\s060a0682\maps_offshore \Proje c tSpe c ific Maps\MajorProje c ts\16_UK_Dogge rBank\03_Environm e nt-and-c onstraints\003576747-01 - SO W F - O ffshore Site Investigation – Surve y Are a.mxd
0 10050km
Le ge nd
O ve rvie w map
Coord inate Syste m : UTM Zone 31Map Datum : W GS84© British Crown and O c e anW ise , 2020. All rightsre se rve d . Lic e nse No. EMS-EK001-593485. NO T TO BE USED FO R NAVIGATIO N
Sofia O ffshore W ind Farm Lim ite d W ind m ill Hill Busine ss Park
W hite hill W ay, Swind on, W iltshire , SN5 6PBSofia Offshore Wind Fa rm
DRAWN DATE@DIN A3
SCALE SIZE
PROJECT
TITLESOWF - Offshore Site Inv estiga tion – Su rv ey Area
1:250.00009.04.2020Matt FaulkDRAWING No. REV
003576747 01
Map inform ation
Cartographic inform ation
! O ffshor e Site Inve stigation – Surve y Corrid or Are a Coord inate s
O ffshore Site Inve stigation – Surve y Are a
µ
!!!
!
!
!
!
!¬«30
¬«29¬«28
¬«27
¬«26¬«25 ¬«24 ¬«23
!!
! !
!!!!
!
!
!
!
!
!!
!!
!¬«68
¬«67 ¬«66 ¬«65 ¬«64¬«63
¬«62
¬«57
¬«55¬«54
¬«53¬«52¬«51¬«50¬«49¬«48
¬«47¬«46
1°50'0"E
1°50'0"E
1°40'0"E
1°40'0"E
1°30'0"E
1°30'0"E
1°20'0"E
1°20'0"E
1°10'0"E
1°10'0"E
1°0'0"E
1°0'0"E55°10'0"N
55°0'0"N
54°50'0"N
54°40'0"N
0 4 82Kilom e tre s
Path: \\s060a0682\maps_offshore \Proje c tSpe c ific Maps\MajorProje c ts\16_UK_Dogge rBank\03_Environm e nt-and-c onstraints\003576747-01 - SO W F - O ffshore Site Investigation – Surve y Are a.mxd
0 10050km
Le ge nd
O ve rvie w map
Coord inate Syste m : UTM Zone 31Map Datum : W GS84© British Crown and O c e anW ise , 2020. All rightsre se rve d . Lic e nse No. EMS-EK001-593485. NO T TO BE USED FO R NAVIGATIO N
Sofia O ffshore W ind Farm Lim ite d W ind m ill Hill Busine ss Park
W hite hill W ay, Swind on, W iltshire , SN5 6PBSofia Offshore Wind Fa rm
DRAWN DATE@DIN A3
SCALE SIZE
PROJECT
TITLESOWF - Offshore Site Inv estiga tion – Su rv ey Area
1:250.00009.04.2020Matt FaulkDRAWING No. REV
003576747 01
Map inform ation
Cartographic inform ation
! O ffshor e Site Inve stigation – Surve y Corrid or Are a Coord inate s
O ffshore Site Inve stigation – Surve y Are a
µ
!!!
!
!
!
!
!¬«30
¬«29¬«28
¬«27
¬«26¬«25 ¬«24 ¬«23
!
!
!
!
!
!
!!¬«62 ¬«61
¬«60
¬«59
¬«58
¬«57
¬«56
¬«55
2°40'0"E
2°40'0"E
2°30'0"E
2°30'0"E
2°20'0"E
2°20'0"E
2°10'0"E
2°10'0"E
2°0'0"E
2°0'0"E
1°50'0"E
1°50'0"E55°10'0"N
55°0'0"N
54°50'0"N
54°40'0"N
0 4 82Kilom e tre s
Path: \\s060a0682\maps_offshore \Proje c tSpe c ific Maps\MajorProje c ts\16_UK_Dogge rBank\03_Environm e nt-and-c onstraints\003576747-01 - SO W F - O ffshore Site Investigation – Surve y Are a.mxd
0 10050km
Le ge nd
O ve rvie w map
Coord inate Syste m : UTM Zone 31Map Datum : W GS84© British Crown and O c e anW ise , 2020. All rightsre se rve d . Lic e nse No. EMS-EK001-593485. NO T TO BE USED FO R NAVIGATIO N
Sofia O ffshore W ind Farm Lim ite d W ind m ill Hill Busine ss Park
W hite hill W ay, Swind on, W iltshire , SN5 6PBSofia Offshore Wind Fa rm
DRAWN DATE@DIN A3
SCALE SIZE
PROJECT
TITLESOWF - Offshore Site Inv estiga tion – Su rv ey Area
1:250.00009.04.2020Matt FaulkDRAWING No. REV
003576747 01
Map inform ation
Cartographic inform ation
! O ffshor e Site Inve stigation – Surve y Corrid or Are a Coord inate s
O ffshore Site Inve stigation – Surve y Are a
µ
!!!
!
!
!
!
!¬«30
¬«29¬«28
¬«27
¬«26¬«25 ¬«24 ¬«23